Loading...
HomeMy WebLinkAboutWNC - Rexburg - Traffic Impact Study - 2024.12.12 Prepared For: WinCo Foods Prepared By: SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 360.352.1465 December 2024 Traffic Impact Study WinCo Foods Rexburg, ID Traffic Impact Study – WinCo Foods Project Information Project: WinCo Foods, Rexburg, ID Prepared for: WinCo Foods 650 Armstrong Place Boise, ID 83704 208.672.2086 Reviewing Agency Jurisdiction: Rexburg, Idaho Project Representative Prepared by: SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 360.352.1465 scjalliance.com Contact: Ryan Shea, PTP, Traffic Analysis Project Reference: SCJ #24-000062 Path: N:\Projects\7148 Blaine A Womer Civil Engineering (BAWCE)\24-000480 Rexburg WinCo\Traffic\03 - Dels\TIA\Rexburg ID TIA 2024-1212.docx Rexburg WinCo Foods Traffic Impact Study Signature The technical material and data contained in this document were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. Prepared by Ryan Shea, PTP Approved by Eric Johnston, PE 12/12/2024 Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page i Table of Contents 1 Introduction And Executive Summary .......................................................................... 4 1.1 Purpose of the Report and Study Objectives ........................................................................ 4 1.2 Site Location and Study Area ................................................................................................. 4 1.3 Development Description ...................................................................................................... 5 1.4 Findings and Conclusions ...................................................................................................... 5 2 Proposed Development ................................................................................................ 6 2.1 Site Development .................................................................................................................. 6 2.2 Project Access ........................................................................................................................ 6 2.3 Study Context ........................................................................................................................ 6 3 Existing Conditions ....................................................................................................... 8 3.1 Area Land Uses ...................................................................................................................... 8 3.2 Roadway Inventory ................................................................................................................ 8 3.3 Existing Traffic Conditions ..................................................................................................... 8 3.4 Crash History ....................................................................................................................... 12 4 Project Traffic Characteristics ..................................................................................... 13 4.1 Site-Generated Traffic Volumes .......................................................................................... 13 4.2 Site Traffic Distribution and Assignment ............................................................................. 14 5 Background Conditions .............................................................................................. 18 5.1 Roadway Network Improvements....................................................................................... 18 5.2 Future Traffic Volumes ........................................................................................................ 18 6 Traffic Operations Analysis ......................................................................................... 27 6.1 Traffic Analysis Methods and Assumptions ........................................................................ 27 6.2 Intersection Analysis ........................................................................................................... 28 6.3 N 2nd E Right Turn Warrant Analysis .................................................................................... 31 6.4 Moody Road Right Turn Warrant Analysis .......................................................................... 32 7 Summary and Conclusions .......................................................................................... 34 Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page ii List of Tables Table 1. Intersection Collision Summary - 01/01/2021 through 12/31/2023 ........................................ 12 Table 2. ITE Trip Generation Rates for Supermarket .............................................................................. 13 Table 3. AM Peak Hour Project Trip Generation ..................................................................................... 14 Table 4. PM Peak Hour Project Trip Generation ..................................................................................... 14 Table 5. Daily Peak Hour Project Trip Generation .................................................................................. 14 Table 6. Level of Service Criteria ............................................................................................................. 27 Table 7. 2024 Existing AM and PM Peak Hour Intersection Operations ................................................. 28 Table 8. 2025 Project Opening AM Peak Hour Intersection Operations ................................................ 29 Table 9. 2025 Project Opening PM Peak Hour Intersection Operations ................................................ 29 Table 10. 2030 Project Opening AM Peak Hour Intersection Operations .............................................. 30 Table 11. 2030 Project Opening PM Peak Hour Intersection Operations .............................................. 31 List of Figures Figure 1. Site Vicinity Map ........................................................................................................................ 4 Figure 2. Preliminary Site Plan .................................................................................................................. 7 Figure 3. Intersection Channelization and Control ................................................................................... 9 Figure 4. Existing 2024 AM Peak Hour Traffic Volumes .......................................................................... 10 Figure 5. Existing 2024 PM Peak Hour Traffic Volumes .......................................................................... 11 Figure 6. AM Peak Hour Site Generated Traffic Volumes ....................................................................... 16 Figure 7. PM Peak Hour Site Generated Traffic Volumes ....................................................................... 17 Figure 8. Projected 2025 AM Peak Hour Traffic Volumes Without Project ............................................ 19 Figure 9. Projected 2025 PM Peak Hour Traffic Volumes Without Project ............................................ 20 Figure 10. Projected 2030 AM Peak Hour Traffic Volumes Without Project .......................................... 21 Figure 11. Projected 2030 PM Peak Hour Traffic Volumes Without Project .......................................... 22 Figure 12. Projected 2025 AM Peak Hour Traffic Volumes With Project. .............................................. 23 Figure 13. Projected 2025 PM Peak Hour Traffic Volumes With Project ................................................ 24 Figure 14. Projected 2030 AM Peak Hour Traffic Volumes With Project ............................................... 25 Figure 15. Projected 2030 PM Peak Hour Traffic Volumes With Project ................................................ 26 Figure 16. N 2nd E Driveway..................................................................................................................... 32 Figure 17.Moody Road Site Driveways ................................................................................................... 33 Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page iii List of Appendices Appendix A Traffic Count Data Appendix B Traffic Volume Calculations Appendix C Operational Analysis Worksheets Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 4 1 Introduction And Executive Summary 1.1 Purpose of the Report and Study Objectives WinCo Foods is proposing to construct an approximate 84,000 square foot WinCo Foods store to be located on vacant land in Rexburg, Idaho. A Traffic Scoping Analysis for the proposed project was prepared and submitted to the City of Rexburg in September of 2024. The scoping analysis identified potential project trip-making characteristics including trip generation and assignment, and suggested parameters for analysis of project-related traffic impacts. The purpose of this Traffic Impact Study (TIS) is to evaluate existing and future traffic conditions in the vicinity of this site and to determine what, if any, potential traffic impacts might be associated with the development of this project. This TIS will form the basis for determining the need for any traffic-related project mitigation. It has been prepared in accordance with City of Rexburg standards and guidance as provided in the Madison County Transportation Master Plan (2015). 1.2 Site Location and Study Area The proposed project will be located on vacant land adjacent to an existing commercial development along E Moody Road. The WinCo Foods project will be developed on an approximate 12.58-acre lot. It is expected that the site will be developed in a single phase to be opened by 2025. Figure 1 illustrates the site vicinity and the transportation network serving the project area. The study area includes following intersections: • N Salem Highway at US 20 SB Ramps • N Salem Highway at US 20 NB Ramps • N 2nd E at E Moody Road • Idaho 33 at E Moody Road • Site Driveways Figure 1. Site Vicinity Map Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 5 1.3 Development Description The proposed project will construct a new approximately 84,000-sf building and a 7,000-sf cross dock facility located on vacant land, adjacent to an existing commercial development along E Moody Road. The WinCo Foods project will be developed on a 12.58-acre lot. Access to the overall commercial site will be provided by five driveways, two existing and three proposed. There is one existing full access driveway provided along E Moody Road that serves existing businesses near N 2nd. A second full access driveway is currently under construction and will serve the proposed project as well as the in-construction strip retail building. The project proposes three additional driveways, two right-in-right-out (RIRO) driveways along E Moody Road and one full access driveway is along N 2nd. 1.4 Findings and Conclusions Operational analysis has been prepared for AM and PM peak hour forecasted traffic volumes in the 2025 project opening year and in the 2030 horizon year. This analysis indicates that: • A total of 215 new-to-network AM peak hour trips would be generated by the project, and 474 new-to-network trips during the PM peak hour. • All intersections are expected to operate within their LOS standards in the 2025 and 2030 AM and PM peak hours with or without the project. • The site driveway along N 2nd E and the west site driveway along Moody Road both meet right- turn-lane warrants. Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 6 2 Proposed Development 2.1 Site Development The proposed project will construct a new approximately 84,000-sf building and a 7,000-sf cross dock facility located on vacant land, adjacent to an existing commercial development along E Moody Road. The WinCo Foods project will be developed on a 12.58-acre lot. It is expected that the proposed WinCo Foods project will be developed in a single phase to be opened in 2025. A preliminary site plan for the project presented in Figure 2. 2.2 Project Access Access to the project will be provided by four driveways; one in-construction full access driveway along E Moody Road across from the Walmart Driveway, two right-in-right-out (RIRO) driveways are proposed along E Moody Road and one full access driveway is proposed along N 2nd. 2.3 Study Context A Traffic Scoping Analysis for the proposed project was prepared and submitted to City of Rexburg in September of 2024. The scoping analysis identified potential project trip-making characteristics including trip generation and assignment, and suggested parameters for analysis of project-related traffic impacts. The analysis covered in this report focuses on existing, year of completion, and five-year horizon of the site access drives and the following study intersections: • N Salem Highway at US 20 SB Ramps • N Salem Highway at US 20 NB Ramps • N 2nd E at E Moody Road • Idaho 33 at E Moody Road • Site Driveways Operational analysis has been prepared during the AM peak hour and PM peak hour for the existing 2024 and forecasted operations in the 2025 project opening year and 2030 horizon year without and with the proposed project. Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 8 3 Existing Conditions 3.1 Area Land Uses The WinCo Foods project will be located south of Moody Road and east of N 2nd E on property that is currently vacant and zoned for community business center (CBC) and planned for commercial use. These designations are consistent with the proposed development. Land uses in the surrounding area largely include commercial, residential and agricultural land uses. 3.2 Roadway Inventory 3.2.1 N 2nd E N 2nd E is a north/south principal arterial. Within the study area this roadway has two travel lanes in each direction with a two-way-left-turn-lane (TWLTL). Within the study area, sidewalks are provided intermittently along both sides of the road. N 2nd E has a speed limit of 45 mph. 3.2.2 Idaho 33 Idaho 33 is a north/south principal arterial. Within the study area this roadway has one travel lane in each direction with a paved non-motorized path along the west side of the roadway. Within the study area, Idaho 33 has a speed limit of 55 mph. 3.2.3 Moody Road Moody Road is an east/west minor arterial providing one travel in each direction with a two-way-left- turn-lane (TWLTL). Within the study area this roadway provides sidewalks along the north side of the roadway and along newly developed areas along the south side. Moody Road has a posted speed limit of 35 mph. 3.2.4 US 20 US 20 is a north/south expressway providing two travel lanes in each direction. Within the study area, US 20 has a speed limit of 70 mph. A summary of the existing intersection channelization and control type for each of the study area intersections is provided in Figure 3. 3.3 Existing Traffic Conditions TC2, a transportation data collection service, provided AM and PM peak hour turning movement counts for the study area intersections. The counts were conducted on Wednesday October 23, 2024 between the hours of 7:00 am and 9:00 am and between 4:00 pm to 6:00 pm. Intersections counted included: • N Salem Highway at US 20 SB Ramps • N Salem Highway at US 20 NB Ramps • N 2nd E at E Moody Road • Idaho 33 at E Moody Road Existing 2024 AM peak hour turning movement counts are shown in Figure 4 and PM peak hour in Figure 5. The count data is included in Appendix A. W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 3 In t e r s e c t i o n C h a n n e l i z a t i o n an d C o n t r o l LE G E N D St o p S i g n Tr a v e l L a n e / C h a n n e l i z a t i o n 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d Tr a f f i c S i g n a l 2 31 4 Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 4 Ex i s Ɵng 2 0 2 4 A M P e a k H o u r Tr a ffic V o l u m e s 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 510 265 365 180 140 590 5 5 5 120 385 5 11 0 810 5 75 505 1 5 2 5 2 5 25 105 40 35 200 50 0 035 22 0 100 3 1 5 5 8 0 695 35 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 5 Ex i s Ɵng 2 0 2 4 P M P e a k H o u r Tr a ffic V o l u m e s 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 345 440 690 345 310 1010 0 5 5 1 5 385 730 5 29 5 580 15 70 505 7 0 5 0 6 0 40 190 60 30 175 65 0 525 20 5 65 2 7 0 0 1 0 0 515 35 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 12 3.4 Crash History Crash data was obtained from The Idaho Transportation Department (ITD) Office of Highway Safety website for the study area intersections The data includes all reported collisions occurring over the most current complete three-year span which includes January 1, 2021 through December 31, 2023. A collision frequency rate per Millions of Entering Vehicles (MEV) was calculated for the study intersections based on the following formula: Collision Rate = 1,000,000 X Total Collisions 365 X Number of Years X Average Daily Entering Traffic Collision rates were calculated for each intersection experiencing crashes using average daily volumes and the number of collisions reported per intersection. Generally crash rates above one crash per million entering vehicles (CEMV) are considered a possible safety concern and warrant further analysis and possible mitigation. None of the study intersections have an existing crate rate above this threshold. Collision data for the study intersections has been summarized in Table 1. Table 1. Intersection Collision Summary - 01/01/2021 through 12/31/2023 Intersection Total Reported Collisions Total Fatal/ Serious Total Injuries Average Collisions per Year Average Daily Entering Traffic Collisions per MEV N Salem Highway at US 20 SB Ramps 13 0 6 4.3 14,300 0.498 N Salem Highway at US 20 NB Ramps 21 0 5 7.0 19,120 0.602 N 2nd E at E Moody Road 23 1 12 7.7 22,180 0.568 Idaho 33 at E Moody Road 9 0 4 3.0 7,870 0.627 Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 13 4 P roject Traffic Characteristics The project-related characteristics having the most effect on area traffic conditions are peak hour trip generation and the directional distribution of traffic volumes on the surrounding roadway network. 