Loading...
HomeMy WebLinkAboutTRAFFIC IMPACT STUDY - 22-00795 - Madison Station Apartments - Bldg 1 1220 North 500 West, Ste. 202 Lehi, UT 84043 p 801.766.4343 www.halesengineering.com Madison Station Traffic Impact Study Rexburg, Idaho July 21, 2022 UT22-2262 1.562520415 07/21/2022 Rexburg - Madison Station Traffic Impact Study i EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Madison Station development located in Rexburg, Idaho. The development is located on the south side of Trejo Street to the west of Yellowstone Highway. The purpose of this traffic impact study is to analyze traffic operations at key intersections for existing (2022) and future (2027) conditions with and without the proposed project and to recommend mitigation measures as needed. The morning and evening peak hour level of service (LOS) results are shown in Table ES-1. Recommended storage lengths are shown in Table ES- 2. An exhibit of the proposed mitigated roadway network is shown in Figure ES-1. A site plan of the project is provided in Appendix A. Table ES-1: Peak Hour Level of Service Results Table ES-2: Recommended Storage Length AM AM Mit. PM PM Mit. AM PM AM PM AM PM 1 West Townhome Access / Trejo Street a a a a a a a a a a 2 Grand Loop & Project Access / Trejo Street a a a a a a a a a a 3 Trejo Street / Yellowstone Highway b A e A A A A A A A 2. Mit. = With Mitigations Source: Hales Engineering, July 2022 Intersection Existing (2022) Background Plus Project Background Plus Project Level of Service Future (2027) 1. Intersection LOS values represent the overall intersection average for roundabout, signalized, and all-way stop-controlled (AWSC) intersections (uppercase letter) and the worst movement for all other unsignalized intersections (lowercase letter) E P E P E P E P E P E P E P E P 2 Grand Loop & Project Access / Trejo Street -------------100 -- 3 Trejo Street / Yellowstone Highway 50 150 -------100 ------ LT RT 1. Storage lengths are based on 2027 95th percentile queue lengths and do not include required deceleration / taper distances Eastbound Source: Hales Engineering, July 2022 2. E = Existing storage length (approximate), if applicable; P = proposed storage length for new turn lanes or changes to existing turn lanes, if applicable Intersection LT RT LT RT LT Recommended Storage Lengths (feet) Northbound Southbound Westbound RT Rexburg - Madison Station Traffic Impact Study ii SUMMARY OF KEY FINDINGS & RECOMMENDATIONS Project Conditions · The development will consist of 360 residential apartment units · The project is anticipated to generate approximately 2,384 weekday daily trips, including 136 trips in the morning peak hour, and 176 trips in the evening peak hour · A WB LT lane is recommended at the Project Access / Trejo St intersection · An increase in throat length at the Project Access should be considered to avoid queuing into an internal intersection · The 90-degree parking along the internal roadways is appropriate provided the aisle widths meet City standards 2022 Background Plus Project Findings · Poor LOS at the Trejo St / Yellowstone Hwy intersection · Acceptable LOS Mitigations · Trejo St / Yellowstone Hwy: Install traffic signal o This may necessitate widening on the EB approach to accommodate a LT lane · None 2027 Background Plus Project Findings · Acceptable LOS · Acceptable LOS Rexburg - Madison Station TIS Mitigated Model Figure ES-1 Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 W T o w n h o m e A c c e s s Trejo St Gr a n d L o o p Yellowstone H wy Rexburg - Madison Station Traffic Impact Study iv TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................................... i SUMMARY OF KEY FINDINGS & RECOMMENDATIONS ......................................................................... ii TABLE OF CONTENTS .............................................................................................................................. iv LIST OF TABLES ......................................................................................................................................... v LIST OF FIGURES ....................................................................................................................................... v I. INTRODUCTION .................................................................................................................................. 1 A. Purpose ................................................................................................................................................. 1 B. Scope .................................................................................................................................................... 2 C. Analysis Methodology ........................................................................................................................... 2 D. Level of Service Standards ................................................................................................................... 2 II. EXISTING (2022) BACKGROUND CONDITIONS............................................................................... 4 A. Purpose ................................................................................................................................................. 4 B. Roadway System .................................................................................................................................. 4 C. Traffic Volumes ..................................................................................................................................... 4 D. Level of Service Analysis ...................................................................................................................... 7 E. Queuing Analysis .................................................................................................................................. 7 F. Mitigation Measures .............................................................................................................................. 7 G. Mitigated Scenario ................................................................................................................................ 8 III. PROJECT CONDITIONS ..................................................................................................................... 9 A. Purpose ................................................................................................................................................. 9 B. Project Description ................................................................................................................................ 9 C. Trip Generation ..................................................................................................................................... 9 D. Trip Distribution and Assignment ........................................................................................................ 10 E. Access ................................................................................................................................................. 10 F. Auxiliary Lanes .................................................................................................................................... 10 G. Internal Roadway Analysis .................................................................................................................. 13 IV. EXISTING (2022) PLUS PROJECT CONDITIONS ........................................................................... 14 A. Purpose ............................................................................................................................................... 14 B. Traffic Volumes ................................................................................................................................... 14 C. Level of Service Analysis .................................................................................................................... 