Loading...
HomeMy WebLinkAboutFOUNDATION - 23-00218 - Tom Luthy Storage - Shell OnlyFROST Structural Engineering 1020 Lincoln Road Phone: 208.227.8404 Idaho Falls, ID 83401 Fax: 208.227.8405 www.frost-structural.com Project: Tom Luthy Metal Building Client: Titan Steel Project No.: IF23-278 Date: Engineer : SEAL: FSE STRUCTURAL CALCULATIONS DBP July 10, 2023 July 10, 2023 BU I L D I N G M A R K : To m L u t h y EN G I N E E R I N G P R O P E R T I E S : Al l o w a b l e B e a r i n g P r e s s u r e = Fr o s t D e p t h o r d e p t h o f F o o t i n g = So i l W e i g h t = Co n t i n u o u s F o o t i n g W i d t h = Pa s s i v e s o i l P r e s s u r e = Co n t i n u o u s F o o t i n g T h i c k n e s s = Fr i c t i o n C o e f f i c i e n t = Fo o t i n g S t e m W i d t h = Co n t r i b u t i n g S l a b / F o o t i n g L e n g t h = Sl a b T h i c k n e s s = Fy = S l a b R e i n f o r c e m e n t A r e a p e r F o o t = FO O T I N G D E S I G N : Gr i d l i n e s / N a m e Ve r t i c a l Fo r c e ( k i p s ) Up l i f t F o r c e (k i p s ) Ho r i z o n t a l Fo r c e - O u t (k i p s ) Co l u m n Lo c a t i o n Fo o t i n g Th i c k n e s s (i n ) Fo o t i n g Wi d t h ( f t ) Co l u m n De a d L o a d (k i p s ) Be a r i n g Pr o v i d e d (k i p s ) Re s i s t i n g Up l i f t ( k i p s ) Re s i s t i n g Ho r i z o n t a l Fo r c e ( k i p s ) Bearing Uplift Horizontal Ha i r p i n to b e Us e d ? Ha i r p i n Ba r S i z e Ha i r p i n An g l e (T y p i c a l l y 0 o r 6 0 ) Ha i r p i n Re q u i r e d Ba r A e a ( 1 le g ) Re q u i r e d Ha i r p i n L e g Le n g t h ( f t ) Sl a b A r e a Re q u i r e d f o r Ha i r p i n - N o Re b a r i n S l a b Hairpin 1- A 15 . 5 5 . 2 3 . 8 E x t e r i o r C o r n e r 12 6 1. 5 5 54 . 0 1 9 . 0 6 . 8 ok o k o k Ye s 4 0 0. 0 8 G r a d e B e a m 0 . 0 0 ok 1- B 0. 2 0 . 0 2 . 1 E x t e r i o r W a l l 10 3 0. 0 2 13 . 5 1 1 . 0 4 . 0 ok o k o k 0. 0 4 G r a d e B e a m 0 . 0 0 1- C 0. 3 0 . 0 2 . 1 E x t e r i o r W a l l 10 3 0. 0 3 13 . 5 1 1 . 0 4 . 0 ok o k o k 0. 0 4 G r a d e B e a m 0 . 0 0 1- E 30 . 1 9 . 3 2 . 0 E x t e r i o r C o r n e r 12 5 3. 0 1 37 . 5 1 5 . 0 4 . 7 ok o k o k 0. 0 4 G r a d e B e a m 0 . 0 0 1- G 0. 3 0 . 0 2 . 9 E x t e r i o r W a l l 10 3 . 5 0. 0 3 18 . 4 1 2 . 4 4 . 6 ok o k o k 0. 0 6 G r a d e B e a m 0 . 0 0 1- J 12 . 4 3 . 3 2 . 3 E x t e r i o r C o r n e r 12 6 1. 2 4 54 . 0 1 9 . 0 7 . 2 ok o k o k Ye s 4 0 0. 0 5 G r a d e B e a m 0 . 0 0 ok 2- A 25 . 3 7 . 4 5 . 2 E x t e r i o r W a l l 12 6 2. 5 3 54 . 0 2 2 . 0 7 . 3 ok o k - Ye s 4 0 0. 1 1 G r a d e B e a m 3 2 . 1 0 ok 2- D 37 . 4 1 0 . 0 0 . 0 I n t e r i o r 12 5 . 5 3. 7 4 45 . 4 1 5 . 9 5 . 2 ok o k o k 0. 0 0 G r a d e B e a m 0 . 0 0 2- F 19 . 2 6 . 2 1 . 6 E x t e r i o r W a l l 12 4 1. 9 2 24 . 0 1 3 . 9 4 . 4 ok o k o k 0. 0 3 G r a d e B e a m 0 . 0 0 2- J 10 . 4 3 . 0 2 . 6 E x t e r i o r C o r n e r 12 6 1. 0 4 54 . 0 1 9 . 0 7 . 3 ok o k o k Ye s 4 0 0. 0 5 G r a d e B e a m 0 . 0 0 ok 3- A 25 . 8 7 . 2 5 . 8 E x t e r i o r W a l l 12 6 2. 5 8 54 . 0 2 2 . 0 7 . 4 ok o k - Ye s 4 0 0. 1 2 G r a d e B e a m 8 8 . 5 9 ok 3- D 37 . 9 8 . 3 0 . 0 I n t e r i o r 12 5 . 5 3. 7 9 45 . 4 1 5 . 9 5 . 6 ok o k o k 0. 0 0 G r a d e B e a m 0 . 0 0 3- G 12 . 2 3 . 0 2 . 8 E x t e r i o r W a l l 12 6 1. 2 2 54 . 0 2 2 . 0 8 . 1 ok o k o k Ye s 4 0 0. 0 6 G r a d e B e a m 0 . 0 0 ok 4- A 41 . 3 1 0 . 8 1 6 . 7 E x t e r i o r W a l l 12 6 4. 1 3 54 . 0 2 2 . 0 6 . 8 ok o k - Ye s 6 0 0. 3 5 G r a d e B e a m 1 1 6 4 . 1 9 ok 4- G 34 . 3 8 . 1 1 6 . 7 E x t e r i o r W a l l 12 6 3. 4 3 54 . 0 2 2 . 0 7 . 4 ok o k - Ye s 6 0 0. 3 5 G r a d e B e a m 1 1 3 1 . 6 5 ok 5- A 12 . 4 4 . 8 3 . 3 E x t e r i o r C o r n e r 10 3 1. 2 4 13 . 5 9 . 1 2 . 7 ok o k - Ye s 4 0 0. 0 7 G r a d e B e a m 1 4 9 . 0 8 ok 5- B 0. 3 0 . 0 3 . 1 E x t e r i o r W a l l 12 4 0. 0 3 24 . 0 1 3 . 9 5 . 5 ok o k o k 0. 0 6 G r a d e B e a m 0 . 0 0 5- C 23 . 6 0 . 0 3 . 1 E x t e r i o r W a l l 12 4 2. 3 6 24 . 0 1 3 . 9 6 . 1 ok o k o k 0. 0 6 G r a d e B e a m 0 . 0 0 5- E 0. 4 0 . 0 3 . 3 E x t e r i o r W a l l 12 4 0. 0 4 24 . 0 1 3 . 9 5 . 5 ok o k o k 0. 0 7 G r a d e B e a m 0 . 0 0 5- G 9. 4 2 . 5 2 . 1 E x t e r i o r C o r n e r 10 3 0. 9 4 13 . 5 9 . 1 3 . 2 ok o k o k Ye s 4 0 0. 0 4 G r a d e B e a m 0 . 0 0 ok ME T A L B U I L D I N G F O U N D A T I O N D E S I G N 36 ' ' 15 0 0 p s f 8' ' 5' ' 4. 0 ' 60 k s i 0. 0 0 0 i n ^ 2 / f t 11 0 p c f 20 0 p s f / f t 0. 