Loading...
HomeMy WebLinkAboutAPPROVED PLANS 5.12.2022 - 22-00636 - Temple View Care Center - Shower RemodelAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Alex Owens Alex.Owens@rexburg.org 208-372-2172 Description : Temple View Care Center - Shower Remodel Address : 660 S 2nd W Record Type : Commercial - Remodel Document Filename : 2207-Ensign-TempleView-Shower.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 22-00636 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments T-1.0 Stamp Cody Jones : Building Open 1 Approved - Building Inspector T-1.0 Free Text Alex Owens : Electrical Open 1 All electrical work must meet 2017 NEC requirements T-1.0 Stamp Alex Owens : Electrical Open 1 Approved - Electrical Inspector E-1.0 Stamp Alex Owens : Electrical Open 6 Approved - Electrical Inspector E-1.0 Free Text Alex Owens : Electrical Open 6 All electrical work to comply with 2017 NEC. Commercial - Remodel Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) SITE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT THE BUILDING IN ACCORDANCE WITH IDAHO BUILDING CODE. SHOULD ANY CONDITIONS DEVELOP NOT COVERED BY THE CONSTRUCTION DOCUMENTS WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH SAID CODE, A CHANGE ORDER DETAILING THE REQUIRED WORK TO ACHIEVE COMPLIANCE SHALL TO BE SUBMITTED TO AND APPROVED BY AHJ BEFORE PROCEEDING WITH THIS WORK. WORK EXEMPT FROM PERMIT BY THE IBC 105.2 OR ASCE 7-05 SECTION 13.1.4 NEED NOT BE DETAILED ON THE CONSTRUCTION DOCUMENTS. EXEMPTIONS FROM PERMIT REQUIREMENTS OF THE CODE SHALL NOT BE DEEMED TO GRANT AUTHORIZATION FOR ANY WORK TO BE DONE IN ANY MANNER IN VIOLATION OF THE PROVISIONS OF THE CODE OR ANY LAWS OR ORDINANCES OF THIS JURISDICTION. WORK SHALL BE EXECUTED IN ACCORDANCE WITH THE BEST STANDARDS AND PRACTICES OF THE TRADE. WORK SHALL BE IN CONFORMANCE WITH APPLICABLE CODES, LOCAL REGULATIONS, SAFETY ORDERS OF THE STATE INDUSTRIAL COMMISSION, OSHA, AND AHJ CODE APPLICATIONS PRIOR TO COMMENCING WORK CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND NOTIFY THE ARCHITECT IN WRITING OF DISCREPANCIES. PROTECT PUBLIC AND PRIVATE PROPERTY AND IMPROVEMENTS FROM DAMAGE. DAMAGED AREAS SHALL BE REPLACED IN GOOD CONDITION. CONTRACTOR SHALL REPLACE DEFECTIVE MATERIALS OR WORKMANSHIP INSTALLED BY THEM AT NO COST TO THE OWNER AND SHALL REMEDY ANY DEFECTS IN MATERIALS OR WORKMANSHIP WHICH APPEAR WITHIN A ONE YEAR PERIOD FROM THE DATE OF PROJECT COMPLETION. CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT, INSURANCE, AND SERVICES FOR THE EXECUTION OF WORK AS SHOWN ON THESE DRAWINGS. CONTRACTOR SHALL MAINTAIN A CLEAN AND ORGANIZED CONSTRUCTION SITE. OWNER TO PROVIDE ASBESTOS INVESTIGATION REPORT OF EXISTING MATERIALS WITHIN PROJECT SCOPE. INSTALLATION OF POST INSTALLED ANCHORS IN REINFORCED CONCRETE SHALL COMMENCE ONCE REINFORCING BARS ARE LOCATED. EXTREME CARE SHALL BE USED TO AVOID DAMAGING THE REINFORCING. 1" MINIMUM CLEARANCE SHALL BE PROVIDED FOR REINFORCING BARS AND 4" CLEARANCE SHALL BE PROVIDED FOR PRE OR POST- TENSIONED REINFORCING. DESIGN AND SAFETY OF SHORING, BRACING, AND TEMPORARY SUPPORTS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. FRAMING CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE FRAMED SIMILAR TO TYPICAL DETAILS AND CONDITIONS. DO NOT SCALE DRAWINGS. DIMENSIONS TAKE PRECEDENCE OVER SCALE AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE. PROVIDE OPENINGS, FURRING, FRAMING, OR BLOCKING AS REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, CABINETS, EQUIPMENT, AND FIXTURES. GYPSUM WALL BOARD SHALL CONFORM TO CURRENT EDITION OF THE IBC AND UL LISTED ASSEMBLIES FOR FIRE RATED ASSEMBLIES U.N.O. PIPE AND DUCT INSULATION SHALL NOT EXCEED A FLAME SPREAD RATING OF 25 AND A SMOKE DENSITY OF 50 WHEN TESTED PER NFPA. CONTRACTOR SHALL PROVIDE PROTECTION OF EXISTING FACILITY