14 D. Queuing Analysis ................................................................................................................................ 14 E. Mitigation Measures ............................................................................................................................ 14 V. FUTURE (2027) BACKGROUND CONDITIONS ............................................................................... 17 A. Purpose ............................................................................................................................................... 17 B. Roadway Network ............................................................................................................................... 17 C. Traffic Volumes ................................................................................................................................... 17 D. Level of Service Analysis .................................................................................................................... 17 E. Queuing Analysis ................................................................................................................................ 20 F. Mitigation Measures ............................................................................................................................ 20 VI. FUTURE (2027) PLUS PROJECT CONDITIONS .............................................................................. 21 A. Purpose ............................................................................................................................................... 21 B. Traffic Volumes ................................................................................................................................... 21 C. Level of Service Analysis .................................................................................................................... 21 D. Queuing Analysis ................................................................................................................................ 21 Rexburg - Madison Station Traffic Impact Study v E. Mitigation Measures ............................................................................................................................ 21 F. Recommended Storage Lengths ........................................................................................................ 24 Appendix A: Project Site Plan Appendix B: Turning Movement Counts Appendix C: LOS Results Appendix D: Queuing Results LIST OF TABLES Table 1: Level of Service Description .................................................................................................... 3 Table 2: Existing (2022) Background Peak Hour LOS .......................................................................... 7 Table 3: Mitigated Existing (2022) Background Peak Hour LOS .......................................................... 8 Table 4: Trip Generation ........................................................................................................................ 9 Table 5: Trip Distribution ...................................................................................................................... 10 Table 6: Existing (2022) Plus Project Peak Hour LOS ........................................................................ 14 Table 7: Future (2027) Background Peak Hour LOS .......................................................................... 17 Table 8: Future (2027) Plus Project Peak Hour LOS .......................................................................... 21 Table 9: Recommended Storage Lengths ........................................................................................... 24 LIST OF FIGURES Figure 1: Vicinity map showing the project location in Rexburg, Idaho ................................................. 1 Figure 2: Existing (2022) background peak hour traffic volumes .......................................................... 5 Figure 3: MUTCD Warrant 3 .................................................................................................................. 8 Figure 4: Trip assignment for the peak hours ...................................................................................... 11 Figure 5: Existing (2022) plus project peak hour traffic volumes ........................................................ 15 Figure 6: Future (2027) background peak hour traffic volumes .......................................................... 18 Figure 7: Future (2027) plus project peak hour traffic volumes ........................................................... 22 Rexburg - Madison Station Traffic Impact Study 1 I. INTRODUCTION A. Purpose This study addresses the traffic impacts associated with the proposed Madison Station development located in Rexburg, Idaho. The proposed project is located on the south side of Trejo Street to the west of Yellowstone Highway. Figure 1 shows a vicinity map of the proposed development. The purpose of this traffic impact study is to analyze traffic operations at key intersections for existing (2022) and future (2027) conditions with and without the proposed project and to recommend mitigation measures as needed. Figure 1: Vicinity map showing the project location in Rexburg, Idaho Rexburg - Madison Station Traffic Impact Study 2 B. Scope The study area was defined based on conversations with the development team and Rexburg City. This study was scoped to evaluate the traffic operational performance impacts of the project on the following intersections: · West Townhome Access / Trejo Street · Grand Loop & Project Access / Trejo Street · Trejo Street / Yellowstone Highway C. Analysis Methodology Level of service (LOS) is a term that describes the operating performance of an intersection or roadway. LOS is measured quantitatively and reported on a scale from A to F, with A representing the best performance and F the worst. Table 1 provides a brief description of each LOS letter designation and an accompanying average delay per vehicle for both signalized and unsignalized intersections. The Highway Capacity Manual (HCM), 7th Edition, 2022 methodology was used in this study to remain consistent with “state-of-the-practice” professional standards. This methodology has different quantitative evaluations for signalized and unsignalized intersections. For signalized, roundabout, and all-way stop-controlled (AWSC) intersections, the LOS is provided for the overall intersection (weighted average of all approach delays). For all other unsignalized intersections, LOS is reported based on the worst movement. Using Synchro/SimTraffic software, which follow the HCM methodology, the peak hour LOS was computed for each study intersection. Multiple runs of SimTraffic were used to provide a statistical evaluation of the interaction between the intersections. The detailed LOS reports are provided in Appendix C. Hales Engineering also calculated the 95th percentile queue lengths for the study intersections using SimTraffic. The detailed queue length reports are provided in Appendix D. D. Level of Service Standards For the purposes of this study, a minimum acceptable intersection performance for each of the study intersections was set at LOS C. If levels of service D, E, or F conditions exist, an explanation and/or mitigation measures will be presented. A LOS C threshold is consistent with Rexburg City standards. Rexburg - Madison Station Traffic Impact Study 3 Table 1: Level of Service Description LOS Description of Traffic Conditions Average Delay (seconds/vehicle) Signalized Intersections Unsignalized Intersections A Free Flow / Insignificant Delay £ 10 £ 10 B Stable Operations / Minimum Delays > 10 to 20 > 10 to 15 C Stable Operations / Acceptable Delays > 20 to 35 > 15 to 25 D Approaching Unstable Flows / Tolerable Delays > 35 to 55 > 25 to 35 E Unstable Operations / Significant Delays > 