2 5 16 ' ' 10 ' ' 1 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building 2 of 22 1 74'-0" 1'-0"24'-0"25'-0"24'-0" 2 60 ' - 0 " 3 100'-0" 45'- 0 1/8 " 40 ' - 0 1 / 8 " 35 ' - 0 " 24 ' - 0 " 26 ' - 0 " 35 ' - 0 " 25 ' - 0 " 30 ' - 0 3 / 1 6 " 3 0'-0 3/ 16" 4 85 ' - 0 " 5 26'-0" 1'-0"24'-0"1'-0" 6 25 ' - 0 " A BL B C D E FG BL J BL 5 BL 4 3 2 BL 1 BL REACTION KEY PLAN 1 - A P = 15.50 U = 5.19 H = 3.77 5 - A P = 12.40 U = 4.83 H = 3.33 2 - A P = 25.29 U = 7.37 H = 5.20 3 - A P = 25.78 U = 7.17 H = 5.83 4 - A P = 41.33 U = 10.79 H = 16.69 G-4 P = 6.32 U = 5.66 H = 3.15 G-3 P = 6.84 U = 5.14 H = 3.20 A-2 P = 5.25 U = 4.33 H = 2.61 A-1 P = 5.32 U = 4.26 H = 2.66 A-4 P = 5.04 U = 3.98 H = 2.62 A-3 P = 4.97 U = 4.05 H = 2.57 J-2 P = 3.16 U = 2.40 H = 1.30 J-1 P = 3.36 U = 2.21 H = 1.34 1 - B P = 0.23 U = 0.00 H = 2.08 1 - E P = 30.07 U = 9.33 H = 2.00 1 - C P = 0.28 U = 0.00 H = 2.13 1 - G P = 0.27 U = 0.00 H = 2.92 1 - J P = 12.44 U = 3.30 H = 2.34 2 - D P = 37.43 U = 10.03 H = 0.00 2 - F P = 19.22 U = 6.18 H = 1.57 2 - J P = 10.43 U = 3.01 H = 2.58 3 - D P = 37.94 U = 8.25 H = 0.00 3 - G P = 12.24 U = 2.97 H = 2.79 4 - G P = 34.27 U = 8.05 H = 16.69 5 - B P = 0.29 U = 0.00 H = 3.11 5 - C P = 23.63 U = 0.00 H = 3.11 5 - E P = 0.36 U = 0.00 H = 3.33 5 - G P = 9.37 U = 2.53 H = 2.08 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.55 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =13.95 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 24.2 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >99 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >22 OK q min (psf) =431 q max (psf) =431 OK qu-max (psf) =672 qu at edge of base (psf) =672 qu-min (psf) =672 qu at edge of base (psf) =672 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 2.10 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 103 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.05 area of bar = 0.31 Min p =0.0004 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.03 Spacing (in) = 207 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.1 OK 1-A Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 1-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 3 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.02 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.21 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >1 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >0 OK q min (psf) =26 q max (psf) =26 OK qu-max (psf) =40 qu at edge of base (psf) =40 qu-min (psf) =40 qu at edge of base (psf) =40 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.02 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 5485 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.01 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 10971 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-B Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 4 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.25 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >2 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >0 OK q min (psf) =31 q max (psf) =31 OK qu-max (psf) =49 qu at edge of base (psf) =49 qu-min (psf) =49 qu at edge of base (psf) =49 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.02 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 4506 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.01 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 9012 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 1-C Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 1-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 5 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.01 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =27.06 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 46.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >200 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >41 OK q min (psf) =1203 q max (psf) =1203 OK qu-max (psf) =1876 qu at edge of base (psf) =1876 qu-min (psf) =1876 qu at edge of base (psf) =1876 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.00 Bar size =#5 p =0.0009 Fy (psi) = 60000 Mu (k-ft) = 3.75 area of bar = 0.31 Min p =0.0012 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.10 Spacing (in) = 57 Use p =0.0012 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 41.7 OK Check Development Length L' short (ft) = 2.00 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.88 area of bar = 0.31 Min p =0.0007 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.05 Spacing (in) = 115 Use p =0.0007 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 41.1 OK 1-E Use: w/ 2 #5 Top and Bottom 5.0 feet long x 5.0 feet wide x 12'' thick Footing Each Way 1-E Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 6 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.24 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >2 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >0 OK q min (psf) =22 q max (psf) =22 OK qu-max (psf) =34 qu at edge of base (psf) =34 qu-min (psf) =34 qu at edge of base (psf) =34 