OCCUPANTS, EQUIPMENT, AND FINISHES. DUST BARRIERS, SOUND BARRIERS, CONSTRUCTION BARRIERS, AND NEGATIVE AIR EQUIPMENT SHALL BE USED AS REQUIRED BY FACILITY INFECTION CONTROL MEASURES. CONTRACTOR SHALL FOLLOW THE "PROJECT MANUAL FOR THE CONSTRUCTION OF HEALTHCARE FACILITIES." THESE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. UNLESS NOTED HEREIN THEY DO NOT DIRECT THE MEANS, METHODS, PHASING, SEQUENCE, OR PROCEDURE OF CONSTRUCTION. @ AT A.B.ANCHOR BOLT A.C.ASPHALT CONCRETE A/C AIR CONDITIONING ADJ.ADJUSTABLE A.F.F.ABOVE FINISH FLOOR AHJ AUTHORITY HAVING JURISDICTION ALT.ALTERNATE AOR ARCHITECT OF RECORD ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS ATS AUTOMATIC TRANSFER SWITCH BLDG BUILDING BTU BRITISH THERMAL UNITS C.D. CONDENSATE DRAIN CFM CUBIC FEET PER MINUTE C.L. CENTER LINE CLR. CLEAR C.O. CLEAN OUT C.W.COLD WATER DEMO DEMOLITION DEPT.DEPARTMENT DIA.DIAMETER (E)EXISTING EA. EACH E.J.EXPANSION JOINT ELEV.ELEVATOR EEPS EMERGENCY ELECTRICAL POWER SYSTEM EQ EQUAL EXT.EXTERIOR F.A.FIRE ALARM F.D.FIRE DAMPER F.E.FIRE EXTINGUISHER F.F.FINISH FLOOR F.S. FLOOR SINK GA GAUGE GALV.GALVANIZED GB GYPSUM BOARD GYP.GYPSUM H.B.HOSE BIB H.M.HOLLOW METAL H.P.HORSE POWER HVAC HEATING, VENTILATION, AND AIR CONDITIONING H.W.HOT WATER ICBO INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS I.D.INSIDE DIAMETER INT.INTERIOR JAN.JANITOR KIT.KITCHEN KW KILOWATT LAB.LABORATORY LAV.LAVATORY MAX.MAXIMUM M.B.MACHINE BOLT MECH.MECHANICAL MED.MEDICINE MIN.MINIMUM M.S.MACHINE SCREW (N)NEW N.E.C.NATIONAL ELECTRICAL CODE NFPA NATIONAL FIRE PROTECTION COUNCIL N.I.C.NOT IN CONTRACT NO. NUMBER N.T.S.NOT TO SCALE O.C.ON CENTER O.D.OUTSIDE DIAMETER P.L. PROPERTY LINE PLWD PLYWOOD P.O.C.POINT OF CONNECTION PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PTDF PRESERVATIVE TREATED DOUGLAS FIR PVC POLYVINYL CHLORIDE RCP REFLECTED CEILING PLAN REN.RENEWAL RM.ROOM SF SQUARE FOOT SIM.SIMILAR SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTOR'S NATIONAL ASSOCIATION S.S.STAINLESS STEEL STOR.STORAGE T. TOILET TEL.TELEPHONE TEMP.TEMPERED T.V.TELEVISION TYP.TYPICAL UL UNDERWRITERS LABORATORY, INC. U.N.O.UNLESS NOTED OTHERWISE V.I.F.VERIFY IN FIELD W/D WASHER / DRYER WD.WOOD W.H.WATER HEATER W/O WITHOUT AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX TITLE SHEET T-1.0 05/12/2022 SAM BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 PROJECT DATAGENERAL NOTESABBREVIATIONS FIRE NOTES 2018 IDAHO BUILDING CODE 2018 IBC WITH AMENDMENTS 2020 EXISTING BUILDING CODE OF IDAHO 2018 IEBC WITH AMENDMENTS 2018 MECHANICAL CODE OF IDAHO 2018 IMC WITH AMENDMENTS 2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILTIES 2009 A117.1 2020 IDAHO ENERGY CONSERVATION CODE 2018 IECC 2018 FIRE CODE OF IDAHO 2018 IFC WITH AMENDMENTS 2016 NFPA 13 2016 NFPA 72 ARCHITECT M2L ARCHITECTURE INC. 2213 FOXWORTHY AVENUE SAN JOSE, CA 95124 949-257-9349 CONTACT: STEVE MILLER OWNER TEMPLE VIEW TRANSITIONAL CARE CENTER 660 SOUTH 2ND WEST REXBURG, ID 83440 VICINITY MAP APPLICABLE CODES PROJECT TEAM SHEET NUMBER SHEET NAME CURRENT REVISION CURRENT REVISION DATE T-1.0 TITLE SHEET A-1.0 FLOOR PLAN A-1.1 PARTIAL FLOOR PLAN A-2.0 ELEVATIONS A-3.0 DETAILS P-1.0 PLUMBING SHEET E-1.0 ELECTRICAL PLAN E-2.0 ELECTRICAL SPECIFICATIONS SHEET INDEX FACILITY NAME:TEMPLE VIEW TRANSITIONAL CARE ADDRESS:660 WEST 2ND SOUTH REXBURG, ID 83440 APN NO:RPR6N40E306615 ACRES:5.001 PROJECT NO:BLD-22-XXXX (E) OCCUPANCY:I-2 (E) CONSTRUCTION TYPE:V-A, FULLY SPRINKLERED THROUGHOUT (E) NUMBER OF STORIES:ONE (14'-0" HIGH) (E) LICENSED BEDS:99 (E) BUILDING AREA:45,319 SF YEAR OF CONSTRUCTION:1987 SCOPE OF WORK 1. 1. 