55 to 80 > 35 to 50 F Forced Flows / Unpredictable Flows / Excessive Delays > 80 > 50 Source: Hales Engineering Descriptions, based on the Highway Capacity Manual (HCM), 7th Edition, 2022 Methodology (Transportation Research Board) Rexburg - Madison Station Traffic Impact Study 4 II. EXISTING (2022) BACKGROUND CONDITIONS A. Purpose The purpose of the background analysis is to study the intersections and roadways during the peak travel periods of the day with background traffic and geometric conditions. Through this analysis, background traffic operational deficiencies can be identified, and potential mitigation measures recommended. This analysis provides a baseline condition that may be compared to the build conditions to identify the impacts of the development. B. Roadway System The primary roadways that will provide access to the project site are described below: Trejo Street – is a city-maintained roadway which is classified by the Madison County Master Transportation Plan (2015) as a local road. The roadway has one travel lane in each direction. The posted speed limit is 25 mph in the study area. C. Traffic Volumes Weekday morning (7:00 to 9:00 a.m.) and evening (4:00 to 6:00 p.m.) peak period traffic counts were performed at the following intersections: · West Townhome Access / Trejo Street · Grand Loop / Trejo Street · Trejo Street / Yellowstone Highway The counts were performed on Wednesday, July 6, 2022. The morning peak hour was determined to be between 8:00 and 9:00 a.m., and the evening peak hour was determined to be between 4:45 and 5:45 p.m. The evening peak hour volumes were approximately 51% higher than the morning peak hour volumes. Both the morning and evening peak hour volumes were used in the analysis. Detailed count data are included in Appendix B. Hales Engineering made seasonal adjustments to the observed traffic volumes. Monthly traffic volume data were obtained from a nearby ITD automatic traffic recorder (ATR) on US-20 (ATR #51). In recent years, traffic volumes in July have been equal to approximately 118% of average traffic volumes. Therefore, the observed traffic volumes were not adjusted. Figure 2 shows the existing morning and evening peak hour volumes as well as intersection geometry at the study intersections. Rexburg - Madison Station TIS Morning Peak Hour Existing (2022) Background Figure 2A Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 2 249 0 1 143 W T o w n h o m e A c c e s s 100 Trejo St 1 4 2 3 8 1 4 321 Grand Loop 8 1 Yellowstone H wy 100 226 4 78 42126 5 2 4 6 5 3021960 Rexburg - Madison Station TIS Evening Peak Hour Existing (2022) Background Figure 2B Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 1 204 1 0 326 W T o w n h o m e A c c e s s 102 Trejo St 5 2 0 1 3 0 514 Grand Loop 2 32 1 Yellowstone H wy 178 373 20 76 28137 5 1 0 7 9 88358116 Rexburg - Madison Station Traffic Impact Study 7 D. Level of Service Analysis Hales Engineering determined that the Trejo Street / Yellowstone Highway intersection is currently operating at a poor LOS during the evening peak hour, as shown in Table 2. These results serve as a baseline condition for the impact analysis of the proposed development during existing (2022) conditions. Table 2: Existing (2022) Background Peak Hour LOS Intersection LOS (Sec. Delay / Veh.) / Movement1 Description Control Morning Peak Evening Peak West Townhome Access / Trejo Street NB/SB Stop a (5.0) / SBL a (5.0) / SBR Grand Loop / Trejo Street SB Stop a (5.9) / SBL a (7.4) / SBL Trejo Street / Yellowstone Highway EB/WB Stop b (14.4) / EBL e (45.0) / EBT 1. Movement indicated for unsignalized intersections where delay and LOS represents worst movement. SBL = Southbound left movement, etc. 2. Uppercase LOS used for signalized, roundabout, and AWSC intersections. Lowercase LOS used for all other unsignalized intersections. Source: Hales Engineering, July 2022 E. Queuing Analysis Hales Engineering calculated the 95th percentile queue lengths for each of the study intersections. Some significant queueing was observed during the evening peak hour. Significant 95th percentile queue lengths during the evening peak hour are summarized as follows: · Trejo St / Yellowstone Hwy: o Eastbound: 275 feet F. Mitigation Measures A traffic signal is warranted at the Trejo Street / Yellowstone Highway intersection based on Warrant 3 (Peak Hour) in the MUTCD in evening peak hour conditions, as shown in Figure 3. It may also meet Warrant 9, depending on the time of day that trains use the railroad crossing on Trejo Street, although no trains were observed during the count periods. For these reasons, it is recommended that a signal be installed. It is worth noting that the eastbound approach may need to be widened to accommodate a left-turn lane. Rexburg - Madison Station Traffic Impact Study 8 Figure 3: MUTCD Warrant 3 G. Mitigated Scenario With the proposed improvements, it is anticipated that all study intersections will operate at an acceptable LOS, as shown in Table 3. Table 3: Mitigated Existing (2022) Background Peak Hour LOS Intersection LOS (Sec. Delay / Veh.) / Movement1 Description Control Morning Peak Evening Peak West Townhome Access / Trejo Street NB/SB Stop a (5.3) / SBL a (3.7) / SBR Grand Loop / Trejo Street SB Stop a (6.2) / SBL a (6.9) / SBL Trejo Street / Yellowstone Highway Signal A (6.2) A (7.1) 1. Movement indicated for unsignalized intersections where delay and LOS represents worst movement. SBL = Southbound left movement, etc. 2. Uppercase LOS used for signalized, roundabout, and AWSC intersections. Lowercase LOS used for all other unsignalized intersections. Source: Hales Engineering, July 2022 Rexburg - Madison Station Traffic Impact Study 9 III. PROJECT CONDITIONS A. Purpose The project conditions discussion explains the type and intensity of development. This provides the basis for trip generation, distribution, and assignment of project trips to the surrounding study intersections defined in Chapter I. B. Project Description The proposed Madison Station development is located on the south side of Trejo Street to the west of Yellowstone Highway. The development will consist of 360 residential apartment units. A concept plan for the proposed development is provided in Appendix A. C. Trip Generation Trip generation for the development was calculated using trip generation rates published in the Institute of Transportation Engineers (ITE), Trip Generation, 11th Edition, 2021. Trip generation for the proposed project is included in Table 4. The total trip generation for the development is as follows: · Daily Trips: 2,384 · Morning Peak Hour Trips: 136 · Evening Peak Hour Trips: 176 Table 4: Trip Generation Total % In % Out In Out Total Multifamily Housing (Low-Rise) (220) 360 DU 2,384 50% 50% 1,192 1,192 2,384 2,384 1,192 1,192 2,384 Multifamily Housing (Low-Rise) (220) 360 DU 136 24% 76% 33 103 136 136 33 103 136 Multifamily Housing (Low-Rise) (220) 360 DU 176 63% 37% 111 65 176 176 111 65 176 Trip Generation Trip Generation ID Rexburg - Madison Station TIS # of Units Unit Type SOURCE: Hales Engineering, July 2022 1. Land Use Code from the Institute of Transportation Engineers (ITE) Trip Generation ,11th Edition,2021. Land Use 1 New Trips TOTAL TOTAL TOTAL Weekday Daily AM Peak Hour PM Peak Hour Rexburg - Madison Station Traffic Impact Study 10 D. Trip Distribution and Assignment Project traffic is assigned to the roadway network based on the type of trip and the proximity of project access points to major streets, high population densities, and regional trip attractions. Existing travel patterns observed during data collection also provide helpful guidance to establishing these distribution percentages, especially near the site. The resulting distribution of project generated trips during the morning and evening peak hour is shown in Table 5. Table 5: Trip Distribution Direction % To/From Project North 25% South 35% East 10% West 30% These trip distribution assumptions