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.25 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.03 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 4070 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 30.8 OK Check Development Length L' short (ft) = 1.25 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.01 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 8141 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 30.3 OK 1-G Use: w/ 1 #4 Top and Bottom 3.5 feet long x 3.5 feet wide x 10'' thick Footing Each Way 1-G Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 7 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.24 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =11.20 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 19.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >80 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >18 OK q min (psf) =346 q max (psf) =346 OK qu-max (psf) =539 qu at edge of base (psf) =539 qu-min (psf) =539 qu at edge of base (psf) =539 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.68 area of bar = 0.31 Min p =0.0006 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.04 Spacing (in) = 129 Use p =0.0006 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.84 area of bar = 0.31 Min p =0.0003 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.02 Spacing (in) = 258 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.1 OK 1-J Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 1-J Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 8 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.53 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =22.76 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 39.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >162 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >36 OK q min (psf) =703 q max (psf) =703 OK qu-max (psf) =1096 qu at edge of base (psf) =1096 qu-min (psf) =1096 qu at edge of base (psf) =1096 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0009 Fy (psi) = 60000 Mu (k-ft) = 3.42 area of bar = 0.31 Min p =0.0011 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.09 Spacing (in) = 63 Use p =0.0011 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.71 area of bar = 0.31 Min p =0.0006 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.04 Spacing (in) = 127 Use p =0.0006 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 2-A Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 2-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 9 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.74 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =33.69 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 58.4 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >245 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >53 OK q min (psf) =1237 q max (psf) =1237 OK qu-max (psf) =1930 qu at edge of base (psf) =1930 qu-min (psf) =1930 qu at edge of base (psf) =1930 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0012 Fy (psi) = 60000 Mu (k-ft) = 4.89 area of bar = 0.31 Min p =0.0016 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.13 Spacing (in) = 44 Use p =0.0016 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 2.44 area of bar = 0.31 Min p =0.0009 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.06 Spacing (in) = 89 Use p =0.0009 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 2-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 2-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 10 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.92 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =17.30 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 30.0 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >120 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >24 OK q min (psf) =1201 q max (psf) =1201 OK qu-max (psf) =1874 qu at edge of base (psf) =1874 qu-min (psf) =1874 qu at edge of base (psf) =1874 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 2.11 area of bar = 0.20 Min p =0.0007 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.05 Spacing (in) = 67 Use p =0.0007 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.05 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.03 Spacing (in) = 134 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 2-F Use: w/ 2 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 2-F Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 11 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.04 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =9.39 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 16.