1. SCOPE REMODEL 3 SHOWER ROOMS DEFERRED APPROVALS NONE NOTES: THIS FACILITY DOES NOT ADMIT PATIENTS SUSTAINED BY ELECTRICAL LIFE SUPPORT SYSTEMS. SITE PLAN ACCESSIBLE PARKING STALLS ACCESSIBLE ENTRANCE PROPERTY LINE (E) BUILDING TO REMAIN SEE SHEET A-1.0 FOR AREA OF WORK SCALE: 1"= 40'-0" W 7 t h S S 2nd W All electrical work must meet 2017 NEC requirements PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED GENERAL STORAGE WHEELCHAIR ALCOVE SOLID UTILITY SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED WOMEN'S BATH SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED MEN'S BATH GENERAL STORAGE NOURISH GENERAL STORAGE GENERAL STORAGE NURSE STAT LOUNGE GREENHOUSE LOUNGE ACTIVITIES LIBRARY TELEVISION ELECT.JAN ACT. DRBC. GENERAL STORAGE PRIV. W/ O BATH ONE BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED PRIV. W/O BATH ONE BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED GENERAL STORAGE MEDICAL PREP. TOILET NURSE STAT OXYGEN STOR. EXAM TOILET NOURISH GENERAL STORAGE PRIV. W/O BATH ONE BED CLEAN UTILITY CLEAN LINEN SOILED LINEN SHOWER 3 STOR. SOILED LINEN CLEAN LINEN JAN. CLEAN LINEN ELECT. WHEEL CHAIR ALCOVE SOILED UTILITY PRIV. W/O BATH ONE BED PRIV. W/O BATH ONE BED CO R R I D O R PRIV. W/O BATH ONE BED PRIV. W/O BATH ONE BED PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED PRIV. W/BATH ONE BED CORRIDOR CORRIDOR CO R R I D O R SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED ADMISSIONS COORDINATOR SALON OFFICE MENS BATH WOMENS BATH PHYSICAL THERAPY CONFERENCE GEN. STORAGE ADMINISTRATION GENERAL OFFICE RECEP. VESTIBULE LOBBY PERSONAL DINING PRIVATE DINING EMPLOYEE DINING GEN. STORAGE KITCHEN FOOD STOR. OFFICE JAN. NURSE CARE DINING MECHANICAL GENERAL STORAGE PATIO ELECT.CAN WASH RECEIVING CORRIDOR LOADING DOCK CLEAN LINEN DRY JAN. WASH SOILED LINEN WOMENS LOCKERS MENS LOCKERS SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED SEMI PRIV. TWO BED PRIV. W/O BATH ONE BED SEMI PRIV. TWO BED PRIV. W/O BATH ONE BED PRIV. W/O BATH ONE BED CORRIDOR /A-1.13 /A-1.11 /A-1.12 AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX FLOOR PLAN A-1.0 03/28/22 Author BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 3/32" = 1'-0"1 FLOOR PLAN LEGEND PATH OF TRAVEL / EGRESS PATH 1 HOUR SMOKE BARRIER WALL 1 HOUR FIRE RATED PARTITIONCORRIDOR WALLS A-2.0 1 4 3 2 SHOWER ROOM 1 1' - 6" 1' - 6 " 6' - 6 " 6' - 6 " 5' - 4 1/2" A-2.0 5 6 7 8 SHOWER ROOM 2 6' - 6 " 6' - 6 " 5' - 5" 5' - 4 1/2" 1' - 0" A-2.0 13 1416 15 A-2.0 9 12 11 10 SHOWER ROOM 3 ACCESSIBLE TOILET ROOM 4 4' - 1 0 1 / 2 " 5' - 0" MIN.2' - 0" 8' - 6" 9' - 9 1 / 2 " 9' - 4 1 / 2 " 4' - 1 1 / 2 " 4' - 3" 5' - 0" 1' - 6" 5' - 0 " 5' - 0 " SHOWER ROOM 1 SHOWER ROOM 2 SHOWER ROOM 3 AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX PARTIAL FLOOR PLAN A-1.1 08/25/21 SAM BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 CONSTRUCTION NOTES 1. 2. 3. 4. 5. 6. 7. ALL WORK IS NEW UNLESS OTHERWISE INDICATED PROTECT STAFF, VISITORS, AND PATIENTS FROM AREA OF WORK. MAINTAIN FIRE AND SMOKE RESISTIVE ASSEMBLIES DURING CONSTRUCTION BY PROVIDING RATED CONSTRUCTION BARRIERS AROUND COMPROMISED ASSEMBLIES, SEE DETAIL 1/A-3.0. MAINTAIN FIRE ALARM AND FIRE SPRINKLER COVERAGE DURING CONSTRUCTION. PROTECT HEADS AND DEVICES IN PLACE UNLESS OTHERWISE INDICATED. PENETRATIONS OF FIRE OR SMOKE RESISTIVE ASSEMBLIES SHALL BE PROTECTED PER A UL LISTED FIRE STOP SYSTEM PATCH FIRE AND SMOKE RESISTIVE ASSEMBLIES PER DETAILS 2 AND 3/A-3.0 NOTCHING AND BORING OF WOOD STUD WALLS SHALL BE LIMITED PER DETAIL 4/A3.0 SHOWER CALCULATION MAXIMUM RESIDENTS 99 SHOWERS/TUBS REQUIRED (1:20)5 (E) SHOWERS/TUBS IN FACILITY 10 SHOWERS/TUBS TO BE REMOVED 10 SHOWERS/TUBS TO BE ADDED 10 TOTAL SHOWERS/TUBS 10 KEYNOTES 3/8" = 1'-0"1 PARTIAL FLOOR PLAN - SHOWER 1 3/8" = 1'-0"2 PARTIAL FLOOR PLAN - SHOWER 2 3/8" = 1'-0"3 PARTIAL FLOOR PLAN - SHOWER 3 3/8" = 1'-0"4 DEMOLITION PLAN - SHOWER 1 3/8" = 1'-0"5 DEMOLITION PLAN - SHOWER 2 3/8" = 1'-0"6 DEMOLITION PLAN - SHOWER 3 X 1 EXISTING DOOR TO REMAIN 2 EXISTING PLUMBING FIXTURE TO REMAIN 3 EXISTING PLUMBING FIXTURE TO BE REMOVED. PROTECT EXISTING PLUMBING LINES IN PLACE, SEE PLUMBING PLAN FOR CONNECTIONS. 