were used to assign the morning and evening peak hour trip generation at the study intersections to create trip assignment for the proposed development. Trip assignment for the development is shown in Figure 4. E. Access The proposed access for the site will be gained at the following locations: Trejo Street: · The Project Access will be located directly across from Grand Loop. It will access the project on the south side of Trejo Street. It is anticipated that the access will be stop- controlled. A second, emergency-only access will be located at the West Townhome Access or on Yellowstone Highway. It is not anticipated that this will regularly experience traffic. F. Auxiliary Lanes Auxiliary lanes are deceleration (ingress) or acceleration (egress) turn lanes that provide for safe turning movements that have less impact on through traffic. These lanes are sometimes needed at accesses or roadway intersections if right- or left-turn volumes are high enough. Deceleration (ingress) lanes are generally needed when there are at least 50 right-turn vehicles or 25 left-turn vehicles in an hour. These guidelines were used for the City roadways in the study area. Based on these guidelines and the anticipated project traffic, it is recommended that the following deceleration (ingress) lanes be installed: · Grand Loop & Project Access / Trejo Street: Westbound left-turn Rexburg - Madison Station TIS Morning Peak Hour Trip Assignment Figure 4A Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 0 10 0 0 31 W T o w n h o m e A c c e s s 000 3 1 0 7 2Trejo St 0 0 1 0 2 30 0 Gr a n d L o o p 0 0 0 Yellowstone H wy 12 0 0 26 10 36 0 3 0 008 Rexburg - Madison Station TIS Evening Peak Hour Trip Assignment Figure 4B Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 0 33 0 0 20 W T o w n h o m e A c c e s s 000 2 0 0 4 5Trejo St 0 0 3 3 7 80 0 Gr a n d L o o p 00 0 Yellowstone H wy 39 0 0 15 7 23 0 1 1 0 0028 Rexburg - Madison Station Traffic Impact Study 13 G. Internal Roadway Analysis At the request of Rexburg City, the internal roadway circulation was analyzed. If feasible, it is recommended that the throat depth be increased at the project access to allow transitions between intersections and to ensure that queueing at the northbound approach of the access does not back into the internal intersection. This could potentially be accomplished by bending the roads such that they tee closer to the clubhouse/leasing office and relocating the parking. Such a change might also eliminate confusion over who has right-of-way at the first internal intersection. In addition, it is recommended that the pedestrian paths and sidewalks follow the natural direction that pedestrians might walk to minimize cutting through landscaping or walking through the center of an intersection. Based on trip generation, it is anticipated that any single internal road after the first intersection would experience a maximum of 1,000 to 1,300 vehicles per day. This is appropriate for a roadway with 90-degree parking on either side, provided that the aisle width meets City standards. Rexburg - Madison Station Traffic Impact Study 14 IV. EXISTING (2022) PLUS PROJECT CONDITIONS A. Purpose The purpose of the existing (2022) plus project analysis is to study the intersections and roadways during the peak travel periods of the day for existing background traffic and geometric conditions plus the net trips generated by the proposed development. This scenario provides valuable insight into the potential impacts of the proposed project on background traffic conditions. B. Traffic Volumes Hales Engineering added the project trips discussed in Chapter III to the existing (2022) background traffic volumes to predict turning movement volumes for existing (2022) plus project conditions. Existing (2022) plus project morning and evening peak hour turning movement volumes are shown in Figure 5. C. Level of Service Analysis Hales Engineering determined that all intersections are anticipated to operate at acceptable levels of service during the morning and evening peak hours with project traffic added, as shown in Table 6. Table 6: Existing (2022) Plus Project Peak Hour LOS Intersection LOS (Sec. Delay / Veh.) / Movement1 Description Control Morning Peak Evening Peak West Townhome Access / Trejo Street NB/SB Stop a (8.1) / SBL a (4.4) / SBR Grand Loop & Project Access / Trejo Street NB/SB Stop a (7.1) / SBL a (8.5) / NBL Trejo Street / Yellowstone Highway Signal A (6.8) A (8.7) 1. Movement indicated for unsignalized intersections where delay and LOS represents worst movement. SBL = Southbound left movement, etc. 2. Uppercase LOS used for signalized, roundabout, and AWSC intersections. Lowercase LOS used for all other unsignalized intersections. Source: Hales Engineering, July 2022 D. Queuing Analysis Hales Engineering calculated the 95th percentile queue lengths for each of the study intersections. No significant queueing is anticipated during the morning and evening peak hours. E. Mitigation Measures No mitigation measures are recommended. Rexburg - Madison Station TIS Morning Peak Hour Existing (2022) Plus Project Figure 5A Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 2 259 0 1 174 W T o w n h o m e A c c e s s 100 3 1 0 7 2Trejo St 1 4 2 3 8 1 0 2 314321 Gr a n d L o o p 8 01 Yellowstone H wy 112 226 4 104 52162 5 2 7 6 5 3021968 Rexburg - Madison Station TIS Evening Peak Hour Existing (2022) Plus Project Figure 5B Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 1 237 1 0 346 W T o w n h o m e A c c e s s 102 2 0 0 4 5Trejo St 5 2 0 1 3 3 7 830514 Gr a n d L o o p 2 3 02 1 Yellowstone H wy 217 373 20 91 35160 5 2 1 7 9 88358144 Rexburg - Madison Station Traffic Impact Study 17 V. FUTURE (2027) BACKGROUND CONDITIONS A. Purpose The purpose of the future (2027) background analysis is to study the intersections and roadways during the peak travel periods of the day for future background traffic and geometric conditions. Through this analysis, future background traffic operational deficiencies can be identified, and potential mitigation measures recommended. B. Roadway Network According to the Madison County Master Transportation Plan, there are no projects planned before 2027 in the study area. Therefore, no changes were made to the roadway network for the future (2027) analysis. C. Traffic Volumes Hales Engineering obtained future (2030) forecasted volumes from the Madison County Master Transportation Plan. Peak period turning movement counts were estimated using National Cooperative Highway Research Program (NCHRP) 255 methodologies which utilize existing peak period turn volumes and future average weekday daily traffic (AWDT) volumes to project the future turn volumes at the major intersections. Future (2027) morning and evening peak hour turning movement volumes are shown in Figure 6. D. Level of Service Analysis Hales Engineering determined that all study intersections are anticipated to operate at acceptable levels of service during the morning and evening peak hours in future (2027) background conditions, as shown in Table 7. These results serve as a baseline condition for the impact analysis of the proposed development for future (2027) conditions. Table 7: Future (2027) Background Peak Hour LOS Intersection LOS (Sec. Delay / Veh.) / Movement1 Description Control Morning Peak Evening Peak West Townhome Access / Trejo Street NB/SB Stop a (5.7) / SBL a (7.5) / SBL Grand Loop / Trejo Street SB Stop a (6.4) / SBL a (7.5) / SBL Trejo Street / Yellowstone Highway Signal A (6.4) A (7.3) 1. Movement indicated for unsignalized intersections where delay and LOS represents worst movement. SBL = Southbound left movement, etc. 2. Uppercase LOS used for signalized, roundabout, and AWSC intersections. Lowercase LOS used for all other unsignalized intersections. Source: Hales Engineering, July 2022 Rexburg - Madison Station TIS Morning Peak Hour Future (2027) Background Figure 