4.1 Site -Generated Traffic Volumes Vehicle trip generation for the WinCo Foods store was estimated using the rates contained in the 11th edition of the Trip Generation Manual published by the Institute of Transportation Engineers (ITE). For the proposed WinCo Foods, the land-use category “Supermarket” (land-use code 850) was used. For this analysis, the “fitted-curve” equation was used when available to estimate trips in preference to using the average trip rate as this approach was recommended by ITE. Internal Capture Internal capture calculations were prepared to reflect the on-site interaction between the existing uses (drive-through restaurant, credit union, and urgent care center) and the proposed project. It is assumed that 10% of the project trips will occur from the existing uses during the AM peak hour and 7% during the PM peak hour. Pass-By It is anticipated that this project will attract some traffic from people already driving on the area roadways. These trips are not new trips added to the local roadways (primary trips) but represent “pass-by” trips according to the following definition: Pass-by trips: Pass-by trips are trips made as an intermediate stop from an origin to a primary destination (i.e., stopping to shop on the way home from work) by vehicles passing directly by the project driveway. The pass-by percentage for Supermarket during the PM peak hour is 24%, which was taken from the 11th edition of the Trip Generation Manual by ITE. The pass-by trips were assigned to N 2nd E 4.1.1 Trip Generation Rates The trip generation rates used for the Supermarket land use category are shown in Table 1. Table 2. ITE Trip Generation Rates for Supermarket Peak Period Unit Trip Rate Internal Capture % Pass-By % Enter % Exit % AM peak hour of Adjacent Street 1,000 sq ft 2.86 10% N/A 59% 41% PM peak hour of Adjacent Street 1,000 sq ft 7.991 7% 24% 50% 50% Daily 1,000 sq ft 89.811 7% 24% 50% 50% 1. Fitted Curve Equation was used In addition to the trips generated by the WinCo Foods store, the cross-dock facility proposed on site will generate additional trips. This proposed use is not easily applicable to a land use category provided in the ITE Trip Generation Manual; however, WinCo has identified that 7-8 trucks will utilize this facility Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 14 each day, which equates to 14-16 daily truck trips. For this study one truck (two trips) is assumed to occur during each peak hour. 4.1.2 Estimated Trip Generation The total trip generation expected from this project is calculated by applying the unit measure for the land use category to the appropriate trip generation rate. The trip generation for the proposed WinCo Foods project is shown in Tables 3 - 5 below. Table 3. AM Peak Hour Project Trip Generation Peak Period Size Total Trips Internal Capture Pass-By Trips New-to-Network Trips Enter Exit Total WinCo Foods Store 84.0 240 25 0 127 88 215 Cross Dock - 2 0 0 1 1 2 Total Trips - 242 25 0 128 89 217 Table 4. PM Peak Hour Project Trip Generation Peak Period Size Total Trips Internal Capture Pass-By Trips New-to-Network Trips Enter Exit Total WinCo Foods Store 84.0 671 47 150 237 237 474 Cross Dock - 2 0 0 1 1 2 Total Trips - 673 47 150 238 238 476 Table 5. Daily Peak Hour Project Trip Generation Peak Period Size Total Trips Internal Capture Pass-By Trips New-to-Network Trips Enter Exit Total WinCo Foods Store 84.0 7,544 528 1,684 2,666 2,666 5,332 Cross Dock - 16 0 0 8 8 16 Total Trips - 7,560 528 1,684 2,674 2,674 5,348 4.2 Site Traffic Distribution and Assignment For this study, the regional distribution of traffic to and from the proposed project was estimated based on locations and densities of the existing residential neighborhoods and employment areas. The regional traffic distribution percentages were provided in the traffic scoping materials and approved by city staff. Traffic assignments were also presented in the scoping materials, based on an initial assessment of which driveways would be used. These driveway assignments have been modified based on the Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 15 operational performance of the driveways, such that all of the site driveways would achieve an acceptable level of service. The regional traffic distribution percentages and site traffic assignment for the proposed development are shown in Figure 6 for the AM peak hour and Figure 7 for the PM peak hour. W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 6 AM P e a k H o u r S i t e G e n e r t e d Tr a f f i c V o l u m e s Pr o j e c t T r i p s Pr i m a r y T r i p s In b o u n d O u t b o u n d T o t a l 12 7 8 8 2 1 5 Pa s s - B y T r i p s In b o u n d O u t b o u n d T o t a l 00 0 To t a l T r i p s In b o u n d O u t b o u n d T o t a l 12 7 8 8 21 5 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s Le g e n d XX % Pr i m a r y T r i p D i s t r i b u t i o n P e r c e n t a g e (X X ) Pa s s - B y T r a f f i c V o l u m e s (X X % ) Pa s s - B y T r i p D i s t r i b u t i o n P e r c e n t a g e XX Pr i m a r y T r a f f i c V o l u m e s 25 % 20 % 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 10 % 6 4 10 % 30 % 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 5% 13 9 16 45 35 1 19 12 2 13 13 9 6 19 8 22 19 6 54 0 24 43 16 32 26 22 38 41 67 25 0 516 13 16 2 3 5 8 7 1 4 6 Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 7 PM P e a k H o u r S i t e G e n e r t e d Tr a f f i c V o l u m e s Pr o j e c t T r i p s Pr i m a r y T r i p s In b o u n d O u t b o u n d T o t a l 23 7 2 3 7 4 7 4 Pa s s - B y T r i p s In b o u n d O u t b o u n d T o t a l 75 7 5 1 5 0 To t a l T r i p s In b o u n d O u t b o u n d T o t a l 31 2 3 1 2 62 4 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s Le g e n d XX % Pr i m a r y T r i p D i s t r i b u t i o n P e r c e n t a g e (X X ) Pa s s - B y T r a f f i c V o l u m e s (X X % ) Pa s s - B y T r i p D i s t r i b u t i o n P e r c e n t a g e XX Pr i m a r y T r a f f i c V o l u m e s 25 % 20 % 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 10 % 12 12 10 % 30 % 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 5% 24 24 124 120 83 95 1 (50%) (50%) 36 35 5 24 24 17 36 23 49 36 18 (38) 81 0 54 7 0 30 59 71 59 71 34 47 ( 1 3 ) (37) 47 30 (38) (-37) 0 0 ( 2 5 ) 12 0 ( 3 7 ) 47 (-25) 2 3 5 8 7 1 4 6 Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 18 5 Background Conditions 5.1 Roadway Network Improvements The City of Rexburg 5-year Capital Improvement Plan was reviewed for planned roadway improvements within the study area. No roadway projects were identified. 5.2 Future Traffic Volumes Traffic volume forecasts were prepared for weekday AM and PM peak hour conditions for the 2025 opening year and the 2030 five year planning horizon. The future traffic volume forecast includes non- specific background traffic growth, pipeline development traffic and estimated traffic generated by the proposed WinCo Foods project. Future year non-project related traffic volumes were estimated based on a background traffic growth rate of 3%, which was provided from a recently approved TIS located within the study area. In addition to the background growth accounted two pipeline development projects have been identified near the study area and have been included in the forecast: • Strip Retail. This project is located withing the same commercial center as the proposed WinCo Foods project along Moody Road. This project includes constructing 12,00-sqft of retail space. • Teton River Temple. This project is located north of the project site along N 2nd E, just south of US 20. These volumes were added to the baseline traffic volumes to estimate the 2025 and 2030 AM and PM peak hour conditions. Traffic volumes without WinCo Foods are shown in Figures 8 - 11. Traffic volumes including WinCo Foods are shown in Figures 12 -15. The traffic volume calculations for the study intersections are included in Appendix B. W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 8 Pr o j e c t e d 2 0 2 5 A M P e a k H o u r Tr a ffic V o l u m e s W i t h o u t P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 545 280 395 195 170 2010 5 2 0 1 0 1 0 125 430 55 11 5 845 25 105 605 1 5 3 0 3 0 25 110 45 35 205 60 0 035 29 5 105 3 5 0 5 8 5 805 35 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 9 Pr o j e c t e d 2 0 2 5 P M P e a k H o u r Tr a ffic V o l u m e s W i t h o u t P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 375 475 755 380 355 2013 5 3 5 1 5 3 0 405 770 40 31 0 615 30 105 605 7 0 6 0 7 0 40 195 65 30 180 80 0 525 26 0 70 3 0 0 0 1 0 0 595 35 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 0 Pr o j e c t e d 2 0 3 0 A M P e a k H o u r Tr a ffic V o l u m e s W i t h o u t P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 620 320 450 225 190 2011 5 2 0 1 0 1 5 145 490 55 13 0 965 30 115 705 2 0 3 0 3 0 30 125 50 40 235 70 0 040 32 5 120 3 9 5 5 9 5 910 40 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 1 Pr o j e c t e d 2 0 3 0 P M P e a k H o u r Tr a ffic V o l u m e s W i t h o u t P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 425 540 855 435 400 2515 0 3 5 1 5 3 0 460 880 40 35 5 705 35 115 655 8 5 6 5 8 0 45 225 70 35 205 90 0 530 29 0 80 3 4 0 0 1 1 5 675 40 2 31 4 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 2 Pr o j e c t e d 2 0 2 5 A M P e a k H o u r Tr a ffic V o l u m e s W i t h P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 560 290 430 225 190 2014 5 2 0 1 0 1 0 125 445 55 12 5 860 25 175 655 1 5 3 5 4 0 25 110 45 35 205 75 0 035 32 5 105 3 8 5 5 8 5 850 35 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 25 610 5 19 0 85 5 15 970 5 19 0 80 20 15 5 15 5 5 8 5 2 0 10 0 65 20 0 15 10 5 15 2 3 5 8 7 1 4 6 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 3 Pr o j e c t e d 2 0 2 5 P M P e a k H o u r Tr a ffic V o l u m e s W i t h P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 395 495 850 455 415 2017 0 3 5 1 5 3 0 405 890 40 37 0 645 30 230 705 7 0 7 0 9 5 40 195 65 30 180 100 0 525 32 0 70 3 7 5 0 1 0 0 680 35 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 5 23 5 24 0 5 15 23 5 22 5 50 17 0 20 1 1 0 2 3 0 3 0 25 0 130 45 0 30 20 85 1,180 15 5 790 25 70 2 3 5 8 7 1 4 6 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 4 Pr o j e c t e d 2 0 3 0 A M P e a k H o u r Tr a ffic V o l u m e s W i t h P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 635 330 485 250 215 2015 5 2 0 1 0 1 5 145 505 55 14 5 980 30 185 755 2 0 3 5 4 0 30 125 50 40 235 85 0 040 36 0 120 4 3 5 5 9 5 955 40 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 5 21 5 95 5 5 21 5 90 20 17 5 15 5 5 9 0 2 0 10 0 65 20 0 15 10 25 685 15 1,105 5 15 2 3 5 8 7 1 4 6 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N W i n C o F o o d s Re x b u r g , I d a h o Tr a f f i c I m p a c t S t u d y Pr o j e c t Si t e Fi g u r e 1 5 Pr o j e c t e d 2 0 3 0 P M P e a k H o u r Tr a ffic V o l u m e s W i t h P r o j e c t 1) N S a l e m H w y a t US 2 0 S B R a m p s 2) N S a l e m H w y a t US 2 0 N B R a m p s 3) N 2 n d E a t E M o o d y R o a d 4) I d a h o 3 3 a t E M o o d y R d 450 565 950 505 460 2518 5 3 5 1 5 3 0 460 1,000 40 41 5 735 35 240 805 8 5 8 0 1 0 5 45 225 70 35 205 110 0 530 35 0 80 4 1 5 0 1 1 5 755 40 5) S i t e D r w y a t E M o o d y R d 6) S i t e D r w y a t E M o o d y R d 8) S i t e D r w y a t N 2 n d E 7) S i t e D r w y a t E M o o d y R d 5 26 0 26 5 5 15 26 0 25 5 50 20 0 20 1 1 0 2 5 5 3 0 25 0 130 45 0 30 20 85 1,345 15 5 890 25 70 2 3 5 8 7 1 4 6 Le g e n d Pe a k H o u r T r a ffic V o l u m e XX X Id a h o 3 3 N 2nd E E M o o d y R d N Salem Hwy US 2 0 N Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 27 6 Traffic Operations Analysis Traffic analyses were conducted to identify any deficiencies within the study area for the weekday AM or PM peak hour in the 2025 project opening year and 2030 five-year analysis period. 6.1 Traffic Analysis Methods and Assumptions 6.1.1 Methods and Assumptions The acknowledged source for determining overall capacity for arterial segments and independent intersections is the current edition of the Highway Capacity Manual (HCM) published by the Transportation Research Board (TRB). Intersection analysis was performed using the Synchro software package (version 12). This software implements the methods of the 7th Edition HCM. For signalized operations, the Level of Service (LOS) and individual volume/capacity (V/C) ratios are reported using the 7th Edition HCM. For unsignalized intersections all movements are reported. For the future year analysis scenarios, signal timings were optimized to account for changes in the traffic volumes. 6.1.2 Mobility Standards LOS is a qualitative term describing operating conditions a driver will experience while traveling on a street or highway during a specific time interval. LOS ranges from A (very little delay) to F (long delays and congestion). For signalized intersections, the overall LOS grade represents the weighted average vehicular delay (in seconds) of all movements at the intersection. For intersections under minor street stop-sign control, the LOS of the most difficult movement (typically the minor street left turn) is used to represent the intersection’s performance. The LOS/delay criteria for stop sign-controlled intersections are different than for signalized intersections because driver expectation is that a signalized intersection is designed to carry higher traffic volumes and experience greater delay. Table 6 shows the Level of Service criteria for stop-controlled intersections and signalized intersections. The Madison County Transportation Master Plan (2015) identifies LOS D as the accepted minimum standard for the study area intersections. Table 6. Level of Service Criteria Level of Service Stop-Controlled Intersection Average Control Delay (seconds/vehicle) Traffic Signal Intersection Average Control Delay (seconds/vehicle) A ≤ 10 ≤ 10 B > 10-15 > 10-20 C > 15-25 > 20-35 D > 25-35 > 35-55 E > 35-50 > 55-80 F > 50 > 80 Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 28 6.2 Intersection Analysis Intersection operations analysis was conducted for the following scenarios: • Existing 2024 traffic volumes • Projected background traffic volumes without the WinCo Foods project for 2025 and 2030 • Projected traffic volumes with the WinCo Foods project for 2025 and 2030. Detailed traffic operations analysis worksheets are included in Appendix C. 6.2.1 2024 Intersection Operations Analysis Table 7 presents a summary of traffic operations analysis results for study intersections in the 2024 base year AM and PM peak hours. These results are based on the traffic volumes collected in October of 2024 as previously described. As indicated in the table, all study area intersections are currently operating within their proscribed mobility standard of LOS D. Table 7. 2024 Existing AM and PM Peak Hour Intersection Operations 1. Two-way Stop Control 2. Worst movement 6.2.2 2025 Year of Opening Intersection Operations Analysis Table 8 summarizes traffic operations analysis results for 2025 AM peak hour traffic conditions with and without the proposed WinCo Foods project. As discussed in section 4, the project trip assignments were modified from the original scoping materials to account for the intersection analysis results, balancing the volumes across the different site driveways to achieve acceptable performance. This reflects the typical behavior of drivers as they would be expected to select a driveway for entering and exiting that presents a reasonable, and not excessive, amount of vehicle congestion and delay. As indicated in the table, all intersections are expected to operate within their applicable LOS D standard without and with project traffic. Project site driveways are all expected to operate at LOS C or better. Traffic Control Mobility Standard AM Peak Hour PM Peak Hour No Intersection V/C Delay LOS V/C Delay LOS 1 N Salem Highway at US 20 SB Ramps Signal LOS D 0.812 13.0 B 0.752 10.8 B 2 N Salem Highway at US 20 NB Ramps Signal LOS D 0.782 10.2 B 0.772 7.6 A 3 N 2nd E at E Moody Road Signal LOS D 0.602 10.6 B 0.762 15.5 B 4 Idaho 33 at E Moody Road TWSC1 LOS D 0.252 16.0 C 0.232 17.2 C Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 29 Table 8. 2025 Project Opening AM Peak Hour Intersection Operations 1. Two-way Stop Control 2. Worst movement Table 9 presents a summary of traffic operations analysis results for 2025 PM peak hour traffic conditions with and without the proposed project. As indicated in the table, all intersections are expected to operate within their applicable LOS D standard with or without project traffic. Project site driveways are all expected to operate at LOS D or better. Table 9. 2025 Project Opening PM Peak Hour Intersection Operations 1. Two-way Stop Control 2. Worst movement Traffic Control Mobility Standard Without Project With Project No Intersection V/C Delay LOS V/C Delay LOS 1 N Salem Highway at US 20 SB Ramps Signal LOS D 0.852 17.3 B 0.872 21.0 C 2 N Salem Highway at US 20 NB Ramps Signal LOS D 0.822 11.6 B 0.852 14.3 B 3 N 2nd E at E Moody Road Signal LOS D 0.662 12.9 B 0.652 12.2 B 4 Idaho 33 at E Moody Road TWSC1 LOS D 0.242 15.5 C 0.262 15.9 C 5 West Site Driveway at E Moody Road TWSC1 LOS D - - - 0.132 12.5 B 6 Center Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 8.8 A 7 East Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 8.8 A 8 Site Driveway at N 2nd E TWSC1 LOS D - - - 0.032 17.2 C Traffic Control Mobility Standard Without Project With Project No Intersection V/C Delay LOS V/C Delay LOS 1 N Salem Highway at US 20 SB Ramps Signal LOS D 0.792 13.0 B 0.862 18.4 B 2 N Salem Highway at US 20 NB Ramps Signal LOS D 0.782 7.9 A 0.872 13.2 B 3 N 2nd E at E Moody Road Signal LOS D 0.792 17.8 B 0.832 25.7 C 4 Idaho 33 at E Moody Road TWSC1 LOS D 0.282 19.3 C 0.332 22.4 C 5 West Site Driveway at E Moody Road TWSC1 LOS D - - - 0.422 23.1 C 6 Center Site Driveway at E Moody Road TWSC1 LOS D - - - 0.022 9.8 A 7 East Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 9.7 A 8 Site Driveway at N 2nd E TWSC1 LOS D - - - 0.432 27.9 D Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 30 6.2.3 2030 Year of Opening Intersection Operations Analysis Table 10 summarizes traffic operations analysis results for 2030 AM peak hour traffic conditions with and without the proposed WinCo Foods project. As indicated in the table, all intersections are expected to operate within their applicable LOS D standard without and with project traffic. Project site driveways are all expected to operate at LOS C or better. Table 10. 2030 Project Opening AM Peak Hour Intersection Operations 1. Two-way Stop Control 2. Worst movement Table 11 presents a summary of traffic operations analysis results for 2030 PM peak hour traffic conditions with and without the proposed project. As indicated in the table, all intersections are expected to operate within their applicable LOS D standard with or without project traffic. Project site driveways are all expected to operate at LOS D or better. Traffic Control Mobility Standard Without Project With Project No Intersection V/C Delay LOS V/C Delay LOS 1 N Salem Highway at US 20 SB Ramps Signal LOS D 0.912 25.7 C 0.942 34.4 C 2 N Salem Highway at US 20 NB Ramps Signal LOS D 0.892 18.2 B 0.942 26.0 C 3 N 2nd E at E Moody Road Signal LOS D 0.692 12.4 B 0.702 13.0 B 4 Idaho 33 at E Moody Road TWSC1 LOS D 0.312 17.8 C 0.142 18.5 C 5 West Site Driveway at E Moody Road TWSC1 LOS D - - - 0.142 12.9 B 6 Center Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 8.8 A 7 East Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 8.8 A 8 Site Driveway at N 2nd E TWSC1 LOS D - - - 0.032 18.9 C Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 31 Table 11. 2030 Project Opening PM Peak Hour Intersection Operations 1. Two-way Stop Control 2. Worst movement 6.3 N 2nd E Right Turn Warrant Analysis A right-turn lane warrant analysis was conducted for the site driveway on N 2nd E. Since the PM peak hour has higher volumes for N 2nd E and the proposed WinCo Foods, the PM peak hour was used to evaluate the right turn lane warrants. Exhibit 3B-1 from the Traffic Manual: Idaho Supplementary Guidance to the MUTCD was used for the warrant analysis and is provided in Figure 16. Traffic Control Mobility Standard Without Project With Project No Intersection V/C Delay LOS V/C Delay LOS 1 N Salem Highway at US 20 SB Ramps Signal LOS D 0.852 17.2 B 0.942 33.1 C 2 N Salem Highway at US 20 NB Ramps Signal LOS D 0.862 11.9 B 0.952 21.6 C 3 N 2nd E at E Moody Road Signal LOS D 0.94 23.9 C 0.962 39.9 D 4 Idaho 33 at E Moody Road TWSC1 LOS D 0.352 23.7 C 0.442 30.2 D 5 West Site Driveway at E Moody Road TWSC1 LOS D - - - 0.462 26.4 D 6 Center Site Driveway at E Moody Road TWSC1 LOS D - - - 0.022 10.0 B 7 East Site Driveway at E Moody Road TWSC1 LOS D - - - 0.012 9.8 A 8 Site Driveway at N 2nd E TWSC1 LOS D - - - 0.502 34.4 D Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 32 Figure 16. N 2nd E Driveway Right Turn Lane Warrant Analysis – PM Peak Hour As shown in Figure 16, the driveway is projected to meet the warrant for a right turn lane. No left turn warrant analysis was conducted due to presence of continuous two way left turn lane along N 2nd E. 6.4 Moody Road Right Turn Warrant Analysis A right-turn lane warrant analysis was conducted for the site driveways on Moody Road. Since the PM peak hour has higher volumes for Moody Road and the proposed WinCo Foods, the PM peak hour was used to evaluate the right turn lane warrants. Exhibit 3B-1 from the Traffic Manual: Idaho Supplementary Guidance to the MUTCD was used for the warrant analysis and is provided in Figure 17. Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 33 Figure 17.Moody Road Site Driveways Right Turn Lane Warrant Analysis – PM Peak Hour As shown in Figure 17, the west driveway is projected to meet the warrant for a right turn lane, while the middle and east driveways do not. No left turn warrant analysis was conducted due to presence of continuous two way left turn lane along Moody Road. Rexburg WinCo Foods Traffic Impact Study SCJ Alliance Dece mber 2024 | Page 34 7 Summary and Conclusions WinCo Foods is proposing to construct an approximate 84,000 square foot WinCo Foods store to be located on vacant land in Rexburg, Idaho new approximately 84,000-sf building and a 7,000-sf cross dock facility located on vacant land, adjacent to an existing commercial development along E Moody Road. Access to the project will be provided by four driveways; one in-construction full access driveway is provided along E Moody Road across from the Walmart Driveway, two right-in-right-out (RIRO) driveways are proposed along E Moody Road and one full access driveway is proposed along N 2nd. Operational analysis has been prepared for AM and PM peak hour forecasted traffic volumes in the 2025 project opening year and in the 2030 horizon year. This analysis indicates that: • A total of 215 new-to-network AM peak hour trips would be generated by the project, and 474 new-to-network trips during the PM peak hour. • All intersections are expected to operate within their LOS standards in the 2025 and 2030 AM and PM peak hours with or without the project. • The site driveway along N 2nd E and the west site driveway along Moody Rd both meet right- turn-lane warrants. Appendix A Traffic Counts Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N Salem Highway & US-20 SB Ramps Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval N Salem Hwy N Salem Hwy US-20 SB Off Ramp US-20 SB On Ramp Total Ending at T L S R T L S R T L S R T L S R 7:15 A 0 0 50 16 3 45 42 0 0 12 0 1 0 0 0 0 166 7:30 A 5 0 69 22 2 41 42 0 0 40 1 4 0 0 0 0 219 7:45 A 1 0 85 21 2 33 43 0 3 52 1 7 0 0 0 0 242 8:00 A 4 0 147 25 6 44 59 0 0 74 0 11 0 0 0 0 360 8:15 A 0 0 132 31 8 52 71 0 2 48 0 10 0 0 0 0 344 8:30 A 4 0 125 30 2 49 74 0 1 51 0 6 0 0 0 0 335 8:45 A 1 0 104 15 8 37 60 0 6 47 0 9 0 0 0 0 272 9:00 A 3 0 90 9 1 32 49 0 2 53 0 4 0 0 0 0 237 9:15 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 18 0 802 169 32 333 440 0 14 377 2 52 0 0 0 0 2175 Peak Hour: 7:45 AM to 8:45 AM Total 9 0 508 101 24 182 264 0 9 220 0 36 0 0 0 0 1311 Approach 609 446 256 0 1311 %HV 1.5%5.4%3.5%n/a 3.2% PHF 0.89 0.91 0.75 n/a 0.91 N Salem Hwy 909 609 300 0 Bike US-20 SB On Ramp 101 508 0 0 Ped US-20 SB Off Ramp 36 283 Ped 0 0 256 Bike 0 220 256 283 0 0 Bike 0 0 7:45 AM to 8:45 AM 0 Ped 0 0 PEDs Across:N S E W Ped 0 182 264 0 1440 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB n/a n/a INT 03 0 728 446 Check WB 0.75 3.5% INT 04 0 In:1311 NB 0.91 5.4% INT 05 0 1174 Out:1311 SB 0.89 1.5% INT 06 0 N Salem Hwy T Int.0.91 3.2% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_01A Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N Salem Highway & US-20 NB Ramps Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval N Salem Hwy N Salem Hwy US-20 NB On Ramp US-20 NB Off Ramp Total Ending at T L S R T L S R T L S R T L S R 7:15 A 0 6 56 0 8 0 76 38 0 0 0 0 0 11 1 32 220 7:30 A 3 10 99 0 4 0 72 24 0 0 0 0 1 11 0 43 259 7:45 A 0 10 127 0 4 0 57 48 0 0 0 0 1 19 0 59 320 8:00 A 2 14 207 0 5 0 85 49 0 0 0 0 7 18 0 112 485 8:15 A 2 7 173 0 8 0 100 40 0 0 0 0 4 23 2 69 414 8:30 A 7 9 167 0 1 0 101 17 0 0 0 0 4 22 0 67 383 8:45 A 4 4 147 0 6 0 78 36 0 0 0 0 4 19 0 66 350 9:00 A 3 5 138 0 3 0 68 31 0 0 0 0 6 13 0 71 326 9:15 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 21 65 1114 0 39 0 637 283 0 0 0 0 27 136 3 519 2757 Peak Hour: 7:45 AM to 8:45 AM Total 15 34 694 0 20 0 364 142 0 0 0 0 19 82 2 314 1632 Approach 728 506 0 398 1632 %HV 2.1%4.0%n/a 4.8%3.3% PHF 0.82 0.90 n/a 0.77 0.84 N Salem Hwy 1174 728 446 0 Bike US-20 NB Off Ramp 0 694 34 0 Ped US-20 NB On Ramp 0 0 Ped 0 0 0 Bike 0 0 178 398 82 0 Bike 398 2 7:45 AM to 8:45 AM 0 Ped 178 314 PEDs Across:N S E W Ped 0 0 364 142 1940 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.77 4.8% INT 03 0 1008 506 Check WB n/a n/a INT 04 0 In:1632 NB 0.90 4.0% INT 05 0 1514 Out:1632 SB 0.82 2.1% INT 06 0 N Salem Hwy T Int.0.84 3.3% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_02A Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N 2nd St & E Moody Rd Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval 2nd St E 2nd St E E Moody Rd E Moody Rd Total Ending at T L S R T L S R T L S R T L S R 7:15 A 1 8 67 0 4 0 92 9 1 17 0 24 0 1 0 0 218 7:30 A 3 6 125 3 3 2 67 14 1 8 0 20 0 1 0 0 246 7:45 A 1 10 154 0 3 0 81 19 0 17 1 20 0 1 0 0 303 8:00 A 6 27 226 0 5 2 101 17 1 27 0 21 0 2 1 1 425 8:15 A 2 10 230 2 5 2 96 27 2 25 1 31 0 0 0 1 425 8:30 A 6 21 177 1 2 1 94 31 1 25 2 20 0 2 1 0 375 8:45 A 5 15 176 3 7 1 95 44 1 32 2 17 0 1 0 1 387 9:00 A 8 10 190 3 2 0 66 32 1 23 2 9 0 3 1 0 339 9:15 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 32 107 1345 12 31 8 692 193 8 174 8 162 0 11 3 3 2718 Peak Hour: 7:45 AM to 8:45 AM Total 19 73 809 6 19 6 386 119 5 109 5 89 0 5 2 3 1612 Approach 888 511 203 10 1612 %HV 2.1%3.7%2.5%n/a 2.7% PHF 0.88 0.91 0.89 0.63 0.95 2nd St E 1368 888 480 0 Bike E Moody Rd 6 809 73 0 Ped E Moody Rd 89 17 Ped 0 5 203 Bike 0 109 397 27 5 0 Bike 10 2 7:45 AM to 8:45 AM 0 Ped 194 3 PEDs Across:N S E W Ped 0 6 386 119 1700 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.63 n/a INT 03 0 921 511 Check WB 0.89 2.5% INT 04 0 In:1612 NB 0.91 3.7% INT 05 0 1432 Out:1612 SB 0.88 2.1% INT 06 0 2nd St E T Int.0.95 2.7% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_03A Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Idaho 33 & E Moody Rd Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval Idaho 33 Idaho 33 E Moody Rd E Moody Rd Total Ending at T L S R T L S R T L S R T L S R 7:15 A 1 0 13 5 0 6 18 3 0 2 8 1 0 4 5 0 65 7:30 A 0 0 25 3 0 7 36 4 0 7 9 0 0 4 2 2 99 7:45 A 0 0 37 12 2 11 29 6 1 8 6 1 0 3 1 1 115 8:00 A 1 0 57 12 0 15 30 6 0 16 10 2 0 7 12 6 173 8:15 A 1 0 58 13 1 12 26 6 0 6 15 2 0 6 2 4 150 8:30 A 0 0 46 11 1 4 20 6 0 6 17 0 0 7 8 4 129 8:45 A 3 1 41 6 0 8 15 4 1 6 7 0 1 4 6 7 105 9:00 A 0 0 30 8 4 5 20 7 0 8 4 0 1 4 5 5 96 9:15 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:30 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9:45 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 6 1 307 70 8 68 194 42 2 59 76 6 2 39 41 29 932 Peak Hour: 7:30 AM to 8:30 AM Total 2 0 198 48 4 42 105 24 1 36 48 5 0 23 23 15 567 Approach 246 171 89 61 567 %HV 0.8%2.3%1.1%n/a 1.2% PHF 0.87 0.84 0.79 0.61 0.82 Idaho 33 379 246 133 0 Bike E Moody Rd 48 198 0 0 Ped E Moody Rd 5 138 Ped 0 48 89 Bike 0 36 136 199 23 0 Bike 61 23 7:30 AM to 8:30 AM 0 Ped 47 15 PEDs Across:N S E W Ped 0 42 105 24 692 1.0 PHF Peak Hour Volume INT 01 0 Bike 1 PHF %HV INT 02 0 EB 0.61 n/a INT 03 0 249 171 Check WB 0.79 1.1% INT 04 0 In:567 NB 0.84 2.3% INT 05 0 420 Out:567 SB 0.87 0.8% INT 06 0 Idaho 33 T Int.0.82 1.2% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 0 0 0 0 INT 09 0 INT 02 0 0 0 0 0 INT 10 0 INT 03 0 1 0 0 1 INT 11 0 INT 04 0 0 0 0 0 INT 12 0 INT 05 0 0 0 0 0 0 0 0 0 0 INT 06 0 0 0 0 0 Special Notes INT 07 0 0 0 0 0 INT 08 0 0 0 0 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 1 0 0 1 SCJ24086M_04A Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N Salem Highway & US-20 SB Ramps Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval N Salem Hwy N Salem Hwy US-20 SB Off Ramp US-20 SB On Ramp Total Ending at T L S R T L S R T L S R T L S R 4:15 P 1 0 62 11 7 86 76 0 5 49 1 7 0 0 0 0 292 4:30 P 4 0 78 16 2 78 91 0 2 56 0 8 0 0 0 0 327 4:45 P 5 0 74 15 10 78 107 0 1 46 1 2 0 0 0 0 323 5:00 P 2 0 82 23 2 84 99 0 4 36 0 10 0 0 0 0 334 5:15 P 4 0 80 18 1 89 113 0 0 44 1 4 0 0 0 0 349 5:30 P 1 0 83 19 3 91 106 0 0 58 0 7 0 0 0 0 364 5:45 P 0 0 78 17 3 78 110 0 3 41 0 7 0 0 0 0 331 6:00 P 3 0 104 13 1 88 113 0 1 60 0 8 0 0 0 0 386 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 20 0 641 132 29 672 815 0 16 390 3 53 0 0 0 0 2706 Peak Hour: 5:00 PM to 6:00 PM Total 8 0 345 67 8 346 442 0 4 203 1 26 0 0 0 0 1430 Approach 412 788 230 0 1430 %HV 1.9%1.0%1.7%n/a 1.4% PHF 0.88 0.98 0.85 n/a 0.93 N Salem Hwy 880 412 468 0 Bike US-20 SB On Ramp 67 345 0 0 Ped US-20 SB Off Ramp 26 414 Ped 0 1 230 Bike 0 203 230 414 0 0 Bike 0 0 5:00 PM to 6:00 PM 0 Ped 0 0 PEDs Across:N S E W Ped 0 346 442 0 1544 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB n/a n/a INT 03 0 548 788 Check WB 0.85 1.7% INT 04 0 In:1430 NB 0.98 1.0% INT 05 0 1336 Out:1430 SB 0.88 1.9% INT 06 0 N Salem Hwy T Int.0.93 1.4% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_01P Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N Salem Highway & US-20 NB Ramps Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval N Salem Hwy N Salem Hwy US-20 NB On Ramp US-20 NB Off Ramp Total Ending at T L S R T L S R T L S R T L S R 4:15 P 2 8 103 0 5 0 146 59 0 0 0 0 6 16 0 64 396 4:30 P 5 13 121 0 1 0 153 60 0 0 0 0 2 16 0 61 424 4:45 P 4 7 113 0 6 0 161 70 0 0 0 0 2 24 0 54 429 5:00 P 4 8 110 0 2 0 154 85 0 0 0 0 0 29 0 73 459 5:15 P 3 9 115 0 3 0 173 84 0 0 0 0 1 29 0 45 455 5:30 P 0 13 128 0 1 0 175 72 0 0 0 0 3 22 0 61 471 5:45 P 2 6 113 0 2 0 165 70 0 0 0 0 1 23 0 67 444 6:00 P 3 7 157 0 0 0 176 82 0 0 0 0 1 25 0 95 542 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 23 71 960 0 20 0 1303 582 0 0 0 0 16 184 0 520 3620 Peak Hour: 5:00 PM to 6:00 PM Total 8 35 513 0 6 0 689 308 0 0 0 0 6 99 0 268 1912 Approach 548 997 0 367 1912 %HV 1.5%0.6%n/a 1.6%1.0% PHF 0.84 0.97 n/a 0.76 0.88 N Salem Hwy 1336 548 788 0 Bike US-20 NB Off Ramp 0 513 35 0 Ped US-20 NB On Ramp 0 0 Ped 0 0 0 Bike 0 0 343 367 99 0 Bike 367 0 5:00 PM to 6:00 PM 0 Ped 343 268 PEDs Across:N S E W Ped 0 0 689 308 2168 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.76 1.6% INT 03 0 781 997 Check WB n/a n/a INT 04 0 In:1912 NB 0.97 0.6% INT 05 0 1778 Out:1912 SB 0.84 1.5% INT 06 0 N Salem Hwy T Int.0.88 1.0% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_02P Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:N 2nd St & E Moody Rd Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval 2nd St E 2nd St E E Moody Rd E Moody Rd Total Ending at T L S R T L S R T L S R T L S R 4:15 P 6 17 126 1 4 0 161 99 2 77 2 17 1 6 4 0 510 4:30 P 4 11 133 3 2 8 139 104 3 80 4 18 0 3 1 2 506 4:45 P 6 18 123 3 4 6 187 100 2 74 0 23 0 3 2 0 539 5:00 P 3 25 123 16 3 2 179 118 0 71 1 23 0 3 3 0 564 5:15 P 3 16 136 2 4 2 186 98 0 82 1 20 0 4 1 2 550 5:30 P 1 20 133 6 2 0 191 74 0 72 3 33 0 2 1 0 535 5:45 P 0 14 135 4 3 2 169 108 0 65 2 28 0 5 0 1 533 6:00 P 4 21 176 5 1 3 183 104 1 75 4 21 1 5 2 1 600 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 27 142 1085 40 23 23 1395 805 8 596 17 183 2 31 14 6 4337 Peak Hour: 5:00 PM to 6:00 PM Total 8 71 580 17 10 7 729 384 1 294 10 102 1 16 4 4 2218 Approach 668 1120 406 24 2218 %HV 1.2%0.9%0.2%4.2%0.9% PHF 0.83 0.97 0.94 0.75 0.92 2nd St E 1515 668 847 0 Bike E Moody Rd 17 580 71 0 Ped E Moody Rd 102 34 Ped 0 10 406 Bike 0 294 865 58 16 0 Bike 24 4 5:00 PM to 6:00 PM 0 Ped 459 4 PEDs Across:N S E W Ped 0 7 729 384 2400 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.75 4.2% INT 03 0 878 1120 Check WB 0.94 0.2% INT 04 0 In:2218 NB 0.97 0.9% INT 05 0 1998 Out:2218 SB 0.83 1.2% INT 06 0 2nd St E T Int.0.92 0.9% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_03P Prepared for: SCJ Alliance Traffic Count Consultants, Inc. Phone: (253) 770-1407 FAX: (253) 770-1411 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Idaho 33 & E Moody Rd Date of Count:Wed 10/23/2024 Location:Rexburg, Idaho Checked By:Jen Time From North on (SB)From South on (NB)From East on (WB)From West on (EB)Interval Interval Idaho 33 Idaho 33 E Moody Rd E Moody Rd Total Ending at T L S R T L S R T L S R T L S R 4:15 P 1 0 36 9 1 13 29 7 2 5 6 0 1 13 12 14 144 4:30 P 2 2 35 10 1 6 50 10 0 4 3 0 1 19 12 15 166 4:45 P 1 1 22 16 1 6 45 7 1 4 8 0 0 16 10 19 154 5:00 P 0 1 31 5 0 9 61 8 0 8 8 0 3 20 10 17 178 5:15 P 0 0 56 20 1 9 47 11 1 6 8 1 0 20 12 16 206 5:30 P 0 0 51 12 0 13 44 8 0 6 15 2 0 10 10 20 191 5:45 P 0 0 39 17 0 24 51 10 0 3 15 0 0 12 13 14 198 6:00 P 0 0 28 15 0 15 49 9 0 13 11 0 2 17 15 23 195 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 4 4 298 104 4 95 376 70 4 49 74 3 7 127 94 138 1432 Peak Hour: 5:00 PM to 6:00 PM Total 0 0 174 64 1 61 191 38 1 28 49 3 2 59 50 73 790 Approach 238 290 80 182 790 %HV n/a 0.3%1.3%1.1%0.5% PHF 0.78 0.85 0.83 0.83 0.96 Idaho 33 491 238 253 0 Bike E Moody Rd 64 174 0 0 Ped E Moody Rd 3 174 Ped 0 49 80 Bike 0 28 168 356 59 0 Bike 182 50 5:00 PM to 6:00 PM 0 Ped 88 73 PEDs Across:N S E W Ped 0 61 191 38 824 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.83 1.1% INT 03 0 275 290 Check WB 0.83 1.3% INT 04 0 In:790 NB 0.85 0.3% INT 05 0 565 Out:790 SB 0.78 n/a INT 06 0 Idaho 33 T Int.0.96 0.5% INT 07 0 Bicycles From: N S E W Conditions: INT 08 0 INT 01 0 INT 09 0 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 0 INT 12 0 INT 05 0 0 0 0 0 0 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 0 0 0 0 0 0 SCJ24086M_04P Appendix B Traffic Volume Adjustments and Forecasts WinCo Foods Development - Rexburg Trip Generation Rexburg, ID In Out In Out Total % Total % Total In Out Total WinCo Foods 850 Supermarket ksqft 84.000 2.86 59% 41% 142 98 240 10% 25 0.0% 0 127 88 215 Total 142 98 240 0 127 88 215 In Out In Out Total % Total % Total In Out Total WinCo Foods 850 Supermarket ksqft 84.000 7.99 50% 50% 336 335 671 7.0% 47 24.0% 150 237 237 474 Total 336 335 671 150 237 237 474 850 Fitted Curve Equation 7.99 In Out In Out Total % Total % Total In Out Total WinCo Foods 850 Supermarket ksqft 84.000 89.81 50% 50% 3,772 3,772 7,544 7.0% 528 24.0% 1,684 2,666 2,666 5,332 Total 3,772 3,772 7,544 1,684 2,666 2,666 5,332 850 Fitted Curve Equation 89.81 Site Plan Description Int. Capture Int. Capture Daily Trip Generation PM Peak Hour Trip Generation Site Plan Description LUC ITE Description Variable Value ITE Rate Distribution Total Trips Pass-By Trips Net New Trips ITE Rate AM Peak Hour Trip Generation Site Plan Description LUC ITE Description Variable Value ITE Rate Distribution Total Trips Pass-By Trips Net New TripsInt. Capture LUC ITE Description Variable Value Net New TripsPass-By TripsDistribution Total Trips AM Peak Hour Volumes 3.00% Existing Adjustments Existing Background Strip Temple Total Baseline Background Baseline Primary Pass-By Site Projected Projected Intersection 2024 (Walmart)2024 2025 Retail Pipeline Pipeline 2025 2030 2030 Car Car Generated 2025 2030 Counts Counts Growth Pipeline Volumes Volumes Growth Volumes Trips Trips Volumes Volumes Volumes L 000 00000 0 0 00000 EB T 000 00000 0 0 00000 R 000 00000 0 0 00000 1L220 0 220 7 4 62 66 293 40 326 32 0 32 325 358 N Salem Hwy WB T 000 00000 0 0 00000 US 20 SB Ramps R36 0 36 100037 6 42 0003742 L 182 0 182 53710197 33 225 26 0 26 223 251 TMC Date: 10/23/2024 NB T 264 0 264 8178280 48 320 909 289 329 R 000 00000 0 0 00000 7:45 - 8:45 L 000 00000 0 0 00000 PHF: 0.91 SB T 508 0 508 15 2 21 23 546 91 622 13 0 13 559 635 R 101 0 101 3000104 18 119 000 104 119 1,311 1,311 80 1,537 1,734 L 82 0 82 200084 15 97 0008497 EB T 202 00002 0 2 00022 R 314 0 314 9 5 21 26 349 57 397 38 0 38 387 435 2L000 00000 0 0 00000 N Salem Hwy WB T 000 00000 0 0 00000 US 20 NB Ramps R000 00000 0 0 00000 L 000 00000 0 0 00000 TMC Date: 10/23/2024 NB T 364 0 364 11 4 14 18 393 66 448 35 0 35 428 483 R 142 0 142 4 3 21 24 170 26 192 22 0 22 192 214 7:45 - 8:45 L 34 0 34 100035 6 40 0003540 PHF: 0.84 SB T 694 0 694 21 6 83 89 804 125 908 45 0 45 849 953 R 000 00000 0 0 00000 1,632 1,632 140 1,978 2,223 L 505 007712 1 13 0001213 EB T 202 00668 0 8 00088 R 303 0 0 17 17 20 1 21 0002021 3L1090 109 3202114 20 131 13 0 13 127 144 N 2nd E WB T 505 0 0 16 16 21 1 22 0002122 E Moody Road R89 0 89 37411103 16 116 41 0 41 144 157 L 606 0 0 49 49 55 1 56 0005556 TMC Date: 10/23/2024 NB T 386 0 386 12 0 33 33 431 69 488 16 0 16 447 504 R 119 0 119 4303126 21 143 000 126 143 7:45 - 8:45 L 73 0 73 229231106 13 117 67 0 67 173 184 PHF: 0.95 SB T 809 0 809 24 0 11 11 844 146 966 16 0 16 860 982 R 606 0 0 21 21 27 1 28 0002728 1,612 1,612 153 2,020 2,262 L 23 0 23 114529 4 32 9093841 EB T 23 0 23 114529 4 32 4043336 R 15 0 15 000015 3 18 0001518 4L360 36 100037 6 42 0003742 Idaho 33 WB T 48 0 48 1 1 10 11 60 9 68 6066674 E Moody Road R505 00005 1 6 00056 L 42 0 42 100043 8 50 0004350 TMC Date: 10/23/2024 NB T 105 0 105 3000108 19 124 000 108 124 R 24 0 24 100025 4 28 0002528 7:30 - 8:30 L 000 00000 0 0 00000 PHF: 0.82 SB T 198 0 198 6000204 36 234 000 204 234 R 58 0 48 2 2 10 12 62 10 70 13 0 13 75 83 577 567 32 649 736 WinCo Foods - Rexburg, ID Annual Growth Rate: Movement Existing Adjustments Existing Background Strip Temple Total Baseline Background Baseline Primary Pass-By Site Projected Projected Intersection 2024 (Walmart)2024 2025 Retail Pipeline Pipeline 2025 2030 2030 Car Car Generated 2025 2030 Counts Counts Growth Pipeline Volumes Volumes Growth Volumes Trips Trips Volumes Volumes Volumes Movement L 02020 000020 0 20 0002020 EB T 61 -12 49 208859 11 68 24 0 24 83 92 R 000 01401414 0 14 43 0 43 57 57 5L000 03033 0 3 19 0 19 22 22 Site Drwy WB T 148 -15 133 4 0 17 17 154 27 177 000 154 177 E Moody Road R01515 000015 0 15 0001515 L 000 09099 0 9 54 0 54 63 63 NB T 000 00000 0 0 00000 R 000 02022 0 2 60688 L 01212 000012 0 12 0001212 SB T 000 00000 0 0 00000 R 01616 000016 0 16 0001616 209 245 146 450 482 L 000 00000 0 0 00000 EB T 61 0 61 2281073 11 82 8088190 R 000 00000 0 0 22 0 22 22 22 6L000 00000 0 0 00000 Site Drwy WB T 148 0 148 4 3 17 20 172 27 195 19 0 19 191 214 E Moody Road R000 00000 0 0 00000 L 000 00000 0 0 00000 NB T 000 00000 0 0 00000 R 000 00000 0 0 60666 L 000 00000 0 0 00000 SB T 000 00000 0 0 00000 R 000 00000 0 0 00000 209 209 55 300 332 L 000 00000 0 0 00000 EB T 61 0 61 2281073 11 82 12 0 12 85 94 R 000 00000 0 0 20222 7L000 00000 0 0 00000 Site Drwy WB T 148 0 148 4 3 17 20 172 27 195 19 0 19 191 214 E Moody Road R000 00000 0 0 00000 L 000 00000 0 0 00000 NB T 000 00000 0 0 00000 R 000 00000 0 0 10111 L 000 00000 0 0 00000 SB T 000 00000 0 0 00000 R 000 00000 0 0 00000 209 209 34 279 311 L 000 00000 0 0 00000 EB T 000 00000 0 0 00000 R 000 00000 0 0 00000 8L000 00000 0 0 50555 Site Drwy WB T 000 00000 0 0 00000 N 2nd E R000 00000 0 0 16 0 16 16 16 L 000 00000 0 0 00000 NB T 511 0 511 15 2 82 84 610 92 687 000 610 687 R 000 00000 0 0 25 0 25 25 25 L 000 00000 0 0 16 0 16 16 16 SB T 901 0 901 27 2 28 30 958 162 1,093 13 0 13 971 1,106 R 000 00000 0 0 00000 1,412 1,412 75 1,643 1,855 PM Peak Hour Volumes 3.00% Existing Adjustments Existing Background Strip Temple Total Baseline Background Baseline Primary Pass-By Site Projected Projected Intersection 2024 (Walmart)2024 2025 Retail Pipeline Pipeline 2025 2030 2030 Car Car Generated 2025 2030 Counts Counts Growth Pipeline Volumes Volumes Growth Volumes Trips Trips Volumes Volumes Volumes L 000 00000 0 0 00000 EB T 000 00000 0 0 00000 R 000 00000 0 0 00000 1L2030 203 6 114051260 37 291 59 0 59 319 350 N Salem Hwy WB T 101 00001 0 1 00011 US 20 SB Ramps R26 0 26 100027 5 31 0002731 L 346 0 346 10 13 13 26 382 62 434 71 0 71 453 505 TMC Date: 10/23/2024 NB T 442 0 442 13 5 13 18 473 80 540 24 0 24 497 564 R 000 00000 0 0 00000 5:00 - 6:00 L 000 00000 0 0 00000 PHF: 0.93 SB T 345 0 345 10 5 13 18 373 62 425 24 0 24 397 449 R 67 0 67 200069 12 79 0006979 1,430 1,430 178 1,764 1,978 L 99 0 99 3000102 18 117 000 102 117 EB T 000 00000 0 0 00000 R 268 0 268 8 131326302 48 342 71 0 71 373 413 2L000 00000 0 0 00000 N Salem Hwy WB T 000 00000 0 0 00000 US 20 NB Ramps R000 00000 0 0 00000 L 000 00000 0 0 00000 TMC Date: 10/23/2024 NB T 689 0 689 21 18 26 44 754 124 857 95 0 95 849 952 R 308 0 308 9 112839356 55 402 59 0 59 415 461 5:00 - 6:00 L 35 0 35 100036 6 41 0003641 PHF: 0.88 SB T 513 0 513 15 16 53 69 597 92 674 83 0 83 680 757 R 000 00000 0 0 00000 1,912 1,912 308 2,455 2,742 L 16 0 16 0 0 13 13 29 3 32 0002932 EB T 404 0 0 10 10 14 1 15 0001415 R 404 0 0 31 31 35 1 36 0003536 3L2940 294 9909312 53 356 47 13 60 372 416 N 2nd E WB T 10 0 10 0 0 11 11 21 2 23 0002123 E Moody Road R102 0 102 329332137 18 152 