4 EXISTING NON-BEARING WALL TO BE REMOVED. PATCH CEILING PER DETAIL 3/A-2.0 5 EXISTING COUNTERTOP TO BE REMOVED 6 EXISTING IN-WALL ELECTRIC HEATER TO BE REMOVED, ELECTRICAL CIRCUIT IN PLACE 7 2X4 WOOD FRAMED WALL, SEE DETAIL 7/A3.0 8 3068 HOLLOW CORE WOOD DOOR AND FRAME, SEE DOOR SCHEDULE 13/A3.0 AND DETAILS 5 AND 6/A3.0 9 HANDWASHING FIXTURE, SEE PLUMBING SHEET, ANCHOR TO WALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE DETAIL 11/A3.0 FOR REQUIRED CLEARANCES. 10 WALK-IN TUB, SEE PLUMBING SHEET 11 GURNEY SHOWER WITH 2" SQUARE PORCELAIN TILE, DCOF>.42, SLOPE TOWARD DRAIN AT 1.5%, INSTALL PER TCNA MANUAL, PROVIDE COVED TILE BASE, SEE PLUMBING SHEET 12 2X6 WOOD FRAMED WALL, SEE DETAIL 7/A3.0 14 TOILET, SEE PLUMBING SHEET, ANCHOR PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE DETAIL 10/A3.0 FOR REQUIRED CLEARANCES. 15 6" SQUARE PORCELAIN FLOOR TILE, DCOF>.42, SLOPE TOWARD DRAIN AT.25%, INSTALL PER TCNA MANUAL, PROVIDE 6" HIGH COVED TILE BASE 17 SEMI RECESSED ELECTRIC WALL HEATER, SEE ELECTRICAL PLANS 18 WAINSCOT TILE ALONG WALLS MATCHNIG ADJACENT ROOM 19 CEILING MOUNTED CURTAIN TRACK WITH 1'-0" HIGH MESH AT TOP OF CURTAIN 2 1 3 4 4 3 4 4 1 3 3 3 5 5 1 3 4 6 1 1 1 2 7 3 8NON-ACCESSIBLE TOILET COMPARTMENT 9 10 11 12 12 11 9 NON-ACCESSIBLE TOILET COMPARTMENT 14 2 2 8 7 11 12 12 11 54" X 60" CLR. AREA 66" X 60" CLR. AREA 60" X 48" CLR. AREA 54" X 60" CLR. AREA 15 15 15 15 15 15 9 7 7 17 17 11 19 17 17 11 11 1919 17 17 17 17 18 18 AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX ELEVATIONS A-2.0 05/12/22 Author BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 1/4" = 1'-0"1 SHOWER ROOM-1 NORTH 1/4" = 1'-0"2 SHOWER ROOM-1 EAST 1/4" = 1'-0"3 SHOWER ROOM-1 SOUTH 1/4" = 1'-0"4 AHOWER ROOM-1 WEST 1/4" = 1'-0"5 SHOWER ROOM-2 NORTH 1/4" = 1'-0"6 SHOWER ROOM-2 EAST 1/4" = 1'-0"7 SHOWER ROOM-2 SOUTH 1/4" = 1'-0"8 SHOWER ROOM-2 WEST 1/4" = 1'-0"9 SHOWER ROOM-3 NORTH 1/4" = 1'-0"10 SHOWER ROOM-3 EAST 1/4" = 1'-0"11 SHOWER ROOM-3 SOUTH 1/4" = 1'-0"12 SHOWER ROOM-3 WEST 1/4" = 1'-0"13 TOILET ROOM-4 WEST 1/4" = 1'-0"14 TOILET ROOM-4 NORTH 1/4" = 1'-0"15 TOILET ROOM-4 EAST 1/4" = 1'-0"16 TOILET ROOM-4 SOUTH KEYNOTESX CONSTRUCTION NOTES 1. 2. 3. 4. 5. 6. 7. ALL WORK IS NEW UNLESS OTHERWISE INDICATED PROTECT STAFF, VISITORS, AND PATIENTS FROM AREA OF WORK. MAINTAIN FIRE AND SMOKE RESISTIVE ASSEMBLIES DURING CONSTRUCTION BY PROVIDING RATED CONSTRUCTION BARRIERS AROUND COMPROMISED ASSEMBLIES, SEE DETAIL 1/A-3.0. MAINTAIN FIRE ALARM AND FIRE SPRINKLER COVERAGE DURING CONSTRUCTION. PROTECT HEADS AND DEVICES IN PLACE UNLESS OTHERWISE INDICATED. PENETRATIONS OF FIRE OR SMOKE RESISTIVE ASSEMBLIES SHALL BE PROTECTED PER A UL LISTED FIRE STOP SYSTEM PATCH FIRE AND SMOKE RESISTIVE ASSEMBLIES PER DETAILS 2 AND 3/A-3.0 NOTCHING AND BORING OF WOOD STUD WALLS SHALL BE LIMITED PER DETAIL 4/A3.0 2 78 9 1012 11 1 GRAB BAR, ANCHOR PER DETAIL15/A3.0 2 EXISTING PLUMBING FIXTURE TO REMAIN 3 EXISTING DOOR TO REMAIN 4 SHOWER ROD AND CURTAIN 5 6" SQUARE CERAMIC TILE OVER CBU OVER WATERPROOF MEMBRANE LAPPED INTO SHOWER PAN, INSTALL PER TCNA MANUAL, PROVIDE 6" HIGH COVED TILE BASE 6 SHOWER HEAD AND CONTROLS, SEE PLUMBING SHEETS 7 2X4 WOOD FRAMED WALL, SEE DETAIL 7/A3.0 8 3068 HOLLOW CORE WOOD DOOR AND FRAME, SEE DOOR SCHEDULE 13/A3.0 AND DETAILS 5 AND 6/A3.0 9 HANDWASHING FIXTURE, SEE PLUMBING SHEET, ANCHOR TO WALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE DETAIL 11/A3.0 FOR REQUIRED CLEARANCES. 10 WALK-IN TUB, SEE PLUMBING SHEET 11 6" SQUARE CERAMIC TILE OVER CBU OVER WATERPROOF MEMBRANE LAPPED INTO SHOWER PAN, INSTALL PER TCNA MANUAL, PROVIDE 6" HIGH COVED TILE BASE 11 GURNEY SHOWER, SEE PLUMBING SHEET 12 2X6 WOOD FRAMED WALL, SEE DETAIL 7/A3.0 13 ACCESSIBLE SHOWER, SEE DETAIL 14/A3.0 FOR MORE INFORMATION 14 TOILET, SEE PLUMBING SHEET, ANCHOR PER MANUFACTURER'S INSTALLATION INSTRUCTIONS, SEE DETAIL 10/A3.0 FOR REQUIRED CLEARANCES. 