6A Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 5 260 0 5 150 W T o w n h o m e A c c e s s 500 Trejo St 1 5 2 5 5 1 5 025 Grand Loop 1 0 5 Yellowstone H wy 105 235 5 85 45135 1 0 2 5 7 0 3522565 Rexburg - Madison Station TIS Evening Peak Hour Future (2027) Background Figure 6B Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 5 215 5 0 355 W T o w n h o m e A c c e s s 505 Trejo St 1 0 2 1 5 3 3 015 Grand Loop 2 52 5 Yellowstone H wy 190 380 25 80 30145 1 0 1 5 8 5 95365125 Rexburg - Madison Station Traffic Impact Study 20 E. Queuing Analysis Hales Engineering calculated the 95th percentile queue lengths for each of the study intersections. No significant queueing is anticipated during the morning and evening peak hours. F. Mitigation Measures No mitigation measures are recommended. Rexburg - Madison Station Traffic Impact Study 21 VI. FUTURE (2027) PLUS PROJECT CONDITIONS A. Purpose The purpose of the future (2027) plus project analysis is to study the intersections and roadways during the peak travel periods of the day for future background traffic and geometric conditions plus the net trips generated by the proposed development. This scenario provides valuable insight into the potential impacts of the proposed project on future background traffic conditions. B. Traffic Volumes Hales Engineering added the project trips discussed in Chapter III to the future (2027) background traffic volumes to predict turning movement volumes for future (2027) plus project conditions. Future (2027) plus project morning and evening peak hour turning movement volumes are shown in Figure 7. C. Level of Service Analysis Hales Engineering determined that all intersections are anticipated to operate at acceptable levels of service during the morning and evening peak hours in future (2027) plus project conditions, as shown in Table 8. Any slight improvement in delay is most likely due to the random arrival of vehicles in the simulation modeling. Table 8: Future (2027) Plus Project Peak Hour LOS Intersection LOS (Sec. Delay / Veh.) / Movement1 Description Control Morning Peak Evening Peak West Townhome Access / Trejo Street NB/SB Stop a (5.5) / SBL a (7.0) / SBL Grand Loop & Project Access / Trejo Street NB/SB Stop a (6.8) / NBL a (8.8) / NBL Trejo Street / Yellowstone Highway Signal A (7.2) A (8.8) 1. Movement indicated for unsignalized intersections where delay and LOS represents worst movement. SBL = Southbound left movement, etc. 2. Uppercase LOS used for signalized, roundabout, and AWSC intersections. Lowercase LOS used for all other unsignalized intersections. Source: Hales Engineering, July 2022 D. Queuing Analysis Hales Engineering calculated the 95th percentile queue lengths for each of the study intersections. No significant queueing is anticipated during the morning and evening peak hours. E. Mitigation Measures No mitigation measures are recommended. Rexburg - Madison Station TIS Morning Peak Hour Future (2027) Plus Project Figure 7A Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 5 270 0 5 181 W T o w n h o m e A c c e s s 500 3 1 0 7 2Trejo St 1 5 2 5 5 1 0 2 315025 Gr a n d L o o p 1 0 0 5 Yellowstone H wy 117 235 5 111 55171 1 0 2 8 7 0 3522573 Rexburg - Madison Station TIS Evening Peak Hour Future (2027) Plus Project Figure 7B Hales Engineering 801.766.4343 1220 North 500 West Ste 202, Lehi, UT, 84043 07/13/2022 5 248 5 0 375 W T o w n h o m e A c c e s s 505 2 0 0 4 5Trejo St 1 0 2 1 5 3 3 7 833015 Gr a n d L o o p 2 502 5 Yellowstone H wy 229 380 25 95 37168 1 0 2 6 8 5 95365153 Rexburg - Madison Station Traffic Impact Study 24 F. Recommended Storage Lengths Hales Engineering determined recommended storage lengths based on the 95th percentile queue lengths given in the future (2027) plus project scenario. These storage lengths do not include the taper length. Recommended storage lengths for the study intersections are shown in Table 9. Intersections shown in Table 9 include new intersections and existing intersections that have recommended storage length changes. Table 9: Recommended Storage Lengths E P E P E P E P E P E P E P E P 2 Grand Loop & Project Access / Trejo Street -------------100 -- 3 Trejo Street / Yellowstone Highway 50 150 -------100 ------ LT RT 1. Storage lengths are based on 2027 95th percentile queue lengths and do not include required deceleration / taper distances Eastbound Source: Hales Engineering, July 2022 2. E = Existing storage length (approximate), if applicable; P = proposed storage length for new turn lanes or changes to existing turn lanes, if applicable Intersection LT RT LT RT LT Recommended Storage Lengths (feet) Northbound Southbound Westbound RT Rexburg - Madison Station Traffic Impact Study APPENDIX A Site Plan 1 TREJO Rexburg - Madison Station Traffic Impact Study APPENDIX B Turning Movement Counts 2364 North 1450 East Lehi, UT 84043 801.636.0891 Intersection Turning Movement Summary Intersection:Yellowstone Highway / Trejo Street Date:7-6-22, Wed North/South:Yellowstone Highway Day of Week Adjustment:100.0% East/West:Trejo Street Month of Year Adjustment:100.0% Jurisdiction:Rexburg Adjustment Station #:0 Project Title:Madison Street TIS Growth Rate:0.0% Project No:UT22-2262 Number of Years:0 Weather:Clear AM PEAK HOUR PERIOD:8:00 AM-9:00 AM AM PEAK 15 MINUTE PERIOD:8:45 AM-9:00 AM 1090 Ye l l o w s t o n e H i g h w a y AM PHF:0.90 677 MIDDAY PEAK HOUR PERIOD:- MIDDAY PEAK 15 MINUTE PERIOD:- MIDDAY PHF:562 528 PM PEAK HOUR PERIOD:4:45 PM-5:45 PM 309 368 PM PEAK 15 MINUTE PERIOD:5:15 PM-5:30 PM PM PHF:0.91 116 358 88 7 60 219 30 0 2 5 Trejo Street Total Entering Vehicles 65 79 304 184 975 24 10 94 94 545 426 76 77 5 5 169 230 241 242 28 41 1468 75 136 137 124 Trejo Street 5 0 0 100 226 4 2 Legend Ye l l o w s t o n e H i g h w a y 178 373 20 AM 348 330 Midday PM 500 571 678 1071 RAW COUNT SUMMARIES Yellowstone Highway Yellowstone Highway Trejo Street Trejo Street TOTALNorthboundSouthboundEastboundWestbound Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds AM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 7:00 -7:15 9 25 0 2 5 30 8 3 10 6 19 0 0 3 7 0 122 7:15 -7:30 9 26 0 1 5 46 6 2 9 2 31 0 1 0 4 0 139 7:30 -7:45 6 34 3 0 8 57 8 1 25 10 28 0 2 0 13 0 194 7:45 -8:00 22 69 0 0 12 49 12 2 29 7 47 0 0 1 22 0 270 8:00 -8:15 30 56 0 0 9 65 17 0 19 18 34 0 3 2 13 0 266 8:15 -8:30 26 45 2 3 6 42 14 2 12 6 26 0 0 6 17 0 202 8:30 -8:45 22 53 2 0 7 55 15 2 20 6 31 0 1 5 19 0 236 8:45 -9:00 22 72 0 2 8 57 14 1 26 11 33 0 1 11 16 0 271 MIDDAY PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 9:00 -9:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 -9:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 -9:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 -10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 -10:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 -10:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 -10:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 -11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 -11:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 -11:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 -11:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 -12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 -12:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 -12:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 -12:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 -13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:00 -13:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:15 -13:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:30 -13:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:45 -14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:00 -14:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:15 -14:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:30 -14:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:45 -15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:00 -15:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:15 -15:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:30 -15:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:45 -16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 16:00 -16:15 35 86 4 0 13 84 19 1 17 6 19 0 0 2 14 0 299 16:15 -16:30 41 78 4 1 15 78 34 1 11 6 16 0 1 2 17 1 303 16:30 -16:45 19 76 0 0 21 73 25 1 39 8 22 0 1 3 21 0 308 16:45 -17:00 32 88 3 0 18 85 25 2 25 5 32 0 0 5 20 0 338 17:00 -17:15 55 104 8 1 27 88 39 3 17 5 35 0 1 0 18 1 397 17:15 -17:30 53 101 5 1 24 95 28 1 16 10 45 0 4 1 20 1 402 17:30 -17:45 38 80 4 0 19 90 24 1 18 8 25 0 0 4 21 0 331 17:45 -18:00 45 100 0 0 17 65 25 1 17 7 31 0 1 6 17 1 331 2364 North 1450 East Lehi, UT 84043 801.636.0891 Intersection Turning Movement Summary Intersection:Grand Loop & East Townhome Access / Trejo Street Date:7-6-22, Wed North/South:Grand Loop & East Townhome Access Day of Week Adjustment:100.0% East/West:Trejo Street Month of Year Adjustment:100.0% Jurisdiction:Rexburg Adjustment Station #:0 Project Title:Madison Street TIS Growth Rate:0.0% Project No:UT22-2262 Number of Years:0 Weather:Clear AM PEAK HOUR PERIOD:7:30 AM-8:30 AM AM PEAK 15 MINUTE PERIOD:7:45 AM-8:00 AM 63 Gr a n d L o o p & E a s t T o w n h o m e A c c e s s AM PHF:0.71 44 MIDDAY PEAK HOUR PERIOD:- MIDDAY PEAK 15 MINUTE PERIOD:- MIDDAY PHF:44 19 PM PEAK HOUR PERIOD:4:15 PM-5:15 PM 9 35 PM PEAK 15 MINUTE PERIOD:5:00 PM-5:15 PM PM PHF:0.80 21 0 23 1 1 0 8 5 9 1 Trejo Street Total Entering Vehicles 21 14 23 2 291 0 0 24 16 231 254 5 14 3 2 275 241 208 252 201 238 271 251 225 2 0 Trejo Street 0 3 5 1 0 5 0 Legend Gr a n d L o o p & E a s t T o w n h o m e A c c e s s 2 0 1 AM 3 6 Midday PM 4 3 9 7 RAW COUNT SUMMARIES Grand Loop & East Townhome AccessGrand Loop & East Townhome Access Trejo Street Trejo Street TOTALNorthboundSouthboundEastboundWestbound Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds AM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 7:00 -7:15 0 0 1 0 2 0 1 1 0 29 0 4 0 0 2 3 35 7:15 -7:30 0 1 2 0 0 0 0 0 2 40 0 0 0 0 4 2 49 7:30 -7:45 0 0 2 0 4 0 0 0 1 60 0 3 0 0 2 0 69 7:45 -8:00 0 0 1 0 0 0 0 1 7 86 0 1 0 0 8 2 102 8:00 -8:15 0 0 1 0 3 0 1 0 3 54 0 0 2 0 6 3 70 8:15 -8:30 1 0 1 0 1 0 0 0 3 38 0 1 1 0 5 0 50 8:30 -8:45 0 0 1 0 1 0 3 0 1 52 1 1 1 0 7 1 67 8:45 -9:00 0 0 1 0 2 0 3 1 5 66 0 2 0 0 5 3 82 MIDDAY PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 9:00 -9:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 -9:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 -9:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 -10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 -10:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 -10:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 -10:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 -11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 -11:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 -11:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 -11:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 -12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 -12:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 -12:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 -12:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 -13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:00 -13:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:15 -13:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:30 -13:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:45 -14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:00 -14:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:15 -14:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:30 -14:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:45 -15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:00 -15:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:15 -15:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:30 -15:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:45 -16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 16:00 -16:15 0 0 0 0 9 1 2 0 1 24 0 0 1 0 2 2 40 16:15 -16:30 0 0 1 0 7 0 1 0 2 48 0 0 0 0 1 3 60 16:30 -16:45 1 0 0 0 2 0 0 0 0 49 0 1 0 0 2 2 54 16:45 -17:00 0 0 0 0 9 0 8 0 1 46 0 0 0 0 8 2 72 17:00 -17:15 1 0 0 0 5 0 12 1 2 58 2 2 2 0 3 2 85 17:15 -17:30 0 0 0 0 8 0 1 0 1 42 0 1 0 1 0 3 53 17:30 -17:45 0 0 0 0 4 0 2 0 1 46 0 1 0 0 1 2 54 17:45 -18:00 0 0 0 0 4 0 0 0 1 48 0 0 0 0 4 0 57 2364 North 1450 East Lehi, UT 84043 801.636.0891 Intersection Turning Movement Summary Intersection:West Townhome Access / Trejo Street Date:7-6-22, Wed North/South:West Townhome Access Day of Week Adjustment:100.0% East/West:Trejo Street Month of Year Adjustment:100.0% Jurisdiction:Rexburg Adjustment Station #:0 Project Title:Madison Street TIS Growth Rate:0.0% Project No:UT22-2262 Number of Years:0 Weather:Clear AM PEAK HOUR PERIOD:8:00 AM-9:00 AM AM PEAK 15 MINUTE PERIOD:8:15 AM-8:30 AM 3 We s t T o w n h o m e A c c e s s AM PHF:0.97 1 MIDDAY PEAK HOUR PERIOD:- MIDDAY PEAK 15 MINUTE PERIOD:- MIDDAY PHF:3 0 PM PEAK HOUR PERIOD:5:00 PM-6:00 PM 1 0 PM PEAK 15 MINUTE PERIOD:5:00 PM-5:15 PM PM PHF:0.79 2 0 1 2 0 0 1 6 9 0 Trejo Street Total Entering Vehicles 0 0 328 143 147 143 326 144 326 329 143 0 0 1 0 147 328 1 0 0 0 331 3 2 1 0 Trejo Street 0 0 2 0 0 2 0 Legend We s t T o w n h o m e A c c e s s 0 0 1 AM 1 2 Midday PM 1 1 3 2 RAW COUNT SUMMARIES West Townhome Access West Townhome Access Trejo Street Trejo Street TOTALNorthboundSouthboundEastboundWestbound Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds AM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 7:00 -7:15 1 0 0 0 0 0 0 1 0 0 1 1 0 18 0 2 20 7:15 -7:30 1 0 1 0 1 0 0 0 0 0 0 0 0 13 0 1 16 7:30 -7:45 1 0 0 0 0 0 0 0 0 0 0 1 0 11 0 0 12 7:45 -8:00 0 0 0 0 0 0 1 0 0 0 0 0 0 29 0 1 30 8:00 -8:15 0 0 1 0 1 0 0 0 0 0 0 0 0 32 0 3 34 8:15 -8:30 0 0 0 0 0 0 0 0 0 0 0 0 0 38 0 0 38 8:30 -8:45 0 0 0 0 0 0 0 0 0 0 0 1 1 36 0 2 37 8:45 -9:00 0 0 1 0 0 0 0 0 0 0 0 1 0 37 0 1 38 MIDDAY PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 9:00 -9:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:15 -9:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 -9:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 -10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 -10:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 -10:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 -10:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 -11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 -11:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 -11:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 -11:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 -12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 -12:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 -12:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 -12:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 -13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:00 -13:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:15 -13:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:30 -13:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13:45 -14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:00 -14:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:15 -14:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:30 -14:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:45 -15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:00 -15:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:15 -15:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:30 -15:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15:45 -16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PM PERIOD COUNTS Period A B C D E F G H I J K L M N O P TOTAL 16:00 -16:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:15 -16:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:30 -16:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:45 -17:00 