HomeMy WebLinkAbout22211 Palisades Apt. ComCheck 6.8.23n�(
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
Rexburg, Idaho
2018 IECC
22211 Palisades Apt
Pocatello, Idaho
6b
New Construction
Owner/Agent:
Additional Efficiency Package(s)
Credits: 1.0 Required 0.0 Proposed
Mechanical Systems List
Quantity System Type & Description
Designer/Contractor:
Scott Roberts
Engineered Systems Associates
1355 East Center St.
Pocatello, Idaho 83201
208-233-0501
scott@engsystems.com
F2 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 36 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Cooling: 1 each - Single Package DX Unit, Capacity = 18 kBtu/h, Air -Cooled Condenser, Unknown Economizer
Proposed Efficiency = 14.00 SEER, Required Efficiency = 14.00 SEER
Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00
Fan System: F2 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency
F3 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 40 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Cooling: 1 each - Single Package DX Unit, Capacity = 18 kBtu/h, Air -Cooled Condenser, Unknown Economizer
Proposed Efficiency = 14.00 SEER, Required Efficiency = 14.00 SEER
Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00
Fan System: F2 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency
F1 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 44 kBtu/h
Proposed Efficiency = 95.00% Ec, Required Efficiency: 80.00 % Ec
Fan System: F1 -- Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 600 CFM, 0.3 motor nameplate hp, 70.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency
Water Heater:
Gas Storage Water Heater, Capacity: 100 gallons, Input Rating: 250 kBtu/h w/ Circulation Pump
Proposed Efficiency: 80.00 % Et, Required Efficiency: 80.00 % Et
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 1 of 10
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
David Hansen, Engineer
Name - Title
Project Title: 22211 Palisades Apt
Data filename:
t44" (-"—
Signature
5/16/2023
Date
Report date: 05/16/23
Page 2 of 10
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2018 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Req.ID
C103.2
Plans, specifications, and/or
Complies
[PR2]1
calculations provide all information
17Does Not
with which compliance can be
�TVot Observable
determined for the mechanical
IINot Applicable
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2
Plans, specifications, and/or
Complies
[PR3]1
calculations provide all information
IIDoes Not
with which compliance can be
�TVot Observable
determined for the service water
ONot Applicable
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C406
Plans, specifications, and/or
Complies
[PR9]1
calculations provide all information
UDoes Not
with which compliance can be
Not Observable
determined for the additional energy
IINot Applicable
efficiency package options.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 3 of 10
Section
#
& Req.ID
Footing / Foundation Inspection
Complies?
Comments/Assumptions
C403.12.2
1 Snow/ice melting system and freeze Complies
1 protection systems have sensors and IIDoes Not
C403.12.3
!controls configured to limit service for
[FO9]3
�1Vot Observable
pavement temperature and outdoor
temperature. future connection to Not Applicable
controls.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 4 of 10
Section
#
Plumbing Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C404.5,
I Heated water supply piping conforms
Complies
C404.5.1,
Ito pipe length and volume
IIDoes Not
C404.5.2
requirements. Refer to section details.
�1Vot Observable
[PL6]3
ETNot Applicable
C404.6.1,
',Automatic time switches installed to
LJComplies
C404.6.2
automatically switch off the
PDoes Not
[PL3]1
recirculating hot-water system or heat
IINot Observable
Itrace.
QNot Applicable
C404.6.3
Pumps that circulate water between a
Complies
[PL7]3
heater and storage tank have controls
Uboes Not
!that limit operation from startup to
<= 5 minutes after end of heating
IINot Observable
;QNot
cycle.
Applicable
C404.7
Demand recirculation water systems
; Complies
[PL8]3
!have controls that start the pump
Does Not
I upon receiving a signal from the
action of a user of a fixture or
NObservable
appliance and limits the temperature
IINot t Applicable
of the water entering the cold -water
piping to 104°F.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 5 of 10
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C402.2.6
;Thermally ineffective panel surfaces of Complies
[ME41]3
!sensible heating panels have IIDoes Not
insulation >= R-3.5.
TJNot Observable
UNot Applicable
C403.8.4
1 Motors for fans that are not less than XTcomplies
[ME142]2
11/12 hp and less than 1 hp are U.Does Not
! electronically commutated motors or
!,have a minimum motor efficiency of �1Vot Observable
170 percent. These motors have the Not Applicable
1 means to adjust motor speed.
C403.8.5 Each DX cooling system > 65 kBtu tucomplies
[ME143]2 land chiller water/evaporative cooling TEFDoes Not
;system with fans > 1/4 hp are
�TVot Observable
designed to vary the indoor fan airflow
as a function of load and comply with Not Applicable
detailed requirements of this section.
