Loading...
HomeMy WebLinkAboutPOWER LOAD FORM - 23-00908 - Aveyo Solar - Addition'WE PACIFIC POWER ROCKY MOUNTAIN COMMERCIAL / INDUSTRIAL CUSTOMER IN N[✓ATION SHEET Please complete this form and return to the Estimator assigned to yourjob Business Information Business / Customer Name: Aveo Solar Request Number: Address: 460 W. 4'h S. Rexbrug ID 83440 Person responsible for advance and contract billing (if different than monthly billing customer): Name: Address: Phone No.: E-mail Address: Fax No: Building Square Footage:: Note: breakdown into use (i.e.: office, warehouse) Hours of Operation (include days & hours): Desired Secondary Voltage Note: Not all voltages may be available Panel Size (in Amps): 400 Service Description ® 3 Phase 120/208v ❑ 3 Phase 277/480v ❑ 1 Phase 120/240v ❑ 1 Phase 120v Only ❑ Other Total number of 3 Phase meters: <_ 200 A 0 > 200 A 1 Total number of 1 Phase meters: <_ 400 A 0 > 400 A 0 Nearest Pole or Equipment number: Type of Service Desired: ❑ Overhead ® Underground Electrical Contractor: Copper Canyon Electric Phone No.: 208-709-2387 Load List attach additional sheets if necessary) Description Motor starting code New Load to be added Load to be removed Total Connected Load after changes Unit HVAC name plate rating) 31 31 Tons* Refrigeration Equipment Tons* Total do not convert to kW 31 Tons Exhaust Fans 7.5 8 HP Gas/Fuel/Sump Pump HP Small Motors < 10 HP HP Air Compressor HP Swimming Pool HP Large Motors > 10 HP (not included above HP Total do not convert to kW 8 HP Electric Heat 15.6 16 kW Water Heating 3 3 kW Lighting 7.8 8 kW Outlets 21.6 22 kW Office Equipment kW Kitchen Equipment 16 16 kW Computers, Magnetic Power Supplies 7.2 8 kW Machinery kW Thermoplastic Injection Equipment kW Elevators kW Boiler kW Snow Melting kW Signs 1.8 2 kW X-RayEquipment kW Washer/Dryer 6.8 7 kW Miscellaneous 7.1 7 kW Heat Exchanger kW Humidifier kW Future kW For PEV (plug-in electric vehicle) chargers see page 2. Total: 89 kW It is important to provide the most accurate information available, as it is used by the Estimator to design PacifiCorp's facilities and determine the customer's costs. Please sign and date this form before giving it to your estimator. Customer Signature Plug-in Electric Vehicle (PEV) Chargers: Date Revised 28Sep17 * Tons = BTUs/12,000 Description Number of charger units Nameplate kW each charger Total kW Level 1 PEV Charger 120v 0 kW Level 2 PEV Charger 240v 0 kW DC Fast PEV Charger 480v 0 kW Tesla Su erChar er 0 kW Total PEV Charger: 0 kW It is important to provide the most accurate information available, as it is used by the Estimator to design PacifiCorp's facilities and determine the customer's costs. Please sign and date this form before giving it to your estimator. Customer Signature Date Attach to page 1 to submit with building load request. Note: • You may wish to consult a trained professional (electrician, engineer, etc.) prior to providing the information to your estimator. • Commercial metering can have many restrictions that should be discussed with the estimator prior to the purchase and installation of your metering equipment. There are also restrictions regarding master metering. If your plans call for master metering, please discuss this with your estimator. • Motors larger than 35hp three phase or 3hp single phase will require approval by our engineering department prior to installation in order to determine the acceptable starting current. • Additional comments: Revised 28Sep17 pg. 2 Load List attach additional sheets if necessary)