Loading...
HomeMy WebLinkAbout22211 Palisades Apt. ComCheck 6.8.23n�( COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: Rexburg, Idaho 2018 IECC 22211 Palisades Apt Pocatello, Idaho 6b New Construction Owner/Agent: Additional Efficiency Package(s) Credits: 1.0 Required 0.0 Proposed Mechanical Systems List Quantity System Type & Description Designer/Contractor: Scott Roberts Engineered Systems Associates 1355 East Center St. Pocatello, Idaho 83201 208-233-0501 scott@engsystems.com F2 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 36 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Cooling: 1 each - Single Package DX Unit, Capacity = 18 kBtu/h, Air -Cooled Condenser, Unknown Economizer Proposed Efficiency = 14.00 SEER, Required Efficiency = 14.00 SEER Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: F2 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 1 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan efficiency, 0.0 design fan efficiency F3 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 40 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Cooling: 1 each - Single Package DX Unit, Capacity = 18 kBtu/h, Air -Cooled Condenser, Unknown Economizer Proposed Efficiency = 14.00 SEER, Required Efficiency = 14.00 SEER Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 Fan System: F2 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 1 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan efficiency, 0.0 design fan efficiency F1 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 44 kBtu/h Proposed Efficiency = 95.00% Ec, Required Efficiency: 80.00 % Ec Fan System: F1 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 2 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan efficiency, 0.0 design fan efficiency Water Heater: Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 250 kBtu/h w/ Circulation Pump Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 1 of 10 Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. David Hansen, Engineer Name - Title Project Title: 22211 Palisades Apt Data filename: t44" (-"— Signature 5/16/2023 Date Report date: 05/16/23 Page 2 of 10 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or Complies [PR2]1 calculations provide all information 17Does Not with which compliance can be �TVot Observable determined for the mechanical IINot Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or Complies [PR3]1 calculations provide all information IIDoes Not with which compliance can be �TVot Observable determined for the service water ONot Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C406 Plans, specifications, and/or Complies [PR9]1 calculations provide all information UDoes Not with which compliance can be Not Observable determined for the additional energy IINot Applicable efficiency package options. Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 3 of 10 Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions C403.12.2 1 Snow/ice melting system and freeze Complies 1 protection systems have sensors and IIDoes Not C403.12.3 !controls configured to limit service for [FO9]3 �1Vot Observable pavement temperature and outdoor temperature. future connection to Not Applicable controls. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 4 of 10 Section # Plumbing Rough -In Inspection Complies? Comments/Assumptions & Req.ID C404.5, I Heated water supply piping conforms Complies C404.5.1, Ito pipe length and volume IIDoes Not C404.5.2 requirements. Refer to section details. �1Vot Observable [PL6]3 ETNot Applicable C404.6.1, ',Automatic time switches installed to LJComplies C404.6.2 automatically switch off the PDoes Not [PL3]1 recirculating hot-water system or heat IINot Observable Itrace. QNot Applicable C404.6.3 Pumps that circulate water between a Complies [PL7]3 heater and storage tank have controls Uboes Not !that limit operation from startup to <= 5 minutes after end of heating IINot Observable ;QNot cycle. Applicable C404.7 Demand recirculation water systems ; Complies [PL8]3 !have controls that start the pump Does Not I upon receiving a signal from the action of a user of a fixture or NObservable appliance and limits the temperature IINot t Applicable of the water entering the cold -water piping to 104°F. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 5 of 10 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C402.2.6 ;Thermally ineffective panel surfaces of Complies [ME41]3 !sensible heating panels have IIDoes Not insulation >= R-3.5. TJNot Observable UNot Applicable C403.8.4 1 Motors for fans that are not less than XTcomplies [ME142]2 11/12 hp and less than 1 hp are U.Does Not ! electronically commutated motors or !,have a minimum motor efficiency of �1Vot Observable 170 percent. These motors have the Not Applicable 1 means to adjust motor speed. C403.8.5 Each DX cooling system > 65 kBtu tucomplies [ME143]2 land chiller water/evaporative cooling TEFDoes Not ;system with fans > 1/4 hp are �TVot Observable designed to vary the indoor fan airflow as a function of load and comply with Not Applicable detailed requirements of this section. C403.12.1 1 Systems that heat outside the building TComplies [ME71]2 envelope are radiant heat systems TEFDoes Not controlled by an occupancy sensing 1,JNot Observable device or timer switch. QNot Applicable C403.2.2 ! Natural or mechanical ventilation is ; Complies [ME59]1 !provided in accordance with 7,Does Not International Mechanical Code Not Observable Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply UNot Applicable to minimum per IMC Chapter 4. j C403.7.1 Demand control ventilation provided ; Complies [ME59]1 for spaces >500 ft2 and >25 'QDoes Not people/1000 ft2 occupant density and ITNot Observable served by systems with air side QNot ,economizer, auto modulating outside Applicable j air damper control, or design airflow >3,000 cfm. C403.7.2 Enclosed parking garage ventilation Complies [ME115]3 !has automatic contaminant detection IIDoes Not land capacity to stage or modulate fans 50% less design �TVot Observable to or of capacity. QNot Applicable HVAC systems serving guestrooms in '! complies C403.7.6 [ME141]3 !Group R-1 buildings with > 50 ;QDoes Not ! guestrooms: Each guestroom is provided with controls that tjNot Observable QNot automatically manage temperature Applicable Isetpoint and ventilation (see sections IC403.7.6.1 and C403.7.6.2). C403.7.4 ! Exhaust air energy recovery on Complies [ME57]1 !systems meeting Table C403.7.4(1) =Does Not land C403.7.4(2). Not Observable _ETNot Applicable C403.7.5 ! Kitchen exhaust systems comply with ; Complies [ME116]3 1 replacement air and conditioned 'QDoes Not supply air limitations, and satisfy hood rating requirements and maximum UFNot Observable', ;QNot Applicable ,exhaust rate criteria. C403.11.1 1 HVAC ducts and plenums insulated in I UE-ornplies accordance with C403.11.1 and FETDoes Not C403.11.2 constructed in accordance with [ME60]2 C403.11.2, verification may need to E]Not Observable IINot Applicable !occur during Foundation Inspection. 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 6 of 10 Section # & Req.ID Mechanical Rough -In Inspection Complies? Comments/Assumptions C403.4.1. ; Heating for vestibules and air curtains Complies 4 !with integral heating include IIDoes Not [ME63]2 !automatic controls that shut off the heating system when outdoor air �1Vot Observable temperatures > 45F. Vestibule Not Applicable heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <_ 60F and cooling setpoint >= 80F. C403.3.3 ; Hot gas bypass limited to: <=240 UComplies [ME35]1 kBtu/h - 50% >240 kBtu/h - 25% Does Not Not Observable QNot Applicable C404.2.1 [ME111]z Gas -fired water -heating equipment installed in new buildings: where a singular piece of water -heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -heating equipment serve the building with combined rating >_ 1,000 kBtu/h, the combined input - capacity -weighted -average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h. T_FCom 'EFDoes Not -EFNot Observable TNot Applicable C408.2.2. Air outlets and zone terminal devices ;Complies 1 have means for air balancing. TEJboes Not [ME53]3 �]Vot Observable i UNot Applicable C403.5, Refrigerated display cases, walk-in ; Complies C403.5.1, coolers or walk-in freezers served by UDoes Not C403.5.2 remote compressors and remote TT1ot Observable [ME123]3 'condensers not located in a IINot Applicable condensing unit, have fan -powered condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 7 of 10 Section # Rough -In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.6 Low -voltage dry -type distribution Complies [EL26]2 electric transformers meet the IIDoes Not minimum efficiency requirements of 'Table C405.6. Not Observable Not Applicable C405.7 Electric motors meet the minimum Complies [EL27]2 