16 24" DEEP SOLID SURFACE COUNTERTOP, MOUNT AT 34" TO TOP 17 SEMI RECESSED ELECTRIC WALL HEATER, SEE ELECTRICAL PLANS 19 CEILING MOUNTED CURTAIN TRACK WITH 1'-0" HIGH MESH AT TOP OF CURTAIN 20 ACCESSIBLE FOLD UP SEAT, ANCHOR PER DETAIL16/A3.0, LOCATE PER DETAIL 14/A3.0 21 6" SQUARE CERAMIC TILE WAINSCOT WITH SCHULTER TOP AT 48" A.F.F, INSTALL PER TCNA MANUAL, PROVIDE 6" HIGH COVED TILE BASE 5 14 16 17 19 36 20 6 4 21 9 4 1 5 12 5 6 20 6 4 2 10 7 8 9 21 3 9 21 11 4 1 5 13 6 5 4 21 5 20 6 4 21 17 17 7 8 21 13 6 5 20 1617 1 21 9 17 21 8 14 1 11 17 6 AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX DETAILS A-3.0 05/12/22 Author BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 TEMPORARY BARRIER 1SCALE: 1/4" = 1'-0"RATED WALL 2SCALE: NTS RATED CEILING 3 STUD NOTCHING 4SCALE: 1/2" = 1'-0"DOOR JAMB 5SCALE: 1" = 1'-0"DOOR HEADER 6SCALE: 1" = 1'-0" DOOR CLEARANCE 12SCALE: 1/4" = 1'-0"(E) SINK CLEARANCE 11SCALE: 1/4" = 1'-0"(E) TOILET CLEARANCE 10SCALE: 1/4" = 1'-0"GRAB BAR 9SCALE: NTSBLOCKING8SCALE: 1" = 1'-0"WALL FRAMING 7SCALE: 1/4" = 1'-0" NOT USED 18SCALE: NTSNOT USED 17SCALE: NTSSHOWER SEAT 16SCALE: NTSGRAB BAR 15SCALE: NTSACCESSIBLE SHOWER 14SCALE: NTSDOOR SCHEDULE 13SCALE: NTS NOT USED 19SCALE: NTS NOT USED 20SCALE: NTS NOT USED 21SCALE: NTS NOT USED 22SCALE: NTS NOT USED 23SCALE: NTS NOT USED 24SCALE: NTS NOT USED 30SCALE: NTSNOT USED 29SCALE: NTSNOT USED 28SCALE: NTSNOT USED 27SCALE: NTSNOT USED 26SCALE: NTSNOT USED 25SCALE: NTS SCALE: NTS 6'-0" CLR FIRE RATED ASSEMBLY PER DETAIL 2/A-2.0. RATING TO MATCH THE DEMOLISHED ASSEMBLY DEMOLISHED PORTION OF RATED ASSEMBLY OR REMOVED PROTECTED OPENING FIRE RATED ASSEMBLY 8'-0" CORRIDOR REDUCED NO MORE THAN 6'-0" NOTES: 1. TEMPORARY RATED ASSEMBLY SHALL MATCH HEIGHT OF WALL IT IS PROTECTING. 2. SEE DETAIL 7/A-2.0 FOR MORE INFORMATION (E) 2X WOOD FRAMED WALL 5/8" TYPE X GYPSUM BOARD EXTENDED INTO JAMB 1/2" DOOR FRAME, FIRE RATED PER PLAN ANCHOR PER MANUFACTURES INSTALLATION INSTRUCTIONS DOOR, FIRE RATED PER PLAN (E) 2X WOOD FRAMED WALL 5/8" TYPE X GYPSUM BOARD EXTENDED INTO JAMB 1/2" DOOR FRAME, FIRE RATED PER PLAN ANCHOR PER MANUFACTURES INSTALLATION INSTRUCTIONS DOOR, FIRE RATED PER PLAN 4X6 HEADER, SEE DETAIL 7/A-2.0 2X4 WOOD STUDS AT 16" O.C. NOTES: 1. WOOD SHALL BE GRADE 2 OR BETTER 2. TORQUE TEST 100% OF EXPANSION ANCHORS AT 25 FT-LBS DOUBLE TOP PLATE ANCHORED TO (E) JOISTS WITH (2) 16d NAIL AT 24" O.C. 2X4 CRIPPLE STUDS AT 16" O.C. WITH A34 CLIPS AT EACH END 4X6 WOOD HEADER WITH A34 CLIPS AT EACH END 2X4 KING AND JACK STUDS WITH A34 CLIPS AT EACH END (E) PTDF SILL PLATE TO REMAIN, TRIM AS REQUIRED FOR NEW DOOR, PROVIDE 3/8" HILTI TZ2 EXPANSION ANCHOR WITH 2" EMBEDMENT WITHIN 9" OF SILL PLATE END WHEN (E) ANCHOR IS GREATER THAN 9". 4X WOOD BLOCKING WITH A34 CLIPS AT EACH END (E) 2X4 WOOD STUDS AT 16" O.C. NOTES: 1. GRAB BARS SHALL BE 1-1/4" MIN. AND 2" MAX. DIAMETER 2. GRAB BARS SHALL BE 1-1/2" FROM WALL AND OBSTACLES 3. GRAB BARS SHALL BE 33" MIN. AND 36" MAX. ABOVE FINISH FLOOR. 4. SEE DETAIL 15/A3.0 FOR ANCHORAGE NOTES: 1. CENTERLINE OF TOILET SHALL BE 18" FROM SIDE WALL 2. SEAT SHALL BE 15-19" A.F.F. 3. TOILET PAPER DISPENSER SHALL BE 7-9" IN FRONT OF TOILET AND 19" MIN. A.F.F. 4. FLUSH CONTROLS SHALL BE ON OPEN SIDE OF TOILET NOTES: 1. COUNTER MOUNTED SINK SHALL BE 34" A.F.F. MAX 2. FAUCETS SHALL BE LEVER TYPE 3. EXPOSED PIPES AND SURFACES UNDER COUNTER SHALL BE INSULATED OR COVERED 4. CENTERLINE OF SINK SHALL BE 18" MIN. FROM SIDE WALL NOTES: 1. HANDLE SHALL BE LEVER TYPE WITH RETURN 2. CLEAR DOOR WIDTH SHALL BE 32" MIN. THRESHOLD HEIGHT SHALL BE 1/2" MAX. 4. HARDWARE SHALL BE LISTED FOR USE IN FIRE DOORS. 