34 0 34 171 186 L 707 0 0 32 32 39 1 40 0003940 TMC Date: 10/23/2024 NB T 729 0 729 22 0 21 21 772 131 881 120 0 120 892 1,001 R 384 0 384 12909405 69 462 000 405 462 5:00 - 6:00 L 71 0 71 229231104 13 115 124 0 124 228 239 PHF: 0.92 SB T 580 0 580 17 0 20 20 617 104 704 30 0 30 647 734 R 17 0 17 1 0 13 13 31 3 33 0003133 2,218 2,218 368 2,885 3,217 L 59 0 59 2561172 11 81 24 0 24 96 105 EB T 50 0 50 226860 9 67 12 0 12 72 79 R 70 0 70 200072 13 83 0007283 4L280 28 100029 5 33 0002933 Idaho 33 WB T 49 0 49 127959 9 67 12 0 12 71 79 E Moody Road R303 00003 1 4 00034 L 61 0 61 200063 11 72 0006372 TMC Date: 10/23/2024 NB T 191 0 191 6000197 34 225 000 197 225 R 38 0 38 100039 7 45 0003945 5:00 - 6:00 L 000 00000 0 0 00000 PHF: 0.96 SB T 174 0 174 5000179 31 205 000 179 205 R 64 0 64 2571278 12 88 24 0 24 102 112 787 787 72 923 1,041 WinCo Foods - Rexburg, ID Movement Annual Growth Rate: Existing Adjustments Existing Background Strip Temple Total Baseline Background Baseline Primary Pass-By Site Projected Projected Intersection 2024 (Walmart)2024 2025 Retail Pipeline Pipeline 2025 2030 2030 Car Car Generated 2025 2030 Counts Counts Growth Pipeline Volumes Volumes Growth Volumes Trips Trips Volumes Volumes Volumes Movement L 02828 000028 0 28 0002828 EB T 179 -22 157 5 0 12 12 174 32 201 54 0 54 228 255 R 000 03803838 0 38 70 0 70 108 108 5L000 07077 0 7 36 0 36 43 43 Site Drwy WB T 174 -21 153 5 0 14 14 172 31 198 000 172 198 E Moody Road R02121 000021 0 21 0002121 L 000 03803838 0 38 81 13 94 132 132 NB T 000 00000 0 0 00000 R 000 07077 0 7 18 0 18 25 25 L 02222 000022 0 22 0002222 SB T 000 00000 0 0 00000 R 03030 000030 0 30 0003030 353 411 272 810 863 L 000 00000 0 0 00000 EB T 179 0 179 5 7 12 19 203 32 230 23 0 23 226 253 R 000 00000 0 0 49 0 49 49 49 6L000 00000 0 0 00000 Site Drwy WB T 174 0 174 5 7 14 21 200 31 226 36 0 36 236 262 E Moody Road R000 00000 0 0 00000 L 000 00000 0 0 00000 NB T 000 00000 0 0 00000 R 000 00000 0 0 17 0 17 17 17 L 000 00000 0 0 00000 SB T 000 00000 0 0 00000 R 000 00000 0 0 00000 353 353 125 529 582 L 000 00000 0 0 00000 EB T 179 0 179 5 7 12 19 203 32 230 35 0 35 238 265 R 000 00000 0 0 50555 7L000 00000 0 0 00000 Site Drwy WB T 174 0 174 5 7 14 21 200 31 226 36 0 36 236 262 E Moody Road R000 00000 0 0 00000 L 000 00000 0 0 00000 NB T 000 00000 0 0 00000 R 000 00000 0 0 10111 L 000 00000 0 0 00000 SB T 000 00000 0 0 00000 R 000 00000 0 0 00000 353 353 77 481 534 L 000 00000 0 0 00000 EB T 000 00000 0 0 00000 R 000 00000 0 0 00000 8L000 00000 0 0 02525 25 25 Site Drwy WB T 000 00000 0 0 00000 N 2nd E R000 00000 0 0 120 37 157 157 157 L 000 00000 0 0 00000 NB T 1,120 0 1,120 34 9 53 62 1,216 202 1,384 0-37-37 1,179 1,347 R 000 00000 0 0 47 37 84 84 84 L 000 00000 0 0 30 38 68 68 68 SB T 686 0 686 21 9 51 60 767 123 869 47 -25 22 789 891 R 000 00000 0 0 00000 1,806 1,806 319 2,301 2,572 Appendix C Operations Analysis Worksheets Lanes, Volumes, Timings Existing 2024 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 220 1 35 180 265 0 0 510 100 Future Volume (vph)0 0 0 220 1 35 180 265 0 0 510 100 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)23.0 23.0 23.0 14.0 57.0 43.0 Total Split (%)28.8% 28.8% 28.8% 17.5% 71.3%53.8% Maximum Green (s)18.5 18.5 18.5 9.5 52.5 38.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 66.2 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Existing 2024 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 220 1 35 180 265 0 0 510 100 Future Volume (veh/h) 0 0 0 220 1 35 180 265 0 0 510 100 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1826 1826 0 0 1870 1870 Adj Flow Rate, veh/h 242 1 38 198 291 0 0 560 110 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, %333550022 Cap, veh/h 328 1 293 404 1160 0 0 689 135 Arrive On Green 0.19 0.19 0.19 0.09 0.64 0.00 0.00 0.45 0.45 Sat Flow, veh/h 1760 7 1572 1739 1826 0 0 1518 298 Grp Volume(v), veh/h 243038198291000670 Grp Sat Flow(s),veh/h/ln 1768 0 1572 1739 18260001817 Q Serve(g_s), s 6.6 0.0 1.0 2.7 3.5 0.0 0.0 0.0 16.1 Cycle Q Clear(g_c), s 6.6 0.0 1.0 2.7 3.5 0.0 0.0 0.0 16.1 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 330 0 293 404 1160000824 V/C Ratio(X)0.74 0.00 0.13 0.49 0.25 0.00 0.00 0.00 0.81 Avail Cap(c_a), veh/h 647057657018970001384 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 19.4 0.0 17.1 9.3 4.0 0.0 0.0 0.0 12.0 Incr Delay (d2), s/veh 3.2 0.0 0.2 0.9 0.1 0.0 0.0 0.0 2.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.0 0.3 0.7 0.8 0.0 0.0 0.0 5.6 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.6 0.0 17.3 10.2 4.1 0.0 0.0 0.0 14.0 LnGrp LOS C B B A B Approach Vol, veh/h 281 489 670 Approach Delay, s/veh 21.9 6.6 14.0 Approach LOS C A B Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 36.6 9.2 27.4 13.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.5 9.5 38.5 18.5 Max Q Clear Time (g_c+I1), s 5.5 4.7 18.1 8.6 Green Ext Time (p_c), s 1.9 0.2 4.8 1.1 Intersection Summary HCM 7th Control Delay, s/veh 13.0 HCM 7th LOS B Lanes, Volumes, Timings Existing 2024 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 8013150000365140356950 Future Volume (vph) 8013150000365140356950 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)29.0 29.0 41.5 41.5 9.5 51.0 Total Split (%)36.3% 36.3%51.9% 51.9% 11.9% 63.8% Maximum Green (s) 24.5 24.5 37.0 37.0 5.0 46.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 55.8 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Existing 2024 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 8013150000365140356950 Future Volume (veh/h) 8013150000365140356950 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 0 1841 1841 1870 1870 0 Adj Flow Rate, veh/h 95 1 226 0 435 66 42 827 0 Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 Percent Heavy Veh, % 555 044220 Cap, veh/h 374 1 332 0 758 642 463 1060 0 Arrive On Green 0.22 0.22 0.22 0.00 0.41 0.41 0.05 0.57 0.00 Sat Flow, veh/h 1739 7 1542 0 1841 1560 1781 1870 0 Grp Volume(v), veh/h 95 0 227 0 435 66 42 827 0 Grp Sat Flow(s),veh/h/ln 1739 0 1548 0 1841 1560 1781 1870 0 Q Serve(g_s), s 1.9 0.0 5.6 0.0 7.5 1.1 0.5 14.2 0.0 Cycle Q Clear(g_c), s 1.9 0.0 5.6 0.0 7.5 1.1 0.5 14.2 0.0 Prop In Lane 1.00 1.00 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 374 0 333 0 758 642 463 1060 0 V/C Ratio(X)0.25 0.00 0.68 0.00 0.57 0.10 0.09 0.78 0.00 Avail Cap(c_a), veh/h 1031 0 918 0 1648 1397 596 2105 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 13.5 0.0 14.9 0.0 9.4 7.5 6.3 6.9 0.0 Incr Delay (d2), s/veh 0.4 0.0 2.4 0.0 0.7 0.1 0.1 1.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 1.9 0.0 2.4 0.3 0.1 3.5 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 13.8 0.0 17.4 0.0 10.1 7.5 6.4 8.2 0.0 LnGrp LOS B B BAAA Approach Vol, veh/h 322 501 869 Approach Delay, s/veh 16.3 9.7 8.1 Approach LOS B A A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.4 21.5 13.4 27.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 37.0 24.5 46.5 Max Q Clear Time (g_c+I1), s 2.5 9.5 7.6 16.2 Green Ext Time (p_c), s 0.0 3.1 1.6 7.2 Intersection Summary HCM 7th Control Delay, s/veh 10.2 HCM 7th LOS B Lanes, Volumes, Timings Existing 2024 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)5 5 5 110 5 90 5 385 120 75 810 5 Future Volume (vph)5 5 5 110 5 90 5 385 120 75 810 5 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)10.0 22.6 11.0 23.6 10.0 35.9 10.5 36.4 Total Split (%)12.5% 28.3% 13.8% 29.5% 12.5% 44.9% 13.1% 45.5% Maximum Green (s)5.5 18.1 6.5 19.1 5.5 31.4 6.0 31.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 40.6 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Existing 2024 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 5 5 5 110 5 90 5 385 120 75 810 5 Future Volume (veh/h) 5 5 5 110 5 90 5 385 120 75 810 5 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1856 1856 1856 1841 1841 1841 1870 1870 1870 Adj Flow Rate, veh/h 5 5 5 116 5 11 5 405 94 79 853 5 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 111333444222 Cap, veh/h 253 32 32 396 63 139 330 913 210 509 1416 8 Arrive On Green 0.01 0.04 0.04 0.09 0.12 0.12 0.01 0.32 0.32 0.07 0.39 0.39 Sat Flow, veh/h 1795 865 865 1767 516 1135 1753 2823 649 1781 3622 21 Grp Volume(v), veh/h 5 0 10 116 0 16 5 249 250 79 418 440 Grp Sat Flow(s),veh/h/ln 1795 0 1730 1767 0 1651 1753 1749 1724 1781 1777 1867 Q Serve(g_s), s 0.1 0.0 0.2 2.3 0.0 0.3 0.1 4.3 4.4 1.1 7.1 7.1 Cycle Q Clear(g_c), s 0.1 0.0 0.2 2.3 0.0 0.3 0.1 4.3 4.4 1.1 7.1 7.1 Prop In Lane 1.00 0.50 1.00 0.69 1.00 0.38 1.00 0.01 Lane Grp Cap(c), veh/h 253 0 63 396 0 203 330 565 557 509 695 730 V/C Ratio(X)0.02 0.00 0.16 0.29 0.00 0.08 0.02 0.44 0.45 0.16 0.60 0.60 Avail Cap(c_a), veh/h 500 0 822 534 0 828 571 1442 1422 657 1489 1564 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.5 0.0 17.8 14.7 0.0 14.8 8.8 10.2 10.2 7.5 9.2 9.2 Incr Delay (d2), s/veh 0.0 0.0 1.1 0.4 0.0 0.2 0.0 0.5 0.6 0.1 0.8 0.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.1 0.8 0.0 0.1 0.0 1.3 1.3 0.3 2.1 2.2 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 17.5 0.0 18.9 15.1 0.0 15.0 8.9 10.7 10.8 7.6 10.1 10.0 LnGrp LOS B BB BABBABB Approach Vol, veh/h 15 132 504 937 Approach Delay, s/veh 18.4 15.1 10.7 9.9 Approach LOS BBBA Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 7.3 16.8 8.0 5.9 4.8 19.4 4.8 9.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 6.0 31.4 6.5 18.1 5.5 31.9 5.5 19.1 Max Q Clear Time (g_c+I1), s 3.1 6.4 4.3 2.2 2.1 9.1 2.1 2.3 Green Ext Time (p_c), s 0.0 3.2 0.1 0.0 0.0 5.7 0.0 0.0 Intersection Summary HCM 7th Control Delay, s/veh 10.6 HCM 7th LOS B HCM 7th TWSC Existing 2024 4: Idaho 33 & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Intersection Int Delay, s/veh 4.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 25 25 15 35 50 5 40 105 25 1 200 50 Future Vol, veh/h 25 25 15 35 50 5 40 105 25 1 200 50 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 82 82 82 82 82 82 82 82 82 82 82 82 Heavy Vehicles, % 111111222111 Mvmt Flow 30 30 18 43 61 6 49 128 30 1 244 61 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 533 533 274 502 548 143 305 0 0 159 0 0 Stage 1 277 277 - 241 241 ------- Stage 2 256 256 - 262 307 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.12 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.218 - - 2.209 - - Pot Cap-1 Maneuver 459 454 767 481 445 907 1256 - - 1427 - - Stage 1 732 683 - 765 708 ------- Stage 2 751 697 - 746 663 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 376 434 767 419 426 907 1256 - - 1427 - - Mov Cap-2 Maneuver 376 434 - 419 426 ------- Stage 1 731 682 - 732 678 ------- Stage 2 650 668 - 695 662 ------- Approach EB WB NB SB HCM Control Delay, s/v13.54 16.02 1.88 0.03 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)408 - - 376 434 767 436 7 - - HCM Lane V/C Ratio 0.039 - - 0.081 0.07 0.024 0.252 0.001 - - HCM Control Delay (s/veh) 8 0 - 15.4 13.9 9.8 16 7.5 0 - HCM Lane LOS A A - C B A C A A - HCM 95th %tile Q(veh) 0.1 - - 0.3 0.2 0.1 1 0 - - Lanes, Volumes, Timings Existing 2024 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 205 1 25 345 440 0 0 345 65 Future Volume (vph)0 0 0 205 1 25 345 440 0 0 345 65 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)22.8 22.8 22.8 24.0 57.2 33.2 Total Split (%)28.5% 28.5% 28.5% 30.0% 71.5%41.5% Maximum Green (s)18.3 18.3 18.3 19.5 52.7 28.7 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 62.3 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Existing 2024 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 205 1 25 345 440 0 0 345 65 Future Volume (veh/h) 0 0 0 205 1 25 345 440 0 0 345 65 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1885 1885 Adj Flow Rate, veh/h 220 1 27 371 473 0 0 371 70 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, %222220011 Cap, veh/h 313 1 280 599 1145 0 0 498 94 Arrive On Green 0.18 0.18 0.18 0.18 0.61 0.00 0.00 0.32 0.32 Sat Flow, veh/h 1774 8 1585 1781 1870 0 0 1542 291 Grp Volume(v), veh/h 221027371473000441 Grp Sat Flow(s),veh/h/ln 1782 0 1585 1781 18700001833 Q Serve(g_s), s 5.0 0.0 0.6 5.0 5.6 0.0 0.0 0.0 9.2 Cycle Q Clear(g_c), s 5.0 0.0 0.6 5.0 5.6 0.0 0.0 0.0 9.2 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 315 0 280 599 1145000592 V/C Ratio(X)0.70 0.00 0.10 0.62 0.41 0.00 0.00 0.00 0.75 Avail Cap(c_a), veh/h 764 0 680 1085 23100001233 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 16.5 0.0 14.7 7.6 4.3 0.0 0.0 0.0 12.9 Incr Delay (d2), s/veh 2.9 0.0 0.1 1.0 0.2 0.0 0.0 0.0 1.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.0 0.0 0.2 1.3 1.2 0.0 0.0 0.0 3.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 19.4 0.0 14.9 8.7 4.5 0.0 0.0 0.0 14.8 LnGrp LOS B B A A B Approach Vol, veh/h 248 844 441 Approach Delay, s/veh 18.9 6.4 14.8 Approach LOS B A B Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 30.6 12.4 18.3 12.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.7 19.5 28.7 18.3 Max Q Clear Time (g_c+I1), s 7.6 7.0 11.2 7.0 Green Ext Time (p_c), s 3.4 0.9 2.6 1.0 Intersection Summary HCM 7th Control Delay, s/veh 10.8 HCM 7th LOS B Lanes, Volumes, Timings Existing 2024 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 10012700000690310355150 Future Volume (vph) 10012700000690310355150 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)24.4 24.4 46.1 46.1 9.5 55.6 Total Split (%)30.5% 30.5%57.6% 57.6% 11.9% 69.5% Maximum Green (s) 19.9 19.9 41.6 41.6 5.0 51.1 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 56.3 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Existing 2024 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10012700000690310355150 Future Volume (veh/h) 10012700000690310355150 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1885 1885 1870 1870 0 Adj Flow Rate, veh/h 114 1 23 0 784 170 40 585 0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Percent Heavy Veh, % 222 011220 Cap, veh/h 169 6 145 0 1019 864 375 1294 0 Arrive On Green 0.09 0.09 0.09 0.00 0.54 0.54 0.04 0.69 0.00 Sat Flow, veh/h 1781 66 1529 0 1885 1598 1781 1870 0 Grp Volume(v), veh/h 114 0 24 0 784 170 40 585 0 Grp Sat Flow(s),veh/h/ln 1781 0 1595 0 1885 1598 1781 1870 0 Q Serve(g_s), s 2.6 0.0 0.6 0.0 13.8 2.3 0.4 5.9 0.0 Cycle Q Clear(g_c), s 2.6 0.0 0.6 0.0 13.8 2.3 0.4 5.9 0.0 Prop In Lane 1.00 0.96 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 169 0 152 0 1019 864 375 1294 0 V/C Ratio(X)0.67 0.00 0.16 0.00 0.77 0.20 0.11 0.45 0.00 Avail Cap(c_a), veh/h 840 0 752 0 1859 1575 507 2265 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 18.5 0.0 17.5 0.0 7.6 5.0 6.1 2.9 0.0 Incr Delay (d2), s/veh 4.6 0.0 0.5 0.0 1.3 0.1 0.1 0.2 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 0.2 0.0 3.7 0.5 0.1 0.7 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 23.1 0.0 18.0 0.0 8.9 5.1 6.2 3.2 0.0 LnGrp LOS C B AAAA Approach Vol, veh/h 138 954 625 Approach Delay, s/veh 22.2 8.2 3.4 Approach LOS C A A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.4 27.3 8.5 33.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 41.6 19.9 51.1 Max Q Clear Time (g_c+I1), s 2.4 15.8 4.6 7.9 Green Ext Time (p_c), s 0.0 7.0 0.3 4.5 Intersection Summary HCM 7th Control Delay, s/veh 7.6 HCM 7th LOS A Lanes, Volumes, Timings Existing 2024 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)15 5 5 295 10 100 5 730 385 70 580 15 Future Volume (vph)15 5 5 295 10 100 5 730 385 70 580 15 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)9.5 22.5 12.0 25.0 9.5 35.9 9.6 36.0 Total Split (%)11.9% 28.1% 15.0% 31.3% 11.9% 44.9% 12.0% 45.0% Maximum Green (s)5.0 18.0 7.5 20.5 5.0 31.4 5.1 31.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 51.1 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Existing 2024 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 15 5 5 295 10 100 5 730 385 70 580 15 Future Volume (veh/h) 15 5 5 295 10 100 5 730 385 70 580 15 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1841 1841 1841 1885 1885 1885 1885 1885 1870 1885 1885 1885 Adj Flow Rate, veh/h 16 5 5 321 11 11 5 793 342 76 630 16 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 444111112111 Cap, veh/h 229 40 40 431 141 141 440 1051 452 319 1737 44 Arrive On Green 0.02 0.05 0.05 0.14 0.16 0.16 0.01 0.43 0.43 0.06 0.49 0.49 Sat Flow, veh/h 1753 844 844 1795 865 865 1795 2438 1049 1795 3569 91 Grp Volume(v), veh/h 16 0 10 321 0 22 5 582 553 76 316 330 Grp Sat Flow(s),veh/h/ln 1753 0 1689 1795 0 1730 1795 1791 1696 1795 1791 1869 Q Serve(g_s), s 0.5 0.0 0.3 7.5 0.0 0.6 0.1 15.2 15.3 1.2 6.1 6.1 Cycle Q Clear(g_c), s 0.5 0.0 0.3 7.5 0.0 0.6 0.1 15.2 15.3 1.2 6.1 6.1 Prop In Lane 1.00 0.50 1.00 0.50 1.00 0.62 1.00 0.05 Lane Grp Cap(c), veh/h 229 0 80 431 0 281 440 772 731 319 872 910 V/C Ratio(X)0.07 0.00 0.13 0.74 0.00 0.08 0.01 0.75 0.76 0.24 0.36 0.36 Avail Cap(c_a), veh/h 352 0 548 431 0 639 589 1013 960 373 1017 1061 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.4 0.0 25.3 21.2 0.0 19.7 8.9 13.3 13.3 9.8 8.9 8.9 Incr Delay (d2), s/veh 0.1 0.0 0.7 6.9 0.0 0.1 0.0 2.3 2.5 0.4 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.1 4.4 0.0 0.2 0.0 5.6 5.3 0.4 2.0 2.1 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 24.5 0.0 26.0 28.1 0.0 19.8 8.9 15.6 15.8 10.2 9.1 9.1 LnGrp LOS C CC BABBBAA Approach Vol, veh/h 26 343 1140 722 Approach Delay, s/veh 25.1 27.6 15.7 9.2 Approach LOS C C B A Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 8.0 28.4 12.0 7.1 4.9 31.5 5.6 13.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.1 31.4 7.5 18.0 5.0 31.5 5.0 20.5 Max Q Clear Time (g_c+I1), s 3.2 17.3 9.5 2.3 2.1 8.1 2.5 2.6 Green Ext Time (p_c), s 0.0 6.7 0.0 0.0 0.0 4.1 0.0 0.0 Intersection Summary HCM 7th Control Delay, s/veh 15.5 HCM 7th LOS B HCM 7th TWSC Existing 2024 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Intersection Int Delay, s/veh 5.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 60 50 70 30 50 5 60 190 40 1 175 65 Future Vol, veh/h 60 50 70 30 50 5 60 190 40 1 175 65 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 111111111111 Mvmt Flow 63 52 73 31 52 5 63 198 42 1 182 68 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 567 583 216 554 596 219 250 0 0 240 0 0 Stage 1 218 218 - 344 344 ------- Stage 2 349 365 - 210 252 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 436 425 826 444 418 823 1321 - - 1333 - - Stage 1 786 724 - 674 639 ------- Stage 2 669 625 - 794 700 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 358 402 826 335 395 823 1321 - - 1333 - - Mov Cap-2 Maneuver 358 402 - 335 395 ------- Stage 1 786 724 - 637 604 ------- Stage 2 574 591 - 671 700 ------- Approach EB WB NB SB HCM Control Delay, s/v13.78 17.21 1.63 0.03 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)360 - - 358 402 826 383 7 - - HCM Lane V/C Ratio 0.047 - - 0.175 0.13 0.088 0.231 0.001 - - HCM Control Delay (s/veh) 7.9 0 - 17.2 15.3 9.8 17.2 7.7 0 - HCM Lane LOS A A - C C A C A A - HCM 95th %tile Q(veh) 0.1 - - 0.6 0.4 0.3 0.9 0 - - Lanes, Volumes, Timings Projected 2025 without Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 295 1 35 195 280 0 0 545 105 Future Volume (vph)0 0 0 295 1 35 195 280 0 0 545 105 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)23.0 23.0 23.0 14.0 57.0 43.0 Total Split (%)28.8% 28.8% 28.8% 17.5% 71.3%53.8% Maximum Green (s)18.5 18.5 18.5 9.5 52.5 38.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 71.1 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2025 without Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 295 1 35 195 280 0 0 545 105 Future Volume (veh/h) 0 0 0 295 1 35 195 280 0 0 545 105 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1826 1826 0 0 1870 1870 Adj Flow Rate, veh/h 321 1 38 212 304 0 0 592 114 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333550022 Cap, veh/h 395 1 352 363 1141 0 0 696 134 Arrive On Green 0.22 0.22 0.22 0.09 0.62 0.00 0.00 0.46 0.46 Sat Flow, veh/h 1762 5 1572 1739 1826 0 0 1524 293 Grp Volume(v), veh/h 322038212304000706 Grp Sat Flow(s),veh/h/ln 1767 0 1572 1739 18260001818 Q Serve(g_s), s 10.3 0.0 1.1 3.4 4.5 0.0 0.0 0.0 20.5 Cycle Q Clear(g_c), s 10.3 0.0 1.1 3.4 4.5 0.0 0.0 0.0 20.5 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 396 0 352 363 1141000830 V/C Ratio(X)0.81 0.00 0.11 0.58 0.27 0.00 0.00 0.00 0.85 Avail Cap(c_a), veh/h 550048948016120001177 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 21.9 0.0 18.3 11.8 5.0 0.0 0.0 0.0 14.4 Incr Delay (d2), s/veh 6.5 0.0 0.1 1.5 0.1 0.0 0.0 0.0 4.