1 0 0 0 0 0 0 1 0 0 0 1 0 70 0 2 71 17:00 -17:15 0 0 0 0 0 0 2 0 0 0 0 0 0 103 0 3 105 17:15 -17:30 0 0 0 0 1 0 0 0 0 0 0 0 0 81 0 2 82 17:30 -17:45 0 0 0 0 0 0 0 1 0 0 1 0 0 63 0 4 64 17:45 -18:00 0 0 1 0 0 0 0 1 0 0 0 0 0 79 0 0 80 Rexburg - Madison Station Traffic Impact Study APPENDIX C LOS Results SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 2 2 100 4.2 A Subtotal 2 2 100 4.2 A L 1 1 100 5.0 A Subtotal 1 1 100 5.0 A T 249 252 101 0.2 A Subtotal 249 252 101 0.2 A L 1 0 0 T 143 142 99 0.2 A Subtotal 144 142 99 0.2 A Total 396 397 100 0.2 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 8 9 109 5.9 A R 1 2 200 3.1 A Subtotal 9 11 122 5.4 A L 14 14 102 2.5 A T 238 242 101 0.5 A Subtotal 252 256 102 0.6 A T 163 161 99 0.7 A R 21 22 106 0.6 A Subtotal 184 183 99 0.7 A Total 446 450 101 0.7 A Volume Served Delay/Veh (sec) SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Unsignalized Avg %Avg LOS L 100 96 96 3.5 A T 226 224 99 0.7 A R 4 5 125 0.3 A Subtotal 330 325 98 1.5 A L 30 32 107 2.0 A T 219 220 100 0.4 A R 60 60 100 0.3 A Subtotal 309 312 101 0.5 A L 78 76 97 14.4 B T 43 41 96 13.9 B R 126 132 105 8.5 A Subtotal 247 249 101 11.2 B L 5 6 114 10.0 A T 24 27 112 11.4 B R 65 67 103 3.7 A Subtotal 94 100 106 6.2 A Total 980 986 101 4.1 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Mitigated Existing (2022) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 2 2 100 4.3 A Subtotal 2 2 100 4.3 A L 1 1 100 5.3 A Subtotal 1 1 100 5.3 A T 249 246 99 0.2 A Subtotal 249 246 99 0.2 A L 1 0 0 T 143 144 101 0.4 A Subtotal 144 144 100 0.4 A Total 396 393 99 0.3 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 8 8 97 6.2 A R 1 1 100 2.8 A Subtotal 9 9 100 5.8 A L 14 13 95 2.4 A T 238 236 99 0.5 A Subtotal 252 249 99 0.6 A T 163 163 100 0.9 A R 21 22 106 0.7 A Subtotal 184 185 101 0.9 A Total 446 443 99 0.8 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) SB EB WB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Mitigated Existing (2022) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 100 100 100 10.5 B T 226 227 100 5.0 A R 4 4 100 1.8 A Subtotal 330 331 100 6.6 A L 30 28 93 9.5 A T 219 217 99 5.4 A R 60 58 96 2.3 A Subtotal 309 303 98 5.2 A L 78 73 94 11.4 B T 43 43 101 8.5 A R 126 126 100 4.5 A Subtotal 247 242 98 7.3 A L 5 4 76 10.4 B T 24 25 104 8.6 A R 65 68 104 3.4 A Subtotal 94 97 103 5.0 A Total 980 973 99 6.2 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 1 1 100 2.3 A Subtotal 1 1 100 2.3 A L 1 1 100 4.1 A R 2 2 100 5.0 A Subtotal 3 3 100 4.7 A T 204 206 101 0.2 A R 1 1 100 0.0 A Subtotal 205 207 101 0.2 A T 326 325 100 0.6 A Subtotal 326 325 100 0.6 A Total 535 536 100 0.4 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 23 20 88 7.4 A R 21 22 106 4.2 A Subtotal 44 42 95 5.7 A L 5 4 80 3.2 A T 201 203 101 0.4 A Subtotal 206 207 100 0.5 A T 305 302 99 0.7 A R 14 16 112 0.5 A Subtotal 319 318 100 0.7 A Total 568 567 100 1.0 A Volume Served Delay/Veh (sec) SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Unsignalized Avg %Avg LOS L 178 176 99 5.8 A T 373 363 97 1.2 A R 20 21 106 0.3 A Subtotal 571 560 98 2.6 A L 88 86 98 3.0 A T 358 350 98 0.8 A R 116 118 102 0.7 A Subtotal 562 554 99 1.1 A L 76 75 99 42.7 E T 28 28 100 45.0 E R 137 134 98 28.5 D Subtotal 241 237 98 34.9 D L 5 5 100 22.0 C T 10 10 98 23.0 C R 79 77 98 4.6 A Subtotal 94 92 98 7.5 A Total 1,467 1,443 98 7.7 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Mitigated Existing (2022) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 1 1 100 3.2 A Subtotal 1 1 100 3.2 A L 1 0 0 R 2 2 100 3.7 A Subtotal 3 2 67 3.7 A T 204 202 99 0.2 A R 1 1 100 0.1 A Subtotal 205 203 99 0.2 A T 326 329 101 0.7 A Subtotal 326 329 101 0.7 A Total 535 535 100 0.5 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 23 21 92 6.9 A R 21 20 96 4.4 A Subtotal 44 41 93 5.7 A L 5 5 100 3.4 A T 201 199 99 0.4 A Subtotal 206 204 99 0.5 A T 305 309 101 1.0 A R 14 15 105 0.8 A Subtotal 319 324 102 1.0 A Total 568 569 100 1.1 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) SB EB WB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Mitigated Existing (2022) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 178 180 101 15.1 B T 373 378 101 5.4 A R 20 18 91 2.3 A Subtotal 571 576 101 8.3 A L 88 82 93 10.5 B T 358 356 100 5.7 A R 116 117 101 3.0 A Subtotal 562 555 99 5.8 A L 76 76 100 12.2 B T 28 27 96 11.0 B R 137 133 97 4.5 A Subtotal 241 236 98 7.7 A L 5 5 100 12.8 B T 10 11 107 9.7 A R 79 79 100 3.6 A Subtotal 94 95 101 4.8 A Total 1,467 1,462 100 7.1 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Plus Project Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 2 2 100 2.9 A Subtotal 2 2 100 2.9 A L 1 1 100 8.1 A Subtotal 1 1 100 8.1 A T 259 259 100 0.2 A Subtotal 259 259 100 0.2 A L 1 0 0 T 176 174 99 0.4 A Subtotal 177 174 98 0.4 A Total 438 436 99 0.3 A Intersection:Project Access/Grand Loop & Trejo St Type:Unsignalized Avg %Avg LOS L 31 32 103 6.9 A R 72 74 103 4.2 A Subtotal 103 106 103 5.0 A L 8 8 97 7.1 A R 1 2 200 2.7 A Subtotal 9 10 111 6.2 A L 14 13 95 2.5 A T 239 238 100 0.6 A R 10 10 98 0.4 A Subtotal 263 261 99 0.7 A L 23 21 91 3.0 A T 163 160 98 0.9 A R 21 20 96 0.9 A Subtotal 207 201 97 1.1 A Total 582 578 99 1.7 A Volume Served Delay/Veh (sec) NB SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Plus Project Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 112 110 98 11.2 B T 226 227 100 5.4 A R 4 3 75 1.9 A Subtotal 342 340 99 7.2 A L 30 30 100 9.3 A T 219 218 100 6.0 A R 68 63 93 2.7 A Subtotal 317 311 98 5.6 A L 104 102 98 11.7 B T 54 56 105 9.8 A R 162 164 101 4.8 A Subtotal 320 322 101 7.9 A L 5 6 114 10.1 B T 27 28 104 9.4 A R 65 65 100 3.5 A Subtotal 97 99 102 5.6 A Total 1,076 1,072 100 6.8 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Plus Project Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 1 1 100 2.3 A Subtotal 1 1 100 2.3 A L 1 0 0 R 2 2 100 4.4 A Subtotal 3 2 67 4.4 A T 237 243 103 0.2 A R 1 2 200 0.1 A Subtotal 238 245 103 0.2 A T 347 347 100 0.7 A Subtotal 347 347 100 0.7 A Total 589 595 101 0.5 A Intersection:Project Access/Grand Loop & Trejo St Type:Unsignalized Avg %Avg LOS L 20 21 106 8.5 A R 45 48 106 3.7 A Subtotal 65 69 106 5.2 A L 23 21 92 8.4 A R 21 20 96 5.0 A Subtotal 44 41 93 6.7 A L 5 5 100 2.7 A T 202 208 103 0.7 A R 33 33 100 0.5 A Subtotal 240 246 103 0.7 A L 78 77 99 3.3 A T 305 305 100 1.0 A R 14 15 105 0.9 A Subtotal 397 397 100 1.4 A Total 746 753 101 1.8 A Volume Served Delay/Veh (sec) NB SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Existing (2022) Plus Project Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 217 215 99 18.7 B T 373 368 99 5.7 A R 20 20 101 2.9 A Subtotal 610 603 99 10.2 B L 88 85 97 10.7 B T 358 357 100 6.4 A R 144 148 103 3.4 A Subtotal 590 590 100 6.3 A L 91 89 98 16.8 B T 36 38 106 15.6 B R 160 166 104 6.3 A Subtotal 287 293 102 10.7 B L 5 6 120 19.3 B T 21 20 96 14.5 B R 79 78 99 4.8 A Subtotal 105 104 99 7.5 A Total 1,591 1,590 100 8.7 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 5 5 95 3.4 A Subtotal 5 5 100 3.4 A L 5 5 95 5.7 A Subtotal 5 5 100 5.7 A T 260 265 102 0.2 A Subtotal 260 265 102 0.2 A L 5 5 95 1.6 A T 150 151 101 0.3 A Subtotal 155 156 101 0.3 A Total 425 431 101 0.4 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 10 10 98 6.4 A R 5 6 114 2.9 A Subtotal 15 16 107 5.1 A L 15 14 95 2.1 A T 256 261 102 0.5 A Subtotal 271 275 101 0.6 A T 170 171 100 0.8 A R 25 23 92 0.8 A Subtotal 195 194 99 0.8 A Total 482 485 101 0.8 A Volume Served Delay/Veh (sec) SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Background Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 105 102 97 10.7 B T 235 232 99 5.1 A R 5 4 76 2.3 A Subtotal 345 338 98 6.8 A L 35 35 99 9.9 A T 225 218 97 5.8 A R 65 67 103 2.1 A Subtotal 325 320 98 5.5 A L 85 84 99 11.1 B T 46 48 105 9.5 A R 135 139 103 4.3 A Subtotal 266 271 102 7.3 A L 10 10 98 11.4 B T 25 26 104 9.4 A R 70 70 100 3.4 A Subtotal 105 106 101 5.6 A Total 