5. HANDLE SHALL BE 34-44" A.F.F. 6. DOOR SHALL HAVE CLOSER WHICH CLOSES PER CBC 11-404.2.8 7. DOOR OPENING FORCE SHALL NOT EXCEED 5 LBS. 8. DOOR SURFACE SHALL BE SMOOTH DOOR: 20 MINUTE RATED - MINERAL CORE WOOD - SINGLE LEAF - 36X80 GRAHAM - GPD-FD 45 FRAME: 20 MINUTE RATED - STEEL - CURRIES - CM SERIES HARDWARE: HANDLE - SARGENT - 11 LINE - BATHROOM KEYED LOCK HINGE - MCKINNEY - FULL MORTISE - FIVE KNUCKLE - 3 PER DOOR KICKPLATE - 10" - ROCKWOOD - K1038 THRESHOLD - NONE CLOSER - YALE - 4400 SERIES - ABOVE DOOR NOTES: 1. DOOR SHALL SWING OPEN 180 DEGREES 2. DOOR SHALL PROTRUDE NO MORE THAN 7" INTO CORRIDOR WHEN FULLY OPEN 3. HARDWARE SHALL MATCH EXISTING HARDWARE FINISHES 4. HARDWARE SHALL BE LISTED FOR USE IN FIRE DOORS 5. DOOR GAPS SHALL BE PER NFPA 80 SHOWER SEAT SHOWER GRAB BAR SHOWER CONTROLS1. 2. NOTES: BACK WALL GRAB BAR SHALL NOT EXTEND OVER SEAT. SIDE GRAB BAR SHALL EXTEND TO END OF SHOWER. 1. NOTES: ANCHOR PER DETAIL 16/A3.0 4X WOOD BLOCKING PER DETAIL 8/A3.0 2X4 WOOD STUD WALL WALL FINISH PER PLAN/ELEVATIONS A-A A A #14 MINIMUM WOOD SCREWS WITH 2" EMBEDMENT INTO STUDS OR BLOCKING, 3 PER ANCHOR PLATE NOTE: COVER SCREWS WITH ESCUTCHEON 1-1/2" ROUND STAINLESS STEEL GRAB BAR WITH 1-1/2" CLEARANCE TO WALL 4X WOOD BLOCKING PER DETAIL 8/A3.0 2X4 WOOD STUD WALL WALL FINISH PER PLAN/ELEVATIONS #14 MINIMUM WOOD SCREWS WITH 2" EMBEDMENT INTO BLOCKING, AT ALL MANUFACTURER'S ANCHOR POINTS. NOTE: COVER SCREWS WITH ESCUTCHEON SHOWER FOLD UP SEAT AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX ELECTRICAL PLAN E-1.0 09/21/21 Author BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 1 EXISTING DOME LIGHTS TO REMAIN 2 6" RECESSED CAN LIGHTS, LED, CONNECT TO EXISTING CIRCUIT IN AREA OF WORK, CONNECT TO EXISTING LIGHT SWITCH 3 WALL MOUNTED ELECTRIC HEATER, SEE SCHEDULE BELOW, CONNECT TO EXISTING CIRCUIT IN AREA OF WORK 4 LIGHT SWITCH, 120 VOLT, MOUNTED 40" A.F.F. 5 20 AMP ELECTRICAL DUPLEX RECEPTACLE, SEE NOTES AND SPECIFICATIONS. 6 RELOCATE EXISTING NURSE CALL PULL STATIONS AS INDICATED 2 3 ELECTRICAL NOTES KEYNOTES 5 48" GFCI6 $ 4 ELECTRICAL FIXTURE SCHEDULE MARK FIXTURE WATTAGE REMARKS A QUANTITY TYPE VOLTSMANUFACTURER CATALOG NUMBER B 50 120LITHONIA LDN6 1 LED CONNECT TO (E) CIRCUIT FOR REMOVED LIGHTS. MARKED SUITABLE FOR WET OR DAMP LOCATIONS. 1. 2. 3. 4. 5. 6. 7. A. B. C. D. E. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. ALL WORK IS NEW UNLESS OTHERWISE INDICATED. PROVIDE ALL LABOR, EQUIPMENT AND COMPONENTS TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM THESE ELECTRICAL DRAWINGS ARE DIAGRAMATIC AND REPRESENT THE INTENT IF THE ELECTRICAL WORK, AND MAY NOT REPRESENT A COMPLETE OPPERATING SYSTEM. ALL POWER BRANCH CIRCUITS SHALL BE INSTALLED WITH A #12 (MIN.) GROUND WIRE. CONNECT ALL CIRCUITS SHOWN IN AREA OF WORK TO EXISTING JUNCTION BOXES. ELECTRICIAN SHALL NOT LOAD ANY CIRCUIT WITH MORE THAN 80% OF THE CIRCUITS (WIRES AND BREAKERS) CAPACITY. LIGHT FIXTURES, NURSE CALL EQUIPMENT, AND ELECTRICAL COMPONENTS SHALL BE LISTED FOR USE IN A WET LOCATIO INSTALL RACEWAY SYSTEMS AS FOLLOWS: USE FLEXIBLE METALLIC CONDUIT ONLY IN AREAS AS PERMITTED BY LOCAL CODE AUTHORITY. USE SEAL-TITE IN AREAS EXPOSED TO WEATHER. USE RIGID GALVANIZED STEEL IN ALL AREAS EXPOSED TO WEATHER OR PHYSICAL DAMAGE. USE COMPRESSION TYPE FITTINGS FOR ELECTRICAL METALLIC TUBING WHERE UTILIZED. USE P.V.C. CONDUIT UNDERGROUND WITH CODE SIZED GROUND. CONDUIT RISERS AND STUBS ABOVE USE EMT OR MC CABLE AT INDOOR LOCATIONS. ALL NEW WIRING SHALL BE COPPER TYPE "THHN/THWN", U.O.N. ALL NEW DISCONNECT SWITCHES SHALL BE HEAVY DUTY TYPE AND TO BE PROVIDED WITH REJECTION TYPE FUSE HOLDERS, U.O.N. OUTDOOR DISCONNECT BOXES TO BE NEMA TYPE 3R. ALL FIXTURE,DEVICE, ETC., LOCATIONS SHALL BE VERIFIED WITH ARCH. DRAWINGS AS WELL AS EQUIPMENT SUPPLIER REQUIREMENTS PRIOR TO ANY ROUGH-IN WORK. ALL LIGHTING FIXTURES SHALL BE MOUNTED AND SUPPORTED