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.6 0.0 0.4 1.2 1.2 0.0 0.0 0.0 8.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 28.4 0.0 18.5 13.3 5.1 0.0 0.0 0.0 18.7 LnGrp LOS C B B A B Approach Vol, veh/h 360 516 706 Approach Delay, s/veh 27.3 8.5 18.7 Approach LOS C A B Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 41.6 10.0 31.7 17.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.5 9.5 38.5 18.5 Max Q Clear Time (g_c+I1), s 6.5 5.4 22.5 12.3 Green Ext Time (p_c), s 2.0 0.2 4.6 1.1 Intersection Summary HCM 7th Control Delay, s/veh 17.3 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 without Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 8553500000395170358050 Future Volume (vph) 8553500000395170358050 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)29.0 29.0 41.5 41.5 9.5 51.0 Total Split (%)36.3% 36.3%51.9% 51.9% 11.9% 63.8% Maximum Green (s) 24.5 24.5 37.0 37.0 5.0 46.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 60 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2025 without Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 8553500000395170358050 Future Volume (veh/h) 8553500000395170358050 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 0 1841 1841 1870 1870 0 Adj Flow Rate, veh/h 92 5 271 0 429 131 38 875 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 555 044220 Cap, veh/h 418 7 366 0 809 685 451 1073 0 Arrive On Green 0.24 0.24 0.24 0.00 0.44 0.44 0.04 0.57 0.00 Sat Flow, veh/h 1739 28 1524 0 1841 1560 1781 1870 0 Grp Volume(v), veh/h 92 0 276 0 429 131 38 875 0 Grp Sat Flow(s),veh/h/ln 1739 0 1552 0 1841 1560 1781 1870 0 Q Serve(g_s), s 2.1 0.0 8.0 0.0 8.2 2.5 0.5 18.1 0.0 Cycle Q Clear(g_c), s 2.1 0.0 8.0 0.0 8.2 2.5 0.5 18.1 0.0 Prop In Lane 1.00 0.98 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 418 0 373 0 809 685 451 1073 0 V/C Ratio(X)0.22 0.00 0.74 0.00 0.53 0.19 0.08 0.82 0.00 Avail Cap(c_a), veh/h 880 0 786 0 1407 1193 561 1797 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 14.7 0.0 17.0 0.0 9.9 8.3 6.8 8.3 0.0 Incr Delay (d2), s/veh 0.3 0.0 2.9 0.0 0.5 0.1 0.1 1.6 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 2.8 0.0 2.7 0.7 0.1 5.2 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 15.0 0.0 19.9 0.0 10.5 8.4 6.9 9.8 0.0 LnGrp LOS B B BAAA Approach Vol, veh/h 368 560 913 Approach Delay, s/veh 18.7 10.0 9.7 Approach LOS B A A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.5 25.8 16.1 32.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 37.0 24.5 46.5 Max Q Clear Time (g_c+I1), s 2.5 10.2 10.0 20.1 Green Ext Time (p_c), s 0.0 3.3 1.8 7.6 Intersection Summary HCM 7th Control Delay, s/veh 11.6 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)10 10 20 115 20 105 55 430 125 105 845 25 Future Volume (vph)10 10 20 115 20 105 55 430 125 105 845 25 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)10.0 22.6 11.0 23.6 10.0 35.9 10.5 36.4 Total Split (%)12.5% 28.3% 13.8% 29.5% 12.5% 44.9% 13.1% 45.5% Maximum Green (s)5.5 18.1 6.5 19.1 5.5 31.4 6.0 31.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 49.1 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2025 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10 10 20 115 20 105 55 430 125 105 845 25 Future Volume (veh/h) 10 10 20 115 20 105 55 430 125 105 845 25 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1856 1856 1856 1841 1841 1841 1870 1870 1870 Adj Flow Rate, veh/h 11 11 21 121 21 58 58 453 132 111 889 26 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 111333444222 Cap, veh/h 296 50 95 400 68 189 360 954 276 489 1346 39 Arrive On Green 0.01 0.09 0.09 0.09 0.16 0.16 0.06 0.36 0.36 0.08 0.38 0.38 Sat Flow, veh/h 1795 580 1106 1767 436 1203 1753 2676 774 1781 3526 103 Grp Volume(v), veh/h 11 0 32 121 0 79 58 295 290 111 448 467 Grp Sat Flow(s),veh/h/ln 1795 0 1686 1767 0 1639 1753 1749 1701 1781 1777 1852 Q Serve(g_s), s 0.3 0.0 0.8 2.8 0.0 2.0 0.9 6.0 6.1 1.7 9.6 9.6 Cycle Q Clear(g_c), s 0.3 0.0 0.8 2.8 0.0 2.0 0.9 6.0 6.1 1.7 9.6 9.6 Prop In Lane 1.00 0.66 1.00 0.73 1.00 0.45 1.00 0.06 Lane Grp Cap(c), veh/h 296 0 144 400 0 257 360 623 606 489 678 707 V/C Ratio(X)0.04 0.00 0.22 0.30 0.00 0.31 0.16 0.47 0.48 0.23 0.66 0.66 Avail Cap(c_a), veh/h 484 0 662 498 0 679 469 1191 1158 574 1229 1281 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.8 0.0 19.7 16.4 0.0 17.2 9.1 11.5 11.5 8.2 11.8 11.8 Incr Delay (d2), s/veh 0.1 0.0 0.8 0.4 0.0 0.7 0.2 0.6 0.6 0.2 1.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 0.3 1.0 0.0 0.7 0.3 2.0 2.0 0.5 3.2 3.4 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 18.8 0.0 20.4 16.8 0.0 17.9 9.3 12.0 12.1 8.5 12.9 12.8 LnGrp LOS B CB BABBABB Approach Vol, veh/h 43 200 643 1026 Approach Delay, s/veh 20.0 17.2 11.8 12.4 Approach LOS C B B B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 8.3 20.9 8.4 8.5 7.1 22.1 5.2 11.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 6.0 31.4 6.5 18.1 5.5 31.9 5.5 19.1 Max Q Clear Time (g_c+I1), s 3.7 8.1 4.8 2.8 2.9 11.6 2.3 4.0 Green Ext Time (p_c), s 0.0 3.8 0.0 0.1 0.0 6.0 0.0 0.3 Intersection Summary HCM 7th Control Delay, s/veh 12.9 HCM 7th LOS B HCM 7th TWSC Projected 2025 without Project 4: Idaho 33 & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/14/2024 Intersection Int Delay, s/veh 4.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 30 15 35 60 5 45 110 25 1 205 60 Future Vol, veh/h 30 30 15 35 60 5 45 110 25 1 205 60 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 111111222111 Mvmt Flow 33 33 16 38 65 5 49 120 27 1 223 65 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 508 502 255 472 521 133 288 0 0 147 0 0 Stage 1 258 258 - 231 231 ------- Stage 2 250 245 - 241 290 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.12 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.218 - - 2.209 - - Pot Cap-1 Maneuver 477 473 786 504 461 919 1274 - - 1441 - - Stage 1 749 696 - 774 715 ------- Stage 2 756 706 - 764 674 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 389 453 786 439 441 919 1274 - - 1441 - - Mov Cap-2 Maneuver 389 453 - 439 441 ------- Stage 1 749 696 - 742 685 ------- Stage 2 652 676 - 713 673 ------- Approach EB WB NB SB HCM Control Delay, s/v 13.4 15.45 1.98 0.03 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)434 - - 389 453 786 452 6 - - HCM Lane V/C Ratio 0.038 - - 0.084 0.072 0.021 0.24 0.001 - - HCM Control Delay (s/veh) 7.9 0 - 15.1 13.6 9.7 15.5 7.5 0 - HCM Lane LOS A A - C B A C A A - HCM 95th %tile Q(veh) 0.1 - - 0.3 0.2 0.1 0.9 0 - - Lanes, Volumes, Timings Projected 2025 without Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 260 1 25 380 475 0 0 375 70 Future Volume (vph)0 0 0 260 1 25 380 475 0 0 375 70 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)22.8 22.8 22.8 24.0 57.2 33.2 Total Split (%)28.5% 28.5% 28.5% 30.0% 71.5%41.5% Maximum Green (s)18.3 18.3 18.3 19.5 52.7 28.7 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 67.4 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2025 without Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 260 1 25 380 475 0 0 375 70 Future Volume (veh/h) 0 0 0 260 1 25 380 475 0 0 375 70 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1885 1885 Adj Flow Rate, veh/h 280 1 27 409 511 0 0 403 75 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, %222220011 Cap, veh/h 370 1 330 570 1143 0 0 511 95 Arrive On Green 0.21 0.21 0.21 0.19 0.61 0.00 0.00 0.33 0.33 Sat Flow, veh/h 1775 6 1585 1781 1870 0 0 1546 288 Grp Volume(v), veh/h 281027409511000478 Grp Sat Flow(s),veh/h/ln 1782 0 1585 1781 18700001833 Q Serve(g_s), s 7.4 0.0 0.7 6.5 7.3 0.0 0.0 0.0 11.8 Cycle Q Clear(g_c), s 7.4 0.0 0.7 6.5 7.3 0.0 0.0 0.0 11.8 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 371 0 330 570 1143000606 V/C Ratio(X)0.76 0.00 0.08 0.72 0.45 0.00 0.00 0.00 0.79 Avail Cap(c_a), veh/h 654058292819770001055 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 18.6 0.0 15.9 9.2 5.2 0.0 0.0 0.0 15.1 Incr Delay (d2), s/veh 3.2 0.0 0.1 1.7 0.3 0.0 0.0 0.0 2.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.0 0.0 0.2 1.9 1.8 0.0 0.0 0.0 4.5 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 21.7 0.0 16.0 10.9 5.5 0.0 0.0 0.0 17.5 LnGrp LOS C B B A B Approach Vol, veh/h 308 920 478 Approach Delay, s/veh 21.2 7.9 17.5 Approach LOS C A B Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 35.0 14.0 21.0 14.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.7 19.5 28.7 18.3 Max Q Clear Time (g_c+I1), s 9.3 8.5 13.8 9.4 Green Ext Time (p_c), s 3.8 1.0 2.7 1.1 Intersection Summary HCM 7th Control Delay, s/veh 13.0 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 without Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 10013000000755355355950 Future Volume (vph) 10013000000755355355950 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)24.4 24.4 46.1 46.1 9.5 55.6 Total Split (%)30.5% 30.5%57.6% 57.6% 11.9% 69.5% Maximum Green (s) 19.9 19.9 41.6 41.6 5.0 51.1 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 56.3 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2025 without Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10013000000755355355950 Future Volume (veh/h) 10013000000755355355950 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1885 1885 1870 1870 0 Adj Flow Rate, veh/h 109 1 65 0 821 207 38 647 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222 011220 Cap, veh/h 182 2 160 0 1046 887 351 1304 0 Arrive On Green 0.10 0.10 0.10 0.00 0.55 0.55 0.04 0.70 0.00 Sat Flow, veh/h 1781 24 1565 0 1885 1598 1781 1870 0 Grp Volume(v), veh/h 109 0 66 0 821 207 38 647 0 Grp Sat Flow(s),veh/h/ln 1781 0 1589 0 1885 1598 1781 1870 0 Q Serve(g_s), s 2.6 0.0 1.7 0.0 15.4 3.0 0.4 7.2 0.0 Cycle Q Clear(g_c), s 2.6 0.0 1.7 0.0 15.4 3.0 0.4 7.2 0.0 Prop In Lane 1.00 0.98 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 182 0 162 0 1046 887 351 1304 0 V/C Ratio(X)0.60 0.00 0.41 0.00 0.78 0.23 0.11 0.50 0.00 Avail Cap(c_a), veh/h 790 0 704 0 1747 1481 475 2130 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 19.3 0.0 18.9 0.0 7.9 5.1 6.6 3.1 0.0 Incr Delay (d2), s/veh 3.1 0.0 1.6 0.0 1.3 0.1 0.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.6 0.0 4.3 0.7 0.1 1.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.4 0.0 20.5 0.0 9.2 5.2 6.7 3.4 0.0 LnGrp LOS C C AAAA Approach Vol, veh/h 175 1028 685 Approach Delay, s/veh 21.7 8.4 3.6 Approach LOS C A A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.4 29.4 9.1 35.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 41.6 19.9 51.1 Max Q Clear Time (g_c+I1), s 2.4 17.4 4.6 9.2 Green Ext Time (p_c), s 0.0 7.5 0.5 5.2 Intersection Summary HCM 7th Control Delay, s/veh 7.9 HCM 7th LOS A Lanes, Volumes, Timings Projected 2025 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)30 15 35 310 20 135 40 770 405 105 615 30 Future Volume (vph)30 15 35 310 20 135 40 770 405 105 615 30 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)9.5 22.5 12.0 25.0 9.5 35.9 9.6 36.0 Total Split (%)11.9% 28.1% 15.0% 31.3% 11.9% 44.9% 12.0% 45.0% Maximum Green (s)5.0 18.0 7.5 20.5 5.0 31.4 5.1 31.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 59.1 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2025 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 15 35 310 20 135 40 770 405 105 615 30 Future Volume (veh/h) 30 15 35 310 20 135 40 770 405 105 615 30 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1841 1841 1841 1885 1885 1885 1885 1885 1870 1885 1885 1885 Adj Flow Rate, veh/h 33 16 0 337 22 17 43 837 358 114 668 33 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 444111112111 Cap, veh/h 270 119 0 427 153 118 450 1064 453 315 1610 80 Arrive On Green 0.04 0.06 0.00 0.13 0.16 0.16 0.04 0.44 0.44 0.07 0.46 0.46 Sat Flow, veh/h 1753 1841 0 1795 986 762 1795 2446 1042 1795 3474 171 Grp Volume(v), veh/h 33 16 0 337 0 39 43 612 583 114 344 357 Grp Sat Flow(s),veh/h/ln 1753 1841 0 1795 0 1748 1795 1791 1698 1795 1791 1854 Q Serve(g_s), s 1.0 0.5 0.0 7.5 0.0 1.1 0.8 17.4 17.6 2.0 7.6 7.6 Cycle Q Clear(g_c), s 1.0 0.5 0.0 7.5 0.0 1.1 0.8 17.4 17.6 2.0 7.6 7.6 Prop In Lane 1.00 0.00 1.00 0.44 1.00 0.61 1.00 0.09 Lane Grp Cap(c), veh/h 270 119 0 427 0 272 450 779 739 315 830 860 V/C Ratio(X)0.12 0.13 0.00 0.79 0.00 0.14 0.10 0.79 0.79 0.36 0.41 0.42 Avail Cap(c_a), veh/h 356 558 0 427 0 603 525 946 897 341 949 983 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.5 26.2 0.0 22.9 0.0 21.7 8.6 14.4 14.4 11.2 10.6 10.6 Incr Delay (d2), s/veh 0.2 0.5 0.0 9.6 0.0 0.2 0.1 3.6 4.0 0.7 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.2 0.0 5.6 0.0 0.5 0.3 6.8 6.5 0.7 2.6 2.7 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 24.7 26.7 0.0 32.5 0.0 21.9 8.7 18.0 18.4 11.8 10.9 10.9 LnGrp LOS CC C CABBBBB Approach Vol, veh/h 49 376 1238 815 Approach Delay, s/veh 25.4 31.4 17.9 11.0 Approach LOS C C B B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 8.7 30.3 12.0 8.3 7.0 32.0 6.6 13.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.1 31.4 7.5 18.0 5.0 31.5 5.0 20.5 Max Q Clear Time (g_c+I1), s 4.0 19.6 9.5 2.5 2.8 9.6 3.0 3.1 Green Ext Time (p_c), s 0.0 6.3 0.0 0.0 0.0 4.4 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 17.8 HCM 7th LOS B HCM 7th TWSC Projected 2025 without Project 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Intersection Int Delay, s/veh 6.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 70 60 70 30 60 5 65 195 40 1 180 80 Future Vol, veh/h 70 60 70 30 60 5 65 195 40 1 180 80 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 111111111111 Mvmt Flow 73 63 73 31 63 5 68 203 42 1 188 83 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 601 611 229 580 632 224 271 0 0 245 0 0 Stage 1 231 231 - 359 359 ------- Stage 2 370 380 - 221 273 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 414 410 813 427 399 818 1298 - - 1327 - - Stage 1 774 715 - 661 629 ------- Stage 2 652 616 - 784 686 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 325 385 813 309 374 818 1298 - - 1327 - - Mov Cap-2 Maneuver 325 385 - 309 374 ------- Stage 1 773 714 - 621 590 ------- Stage 2 544 578 - 650 685 ------- Approach EB WB NB SB HCM Control Delay, s/v15.05 18.73 1.72 0.03 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)377 - - 325 385 813 360 6 - - HCM Lane V/C Ratio 0.052 - - 0.225 0.163 0.09 0.275 0.001 - - HCM Control Delay (s/veh) 7.9 0 - 19.3 16.2 9.9 18.7 7.7 0 - HCM Lane LOS A A - C C A C A A - HCM 95th %tile Q(veh) 0.2 - - 0.8 0.6 0.3 1.1 0 - - Lanes, Volumes, Timings Projected 2025 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 325 1 35 225 290 0 0 560 105 Future Volume (vph)0 0 0 325 1 35 225 290 0 0 560 105 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)23.0 23.0 23.0 14.0 57.0 43.0 Total Split (%)28.8% 28.8% 28.8% 17.5% 71.3%53.8% Maximum Green (s)18.5 18.5 18.5 9.5 52.5 38.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 73.6 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2025 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 325 1 35 225 290 0 0 560 105 Future Volume (veh/h) 0 0 0 325 1 35 225 290 0 0 560 105 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1826 1826 0 0 1870 1870 Adj Flow Rate, veh/h 353 1 38 245 315 0 0 609 114 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333550022 Cap, veh/h 415 1 370 355 1143 0 0 699 131 Arrive On Green 0.24 0.24 0.24 0.10 0.63 0.00 0.00 0.46 0.46 Sat Flow, veh/h 1762 5 1572 1739 1826 0 0 1532 287 Grp Volume(v), veh/h 354038245315000723 Grp Sat Flow(s),veh/h/ln 1767 0 1572 1739 18260001819 Q Serve(g_s), s 12.4 0.0 1.2 4.4 5.1 0.0 0.0 0.0 23.3 Cycle Q Clear(g_c), s 12.4 0.0 1.2 4.4 5.1 0.0 0.0 0.0 23.3 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 416 0 370 355 1143000830 V/C Ratio(X)0.85 0.00 0.10 0.69 0.28 0.00 0.00 0.00 0.87 Avail Cap(c_a), veh/h 503044843514760001078 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 23.7 0.0 19.5 13.2 5.5 0.0 0.0 0.0 15.9 Incr Delay (d2), s/veh 11.3 0.0 0.1 3.5 0.1 0.0 0.0 0.0 6.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.1 0.0 0.4 1.8 1.5 0.0 0.0 0.0 9.8 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 35.1 0.0 19.6 16.7 5.6 0.0 0.0 0.0 22.3 LnGrp LOS D B B A C Approach Vol, veh/h 392 560 723 Approach Delay, s/veh 33.6 10.5 22.3 Approach LOS C B C Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 45.2 11.0 34.1 19.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.5 9.5 38.5 18.5 Max Q Clear Time (g_c+I1), s 7.1 6.4 25.3 14.4 Green Ext Time (p_c), s 2.1 0.2 4.3 0.9 Intersection Summary HCM 7th Control Delay, s/veh 21.0 HCM 7th LOS C Lanes, Volumes, Timings Projected 2025 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 8553850000430190358500 Future Volume (vph) 8553850000430190358500 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)29.0 29.0 41.5 41.5 9.5 51.0 Total Split (%)36.3% 36.3%51.9% 51.9% 11.9% 63.8% Maximum Green (s) 24.5 24.5 37.0 37.0 5.0 46.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 66.5 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2025 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 8553850000430190358500 Future Volume (veh/h) 8553850000430190358500 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 0 1841 1841 1870 1870 0 Adj Flow Rate, veh/h 92 5 315 0 467 93 38 924 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 555 044220 Cap, veh/h 452 6 397 0 849 719 434 1086 0 Arrive On Green 0.26 0.26 0.26 0.00 0.46 0.46 0.04 0.58 0.00 Sat Flow, veh/h 1739 24 1527 0 1841 1560 1781 1870 0 Grp Volume(v), veh/h 92 0 320 0 467 93 38 924 0 Grp Sat Flow(s),veh/h/ln 1739 0 1551 0 1841 1560 1781 1870 0 Q Serve(g_s), s 2.3 0.0 10.9 0.0 10.3 1.9 0.6 23.1 0.0 Cycle Q Clear(g_c), s 2.3 0.0 10.9 0.0 10.3 1.9 0.6 23.1 0.0 Prop In Lane 1.00 0.98 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 452 0 403 0 849 719 434 1086 0 V/C Ratio(X)0.20 0.00 0.79 0.00 0.55 0.13 0.09 0.85 0.00 Avail Cap(c_a), veh/h 755 0 673 0 1206 1022 521 1540 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 16.3 0.0 19.5 0.0 11.0 8.7 7.6 9.8 0.0 Incr Delay (d2), s/veh 0.2 0.0 3.6 0.0 0.6 0.1 0.1 3.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 3.9 0.0 3.6 0.6 0.2 7.7 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 16.5 0.0 23.0 0.0 11.5 8.8 7.7 13.2 0.0 LnGrp LOS B C BAAB Approach Vol, veh/h 412 560 962 Approach Delay, s/veh 21.6 11.1 13.0 Approach LOS C B B Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.7 30.5 19.2 37.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 37.0 24.5 46.5 Max Q Clear Time (g_c+I1), s 2.6 12.3 12.9 25.1 Green Ext Time (p_c), s 0.0 3.4 1.9 7.7 Intersection Summary HCM 7th Control Delay, s/veh 14.3 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)10 10 20 125 20 145 55 445 125 175 860 25 Future Volume (vph)10 10 20 125 20 145 55 445 125 175 860 25 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 818 765 2783 Travel Time (s)35.9 18.6 17.4 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)10.0 22.6 11.0 23.6 10.0 35.9 10.5 36.4 Total Split (%)12.5% 28.3% 13.8% 29.5% 12.5% 44.9% 13.1% 45.5% Maximum Green (s)5.5 18.1 6.5 19.1 5.5 31.4 6.0 31.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 48.7 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2025 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10 10 20 125 20 145 55 445 125 175 860 25 Future Volume (veh/h) 10 10 20 125 20 145 55 445 125 175 860 25 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1856 1856 1856 1841 1841 1841 1870 1870 1870 Adj Flow Rate, veh/h 11 11 0 132 21 16 58 468 100 184 905 26 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 111333444222 Cap, veh/h 267 109 0 394 132 100 369 1001 213 526 1382 40 Arrive On Green 0.01 0.06 0.00 0.09 0.13 0.13 0.06 0.35 0.35 0.10 0.39 0.39 Sat Flow, veh/h 1795 1885 0 1767 977 744 1753 2870 609 1781 3528 101 Grp Volume(v), veh/h 11 11 0 132 0 37 58 284 284 184 456 475 Grp Sat Flow(s),veh/h/ln 1795 1885 0 1767 0 1722 1753 1749 1731 1781 1777 1852 Q Serve(g_s), s 0.3 0.2 0.0 3.0 0.0 0.9 0.9 5.7 5.7 2.8 9.4 9.4 Cycle Q Clear(g_c), s 0.3 0.2 0.0 3.0 0.0 0.9 0.9 5.7 5.7 2.8 9.4 9.4 Prop In Lane 1.00 0.00 1.00 0.43 1.00 0.35 1.00 0.05 Lane Grp Cap(c), veh/h 267 109 0 394 0 232 369 610 604 526 696 726 V/C Ratio(X)0.04 0.10 0.00 0.33 0.00 0.16 0.16 0.47 0.47 0.35 0.65 0.65 Avail Cap(c_a), veh/h 461 762 0 490 0 734 484 1226 1214 586 1266 1319 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 19.4 20.0 0.0 16.7 0.0 17.1 8.9 11.3 11.4 8.0 11.1 11.1 Incr Delay (d2), s/veh 0.1 0.4 0.0 0.5 0.0 0.3 0.2 0.6 0.6 0.4 1.1 1.