C403.12.1 1 Systems that heat outside the building TComplies
[ME71]2 envelope are radiant heat systems TEFDoes Not
controlled by an occupancy sensing
1,JNot Observable
device or timer switch.
QNot Applicable
C403.2.2 ! Natural or mechanical ventilation is ; Complies
[ME59]1 !provided in accordance with 7,Does Not
International Mechanical Code
Not Observable
Chapter 4. Mechanical ventilation has
capability to reduce outdoor air supply UNot Applicable
to minimum per IMC Chapter 4. j
C403.7.1
Demand control ventilation provided ; Complies
[ME59]1
for spaces >500 ft2 and >25 'QDoes Not
people/1000 ft2 occupant density and
ITNot Observable
served by systems with air side
QNot
,economizer, auto modulating outside Applicable
j air damper control, or design airflow
>3,000 cfm.
C403.7.2
Enclosed parking garage ventilation Complies
[ME115]3
!has automatic contaminant detection IIDoes Not
land capacity to stage or modulate
fans 50% less design �TVot Observable
to or of capacity.
QNot Applicable
HVAC systems serving guestrooms in '! complies
C403.7.6
[ME141]3
!Group R-1 buildings with > 50 ;QDoes Not
! guestrooms: Each guestroom is
provided with controls that tjNot Observable
QNot
automatically manage temperature Applicable
Isetpoint and ventilation (see sections
IC403.7.6.1 and C403.7.6.2).
C403.7.4 ! Exhaust air energy recovery on Complies
[ME57]1 !systems meeting Table C403.7.4(1) =Does Not
land C403.7.4(2).
Not Observable
_ETNot Applicable
C403.7.5
! Kitchen exhaust systems comply with ; Complies
[ME116]3
1 replacement air and conditioned 'QDoes Not
supply air limitations, and satisfy hood
rating requirements and maximum UFNot Observable',
;QNot Applicable
,exhaust rate criteria.
C403.11.1
1 HVAC ducts and plenums insulated in I UE-ornplies
accordance with C403.11.1 and FETDoes Not
C403.11.2
constructed in accordance with
[ME60]2
C403.11.2, verification may need to E]Not Observable
IINot Applicable
!occur during Foundation Inspection.
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 6 of 10
Section
#
& Req.ID
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
C403.4.1.
; Heating for vestibules and air curtains
Complies
4
!with integral heating include
IIDoes Not
[ME63]2
!automatic controls that shut off the
heating system when outdoor air
�1Vot Observable
temperatures > 45F. Vestibule
Not Applicable
heating and cooling systems
controlled by a thermostat in the
vestibule with heating setpoint <_
60F and cooling setpoint >= 80F.
C403.3.3
; Hot gas bypass limited to: <=240
UComplies
[ME35]1
kBtu/h - 50% >240 kBtu/h - 25%
Does Not
Not Observable
QNot Applicable
C404.2.1
[ME111]z
Gas -fired water -heating equipment
installed in new buildings: where a
singular piece of water -heating
equipment >= 1,000 kBtu/h serves
the entire building, thermal efficiency
>= 90 Et. Where multiple pieces of
water -heating equipment serve the
building with combined rating >_
1,000 kBtu/h, the combined input -
capacity -weighted -average thermal
efficiency >= 90 Et. Exclude input
rating of equipment in individual
dwelling units and equipment <= 100
kBtu/h.
T_FCom
'EFDoes Not
-EFNot Observable
TNot Applicable
C408.2.2. Air outlets and zone terminal devices ;Complies
1
have means for air balancing.
TEJboes Not
[ME53]3
�]Vot Observable
i
UNot Applicable
C403.5,
Refrigerated display cases, walk-in
; Complies
C403.5.1,
coolers or walk-in freezers served by
UDoes Not
C403.5.2
remote compressors and remote
TT1ot Observable
[ME123]3
'condensers not located in a
IINot Applicable
condensing unit, have fan -powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 7 of 10
Section
#
Rough -In Electrical Inspection
Complies?
Comments/Assumptions
& Req.ID
C405.6 Low -voltage dry -type distribution Complies
[EL26]2 electric transformers meet the IIDoes Not
minimum efficiency requirements of
'Table C405.6. Not Observable
Not Applicable
C405.7
Electric motors meet the minimum Complies
[EL27]2
efficiency requirements of Tables U.Does Not
C405.7(1) through C405.7(4).