IN ACCORDANCE WITH OSHA STANDARDS AND ALL LOCAL, STATE AND NATIONAL ELECTRICAL CODES. ELECTRICAL CONTRACTOR SHALL PROVIDE LIGHTING FIXTURE MOUNTING KITS AS REQUIRED TO SUIT THE EXACT TYPE OF CEILING TO WHICH THEY ARE MOUNTED. THESE DRAWINGS ARE DIAGRAMMATIC AND REPRESENT THE INTENT OF EQUIPMENT, DEVICES, ETC...TO BE CONNECTED AND THE CIRCUITS TO WHICH THEY ARE TO BE CONNECTED TO. CONTRACTOR SHALL INSTALL ALL CONDUIT, J-BOXES, ETC...AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. ALL EXTERIOR EQUIPMENT SHALL BE WEATHERPROOF. ELECTRICAL CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL LOCAL,STATE, AND NATIONAL GOVERNING CODES. ALL EQUIPMENT SHALL BE NEW AND BEAR A "UL" LABEL - U.ON. ELECTRICAL CONTRACTOR SHALL BE INCLUDED IN BID - COSTS FOR ALL HVAC CONTROL COMPONENTS, CONDUITS, DEVICES, ETC...AS DEEMED NECESSARY FOR A COMPLETE AND OPERATIONAL HVAC SYSTEM. REFER TO MECHANICAL DRAWINGS, DIAGRAMS AND SPECS FOR THOSE ITEMS REQUIRED UNDER THE ELECTRICAL SECTION OF THIS CONTRACT. ELECTRICAL CONTRACTOR SHALL VISIT SITE PRIOR TO BID DATE, TO VERIFY ALL EXISTING CONDITIONS TO BE ENCOUNTERED IN THE INSTALLATION OF ALL NEW EQUIPMENT, FIXTURES, DEVICES, FEEDERS, ETC...EXACT INSTALLATION METHOD AND REQUIREMENTS SHALL BE VERIFIED AND DETERMINED PRIOR TO BID DATE. CONTRACTOR SHALL IMMEDIATELY NOTIFY THIS ENGINEER OF ANY REQUIRED MODIFICATIONS WHICH ARE NOT SHOWN ON THESE DRAWINGS. SUBMITTAL OF BID INDICATES CONTRACTOR IS AWARE OF ALL JOB SITE CONDITIONS AND WORK TO BE PERFORMED. ALL ELECTRICAL EQUIPMENT CHARACTERISTICS, LOCATIONS, AND CONNECTION REQUIREMENTS SHALL BE VERIFIED PRIOR TO ANY ROUGH-IN WORK. COMPLETE ELECTRICAL SYSTEM SHALL BE GROUNDED IN ACCORDANCE WITH THE PRESENTLY ADOPTED EDITION OF THE N.E.C. ART. 250. NOTIFY THE ENGINEER IMMEDIATELY WHEREVER EXISTING EQUIPMENT IS ENCOUNTERED WHICH MUST BE RELOCATED DUE TO THE NEW CONSTRUCTION, OR NOT INDICATED ON "AS-BUILT" DRAWINGS OR WAS BURIED UNDERGROUND OR EMBEDDED IN STRUCTURE WALLS. RECEPTACLE OUTLET LOCATIONS SHALL COMPLY WITH NEC 210-52. THIS SHALL INCLUDE 120 VOLT, SINGLE PHASE, 15 AND 20 AMP RECEPTACLES INSTALLED IN BATHROOMS, GARAGES, BASEMENTS, OUTDOORS, KITCHEN COUNTERS, AND WET BAR SINKS HAVE GROUND FAULT CIRCUIT INTERRUPTER PROTECTION. GFCI RECEPTACLES SHALL BE LISTED TAMPER RESISTANT. 120 VOLT, SINGLE PHASE, 15 AND 20 AMP BRANCH CIRCUITS RECEPTACLES SHALL BE PROVIDED BY A LISTED ARC FAULT CIRCUIT INTERRUPTER, COMBINATION TYPE, INSTALLED TO PROVIDE PROTECTION TO THE BRANCH CIRCUIT. NON-METALLIC SHEATHING (ROMEX) SHALL BE CONCEALED WITHIN CONSTRUCTION OR PROTECTED FROM PHYSICAL DAMAGE. PROVIDE AT LEAST 1 LIGHTING CIRCUIT FOR EACH 500 SQUARE FEET OF LIVABLE FLOOR SPACE. CONTRACTOR SHALL LABEL ALL CIRCUITS 3/8" = 1'-0"1 ELECTRICAL PLAN - SHOWER 1 3/8" = 1'-0"2 ELECTRICAL PLAN - SHOWER 2 3/8" = 1'-0"3 ELECTRICAL PLAN - SHOWER 3 $ NC NC NC NC NC NC NC NC NC A A TYP. $ 1500 120STIEBEL ELTRON CK-15E 1 HEATER CONNECT TO (E) CIRCUIT FOR REMOVED HEATER. LOAD REDUCED. B B B B 1 1 1 TYP. A TYP. 2 2 3 4 4 NC NC 6 6 6 6 B B B B All electrical work to comp ly with 2017 NEC. AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX ELECTRICAL SPECIFICATIONS E-2.0 08/24/22 SAM BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 SHOWER ROOM 1 SHOWER ROOM 1 SHOWER ROOM 2 SHOWER ROOM 2 SHOWER ROOM 3 SHOWER ROOM 3 ACCESSIBLE TOILET ROOM 4 AR-987295 STEVE MILLER REN. 4/30/24 ⭐⭐L T IC E N S E D ARCHIT E C S O 32451 GOLDEN LANTERN, SUIT 204, LAGUNA NIGUEL, CA 92677 949-257-9349 M2LARCHITECTURE.COM DP O R F I R M CO N S U L T A N T PR O J E C T I N F O R M A T I O N AP P R O V A L S T A M P SH E E T I N F O R M A T I O N PROJ NO.: ST A M P DATE: REVISION: REVISION DATE: REVISION: DRAWN BY: AP N : M2 L N O : PR O J E C T N O : HT AADTIEOF SH O W E R R E M O D E L EN S I G N G R O U P TE M P L E V I E W T R A N S I T I O N A L 66 0 S O U T H 2 N D W E S T , R E X B U R G , I D 8 3 4 4 0 BLD-22-0XXXX PLUMBING SHEET P-1.0 05/12/22 Author BL D - 2 2 - 0 X X X X RP R 6 N 4 0 E 3 0 6 6 1 5 22 0 7 CONSTRUCTION NOTES KEYNOTES 1. 