HomeMy WebLinkAboutCOMCHECK 10.18.2023 - 23-00605 - Dutch Bros - New Commercial BldgCOMcheck Software Version 4.1.5.1
Envelope Compliance Certificate
Project Title:
2018 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:8%
Location:Rexburg, Idaho
Climate Zone:6b
Construction Site:
855 W. Main St.
Rexburg, Idaho 83440
Owner/Agent:Designer/Contractor:
Omar Garzon
Gnich Architecture Studio
1001 SE Sandy Blvd, Suite 100
Portland, Oregon 97214
971-346-2525
omarg@gnicharch.com
Project Information
Energy Code:
Dutch Bros Coffee - ID0906
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-Drive-thru and Walk-up Coffee Shop with no indoor or outdoor
seating (Dining: Cafeteria/Fast Food) : Nonresidential
950
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Drive-thru and
Walk-up Coffee Shop with no indoor or outdoor seating]
950 ---30.0 0.032 0.032
Floor: Slab-On-Grade:Unheated, Vertical 3 ft., [Bldg. Use 1 - Drive-thru
and Walk-up Coffee Shop with no indoor or outdoor seating] (c)
137 ---10.0 0.510 0.540
NORTH
Ext. Wall 1 - Front: Wood-Framed, 24in. o.c., [Bldg. Use 1 - Drive-thru
and Walk-up Coffee Shop with no indoor or outdoor seating]
380 21.0 3.0 0.049 0.051
Window B: Metal Frame: Fixed, Perf. Specs.: Product ID N/A, SHGC
0.64, PF 0.54, [Bldg. Use 1 - Drive-thru and Walk-up Coffee Shop with
no indoor or outdoor seating] (b)
54 ------0.360 0.360
Door 02: Glass (over 50 9.56976e-315lazing): Metal Frame, Non-
Entrance Door, Perf. Specs.: Product ID N/A, SHGC 0.58, PF 0.38,
[Bldg. Use 1 - Drive-thru and Walk-up Coffee Shop with no indoor or
outdoor seating] (b)
21 ------0.770 0.430
EAST
Ext. Wall 2 - Walk-Up Window: Wood-Framed, 24in. o.c., [Bldg. Use 1 -
Drive-thru and Walk-up Coffee Shop with no indoor or outdoor seating]
682 21.0 3.0 0.049 0.051
Window A: Metal Frame: Operable, Perf. Specs.: Product ID N/A,
SHGC 0.64, PF 1.64, [Bldg. Use 1 - Drive-thru and Walk-up Coffee
Shop with no indoor or outdoor seating] (b)
24 ------0.430 0.430
Window C: Metal Frame: Fixed, Perf. Specs.: Product ID N/A, SHGC
0.64, PF 1.64, [Bldg. Use 1 - Drive-thru and Walk-up Coffee Shop with
46 ------0.360 0.360
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
101 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
no indoor or outdoor seating] (b)
SOUTH
Ext. Wall 3 - Rear: Wood-Framed, 24in. o.c., [Bldg. Use 1 - Drive-thru
and Walk-up Coffee Shop with no indoor or outdoor seating]
380 21.0 3.0 0.049 0.051
Door 01: Insulated Metal, Swinging, [Bldg. Use 1 - Drive-thru and Walk-
up Coffee Shop with no indoor or outdoor seating]
25 ------0.370 0.370
WEST
Ext. Wall 4 - Drive-Thru Window: Wood-Framed, 24in. o.c., [Bldg. Use 1
- Drive-thru and Walk-up Coffee Shop with no indoor or outdoor seating]
682 21.0 3.0 0.049 0.051
Window A: Metal Frame: Operable, Perf. Specs.: Product ID N/A,
SHGC 0.64, PF 0.54, [Bldg. Use 1 - Drive-thru and Walk-up Coffee
Shop with no indoor or outdoor seating] (b)
24 ------0.430 0.430
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 1% better than code
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
102 ofPage
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.5.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2018 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.4.1
[PR10]1
The vertical fenestration area <= 30
percent of the gross above-grade wall
area.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A2.0
C402.4.1
[PR11]1
The skylight area <= 3 percent of the
gross roof area.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A4.0
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
103 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A7.0
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C105
[FO3]2
Installed slab-on-grade insulation type
and R-value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.4
[FO7]2
Slab edge insulation depth/length.
Slab insulation extending away from
building is covered by pavement or
>= 10 inches of soil.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
104 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A2.0
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A2.0
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
2.1
[FR19]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and material
permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an
approved manner.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Exception: Doors that open directly from a space =3000 ft2.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
105 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close. Refernece section C403.7.7 for
operational details.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
106 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.6
[EL26]2
Low-voltage dry-type distribution
electric transformers meet the
minimum efficiency requirements of
Table C405.6.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.7
[EL27]2
Electric motors meet the minimum
efficiency requirements of Tables
C405.7(1) through C405.7(4).
Efficiency verified through certification
under an approved certification
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.8.2,
C405.8.2.
1
[EL28]2
Escalators and moving walks comply
with ASME A17.1/CSA B44 and have
automatic controls configured to
reduce speed to the minimum
permitted speed in accordance with
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.9
[EL29]2
Total voltage drop across the
combination of feeders and branch
circuits <= 5%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E3.01
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
107 ofPage
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A7.0
C402.2.1
[IN20]1
Insulation installed on a suspended
ceiling having ceiling tiles is not being
specified for roor/ceiling assemblies.
Continuous insulation board installed
in 2 or more layers with edge joints
offset between layers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A2.0
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C105
[IN6]1
Installed above-grade wall insulation
type and R-value consistent with
insulation specifications reported in
plans and COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.3
[IN8]2
Installed floor insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C105
[IN2]1
Installed roof insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A8.1
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
108 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C408.1.1
[FI57]1
Building operations and maintenance
documents will be provided to the
owner. Documents will cover
manufacturers' information,
specifications, programming
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
109 ofPage
Project Title:
Data filename:
Dutch Bros Coffee - ID0906
R:\29_Dutch Bros\2023 PROJECTS\ID0906 (Rexburg, ID_855 W Main St_BTS)\B-
Drawings\ID0906_230831_Issued for Permit\4-Envelope COMcheck\Dutch_Bros_Coffee_-
_ID0906.cxl
09/22/23Report date:
1010 ofPage