Efficiency verified through certification �1Vot Observable
!under an approved certification Not Applicable
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
C405.8.2,
Escalators and moving walks comply Complies
C405.8.2.
!with ASME A17.1/CSA B44 and have Does Not
1
[EL28]2
automatic controls configured to
reduce speed to the minimum Not Observable
IIN
!permitted speed in accordance with t Applicable
!ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
C405.9
,Total voltage drop across the Complies
[EL29]2
!combination of feeders and branch UDoes Not
!circuits <= 5%
Not Observable
j_ETNot Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 8 of 10
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
C303.3,
! Furnished O&M manuals for HVAC
Complies
C408.2.5.
!systems within 90 days of system
Does Not
3
!acceptance.
[F18]3
TJNot Observable
-EFNot
Applicable
C403.2.2
HVAC systems and equipment
Complies
[F127]3
capacity does not exceed calculated
PDoes Not
loads.
IIIVot Observable
QNot Applicable
C403.2.4.
j Heating and cooling to each zone is
Complies
1
controlled by a thermostat control.
PDoes Not
[FI47]3
Minimum one humidity control device
per installed
�Iot Observable
1 humidification/dehumidification
'QNot Applicable
1 system.
C403.4.1.
(Thermostatic controls have a 5 °F
UComplies
2
deadband.
IIDoes Not
[FI38]3
!
-E:]Vot Observable
QNot Applicable
C403.2.4.
(Temperature controls have setpoint
IETCornplies
1.3
1 overlap restrictions.
`QDoes Not
[F120]3
TJNot Observable
j QNot Applicable
Each zone equipped with setback ; Complies
C403.2.4.
2
controls using automatic time clock or
Does Not
[FI39]3
programmable control system.
EJNot Observable
QNot Applicable
C403.2.4.
,Automatic Controls: Setback to 55°F
; Complies
2.1,
!(heat) and 85°F (cool); 7-day clock, 2-
IIDoes Not
C403.2.4.
1 hour occupant override, 10-hour
Not Observable
TJNot
[F140]s
!backup
1
Not Applicable
C403.2.4.
! Systems include optimum start
; complies
2.3
controls.
;QDoes Not
[FI41]3
IUNot Observable
QNot Applicable
C404.3
'Heat traps installed on supply and
; complies
[FI11]3
discharge piping of non -circulating
TEFDoes Not
systems.
U1Vot Observable
QNot Applicable
C404.4
!All piping insulated in accordance with
; Complies
[FI25]2
! section details and Table C403.11.3.
TElboes Not
r,[J]Vot Observable
QNot Applicable
C404.6.1
I Controls are installed that limit the
; Complies
[F112]3
operation of a recirculation pump
TEFDoes Not
installed to maintain temperature of a
,
!storage tank. System return pipe is a
E]Not Observable
;QNot
!dedicated return pipe or a cold water
Applicable
supply pipe.
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 9 of 10
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
C408.1.1
! Building operations and maintenance Complies
[FI57]1
documents will be provided to the IIDoes Not
!owner. Documents will cover
! manufacturers' information, TJNot Observable
!specifications, programming Not Applicable
! procedures and means of illustrating
!,to owner how building, equipment and,
!systems are intended to be installed,
!maintained, and operated.
!Commissioning plan developed by Complies
C408.2.1
[FI28]1
!registered design professional or IIDoes Not
! approved agency.
Not Observable
UNot Applicable
C408.2.3.
! HVAC equipment has been tested to : Complies
1
!ensure proper operation. Elboes Not
[F131]1
! Not Observable
QNot Applicable
C408.2.3.
! HVAC control systems have been Complies
2
tested to ensure proper operation, FETDoes Not
[FI10]1
! calibration and adjustment of controls.
Not Observable
QNot Applicable
C408.2.4 Preliminary commissioning report Complies
[F129]1 :completed and certified by registered EFDoes Not
design professional or approved
Not Observable
agency.
jEFNot Applicable
C408.2.5.
Furnished HVAC as -built drawings : Complies
1
!submitted within 90 days of system EFDoes Not
[FI7]3
!acceptance.
UNot Observable
QNot Applicable
C408.2.5.
!An air and/or hydronic system Complies
3
balancing report is provided for HVAC 'QDoes Not
[F143]1
systems.
Not Observable
i
! ETNot Applicable
C408.2.5.
! Final commissioning report due to : Complies
4
building owner within 90 days of `QDoes Not
[F130]1
receipt of certificate of occupancy.
Not Observable
_ET;Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 22211 Palisades Apt Report date: 05/16/23
Data filename: Page 10 of 10