2. 3. 4. 5. 6. 7. A. B. C. D. E. 8. 9. ALL WORK IS NEW UNLESS OTHERWISE NOTED MECHANICAL AND PLUMBING SYSTEMS AND COMPONENTS SHALL MEET OR EXCEED THE REQUIREMENTS OF CPC, CMC, AND LOCAL CODE REQUIREMENTS SPECIFIED EQUIPMENT MAY BE SUBSTITUTED WITH ARCHITECT'S REVIEW AND APPROVAL. DOMESTIC WATER PIPES SHALL BE TYPE "L" COPPER MID RANGE LEAD FREE. WASTE LINES SHALL BE "NO-HUB" MALLABLE IRON WITH HEAVY DUTY FOUR BAND COUPLINGS AND DRAIN 1/8"-1/4" PER FOOT TOWARD THE MAIN LINES PIPES, FITTINGS, FLUTING, AND FIXTURES USED TO CONVEY POTABLE WATER SHALL BE LEAD FREE IN COMPLIANCE WITH CA AB 1953 PLUMBING FIXTURES SHALL MEET THE FOLLOWING MAXIMUM FLOW RATES SET BY THE CA ENERGY COMMISSION WATER CLOSETS 1.2 GPM SHOWER HEAD 2.0 GPM LAUNDRY FAUCETS 2.2 GPM KITCHEN SINKS 1.8 GPM OTHER SINKS 1.5 GPM NO UNRECIRCULATED WATER LINES SHALL EXCEED 25' AND THERE SHALL BE NO DEAD ENDS. REMOVE DEMOLISHED LINES BACK TO NEAREST TEE. CONTRACTOR SHALL VERIFY THE EXISTING EXHAUST FANS IN EACH SHOWER ROOM EXCEEDS 200 CFM. CONTRACTOR SHALL VERIFY THERE ARE NO EXISTING RETURN DUCTS IN THE SHOWER ROOMS 1 EXISTING HOT AND COLD MAIN LINES IN ATTIC, PROTECT IN PLACE 2 EXISTING VENT THROUGH THE ROOF TO REMAIN 3 EXTEND WASTE LINES UNDERGROUND, SLOPE TO POC. PATCH CONCRETE WITH 3000 PSI CONCRETE AND #4 BARS AT 18" O.CO 12" LONG MINUMIM WITH 4" EMBEDMENT INTO EXISTING CONCRETE 4 EXISTING WASTE LINE UNDERGROUND TO REMAIN 5 CONNECT TO EXISTING VENT THROUGH THE ROOF 6 PROVIDE WATER SUPPLY LINES IN ATTIC, SUPPORT WITH 1-HOLE CLIPS AT 8'-0" O.C. TO EXISTING STRUCTURE. 7 REMOVE EXISTING WATER SUPPLY LINES IN ATTIC FROM REMOVED FIXTURES 8 REMOVE EXISTING FLOOR DRAIN, PROTECT CONNECTION TO VENT 9 EXISTING PLUMBING FIXTURE TO BE REMOVED 10 REMOVE PORTION OF WASTE LINE 11 EXISTING PLUMBING FIXTURE TO REMAIN SYMBOL DESCRIPTION LEGEND 2 MARK EQUIPMENT MODEL REMARKS S 1 SHOWER HEAD/ MIXING VALVE PROVIDE HAND HELD SHOWER #152 WITH 24" SLIDE BAR MANUF. NOTES: 1.PROVIDE CHICAGO #1017ABCP STOPS AND SUPPLIES 2.SHOWER SHALL HAVE A PRESSURE BALANCE, THERMOSTATIC MIXING VALVE, OR A COMBINATION. D 1 FLOOR DRAIN SET ADJUSTABLE COLLAR TO PROVIDE < 2% FLOOR SLOPE Z415-3NL-5BZURN WC 1 WATER CLOSET CIMARRON K-3619-RA-0KOHLER 1905 VOCCPCHICAGO HW 1 WAND WASHING FIXTURE DECORUM 9024901EC AMERICAN STANDARD GPF = 1.28, PROVIDE FLUSH VALVE ON OPEN SIDE H VTR S C HOT WATER PIPE (SIZE PER PLAN 1/2" IF NO NOTATION) COLD WATER PIPE (SIZE PER PLAN 1/2" IF NO NOTATION) SEWER PIPE (SIZE PER PLAN 2" IF NO NOTATION) 1-1/2" VENT THRU ROOF PIPE INSIDE WALL POC POINT OF CONNECTION WITH (E) SERVICE PROVIDE MOEN CA9301 FAUCET BATTERY OPERATED TOUCHLESS PLUMBING SCHEDULE 3.SINK FAUCETS SHALL PROVIDE A LAMINAR FLOW 1 3 4 6 7 1 VTR VTR D 1 2 2 VTR VTR 2 3 3 4 8 4" 3/8" = 1'-0"1 PLUMBING DEMO PLAN - SHOWER 1 3/8" = 1'-0"2 PLUMBING PLAN - SHOWER 1 3/8" = 1'-0"3 PLUMBING DEMO PLAN - SHOWER 2 3/8" = 1'-0"4 PLUMBING PLAN - SHOWER 2 3/8" = 1'-0"5 PLUMBING DEMO PLAN - SHOWER 3 3/8" = 1'-0"6 PLUMBING PLAN - SHOWER 3 VTR 2 3" 3" 2" X X X X X X X X X 10 2" 2"X X X X X X X X 10 11 9 TYP. WALK IN TUB 3060WCLWDT 1 MEDITUB T 1 S 1 S 1 D 1 4" 3" 3" 2" 2" 2" X X X X X X X X X X X X X X X X X 10 D 1 2" 2" 2" 1 3 3 HW 1 VTR 2 VTR VTR 2 5 5 5 5 6 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X VTR 2 VTR 2 VTR 2 VTR 2 4 4" 3" 3" 3"2" 2" 2" VTR 2 VTR 2 VTR 2 VTR 2 4 4" 3" 3" 3" 2" 2" 2" S 1 S 1D 1 D 1 D 1 HW 1 T 1 1 1 3 2" 2" 2" 11 11 10 10 10 9 8 7 TYP. 3 3 5 5 5 5 6 6 6 3 3 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X VTR 2 VTR 2 VTR 2 4 1 7 TYP. 9 8 8 4" 3" 2" 2" 3" 10 VTR 2 2 VTR 2 4 1 4" 3" 2" 2" 3" 2" 2" 2" 6 3 3 5 6 3 HW 1 WC 1 S 1 S 1 D 1 D 1 D 1 6 6