Loading...
HomeMy WebLinkAboutID0906_Pg 1-2 INFRASTRUCTURE - 23-00605 - Dutch Bros - New Bldg - Reviewed - Corrections - ResponseAuthor Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Don Allen Don.Allen@rexburg.org 208-372-2174 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Dutch Bros - New Commercial Bldg Address : 905 W Main Street Application Type : Document Filename : INFRASTRUCTURE - 23-00605 - Dutch Bros - New Bldg.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C4.0 Free Text Todd Smith : Broadband Open 8 Coordination with ITD is advisable. when planning and installing the fiber conduit and handholes. SP1.0 Free Text Kyle Baldwin : P&Z Open 16 Please show snow storage locations and area calculations. Snow storage must be 10% of parking/maneuvering areas and cannot cover required parking stalls. Landscaping may double as snow storage areas. SP1.0 Free Text Kyle Baldwin : P&Z Open 16 Central Features and Community Spaces requirement must be met using outdoor bench or outdoor seating area or bike rack etc. SP1.0 Callout Kyle Baldwin : P&Z Open 16 If this is an outdoor seating area it will satisfy community spaces requirement. If so, please label. C2.0 Callout Joel Gray : PW Open 4 Gates must open 180 degrees. C2.0 Callout Joel Gray : PW Open 4 Curbing arch must be softened to allow for garbage truck to access north dumpster. # 23-00605 New Commercial Building Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 09.11.2023 Approval of plans does not constitute approval of variance from code Page 1 of 2 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C4.0 Callout Joel Gray : PW Open 8 Approximate location of 6" water stub. Report Date: 09.11.2023 Approval of plans does not constitute approval of variance from code Page 2 of 2 Powered by TCPDF (www.tcpdf.org)