efficiency requirements of Tables U.Does Not C405.7(1) through C405.7(4). Efficiency verified through certification �1Vot Observable !under an approved certification Not Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). C405.8.2, Escalators and moving walks comply Complies C405.8.2. !with ASME A17.1/CSA B44 and have Does Not 1 [EL28]2 automatic controls configured to reduce speed to the minimum Not Observable IIN !permitted speed in accordance with t Applicable !ASME A17.1/CSA B44 or applicable local code when not conveying passengers. C405.9 ,Total voltage drop across the Complies [EL29]2 !combination of feeders and branch UDoes Not !circuits <= 5% Not Observable j_ETNot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 8 of 10 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, ! Furnished O&M manuals for HVAC Complies C408.2.5. !systems within 90 days of system Does Not 3 !acceptance. [F18]3 TJNot Observable -EFNot Applicable C403.2.2 HVAC systems and equipment Complies [F127]3 capacity does not exceed calculated PDoes Not loads. IIIVot Observable QNot Applicable C403.2.4. j Heating and cooling to each zone is Complies 1 controlled by a thermostat control. PDoes Not [FI47]3 Minimum one humidity control device per installed �Iot Observable 1 humidification/dehumidification 'QNot Applicable 1 system. C403.4.1. (Thermostatic controls have a 5 °F UComplies 2 deadband. IIDoes Not [FI38]3 ! -E:]Vot Observable QNot Applicable C403.2.4. (Temperature controls have setpoint IETCornplies 1.3 1 overlap restrictions. `QDoes Not [F120]3 TJNot Observable j QNot Applicable Each zone equipped with setback ; Complies C403.2.4. 2 controls using automatic time clock or Does Not [FI39]3 programmable control system. EJNot Observable QNot Applicable C403.2.4. ,Automatic Controls: Setback to 55°F ; Complies 2.1, !(heat) and 85°F (cool); 7-day clock, 2- IIDoes Not C403.2.4. 1 hour occupant override, 10-hour Not Observable TJNot [F140]s !backup 1 Not Applicable C403.2.4. ! Systems include optimum start ; complies 2.3 controls. ;QDoes Not [FI41]3 IUNot Observable QNot Applicable C404.3 'Heat traps installed on supply and ; complies [FI11]3 discharge piping of non -circulating TEFDoes Not systems. U1Vot Observable QNot Applicable C404.4 !All piping insulated in accordance with ; Complies [FI25]2 ! section details and Table C403.11.3. TElboes Not r,[J]Vot Observable QNot Applicable C404.6.1 I Controls are installed that limit the ; Complies [F112]3 operation of a recirculation pump TEFDoes Not installed to maintain temperature of a , !storage tank. System return pipe is a E]Not Observable ;QNot !dedicated return pipe or a cold water Applicable supply pipe. 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 9 of 10 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.1.1 ! Building operations and maintenance Complies [FI57]1 documents will be provided to the IIDoes Not !owner. Documents will cover ! manufacturers' information, TJNot Observable !specifications, programming Not Applicable ! procedures and means of illustrating !,to owner how building, equipment and, !systems are intended to be installed, !maintained, and operated. !Commissioning plan developed by Complies C408.2.1 [FI28]1 !registered design professional or IIDoes Not ! approved agency. Not Observable UNot Applicable C408.2.3. ! HVAC equipment has been tested to : Complies 1 !ensure proper operation. Elboes Not [F131]1 ! Not Observable QNot Applicable C408.2.3. ! HVAC control systems have been Complies 2 tested to ensure proper operation, FETDoes Not [FI10]1 ! calibration and adjustment of controls. Not Observable QNot Applicable C408.2.4 Preliminary commissioning report Complies [F129]1 :completed and certified by registered EFDoes Not design professional or approved Not Observable agency. jEFNot Applicable C408.2.5. Furnished HVAC as -built drawings : Complies 1 !submitted within 90 days of system EFDoes Not [FI7]3 !acceptance. UNot Observable QNot Applicable C408.2.5. !An air and/or hydronic system Complies 3 balancing report is provided for HVAC 'QDoes Not [F143]1 systems. Not Observable i ! ETNot Applicable C408.2.5. ! Final commissioning report due to : Complies 4 building owner within 90 days of `QDoes Not [F130]1 receipt of certificate of occupancy. Not Observable _ET;Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 22211 Palisades Apt Report date: 05/16/23 Data filename: Page 10 of 10