HomeMy WebLinkAboutID0906_Pg 1-2 INFRASTRUCTURE - 23-00605 - Dutch Bros - New Bldg - Reviewed - Corrections - ResponseAuthor Name Author Email Author Phone No.:
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Joel Gray Joel.Gray@rexburg.org 208-372-2331
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Don Allen Don.Allen@rexburg.org 208-372-2174
Todd Smith Todd.Smith@rexburg.org 208-372-2181
Katie Saurey Katie.Saurey@rexburg.org 208-372-2167
Description : Dutch Bros - New Commercial Bldg
Address : 905 W Main Street
Application Type :
Document Filename : INFRASTRUCTURE - 23-00605 - Dutch Bros - New Bldg.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
C4.0 Free Text Todd Smith : Broadband Open 8 Coordination with ITD is advisable. when planning and
installing the fiber conduit and handholes.
SP1.0 Free Text Kyle Baldwin : P&Z Open 16 Please show snow storage locations and area calculations.
Snow storage must be 10% of parking/maneuvering areas and
cannot cover required parking stalls. Landscaping may double
as snow storage areas.
SP1.0 Free Text Kyle Baldwin : P&Z Open 16 Central Features and Community Spaces requirement must be
met using outdoor bench or outdoor seating area or bike rack
etc.
SP1.0 Callout Kyle Baldwin : P&Z Open 16 If this is an outdoor seating area it will satisfy community
spaces requirement. If so, please label.
C2.0 Callout Joel Gray : PW Open 4 Gates must open 180 degrees.
C2.0 Callout Joel Gray : PW Open 4 Curbing arch must be softened to allow for garbage truck to
access north dumpster.
# 23-00605
New Commercial Building
Please digitally re-submit all pages of the plan set in response to requested revisions
for our next review cycle, with noted items resolved.
Report Date: 09.11.2023
Approval of plans does not constitute approval of variance from code
Page 1 of 2
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
C4.0 Callout Joel Gray : PW Open 8 Approximate location of 6" water stub.
Report Date: 09.11.2023
Approval of plans does not constitute approval of variance from code
Page 2 of 2
Powered by TCPDF (www.tcpdf.org)