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.1 0.0 1.1 0.0 0.3 0.3 1.9 1.9 0.9 3.1 3.2 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 19.5 20.4 0.0 17.2 0.0 17.5 9.1 11.9 11.9 8.4 12.2 12.2 LnGrp LOS BC B BABBABB Approach Vol, veh/h 22 169 626 1115 Approach Delay, s/veh 19.9 17.3 11.6 11.6 Approach LOS BBBB Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.0 20.1 8.6 7.1 7.1 22.0 5.1 10.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 6.0 31.4 6.5 18.1 5.5 31.9 5.5 19.1 Max Q Clear Time (g_c+I1), s 4.8 7.7 5.0 2.2 2.9 11.4 2.3 2.9 Green Ext Time (p_c), s 0.1 3.6 0.0 0.0 0.0 6.1 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 12.2 HCM 7th LOS B HCM 7th TWSC Projected 2025 with Project 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 40 35 15 35 65 5 45 110 25 1 205 75 Future Vol, veh/h 40 35 15 35 65 5 45 110 25 1 205 75 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 111111222111 Mvmt Flow 43 38 16 38 71 5 49 120 27 1 223 82 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 518 510 264 475 538 133 304 0 0 147 0 0 Stage 1 266 266 - 231 231 ------- Stage 2 253 245 - 244 307 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.12 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.218 - - 2.209 - - Pot Cap-1 Maneuver 469 468 777 502 451 919 1256 - - 1441 - - Stage 1 742 691 - 774 715 ------- Stage 2 754 706 - 762 663 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 376 447 777 431 432 919 1256 - - 1441 - - Mov Cap-2 Maneuver 376 447 - 431 432 ------- Stage 1 741 690 - 741 685 ------- Stage 2 643 676 - 704 662 ------- Approach EB WB NB SB HCM Control Delay, s/v14.02 15.93 2 0.03 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)434 - - 376 447 777 443 6 - - HCM Lane V/C Ratio 0.039 - - 0.116 0.085 0.021 0.258 0.001 - - HCM Control Delay (s/veh) 8 0 - 15.8 13.8 9.7 15.9 7.5 0 - HCM Lane LOS A A - C B A C A A - HCM 95th %tile Q(veh) 0.1 - - 0.4 0.3 0.1 1 0 - - HCM 7th TWSC Projected 2025 with Project 5: Site Drwy/Walmart Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 20 85 55 20 155 15 65 1 10 10 1 15 Future Vol, veh/h 20 85 55 20 155 15 65 1 10 10 1 15 Conflicting Peds, #/hr000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 100 ----50--50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 222222222222 Mvmt Flow 22 92 60 22 168 16 71 1 11 11 1 16 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 185 0 0 152 0 0 378 394 122 357 416 177 Stage 1 ------166166-220220- Stage 2 ------213228-136196- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.125.52-6.125.52- Critical Hdwy Stg 2 ------6.125.52-6.125.52- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1390 - - 1429 - - 579 542 929 599 527 866 Stage 1 ------836761-782721- Stage 2 ------790715-867739- Platoon blocked, %- -- - Mov Cap-1 Maneuver 1390 - - 1429 - - 550 526 929 572 511 866 Mov Cap-2 Maneuver ------550526-572511- Stage 1 ------823749-770710- Stage 2 ------762704-842727- Approach EB WB NB SB HCM Control Delay, s/v 0.95 0.8 12.06 10.19 HCM LOS B B Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h)549 929 1390 - - 1429 - - 566 866 HCM Lane V/C Ratio 0.131 0.012 0.016 - - 0.015 - - 0.021 0.019 HCM Control Delay (s/veh) 12.5 8.9 7.6 - - 7.6 - - 11.5 9.2 HCM Lane LOS B A A - - A - - B A HCM 95th %tile Q(veh) 0.4 0 0 - - 0 - - 0.1 0.1 HCM 7th TWSC Projected 2025 with Project 6: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 80 20 0 190 0 5 Future Vol, veh/h 8020019005 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 87 22 0 207 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 98 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 958 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----958 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 8.78 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)958 - - - HCM Lane V/C Ratio 0.006 - - - HCM Control Delay (s/veh) 8.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2025 with Project 7: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 85 5 0 190 0 5 Future Vol, veh/h 85 5 0 190 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 925020705 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 95 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 962 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----962 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 8.77 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)962 - - - HCM Lane V/C Ratio 0.006 - - - HCM Control Delay (s/veh) 8.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2025 with Project 8: N 2nd E & Site Drwy PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 15 610 25 15 970 Future Vol, veh/h 5 15 610 25 15 970 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - - 100 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 16 663 27 16 1054 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1236 345 0 0 690 0 Stage 1 677 ----- Stage 2 560 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 15.84----- Critical Hdwy Stg 25.84----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 168 651 - - 900 - Stage 1 466 ----- Stage 2 536 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 165 651 - - 900 - Mov Cap-2 Maneuver 301 ----- Stage 1 466 ----- Stage 2 526 ----- Approach WB NB SB HCM Control Delay, s/v 12.3 0 0.14 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h)- - 301 651 900 - HCM Lane V/C Ratio - - 0.018 0.025 0.018 - HCM Control Delay (s/veh) - - 17.2 10.7 9.1 - HCM Lane LOS - - C B A - HCM 95th %tile Q(veh) - - 0.1 0.1 0.1 - Lanes, Volumes, Timings Projected 2025 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 320 1 25 455 495 0 0 395 70 Future Volume (vph)0 0 0 320 1 25 455 495 0 0 395 70 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)22.8 22.8 22.8 24.0 57.2 33.2 Total Split (%)28.5% 28.5% 28.5% 30.0% 71.5%41.5% Maximum Green (s)18.3 18.3 18.3 19.5 52.7 28.7 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 72.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2025 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 320 1 25 455 495 0 0 395 70 Future Volume (veh/h) 0 0 0 320 1 25 455 495 0 0 395 70 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1885 1885 Adj Flow Rate, veh/h 344 1 27 489 532 0 0 425 75 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, %222220011 Cap, veh/h 415 1 371 567 1151 0 0 511 90 Arrive On Green 0.23 0.23 0.23 0.21 0.62 0.00 0.00 0.33 0.33 Sat Flow, veh/h 1776 5 1585 1781 1870 0 0 1560 275 Grp Volume(v), veh/h 345027489532000500 Grp Sat Flow(s),veh/h/ln 1782 0 1585 1781 18700001836 Q Serve(g_s), s 11.0 0.0 0.8 9.6 9.1 0.0 0.0 0.0 15.0 Cycle Q Clear(g_c), s 11.0 0.0 0.8 9.6 9.1 0.0 0.0 0.0 15.0 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.15 Lane Grp Cap(c), veh/h 417 0 371 567 1151000601 V/C Ratio(X)0.83 0.00 0.07 0.86 0.46 0.00 0.00 0.00 0.83 Avail Cap(c_a), veh/h 54604857701650000882 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 21.8 0.0 17.8 11.1 6.2 0.0 0.0 0.0 18.6 Incr Delay (d2), s/veh 8.0 0.0 0.1 7.5 0.3 0.0 0.0 0.0 4.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.1 0.0 0.3 4.0 2.7 0.0 0.0 0.0 6.4 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 29.7 0.0 17.9 18.6 6.5 0.0 0.0 0.0 23.1 LnGrp LOS C B B A C Approach Vol, veh/h 372 1021 500 Approach Delay, s/veh 28.9 12.3 23.1 Approach LOS C B C Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 41.3 17.2 24.1 18.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.7 19.5 28.7 18.3 Max Q Clear Time (g_c+I1), s 11.1 11.6 17.0 13.0 Green Ext Time (p_c), s 4.0 1.1 2.5 1.0 Intersection Summary HCM 7th Control Delay, s/veh 18.4 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 10013750000850415356800 Future Volume (vph) 10013750000850415356800 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)24.4 24.4 46.1 46.1 9.5 55.6 Total Split (%)30.5% 30.5%57.6% 57.6% 11.9% 69.5% Maximum Green (s) 19.9 19.9 41.6 41.6 5.0 51.1 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 66.5 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2025 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10013750000850415356800 Future Volume (veh/h) 10013750000850415356800 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1885 1885 1870 1870 0 Adj Flow Rate, veh/h 109 1 201 0 924 239 38 739 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222 011220 Cap, veh/h 306 1 271 0 1066 903 260 1270 0 Arrive On Green 0.17 0.17 0.17 0.00 0.57 0.57 0.04 0.68 0.00 Sat Flow, veh/h 1781 8 1578 0 1885 1598 1781 1870 0 Grp Volume(v), veh/h 109 0 202 0 924 239 38 739 0 Grp Sat Flow(s),veh/h/ln 1781 0 1586 0 1885 1598 1781 1870 0 Q Serve(g_s), s 3.3 0.0 7.3 0.0 25.2 4.6 0.5 12.7 0.0 Cycle Q Clear(g_c), s 3.3 0.0 7.3 0.0 25.2 4.6 0.5 12.7 0.0 Prop In Lane 1.00 1.00 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 306 0 273 0 1066 903 260 1270 0 V/C Ratio(X)0.36 0.00 0.74 0.00 0.87 0.26 0.15 0.58 0.00 Avail Cap(c_a), veh/h 587 0 523 0 1299 1101 338 1583 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 22.0 0.0 23.7 0.0 11.2 6.7 10.7 5.1 0.0 Incr Delay (d2), s/veh 0.7 0.0 3.9 0.0 5.5 0.2 0.3 0.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 2.8 0.0 9.6 1.3 0.2 3.2 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.7 0.0 27.7 0.0 16.7 6.9 11.0 5.6 0.0 LnGrp LOS C C BABA Approach Vol, veh/h 311 1163 777 Approach Delay, s/veh 25.9 14.7 5.8 Approach LOS C B A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 6.9 38.6 14.9 45.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 41.6 19.9 51.1 Max Q Clear Time (g_c+I1), s 2.5 27.2 9.3 14.7 Green Ext Time (p_c), s 0.0 6.9 1.1 6.3 Intersection Summary HCM 7th Control Delay, s/veh 13.2 HCM 7th LOS B Lanes, Volumes, Timings Projected 2025 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)30 15 35 370 20 170 40 890 405 230 645 30 Future Volume (vph)30 15 35 370 20 170 40 890 405 230 645 30 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 818 765 2783 Travel Time (s)35.9 18.6 17.4 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)9.6 22.6 22.1 35.1 9.6 52.9 22.4 65.7 Total Split (%)8.0% 18.8% 18.4% 29.3% 8.0% 44.1% 18.7% 54.8% Maximum Green (s)5.1 18.1 17.6 30.6 5.1 48.4 17.9 61.2 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 103 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2025 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 15 35 370 20 170 40 890 405 230 645 30 Future Volume (veh/h) 30 15 35 370 20 170 40 890 405 230 645 30 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1841 1841 1841 1885 1885 1885 1885 1885 1870 1885 1885 1885 Adj Flow Rate, veh/h 33 16 0 402 22 17 43 967 380 250 701 33 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 444111112111 Cap, veh/h 201 91 0 489 211 163 435 1157 450 300 1807 85 Arrive On Green 0.03 0.05 0.00 0.20 0.21 0.21 0.04 0.46 0.46 0.10 0.52 0.52 Sat Flow, veh/h 1753 1841 0 1795 986 762 1795 2519 980 1795 3483 164 Grp Volume(v), veh/h 33 16 0 402 0 39 43 685 662 250 360 374 Grp Sat Flow(s),veh/h/ln 1753 1841 0 1795 0 1748 1795 1791 1709 1795 1791 1856 Q Serve(g_s), s 1.6 0.8 0.0 17.6 0.0 1.6 1.1 30.1 30.8 6.2 10.9 10.9 Cycle Q Clear(g_c), s 1.6 0.8 0.0 17.6 0.0 1.6 1.1 30.1 30.8 6.2 10.9 10.9 Prop In Lane 1.00 0.00 1.00 0.44 1.00 0.57 1.00 0.09 Lane Grp Cap(c), veh/h 201 91 0 489 0 373 435 823 785 300 929 963 V/C Ratio(X)0.16 0.18 0.00 0.82 0.00 0.10 0.10 0.83 0.84 0.83 0.39 0.39 Avail Cap(c_a), veh/h 246 370 0 489 0 594 471 962 918 485 1217 1261 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.8 41.1 0.0 31.5 0.0 28.5 11.9 21.3 21.5 18.8 13.1 13.1 Incr Delay (d2), s/veh 0.4 0.9 0.0 10.9 0.0 0.1 0.1 5.5 6.4 6.6 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.4 0.0 9.5 0.0 0.7 0.4 13.1 12.9 2.8 4.2 4.4 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 39.2 42.0 0.0 42.3 0.0 28.6 12.0 26.8 27.9 25.4 13.3 13.3 LnGrp LOS D D D C B C C C B B Approach Vol, veh/h 49 441 1390 984 Approach Delay, s/veh 40.1 41.1 26.9 16.4 Approach LOS D D C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 13.1 45.9 22.1 8.9 7.8 51.2 7.3 23.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 17.9 48.4 17.6 18.1 5.1 61.2 5.1 30.6 Max Q Clear Time (g_c+I1), s 8.2 32.8 19.6 2.8 3.1 12.9 3.6 3.6 Green Ext Time (p_c), s 0.5 8.6 0.0 0.0 0.0 5.4 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 25.7 HCM 7th LOS C HCM 7th TWSC Projected 2025 with Project 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 7.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 95 70 70 30 70 5 65 195 40 1 180 100 Future Vol, veh/h 95 70 70 30 70 5 65 195 40 1 180 100 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 111111111111 Mvmt Flow 99 73 73 31 73 5 68 203 42 1 188 104 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 617 622 240 585 653 224 292 0 0 245 0 0 Stage 1 242 242 - 359 359 ------- Stage 2 375 380 - 226 294 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 404 404 802 424 388 818 1276 - - 1327 - - Stage 1 764 708 - 661 629 ------- Stage 2 648 616 - 779 672 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 305 379 802 295 364 818 1276 - - 1327 - - Mov Cap-2 Maneuver 305 379 - 295 364 ------- Stage 1 763 707 - 620 590 ------- Stage 2 530 578 - 634 671 ------- Approach EB WB NB SB HCM Control Delay, s/v17.01 19.91 1.73 0.03 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)377 - - 305 379 802 350 6 - - HCM Lane V/C Ratio 0.053 - - 0.325 0.192 0.091 0.313 0.001 - - HCM Control Delay (s/veh) 8 0 - 22.4 16.8 9.9 19.9 7.7 0 - HCM Lane LOS A A - C C A C A A - HCM 95th %tile Q(veh) 0.2 - - 1.4 0.7 0.3 1.3 0 - - HCM 7th TWSC Projected 2025 with Project 5: Site Drwy/Walmart Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 5.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 230 110 45 170 20 130 1 25 20 1 30 Future Vol, veh/h 30 230 110 45 170 20 130 1 25 20 1 30 Conflicting Peds, #/hr000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 100 ----0--50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 222222222222 Mvmt Flow 33 250 120 49 185 22 141 1 27 22 1 33 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 207 0 0 370 0 0 658 679 310 609 728 196 Stage 1 ------375375-293293- Stage 2 ------283304-316435- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.125.52-6.125.52- Critical Hdwy Stg 2 ------6.125.52-6.125.52- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1365 - - 1189 - - 377 373 730 407 350 846 Stage 1 ------646617-715670- Stage 2 ------724663-695581- Platoon blocked, %- -- - Mov Cap-1 Maneuver 1365 - - 1189 - - 339 350 730 366 328 846 Mov Cap-2 Maneuver ------339350-366328- Stage 1 ------631602-685642- Stage 2 ------666635-652567- Approach EB WB NB SB HCM Control Delay, s/v 0.62 1.56 21.04 11.95 HCM LOS C B Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h)339 730 1365 - - 1189 - - 364 846 HCM Lane V/C Ratio 0.42 0.037 0.024 - - 0.041 - - 0.063 0.039 HCM Control Delay (s/veh) 23.1 10.1 7.7 - - 8.2 - - 15.6 9.4 HCM Lane LOS C B A - - A - - C A HCM 95th %tile Q(veh) 2 0.1 0.1 - - 0.1 - - 0.2 0.1 HCM 7th TWSC Projected 2025 with Project 6: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 225 50 0 235 0 15 Future Vol, veh/h 225 50 0 235 0 15 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 245 54 0 255 0 16 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 272 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 767 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----767 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 9.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)767 - - - HCM Lane V/C Ratio 0.021 - - - HCM Control Delay (s/veh) 9.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0.1 - - - HCM 7th TWSC Projected 2025 with Project 7: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 240 5 0 235 0 5 Future Vol, veh/h 240 5 0 235 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 261 5 0 255 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 264 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 775 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----775 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 9.68 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)775 - - - HCM Lane V/C Ratio 0.007 - - - HCM Control Delay (s/veh) 9.7 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2025 with Project 8: N 2nd E & Site Drwy PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 2.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 25 155 1180 85 70 790 Future Vol, veh/h 25 155 1180 85 70 790 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - - 100 - Veh in Median Storage, # 2 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 27 168 1283 92 76 859 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1910 687 0 0 1375 0 Stage 1 1329 ----- Stage 2 582 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 15.84----- Critical Hdwy Stg 25.84----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 60 389 - - 495 - Stage 1 212 ----- Stage 2 522 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 51 389 - - 495 - Mov Cap-2 Maneuver 185 ----- Stage 1 212 ----- Stage 2 442 ----- Approach WB NB SB HCM Control Delay, s/v22.07 0 1.11 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h)- - 185 389 495 - HCM Lane V/C Ratio - - 0.147 0.433 0.154 - HCM Control Delay (s/veh) - - 27.9 21.1 13.6 - HCM Lane LOS - - D C B - HCM 95th %tile Q(veh) - - 0.5 2.1 0.5 - Lanes, Volumes, Timings Projected 2030 without Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 325 1 40 225 320 0 0 620 120 Future Volume (vph)0 0 0 325 1 40 225 320 0 0 620 120 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)23.0 23.0 23.0 14.0 57.0 43.0 Total Split (%)28.8% 28.8% 28.8% 17.5% 71.3%53.8% Maximum Green (s)18.5 18.5 18.5 9.5 52.5 38.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 77 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2030 without Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 325 1 40 225 320 0 0 620 120 Future Volume (veh/h) 0 0 0 325 1 40 225 320 0 0 620 120 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1826 1826 0 0 1870 1870 Adj Flow Rate, veh/h 353 1 43 245 348 0 0 674 130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333550022 Cap, veh/h 405 1 362 317 1174 0 0 739 143 Arrive On Green 0.23 0.23 0.23 0.09 0.64 0.00 0.00 0.49 0.49 Sat Flow, veh/h 1762 5 1572 1739 1826 0 0 1524 294 Grp Volume(v), veh/h 354043245348000804 Grp Sat Flow(s),veh/h/ln 1767 0 1572 1739 18260001817 Q Serve(g_s), s 13.7 0.0 1.5 4.6 6.0 0.0 0.0 0.0 29.0 Cycle Q Clear(g_c), s 13.7 0.0 1.5 4.6 6.0 0.0 0.0 0.0 29.0 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 406 0 362 317 1174000882 V/C Ratio(X)0.87 0.00 0.12 0.77 0.30 0.00 0.00 0.00 0.91 Avail Cap(c_a), veh/h 46104103851352000987 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 26.3 0.0 21.6 15.1 5.6 0.0 0.0 0.0 16.9 Incr Delay (d2), s/veh 15.1 0.0 0.1 7.8 0.1 0.0 0.0 0.0 11.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 7.1 0.0 0.6 2.5 1.8 0.0 0.0 0.0 13.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 41.4 0.0 21.8 22.9 5.7 0.0 0.0 0.0 28.5 LnGrp LOS D C C A C Approach Vol, veh/h 397 593 804 Approach Delay, s/veh 39.3 12.8 28.5 Approach LOS D B C Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 50.1 11.2 38.9 20.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.5 9.5 38.5 18.5 Max Q Clear Time (g_c+I1), s 8.0 6.6 31.0 15.7 Green Ext Time (p_c), s 2.4 0.2 3.4 0.6 Intersection Summary HCM 7th Control Delay, s/veh 25.7 HCM 7th LOS C Lanes, Volumes, Timings Projected 2030 without Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 9553950000450190409100 Future Volume (vph) 9553950000450190409100 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)29.0 29.0 41.5 41.5 9.5 51.0 Total Split (%)36.3% 36.3%51.9% 51.9% 11.9% 63.8% Maximum Green (s) 24.5 24.5 37.0 37.0 5.0 46.