1,042 1,035 99 6.4 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 5 5 100 3.7 A Subtotal 5 5 100 3.7 A L 5 5 100 7.5 A R 5 5 100 3.7 A Subtotal 10 10 100 5.6 A T 215 220 102 0.2 A R 5 5 100 0.1 A Subtotal 220 225 102 0.2 A T 355 351 99 0.7 A Subtotal 355 351 99 0.7 A Total 590 591 100 0.6 A Intersection:Trejo St & Grand Loop Type:Unsignalized Avg %Avg LOS L 25 25 101 7.5 A R 25 25 101 4.2 A Subtotal 50 50 100 5.9 A L 10 11 110 3.1 A T 215 219 102 0.5 A Subtotal 225 230 102 0.6 A T 330 326 99 1.0 A R 15 15 98 0.7 A Subtotal 345 341 99 1.0 A Total 620 621 100 1.2 A Volume Served Delay/Veh (sec) SB EB WB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Background Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 190 185 97 15.8 B T 380 383 101 5.5 A R 25 25 101 2.4 A Subtotal 595 593 100 8.6 A L 95 92 97 11.3 B T 365 367 101 5.8 A R 125 126 101 2.9 A Subtotal 585 585 100 6.0 A L 80 83 104 12.9 B T 30 30 100 11.2 B R 145 142 98 4.6 A Subtotal 255 255 100 8.1 A L 10 9 88 12.1 B T 15 15 98 9.8 A R 85 82 97 3.9 A Subtotal 110 106 96 5.4 A Total 1,544 1,539 100 7.3 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Plus Project Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 1 1 100 2.3 A Subtotal 1 1 100 2.3 A L 1 0 0 R 2 2 100 4.4 A Subtotal 3 2 67 4.4 A T 237 243 103 0.2 A R 1 2 200 0.1 A Subtotal 238 245 103 0.2 A T 347 347 100 0.7 A Subtotal 347 347 100 0.7 A Total 589 595 101 0.5 A Intersection:Project Access/Grand Loop & Trejo St Type:Unsignalized Avg %Avg LOS L 20 21 106 8.5 A R 45 48 106 3.7 A Subtotal 65 69 106 5.2 A L 23 21 92 8.4 A R 21 20 96 5.0 A Subtotal 44 41 93 6.7 A L 5 5 100 2.7 A T 202 208 103 0.7 A R 33 33 100 0.5 A Subtotal 240 246 103 0.7 A L 78 77 99 3.3 A T 305 305 100 1.0 A R 14 15 105 0.9 A Subtotal 397 397 100 1.4 A Total 746 753 101 1.8 A Volume Served Delay/Veh (sec) NB SB EB WB Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Plus Project Time Period:Morning Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 217 215 99 18.7 B T 373 368 99 5.7 A R 20 20 101 2.9 A Subtotal 610 603 99 10.2 B L 88 85 97 10.7 B T 358 357 100 6.4 A R 144 148 103 3.4 A Subtotal 590 590 100 6.3 A L 91 89 98 16.8 B T 36 38 106 15.6 B R 160 166 104 6.3 A Subtotal 287 293 102 10.7 B L 5 6 120 19.3 B T 21 20 96 14.5 B R 79 78 99 4.8 A Subtotal 105 104 99 7.5 A Total 1,591 1,590 100 8.7 A SB EB WB Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Plus Project Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:W Townhome Access & Trejo St Type:Unsignalized Avg %Avg LOS R 1 1 100 2.3 A Subtotal 1 1 100 2.3 A L 1 0 0 R 2 2 100 4.4 A Subtotal 3 2 67 4.4 A T 237 243 103 0.2 A R 1 2 200 0.1 A Subtotal 238 245 103 0.2 A T 347 347 100 0.7 A Subtotal 347 347 100 0.7 A Total 589 595 101 0.5 A Intersection:Project Access/Grand Loop & Trejo St Type:Unsignalized Avg %Avg LOS L 20 21 106 8.5 A R 45 48 106 3.7 A Subtotal 65 69 106 5.2 A L 23 21 92 8.4 A R 21 20 96 5.0 A Subtotal 44 41 93 6.7 A L 5 5 100 2.7 A T 202 208 103 0.7 A R 33 33 100 0.5 A Subtotal 240 246 103 0.7 A L 78 77 99 3.3 A T 305 305 100 1.0 A R 14 15 105 0.9 A Subtotal 397 397 100 1.4 A Total 746 753 101 1.8 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume Approach Movement Demand Volume Volume Served Delay/Veh (sec) NB SB EB WB SimTraffic LOS Report Project:Rexburg - Madison Station TIS Analysis Period:Future (2027) Plus Project Time Period:Evening Peak Hour Project #:UT22-2262 Intersection:Yellowstone Hwy & Trejo St Type:Signalized Avg %Avg LOS L 217 215 99 18.7 B T 373 368 99 5.7 A R 20 20 101 2.9 A Subtotal 610 603 99 10.2 B L 88 85 97 10.7 B T 358 357 100 6.4 A R 144 148 103 3.4 A Subtotal 590 590 100 6.3 A L 91 89 98 16.8 B T 36 38 106 15.6 B R 160 166 104 6.3 A Subtotal 287 293 102 10.7 B L 5 6 120 19.3 B T 21 20 96 14.5 B R 79 78 99 4.8 A Subtotal 105 104 99 7.5 A Total 1,591 1,590 100 8.7 A Volume Served Delay/Veh (sec) NB SB EB WB Approach Movement Demand Volume Rexburg - Madison Station Traffic Impact Study APPENDIX D 95th Percentile Queue Length Reports SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Existing (2022) Background Time Period: Morning Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R L LR LTR T TR LT LTR LT R 01: W Townhome Access & Trejo St ---------------------- 02: Trejo St & Grand Loop ------50 -------------- 03: Yellowstone Hwy & Trejo St 50 --------------150 50 50 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Mitigated Existing (2022) Background Time Period: Morning Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R T TR L LR LTR T TR L LT TR L TR 01: W Townhome Access & Trejo St ---------------------------- 02: Trejo St & Grand Loop ----------50 ---------------- 03: Yellowstone Hwy & Trejo St 75 --75 50 50 ----75 75 75 --100 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Existing (2022) Background Time Period: Evening Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R T TR L LR LTR T TR LT LTR TR LT R TR 01: W Townhome Access & Trejo St ------------------------------ 02: Trejo St & Grand Loop ----------50 ------------------ 03: Yellowstone Hwy & Trejo St 75 ------50 ----------275 --50 75 -- NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Mitigated Existing (2022) Background Time Period: Evening Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R T TR L LR LTR T TR L LT TR L TR 01: W Townhome Access & Trejo St ---------------------------- 02: Trejo St & Grand Loop ----------50 ---------------- 03: Yellowstone Hwy & Trejo St 125 --100 75 75 ----100 75 75 --100 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Existing (2022) Plus Project Time Period: Morning Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L LTR R T TR L LTR T TR L LTR TR L LT TR 01: W Townhome Access & Trejo St ------------------------------ 02: Project Access/Grand Loop & Trejo St --75 --------50 ----------25 ---- 03: Yellowstone Hwy & Trejo St 75 ----75 75 50 --100 75 100 --100 ----75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Existing (2022) Plus Project Time Period: Evening Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L LTR R T TR L LTR T TR L LTR TR L TR 01: W Townhome Access & Trejo St ---------------------------- 02: Project Access/Grand Loop & Trejo St --75 --------50 ----------50 -- 03: Yellowstone Hwy & Trejo St 150 ----100 100 75 --125 100 100 --100 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Future (2027) Background Time Period: Morning Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R T TR L LR LTR T TR L LT TR L LT TR 01: W Townhome Access & Trejo St ------------------------------ 02: Trejo St & Grand Loop ----------50 ------------------ 03: Yellowstone Hwy & Trejo St 75 --75 75 50 ----100 75 75 --100 50 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Future (2027) Background Time Period: Evening Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L R T TR L LR LTR T TR L LT TR L LT TR 01: W Townhome Access & Trejo St ------------50 ---------------- 02: Trejo St & Grand Loop ----------50 --------50 -------- 03: Yellowstone Hwy & Trejo St 125 --75 75 75 ----100 75 75 --75 50 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Future (2027) Plus Project Time Period: Morning Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L LTR R T TR L LTR T TR L LTR TR L TR 01: W Townhome Access & Trejo St ---------------------------- 02: Project Access/Grand Loop & Trejo St --75 --------50 ----------50 -- 03: Yellowstone Hwy & Trejo St 150 ----100 100 75 --125 100 100 --100 --75 NB SB EB WB SimTraffic Queueing Report Project: Rexburg - Madison Station TIS Analysis: Future (2027) Plus Project Time Period: Evening Peak Hour 95th Percentile Queue Length (feet) - Rounded Up to Nearest Multiple of 25 ft Project #: UT22-2262 Intersection L LTR R T TR L LTR T TR L LTR TR L TR 01: W Townhome Access & Trejo St ---------------------------- 02: Project Access/Grand Loop & Trejo St --75 --------50 ----------50 -- 03: Yellowstone Hwy & Trejo St 150 ----100 100 75 --125 100 100 --100 --75 NB SB EB WB