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 71.1 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2030 without Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 9553950000450190409100 Future Volume (veh/h) 9553950000450190409100 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 0 1841 1841 1870 1870 0 Adj Flow Rate, veh/h 103 5 342 0 489 98 43 989 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 555 044220 Cap, veh/h 466 6 410 0 889 753 430 1110 0 Arrive On Green 0.27 0.27 0.27 0.00 0.48 0.48 0.04 0.59 0.00 Sat Flow, veh/h 1739 22 1528 0 1841 1560 1781 1870 0 Grp Volume(v), veh/h 103 0 347 0 489 98 43 989 0 Grp Sat Flow(s),veh/h/ln 1739 0 1551 0 1841 1560 1781 1870 0 Q Serve(g_s), s 3.0 0.0 13.7 0.0 12.2 2.3 0.7 29.7 0.0 Cycle Q Clear(g_c), s 3.0 0.0 13.7 0.0 12.2 2.3 0.7 29.7 0.0 Prop In Lane 1.00 0.99 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 466 0 416 0 889 753 430 1110 0 V/C Ratio(X)0.22 0.00 0.83 0.00 0.55 0.13 0.10 0.89 0.00 Avail Cap(c_a), veh/h 654 0 583 0 1046 886 493 1335 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 18.5 0.0 22.5 0.0 11.9 9.3 8.2 11.4 0.0 Incr Delay (d2), s/veh 0.2 0.0 7.2 0.0 0.5 0.1 0.1 6.9 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 5.5 0.0 4.4 0.7 0.2 11.5 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 18.8 0.0 29.7 0.0 12.4 9.4 8.3 18.3 0.0 LnGrp LOS B C BAAB Approach Vol, veh/h 450 587 1032 Approach Delay, s/veh 27.2 11.9 17.9 Approach LOS C B B Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 7.2 36.0 22.0 43.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 37.0 24.5 46.5 Max Q Clear Time (g_c+I1), s 2.7 14.2 15.7 31.7 Green Ext Time (p_c), s 0.0 3.6 1.7 7.0 Intersection Summary HCM 7th Control Delay, s/veh 18.2 HCM 7th LOS B Lanes, Volumes, Timings Projected 2030 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)15 10 20 130 20 115 55 490 145 115 965 30 Future Volume (vph)15 10 20 130 20 115 55 490 145 115 965 30 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)10.0 22.6 11.0 23.6 10.0 35.9 10.5 36.4 Total Split (%)12.5% 28.3% 13.8% 29.5% 12.5% 44.9% 13.1% 45.5% Maximum Green (s)5.5 18.1 6.5 19.1 5.5 31.4 6.0 31.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 51.4 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2030 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 15 10 20 130 20 115 55 490 145 115 965 30 Future Volume (veh/h) 15 10 20 130 20 115 55 490 145 115 965 30 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1856 1856 1856 1841 1841 1841 1870 1870 1870 Adj Flow Rate, veh/h 16 11 0 137 21 10 58 516 121 121 1016 32 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 111333444222 Cap, veh/h 264 106 0 386 154 74 345 1104 258 500 1475 46 Arrive On Green 0.02 0.06 0.00 0.09 0.13 0.13 0.06 0.39 0.39 0.08 0.42 0.42 Sat Flow, veh/h 1795 1885 0 1767 1188 566 1753 2814 657 1781 3517 111 Grp Volume(v), veh/h 16 11 0 137 0 31 58 320 317 121 513 535 Grp Sat Flow(s),veh/h/ln 1795 1885 0 1767 0 1754 1753 1749 1722 1781 1777 1850 Q Serve(g_s), s 0.4 0.3 0.0 3.3 0.0 0.8 0.9 6.5 6.6 1.8 11.3 11.3 Cycle Q Clear(g_c), s 0.4 0.3 0.0 3.3 0.0 0.8 0.9 6.5 6.6 1.8 11.3 11.3 Prop In Lane 1.00 0.00 1.00 0.32 1.00 0.38 1.00 0.06 Lane Grp Cap(c), veh/h 264 106 0 386 0 228 345 686 676 500 745 776 V/C Ratio(X)0.06 0.10 0.00 0.35 0.00 0.14 0.17 0.47 0.47 0.24 0.69 0.69 Avail Cap(c_a), veh/h 433 710 0 459 0 697 448 1142 1125 574 1179 1228 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.7 21.5 0.0 17.9 0.0 18.5 8.7 10.9 10.9 7.6 11.4 11.4 Incr Delay (d2), s/veh 0.1 0.4 0.0 0.6 0.0 0.3 0.2 0.5 0.5 0.2 1.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.1 0.0 1.3 0.0 0.3 0.3 2.1 2.1 0.6 3.8 3.9 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 20.8 22.0 0.0 18.4 0.0 18.8 9.0 11.4 11.4 7.9 12.5 12.5 LnGrp LOS CC B BABBABB Approach Vol, veh/h 27 168 695 1169 Approach Delay, s/veh 21.3 18.5 11.2 12.0 Approach LOS C B B B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 8.5 23.4 9.0 7.2 7.2 24.7 5.5 10.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 6.0 31.4 6.5 18.1 5.5 31.9 5.5 19.1 Max Q Clear Time (g_c+I1), s 3.8 8.6 5.3 2.3 2.9 13.3 2.4 2.8 Green Ext Time (p_c), s 0.1 4.1 0.0 0.0 0.0 6.8 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 12.4 HCM 7th LOS B HCM 7th TWSC Projected 2030 without Project 4: Idaho 33 & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Intersection Int Delay, s/veh 5.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 30 20 40 70 5 50 125 30 1 235 70 Future Vol, veh/h 30 30 20 40 70 5 50 125 30 1 235 70 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 111111222111 Mvmt Flow 33 33 22 43 76 5 54 136 33 1 255 76 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 578 573 293 535 595 152 332 0 0 168 0 0 Stage 1 296 296 - 261 261 ------- Stage 2 283 277 - 274 334 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.12 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.218 - - 2.209 - - Pot Cap-1 Maneuver 428 431 748 458 419 897 1228 - - 1415 - - Stage 1 715 670 - 746 694 ------- Stage 2 727 683 - 734 645 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 330 410 748 390 398 897 1228 - - 1415 - - Mov Cap-2 Maneuver 330 410 - 390 398 ------- Stage 1 714 670 - 710 660 ------- Stage 2 608 649 - 678 645 ------- Approach EB WB NB SB HCM Control Delay, s/v14.35 17.81 1.97 0.02 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)423 - - 330 410 748 405 6 - - HCM Lane V/C Ratio 0.044 - - 0.099 0.08 0.029 0.309 0.001 - - HCM Control Delay (s/veh) 8.1 0 - 17.1 14.5 10 17.8 7.5 0 - HCM Lane LOS A A - C B A C A A - HCM 95th %tile Q(veh) 0.1 - - 0.3 0.3 0.1 1.3 0 - - Lanes, Volumes, Timings Projected 2030 without Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 290 1 30 435 540 0 0 425 80 Future Volume (vph)0 0 0 290 1 30 435 540 0 0 425 80 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)22.8 22.8 22.8 24.0 57.2 33.2 Total Split (%)28.5% 28.5% 28.5% 30.0% 71.5%41.5% Maximum Green (s)18.3 18.3 18.3 19.5 52.7 28.7 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 73.5 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2030 without Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 290 1 30 435 540 0 0 425 80 Future Volume (veh/h) 0 0 0 290 1 30 435 540 0 0 425 80 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1885 1885 Adj Flow Rate, veh/h 312 1 32 468 581 0 0 457 86 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, %222220011 Cap, veh/h 387 1 345 547 1176 0 0 543 102 Arrive On Green 0.22 0.22 0.22 0.20 0.63 0.00 0.00 0.35 0.35 Sat Flow, veh/h 1776 6 1585 1781 1870 0 0 1543 290 Grp Volume(v), veh/h 313032468581000543 Grp Sat Flow(s),veh/h/ln 1782 0 1585 1781 18700001833 Q Serve(g_s), s 9.8 0.0 0.9 8.7 9.8 0.0 0.0 0.0 16.0 Cycle Q Clear(g_c), s 9.8 0.0 0.9 8.7 9.8 0.0 0.0 0.0 16.0 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 388 0 345 547 1176000646 V/C Ratio(X)0.81 0.00 0.09 0.85 0.49 0.00 0.00 0.00 0.84 Avail Cap(c_a), veh/h 55504947831679000896 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 21.8 0.0 18.3 10.9 5.9 0.0 0.0 0.0 17.5 Incr Delay (d2), s/veh 5.7 0.0 0.1 6.5 0.3 0.0 0.0 0.0 5.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 0.0 0.3 3.4 2.8 0.0 0.0 0.0 6.9 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 27.5 0.0 18.4 17.4 6.2 0.0 0.0 0.0 22.8 LnGrp LOS C B B A C Approach Vol, veh/h 345 1049 543 Approach Delay, s/veh 26.7 11.2 22.8 Approach LOS C B C Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 41.4 16.2 25.2 17.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.7 19.5 28.7 18.3 Max Q Clear Time (g_c+I1), s 11.8 10.7 18.0 11.8 Green Ext Time (p_c), s 4.5 1.1 2.7 1.1 Intersection Summary HCM 7th Control Delay, s/veh 17.2 HCM 7th LOS B Lanes, Volumes, Timings Projected 2030 without Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 11513400000855400406750 Future Volume (vph) 11513400000855400406750 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)24.4 24.4 46.1 46.1 9.5 55.6 Total Split (%)30.5% 30.5%57.6% 57.6% 11.9% 69.5% Maximum Green (s) 19.9 19.9 41.6 41.6 5.0 51.1 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 65.2 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2030 without Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 11513400000855400406750 Future Volume (veh/h) 11513400000855400406750 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1885 1885 1870 1870 0 Adj Flow Rate, veh/h 125 1 158 0 929 234 43 734 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222 011220 Cap, veh/h 261 1 231 0 1085 919 281 1304 0 Arrive On Green 0.15 0.15 0.15 0.00 0.58 0.58 0.04 0.70 0.00 Sat Flow, veh/h 1781 10 1577 0 1885 1598 1781 1870 0 Grp Volume(v), veh/h 125 0 159 0 929 234 43 734 0 Grp Sat Flow(s),veh/h/ln 1781 0 1587 0 1885 1598 1781 1870 0 Q Serve(g_s), s 3.7 0.0 5.5 0.0 23.7 4.2 0.5 11.2 0.0 Cycle Q Clear(g_c), s 3.7 0.0 5.5 0.0 23.7 4.2 0.5 11.2 0.0 Prop In Lane 1.00 0.99 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 261 0 232 0 1085 919 281 1304 0 V/C Ratio(X)0.48 0.00 0.68 0.00 0.86 0.25 0.15 0.56 0.00 Avail Cap(c_a), veh/h 617 0 550 0 1365 1157 359 1663 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 22.5 0.0 23.3 0.0 10.2 6.1 9.8 4.3 0.0 Incr Delay (d2), s/veh 1.4 0.0 3.6 0.0 4.6 0.1 0.2 0.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 0.0 2.1 0.0 8.5 1.1 0.2 2.5 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 23.9 0.0 26.8 0.0 14.8 6.2 10.1 4.7 0.0 LnGrp LOS C C BABA Approach Vol, veh/h 284 1163 777 Approach Delay, s/veh 25.5 13.1 5.0 Approach LOS C B A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 7.0 37.6 12.9 44.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 41.6 19.9 51.1 Max Q Clear Time (g_c+I1), s 2.5 25.7 7.5 13.2 Green Ext Time (p_c), s 0.0 7.4 1.0 6.2 Intersection Summary HCM 7th Control Delay, s/veh 11.9 HCM 7th LOS B Lanes, Volumes, Timings Projected 2030 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)30 15 35 355 25 150 40 880 460 115 705 35 Future Volume (vph)30 15 35 355 25 150 40 880 460 115 705 35 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 2678 2125 2783 Travel Time (s)35.9 60.9 48.3 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)9.5 22.5 12.2 25.2 9.5 35.7 9.6 35.8 Total Split (%)11.9% 28.1% 15.3% 31.5% 11.9% 44.6% 12.0% 44.8% Maximum Green (s)5.0 18.0 7.7 20.7 5.0 31.2 5.1 31.3 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 62.8 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2030 without Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 15 35 355 25 150 40 880 460 115 705 35 Future Volume (veh/h) 30 15 35 355 25 150 40 880 460 115 705 35 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1841 1841 1841 1885 1885 1885 1885 1885 1870 1885 1885 1885 Adj Flow Rate, veh/h 33 16 0 386 27 16 43 957 424 125 766 38 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 444111112111 Cap, veh/h 259 116 0 409 166 99 424 1119 489 280 1700 84 Arrive On Green 0.03 0.06 0.00 0.12 0.15 0.15 0.04 0.46 0.46 0.07 0.49 0.49 Sat Flow, veh/h 1753 1841 0 1795 1109 657 1795 2425 1060 1795 3473 172 Grp Volume(v), veh/h 33 16 0 386 0 43 43 703 678 125 395 409 Grp Sat Flow(s),veh/h/ln 1753 1841 0 1795 0 1767 1795 1791 1694 1795 1791 1854 Q Serve(g_s), s 1.1 0.5 0.0 7.7 0.0 1.3 0.8 22.1 22.8 2.2 9.2 9.2 Cycle Q Clear(g_c), s 1.1 0.5 0.0 7.7 0.0 1.3 0.8 22.1 22.8 2.2 9.2 9.2 Prop In Lane 1.00 0.00 1.00 0.37 1.00 0.63 1.00 0.09 Lane Grp Cap(c), veh/h 259 116 0 409 0 265 424 826 782 280 877 908 V/C Ratio(X)0.13 0.14 0.00 0.94 0.00 0.16 0.10 0.85 0.87 0.45 0.45 0.45 Avail Cap(c_a), veh/h 337 522 0 409 0 577 491 881 834 298 884 915 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.3 28.1 0.0 25.8 0.0 23.5 8.5 15.1 15.3 13.2 10.6 10.6 Incr Delay (d2), s/veh 0.2 0.5 0.0 30.5 0.0 0.3 0.1 7.7 9.2 1.1 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.2 0.0 5.3 0.0 0.6 0.3 9.4 9.4 0.8 3.2 3.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 26.5 28.6 0.0 56.3 0.0 23.8 8.6 22.8 24.5 14.3 11.0 10.9 LnGrp LOS C C E C A C C B B B Approach Vol, veh/h 49 429 1424 929 Approach Delay, s/veh 27.2 53.0 23.2 11.4 Approach LOS C D C B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 8.9 33.8 12.2 8.5 7.2 35.6 6.7 14.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.1 31.2 7.7 18.0 5.0 31.3 5.0 20.7 Max Q Clear Time (g_c+I1), s 4.2 24.8 9.7 2.5 2.8 11.2 3.1 3.3 Green Ext Time (p_c), s 0.0 4.5 0.0 0.0 0.0 5.1 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 23.9 HCM 7th LOS C HCM 7th TWSC Projected 2030 without Project 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 11/15/2024 Intersection Int Delay, s/veh 7.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 80 65 85 35 65 5 70 225 45 1 205 90 Future Vol, veh/h 80 65 85 35 65 5 70 225 45 1 205 90 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 111111111111 Mvmt Flow 83 68 89 36 68 5 73 234 47 1 214 94 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 677 690 260 653 713 258 307 0 0 281 0 0 Stage 1 263 263 - 404 404 ------- Stage 2 414 427 - 249 309 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 368 370 781 382 358 783 1259 - - 1287 - - Stage 1 745 693 - 626 601 ------- Stage 2 617 587 - 757 661 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 275 344 781 256 333 783 1259 - - 1287 - - Mov Cap-2 Maneuver 275 344 - 256 333 ------- Stage 1 744 692 - 582 560 ------- Stage 2 502 546 - 605 660 ------- Approach EB WB NB SB HCM Control Delay, s/v 17.1 22.75 1.65 0.03 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)359 - - 275 344 781 311 6 - - HCM Lane V/C Ratio 0.058 - - 0.303 0.197 0.113 0.352 0.001 - - HCM Control Delay (s/veh) 8 0 - 23.7 18 10.2 22.7 7.8 0 - HCM Lane LOS A A - C C B C A A - HCM 95th %tile Q(veh) 0.2 - - 1.2 0.7 0.4 1.5 0 - - Lanes, Volumes, Timings Projected 2030 with Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 360 1 40 250 330 0 0 635 120 Future Volume (vph)0 0 0 360 1 40 250 330 0 0 635 120 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)23.0 23.0 23.0 14.0 57.0 43.0 Total Split (%)28.8% 28.8% 28.8% 17.5% 71.3%53.8% Maximum Green (s)18.5 18.5 18.5 9.5 52.5 38.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 78.5 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2030 with Project 1: N Salem Hwy & US 20 SB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 360 1 40 250 330 0 0 635 120 Future Volume (veh/h) 0 0 0 360 1 40 250 330 0 0 635 120 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1856 1826 1826 0 0 1870 1870 Adj Flow Rate, veh/h 391 1 43 272 359 0 0 690 130 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, %333550022 Cap, veh/h 423 1 377 312 1175 0 0 732 138 Arrive On Green 0.24 0.24 0.24 0.11 0.64 0.00 0.00 0.48 0.48 Sat Flow, veh/h 1763 5 1572 1739 1826 0 0 1530 288 Grp Volume(v), veh/h 392043272359000820 Grp Sat Flow(s),veh/h/ln 1767 0 1572 1739 18260001818 Q Serve(g_s), s 16.7 0.0 1.6 6.2 6.7 0.0 0.0 0.0 33.1 Cycle Q Clear(g_c), s 16.7 0.0 1.6 6.2 6.7 0.0 0.0 0.0 33.1 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.16 Lane Grp Cap(c), veh/h 424 0 377 312 1175000870 V/C Ratio(X)0.93 0.00 0.11 0.87 0.31 0.00 0.00 0.00 0.94 Avail Cap(c_a), veh/h 42403773401242000907 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 28.7 0.0 22.9 18.0 6.1 0.0 0.0 0.0 19.1 Incr Delay (d2), s/veh 26.1 0.0 0.1 20.1 0.1 0.0 0.0 0.0 17.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 9.8 0.0 0.6 3.9 2.2 0.0 0.0 0.0 16.6 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 54.8 0.0 23.1 38.1 6.2 0.0 0.0 0.0 36.4 LnGrp LOS D C D A D Approach Vol, veh/h 435 631 820 Approach Delay, s/veh 51.6 20.0 36.4 Approach LOS D B D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 54.2 12.8 41.4 23.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.5 9.5 38.5 18.5 Max Q Clear Time (g_c+I1), s 8.7 8.2 35.1 18.7 Green Ext Time (p_c), s 2.4 0.1 1.8 0.0 Intersection Summary HCM 7th Control Delay, s/veh 34.4 HCM 7th LOS C Lanes, Volumes, Timings Projected 2030 with Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 9554350000485215409550 Future Volume (vph) 9554350000485215409550 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)29.0 29.0 41.5 41.5 9.5 51.0 Total Split (%)36.3% 36.3%51.9% 51.9% 11.9% 63.8% Maximum Green (s) 24.5 24.5 37.0 37.0 5.0 46.5 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 76.2 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2030 with Project 2: N Salem Hwy & US 20 NB Ramps AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 9554350000485215409550 Future Volume (veh/h) 9554350000485215409550 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1826 1826 1826 0 1841 1841 1870 1870 0 Adj Flow Rate, veh/h 103 5 397 0 527 109 43 1038 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 555 044220 Cap, veh/h 504 6 444 0 903 765 393 1103 0 Arrive On Green 0.29 0.29 0.29 0.00 0.49 0.49 0.04 0.59 0.00 Sat Flow, veh/h 1739 19 1531 0 1841 1560 1781 1870 0 Grp Volume(v), veh/h 103 0 402 0 527 109 43 1038 0 Grp Sat Flow(s),veh/h/ln 1739 0 1550 0 1841 1560 1781 1870 0 Q Serve(g_s), s 3.3 0.0 18.6 0.0 15.3 2.9 0.8 38.3 0.0 Cycle Q Clear(g_c), s 3.3 0.0 18.6 0.0 15.3 2.9 0.8 38.3 0.0 Prop In Lane 1.00 0.99 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 504 0 450 0 903 765 393 1103 0 V/C Ratio(X)0.20 0.00 0.89 0.00 0.58 0.14 0.11 0.94 0.00 Avail Cap(c_a), veh/h 568 0 507 0 909 770 441 1161 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 20.1 0.0 25.5 0.0 13.6 10.5 9.7 14.2 0.0 Incr Delay (d2), s/veh 0.2 0.0 16.9 0.0 1.0 0.1 0.1 14.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 8.6 0.0 5.9 0.9 0.3 17.5 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 20.3 0.0 42.4 0.0 14.6 10.5 9.8 28.3 0.0 LnGrp LOS C D B B A C Approach Vol, veh/h 505 636 1081 Approach Delay, s/veh 37.8 13.9 27.6 Approach LOS D B C Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 7.5 41.2 26.2 48.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 37.0 24.5 46.5 Max Q Clear Time (g_c+I1), s 2.8 17.3 20.6 40.3 Green Ext Time (p_c), s 0.0 3.8 1.1 3.9 Intersection Summary HCM 7th Control Delay, s/veh 26.0 HCM 7th LOS C Lanes, Volumes, Timings Projected 2030 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)15 10 20 145 20 155 55 505 145 185 980 30 Future Volume (vph)15 10 20 145 20 155 55 505 145 185 980 30 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 818 765 2783 Travel Time (s)35.9 18.6 17.4 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)10.0 22.6 11.0 23.6 10.0 35.9 10.5 36.4 Total Split (%)12.5% 28.3% 13.8% 29.5% 12.5% 44.9% 13.1% 45.5% Maximum Green (s)5.5 18.1 6.5 19.1 5.5 31.4 6.0 31.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 50.5 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2030 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 15 10 20 145 20 155 55 505 145 185 980 30 Future Volume (veh/h) 15 10 20 145 20 155 55 505 145 185 980 30 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1856 1856 1856 1841 1841 1841 1870 1870 1870 Adj Flow Rate, veh/h 16 11 0 153 21 16 58 532 121 195 1032 32 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 111333444222 Cap, veh/h 263 111 0 402 139 106 336 1066 241 501 1476 46 Arrive On Green 0.02 0.06 0.00 0.10 0.14 0.14 0.06 0.38 0.38 0.10 0.42 0.42 Sat Flow, veh/h 1795 1885 0 1767 977 744 1753 2832 642 1781 3518 109 Grp Volume(v), veh/h 16 11 0 153 0 37 58 328 325 195 521 543 Grp Sat Flow(s),veh/h/ln 1795 1885 0 1767 0 1722 1753 1749 1725 1781 1777 1851 Q Serve(g_s), s 0.4 0.3 0.0 3.8 0.0 0.9 1.0 7.1 7.2 3.2 11.9 11.9 Cycle Q Clear(g_c), s 0.4 0.3 0.0 3.8 0.0 0.9 1.0 7.1 7.2 3.2 11.9 11.9 Prop In Lane 1.00 0.00 1.00 0.43 1.00 0.37 1.00 0.06 Lane Grp Cap(c), veh/h 263 111 0 402 0 245 336 658 649 501 745 776 V/C Ratio(X)0.06 0.10 0.00 0.38 0.00 0.15 0.17 0.50 0.50 0.39 0.70 0.70 Avail Cap(c_a), veh/h 426 688 0 451 0 663 433 1108 1093 541 1143 1191 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.2 22.1 0.0 17.6 0.0 18.6 9.4 11.9 11.9 8.4 11.8 11.8 Incr Delay (d2), s/veh 0.1 0.4 0.0 0.6 0.0 0.3 0.2 0.6 0.6 0.5 1.2 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.1 0.0 1.4 0.0 0.4 0.3 2.4 2.4 1.0 4.0 4.2 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 21.3 22.5 0.0 18.2 0.0 18.9 9.6 12.5 12.5 8.9 13.0 13.0 LnGrp LOS CC B BABBABB Approach Vol, veh/h 27 190 711 1259 Approach Delay, s/veh 21.8 18.4 12.2 12.4 Approach LOS C B B B Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.4 23.2 9.6 7.4 7.3 25.3 5.5 11.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 6.0 31.4 6.5 18.1 5.5 31.9 5.5 19.1 Max Q Clear Time (g_c+I1), s 5.2 9.2 5.8 2.3 3.0 13.9 2.4 2.9 Green Ext Time (p_c), s 0.0 4.2 0.0 0.0 0.0 6.8 0.0 0.1 Intersection Summary HCM 7th Control Delay, s/veh 13.0 HCM 7th LOS B HCM 7th TWSC Projected 2030 with Project 4: Idaho 33 & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 5.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 40 35 20 40 75 5 50 125 30 1 235 85 Future Vol, veh/h 40 35 20 40 75 5 50 125 30 1 235 85 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 111111222111 Mvmt Flow 43 38 22 43 82 5 54 136 33 1 255 92 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 589 581 302 538 611 152 348 0 0 168 0 0 Stage 1 304 304 - 261 261 ------- Stage 2 285 277 - 277 350 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.12 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.218 - - 2.209 - - Pot Cap-1 Maneuver 421 427 740 456 410 897 1211 - - 1415 - - Stage 1 708 665 - 746 694 ------- Stage 2 724 683 - 732 635 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 318 405 740 382 389 897 1211 - - 1415 - - Mov Cap-2 Maneuver 318 405 - 382 389 ------- Stage 1 707 664 - 709 660 ------- Stage 2 599 649 - 669 634 ------- Approach EB WB NB SB HCM Control Delay, s/v15.19 18.48 1.98 0.02 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)423 - - 318 405 740 396 5 - - HCM Lane V/C Ratio 0.045 - - 0.137 0.094 0.029 0.329 0.001 - - HCM Control Delay (s/veh) 8.1 0 - 18.1 14.8 10 18.5 7.5 0 - HCM Lane LOS A A - C B B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.5 0.3 0.1 1.4 0 - - HCM 7th TWSC Projected 2030 with Project 5: Site Drwy/Walmart Drwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 3.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 20 90 55 20 175 15 65 1 10 10 1 15 Future Vol, veh/h 20 90 55 20 175 15 65 1 10 10 1 15 Conflicting Peds, #/hr000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 100 ----50--50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 222222222222 Mvmt Flow 22 98 60 22 190 16 71 1 11 11 1 16 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 207 0 0 158 0 0 405 421 128 384 443 198 Stage 1 ------171171-242242- Stage 2 ------234250-142201- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.125.52-6.125.52- Critical Hdwy Stg 2 ------6.125.52-6.125.52- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1365 - - 1422 - - 556 524 922 575 509 843 Stage 1 ------831757-762706- Stage 2 ------769700-861735- Platoon blocked, %- -- - Mov Cap-1 Maneuver 1365 - - 1422 - - 527 507 922 549 493 843 Mov Cap-2 Maneuver ------527507-549493- Stage 1 ------817745-750695- Stage 2 ------741689-836723- Approach EB WB NB SB HCM Control Delay, s/v 0.93 0.72 12.39 10.38 HCM LOS B B Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h)527 922 1365 - - 1422 - - 543 843 HCM Lane V/C Ratio 0.136 0.012 0.016 - - 0.015 - - 0.022 0.019 HCM Control Delay (s/veh) 12.9 8.9 7.7 - - 7.6 - - 11.8 9.4 HCM Lane LOS B A A - - A - - B A HCM 95th %tile Q(veh) 0.5 0 0 - - 0 - - 0.1 0.1 HCM 7th TWSC Projected 2030 with Project 6: Site Drwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 90 20 0 215 0 5 Future Vol, veh/h 9020021505 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 98 22 0 234 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 109 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 945 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----945 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 8.83 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)945 - - - HCM Lane V/C Ratio 0.006 - - - HCM Control Delay (s/veh) 8.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2030 with Project 7: Site Drwy & E Moody Rd AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 95 5 0 215 0 5 Future Vol, veh/h 95 5 0 215 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 103 5 0 234 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 106 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 948 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----948 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 8.82 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)948 - - - HCM Lane V/C Ratio 0.006 - - - HCM Control Delay (s/veh) 8.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2030 with Project 8: N 2nd E & Site Drwy AM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 5 15 685 25 15 1105 Future Vol, veh/h 5 15 685 25 15 1105 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - - 100 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 16 745 27 16 1201 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1391 386 0 0 772 0 Stage 1 758 ----- Stage 2 633 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 15.84----- Critical Hdwy Stg 25.84----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 133 612 - - 839 - Stage 1 423 ----- Stage 2 491 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 130 612 - - 839 - Mov Cap-2 Maneuver 265 ----- Stage 1 423 ----- Stage 2 482 ----- Approach WB NB SB HCM Control Delay, s/v 13 0 0.13 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h)- - 265 612 839 - HCM Lane V/C Ratio - - 0.021 0.027 0.019 - HCM Control Delay (s/veh) - - 18.9 11 9.4 - HCM Lane LOS - - C B A - HCM 95th %tile Q(veh) - - 0.1 0.1 0.1 - Lanes, Volumes, Timings Projected 2030 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 0 0 350 1 30 505 565 0 0 450 80 Future Volume (vph)0 0 0 350 1 30 505 565 0 0 450 80 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 0 200 150 0 0 0 Storage Lanes 0 0 0 1 1 0 0 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1742 1416 913 1401 Travel Time (s)39.6 32.2 20.8 31.8 Turn Type Perm NA Perm pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 8 2 Detector Phase 88852 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 9.5 22.5 22.5 Total Split (s)22.8 22.8 22.8 24.0 57.2 33.2 Total Split (%)28.5% 28.5% 28.5% 30.0% 71.5%41.5% Maximum Green (s)18.3 18.3 18.3 19.5 52.7 28.7 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None Min Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 77.6 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Splits and Phases: 1: N Salem Hwy & US 20 SB Ramps HCM 7th Signalized Intersection Summary Projected 2030 with Project 1: N Salem Hwy & US 20 SB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 0 350 1 30 505 565 0 0 450 80 Future Volume (veh/h) 0 0 0 350 1 30 505 565 0 0 450 80 Initial Q (Qb), veh 000000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT)1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1885 1885 Adj Flow Rate, veh/h 376 1 32 543 608 0 0 484 86 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, %222220011 Cap, veh/h 415 1 370 576 1215 0 0 531 94 Arrive On Green 0.23 0.23 0.23 0.25 0.65 0.00 0.00 0.34 0.34 Sat Flow, veh/h 1777 5 1585 1781 1870 0 0 1558 277 Grp Volume(v), veh/h 377032543608000570 Grp Sat Flow(s),veh/h/ln 1782 0 1585 1781 18700001835 Q Serve(g_s), s 15.8 0.0 1.2 17.2 13.0 0.0 0.0 0.0 22.8 Cycle Q Clear(g_c), s 15.8 0.0 1.2 17.2 13.0 0.0 0.0 0.0 22.8 Prop In Lane 1.00 1.00 1.00 0.00 0.00 0.15 Lane Grp Cap(c), veh/h 416 0 370 576 1215000625 V/C Ratio(X)0.91 0.00 0.09 0.94 0.50 0.00 0.00 0.00 0.91 Avail Cap(c_a), veh/h 42403775821282000685 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 Uniform Delay (d), s/veh 28.7 0.0 23.1 18.8 7.0 0.0 0.0 0.0 24.3 Incr Delay (d2), s/veh 22.6 0.0 0.1 23.8 0.3 0.0 0.0 0.0 15.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 9.1 0.0 0.5 10.1 4.2 0.0 0.0 0.0 12.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 51.3 0.0 23.2 42.6 7.3 0.0 0.0 0.0 40.0 LnGrp LOS D C D A D Approach Vol, veh/h 409 1151 570 Approach Delay, s/veh 49.1 23.9 40.0 Approach LOS D C D Timer - Assigned Phs 2 5 6 8 Phs Duration (G+Y+Rc), s 54.5 23.8 30.7 22.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 52.7 19.5 28.7 18.3 Max Q Clear Time (g_c+I1), s 15.0 19.2 24.8 17.8 Green Ext Time (p_c), s 4.7 0.1 1.3 0.1 Intersection Summary HCM 7th Control Delay, s/veh 33.1 HCM 7th LOS C Lanes, Volumes, Timings Projected 2030 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 11514150000950460407550 Future Volume (vph) 11514150000950460407550 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 100 0 0 0 0 150 0 Storage Lanes 1 1 0 0 0 1 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1724 1826 2783 913 Travel Time (s)39.2 41.5 63.3 20.8 Turn Type Perm NA NA Perm pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 2 6 Detector Phase 4 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)22.5 22.5 22.5 22.5 9.5 22.5 Total Split (s)22.5 22.5 48.0 48.0 9.5 57.5 Total Split (%)28.1% 28.1%60.0% 60.0% 11.9% 71.9% Maximum Green (s) 18.0 18.0 43.5 43.5 5.0 53.0 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None Min Min None Min Walk Time (s)7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 80 Actuated Cycle Length: 74.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Splits and Phases: 2: N Salem Hwy & US 20 NB Ramps HCM 7th Signalized Intersection Summary Projected 2030 with Project 2: N Salem Hwy & US 20 NB Ramps PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 11514150000950460407550 Future Volume (veh/h) 11514150000950460407550 Initial Q (Qb), veh 000 000000 Lane Width Adj.1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1885 1885 1870 1870 0 Adj Flow Rate, veh/h 125 1 266 0 1033 272 43 821 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222 011220 Cap, veh/h 356 1 316 0 1088 922 196 1268 0 Arrive On Green 0.20 0.20 0.20 0.00 0.58 0.58 0.04 0.68 0.00 Sat Flow, veh/h 1781 6 1580 0 1885 1598 1781 1870 0 Grp Volume(v), veh/h 125 0 267 0 1033 272 43 821 0 Grp Sat Flow(s),veh/h/ln 1781 0 1586 0 1885 1598 1781 1870 0 Q Serve(g_s), s 4.4 0.0 11.9 0.0 37.7 6.4 0.6 18.5 0.0 Cycle Q Clear(g_c), s 4.4 0.0 11.9 0.0 37.7 6.4 0.6 18.5 0.0 Prop In Lane 1.00 1.00 0.00 1.00 1.00 0.00 Lane Grp Cap(c), veh/h 356 0 317 0 1088 922 196 1268 0 V/C Ratio(X)0.35 0.00 0.84 0.00 0.95 0.30 0.22 0.65 0.00 Avail Cap(c_a), veh/h 436 0 388 0 1114 944 246 1347 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 25.3 0.0 28.3 0.0 14.6 7.9 16.7 6.8 0.0 Incr Delay (d2), s/veh 0.6 0.0 13.1 0.0 16.1 0.2 0.6 1.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 0.0 5.5 0.0 18.1 1.9 0.4 5.8 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 25.9 0.0 41.4 0.0 30.7 8.1 17.3 7.8 0.0 LnGrp LOS C D C A B A Approach Vol, veh/h 392 1305 864 Approach Delay, s/veh 36.5 26.0 8.3 Approach LOS D C A Timer - Assigned Phs 1 2 4 6 Phs Duration (G+Y+Rc), s 7.4 47.0 19.2 54.4 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.0 43.5 18.0 53.0 Max Q Clear Time (g_c+I1), s 2.6 39.7 13.9 20.5 Green Ext Time (p_c), s 0.0 2.7 0.8 7.3 Intersection Summary HCM 7th Control Delay, s/veh 21.6 HCM 7th LOS C Lanes, Volumes, Timings Projected 2030 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)30 15 35 415 25 185 40 1000 460 240 735 35 Future Volume (vph)30 15 35 415 25 185 40 1000 460 240 735 35 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 0 200 0 150 0 125 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)30 30 30 30 Link Distance (ft)1579 818 765 2783 Travel Time (s)35.9 18.6 17.4 63.3 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s)9.6 22.6 30.4 43.4 9.6 70.0 27.0 87.4 Total Split (%)6.4% 15.1% 20.3% 28.9% 6.4% 46.7% 18.0% 58.3% Maximum Green (s)5.1 18.1 25.9 38.9 5.1 65.5 22.5 82.9 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Min None Min Walk Time (s)7.0 7.0 7.0 7.0 Flash Don't Walk (s)11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr)0 0 0 0 Intersection Summary Area Type:Other Cycle Length: 150 Actuated Cycle Length: 134.3 Natural Cycle: 140 Control Type: Actuated-Uncoordinated Splits and Phases: 3: N 2nd E/N Salem Hwy & E Moody Rd HCM 7th Signalized Intersection Summary Projected 2030 with Project 3: N 2nd E/N Salem Hwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 30 15 35 415 25 185 40 1000 460 240 735 35 Future Volume (veh/h) 30 15 35 415 25 185 40 1000 460 240 735 35 Initial Q (Qb), veh 000000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1841 1841 1841 1885 1885 1885 1885 1885 1870 1885 1885 1885 Adj Flow Rate, veh/h 33 16 0 451 27 33 43 1087 467 261 799 38 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 444111112111 Cap, veh/h 157 72 0 471 168 206 414 1219 510 291 2021 96 Arrive On Green 0.03 0.04 0.00 0.21 0.22 0.22 0.03 0.50 0.50 0.12 0.58 0.58 Sat Flow, veh/h 1753 1841 0 1795 772 943 1795 2461 1030 1795 3481 166 Grp Volume(v), veh/h 33 16 0 451 0 60 43 783 771 261 411 426 Grp Sat Flow(s),veh/h/ln 1753 1841 0 1795 0 1715 1795 1791 1700 1795 1791 1855 Q Serve(g_s), s 2.2 1.1 0.0 25.9 0.0 3.6 1.5 49.3 52.5 12.1 15.7 15.7 Cycle Q Clear(g_c), s 2.2 1.1 0.0 25.9 0.0 3.6 1.5 49.3 52.5 12.1 15.7 15.7 Prop In Lane 1.00 0.00 1.00 0.55 1.00 0.61 1.00 0.09 Lane Grp Cap(c), veh/h 157 72 0 471 0 374 414 887 842 291 1040 1077 V/C Ratio(X)0.21 0.22 0.00 0.96 0.00 0.16 0.10 0.88 0.92 0.90 0.40 0.40 Avail Cap(c_a), veh/h 180 265 0 471 0 531 432 934 887 405 1182 1225 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 55.8 58.5 0.0 46.3 0.0 39.8 14.5 28.4 29.2 37.1 14.3 14.3 Incr Delay (d2), s/veh 0.7 1.6 0.0 31.0 0.0 0.2 0.1 9.7 13.5 17.2 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.5 0.0 5.6 0.0 1.5 0.6 22.9 23.9 9.4 6.3 6.6 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 56.5 60.1 0.0 77.3 0.0 40.0 14.6 38.1 42.8 54.3 14.6 14.6 LnGrp LOS E E E D B D D D B B Approach Vol, veh/h 49 511 1597 1098 Approach Delay, s/veh 57.6 72.9 39.7 24.0 Approach LOS E E D C Timer - Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 19.1 66.7 30.4 9.4 8.4 77.4 7.9 31.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 22.5 65.5 25.9 18.1 5.1 82.9 5.1 38.9 Max Q Clear Time (g_c+I1), s 14.1 54.5 27.9 3.1 3.5 17.7 4.2 5.6 Green Ext Time (p_c), s 0.5 7.7 0.0 0.0 0.0 6.5 0.0 0.3 Intersection Summary HCM 7th Control Delay, s/veh 39.9 HCM 7th LOS D HCM 7th TWSC Projected 2030 with Project 4: Idaho 33 & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 8.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 105 80 85 35 80 5 70 225 45 1 205 110 Future Vol, veh/h 105 80 85 35 80 5 70 225 45 1 205 110 Conflicting Peds, #/hr000000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 150 - 150 --------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, % 111111111111 Mvmt Flow 109 83 89 36 83 5 73 234 47 1 214 115 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 695 700 271 661 734 258 328 0 0 281 0 0 Stage 1 273 273 - 404 404 ------- Stage 2 422 427 - 257 330 ------- Critical Hdwy 7.11 6.51 6.21 7.11 6.51 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 16.115.51-6.115.51------- Critical Hdwy Stg 26.115.51-6.115.51------- Follow-up Hdwy 3.509 4.009 3.309 3.509 4.009 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 358 365 770 377 349 783 1237 - - 1287 - - Stage 1 735 686 - 626 601 ------- Stage 2 611 587 - 750 647 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 250 339 770 238 324 783 1237 - - 1287 - - Mov Cap-2 Maneuver 250 339 - 238 324 ------- Stage 1 735 685 - 582 559 ------- Stage 2 481 546 - 582 647 ------- Approach EB WB NB SB HCM Control Delay, s/v20.61 25.35 1.67 0.02 HCM LOS C D Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2EBLn3WBLn1 SBL SBT SBR Capacity (veh/h)359 - - 250 339 770 300 5 - - HCM Lane V/C Ratio 0.059 - - 0.438 0.246 0.115 0.417 0.001 - - HCM Control Delay (s/veh) 8.1 0 - 30.2 19.1 10.3 25.4 7.8 0 - HCM Lane LOS A A - D C B D A A - HCM 95th %tile Q(veh) 0.2 - - 2.1 1 0.4 2 0 - - HCM 7th TWSC Projected 2030 with Project 5: Site Drwy/Walmart Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 5.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 30 255 110 45 200 20 130 1 25 20 1 30 Future Vol, veh/h 30 255 110 45 200 20 130 1 25 20 1 30 Conflicting Peds, #/hr000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 100 - - 100 ----50--50 Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 222222222222 Mvmt Flow 33 277 120 49 217 22 141 1 27 22 1 33 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 239 0 0 397 0 0 718 739 337 669 788 228 Stage 1 ------402402-326326- Stage 2 ------316337-343462- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.125.52-6.125.52- Critical Hdwy Stg 2 ------6.125.52-6.125.52- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1328 - - 1162 - - 344 345 705 371 323 811 Stage 1 ------625600-686648- Stage 2 ------695641-672565- Platoon blocked, %- -- - Mov Cap-1 Maneuver 1328 - - 1162 - - 308 322 705 332 302 811 Mov Cap-2 Maneuver ------308322-332302- Stage 1 ------609585-658621- Stage 2 ------638614-629551- Approach EB WB NB SB HCM Control Delay, s/v 0.59 1.4 23.81 12.53 HCM LOS C B Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h)308 705 1328 - - 1162 - - 331 811 HCM Lane V/C Ratio 0.463 0.039 0.025 - - 0.042 - - 0.069 0.04 HCM Control Delay (s/veh) 26.4 10.3 7.8 - - 8.2 - - 16.7 9.6 HCM Lane LOS D B A - - A - - C A HCM 95th %tile Q(veh) 2.3 0.1 0.1 - - 0.1 - - 0.2 0.1 HCM 7th TWSC Projected 2030 with Project 6: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 255 50 0 260 0 15 Future Vol, veh/h 255 50 0 260 0 15 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 277 54 0 283 0 16 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 304 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 735 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----735 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 10.01 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)735 - - - HCM Lane V/C Ratio 0.022 - - - HCM Control Delay (s/veh) 10 - - - HCM Lane LOS B - - - HCM 95th %tile Q(veh) 0.1 - - - HCM 7th TWSC Projected 2030 with Project 7: Site Drwy & E Moody Rd PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 265 5 0 260 0 5 Future Vol, veh/h 265 5 0 260 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length -----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 288 5 0 283 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 - - - 291 Stage 1 ------ Stage 2 ------ Critical Hdwy -----6.22 Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy -----3.318 Pot Cap-1 Maneuver - - 0 - 0 748 Stage 1 - - 0 - 0 - Stage 2 - - 0 - 0 - Platoon blocked, % - -- Mov Cap-1 Maneuver -----748 Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB WB NB HCM Control Delay, s/v 0 0 9.85 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBT Capacity (veh/h)748 - - - HCM Lane V/C Ratio 0.007 - - - HCM Control Delay (s/veh) 9.8 - - - HCM Lane LOS A - - - HCM 95th %tile Q(veh) 0 - - - HCM 7th TWSC Projected 2030 with Project 8: N 2nd E & Site Drwy PM Peak Hour Rexburg WinCo Synchro 12 Report SCJ Alliance 12/06/2024 Intersection Int Delay, s/veh 2.3 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 25 155 1345 85 70 890 Future Vol, veh/h 25 155 1345 85 70 890 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - - 100 - Veh in Median Storage, # 2 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 27 168 1462 92 76 967 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 2144 777 0 0 1554 0 Stage 1 1508 ----- Stage 2 636 ----- Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 15.84----- Critical Hdwy Stg 25.84----- Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 42 340 - - 422 - Stage 1 169 ----- Stage 2 490 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 34 340 - - 422 - Mov Cap-2 Maneuver 149 ----- Stage 1 169 ----- Stage 2 401 ----- Approach WB NB SB HCM Control Delay, s/v26.83 0 1.12 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h)- - 149 340 422 - HCM Lane V/C Ratio - - 0.182 0.496 0.18 - HCM Control Delay (s/veh) - - 34.4 25.6 15.4 - HCM Lane LOS - - D D C - HCM 95th %tile Q(veh) - - 0.6 2.6 0.7 -