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >67 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >15 OK q min (psf) =290 q max (psf) =290 OK qu-max (psf) =452 qu at edge of base (psf) =452 qu-min (psf) =452 qu at edge of base (psf) =452 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.41 area of bar = 0.31 Min p =0.0005 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.04 Spacing (in) = 154 Use p =0.0005 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.71 area of bar = 0.31 Min p =0.0002 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.02 Spacing (in) = 308 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.1 OK 2-J Use: w/ 1 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 2-J Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 12 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.58 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =23.20 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 40.2 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >165 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >37 OK q min (psf) =716 q max (psf) =716 OK qu-max (psf) =1117 qu at edge of base (psf) =1117 qu-min (psf) =1117 qu at edge of base (psf) =1117 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0009 Fy (psi) = 60000 Mu (k-ft) = 3.49 area of bar = 0.31 Min p =0.0012 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.09 Spacing (in) = 62 Use p =0.0012 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0005 Fy (psi) = 60000 Mu (k-ft) = 1.75 area of bar = 0.31 Min p =0.0006 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.04 Spacing (in) = 124 Use p =0.0006 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 3-A Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 3-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 13 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.79 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =34.15 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 59.2 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =5.5 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =5.5 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >249 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >53 OK q min (psf) =1254 q max (psf) =1254 OK qu-max (psf) =1957 qu at edge of base (psf) =1957 qu-min (psf) =1957 qu at edge of base (psf) =1957 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.25 Bar size =#5 p =0.0012 Fy (psi) = 60000 Mu (k-ft) = 4.95 area of bar = 0.31 Min p =0.0016 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.13 Spacing (in) = 43 Use p =0.0016 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.7 OK Check Development Length L' short (ft) = 2.25 Bar size =#5 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 2.48 area of bar = 0.31 Min p =0.0009 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.06 Spacing (in) = 87 Use p =0.0009 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 44.1 OK 3-D Use: w/ 2 #5 Top and Bottom 5.5 feet long x 5.5 feet wide x 12'' thick Footing Each Way 3-D Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 14 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.22 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =11.02 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 19.1 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >79 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >18 OK q min (psf) =340 q max (psf) =340 OK qu-max (psf) =530 qu at edge of base (psf) =530 qu-min (psf) =530 qu at edge of base (psf) =530 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.66 area of bar = 0.31 Min p =0.0005 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.04 Spacing (in) = 131 Use p =0.0005 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.83 area of bar = 0.31 Min p =0.0003 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.02 Spacing (in) = 262 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 47.1 OK 3-G Use: w/ 1 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 3-G Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 15 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =4.13 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =37.20 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 64.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >265 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >59 OK q min (psf) =1148 q max (psf) =1148 OK qu-max (psf) =1791 qu at edge of base (psf) =1791 qu-min (psf) =1791 qu at edge of base (psf) =1791 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0014 Fy (psi) = 60000 Mu (k-ft) = 5.60 area of bar = 0.31 Min p =0.0019 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.15 Spacing (in) = 38 Use p =0.0019 Ld3 (in) =12 Total Bars = 3 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0007 Fy (psi) = 60000 Mu (k-ft) = 2.80 area of bar = 0.31 Min p =0.0010 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.07 Spacing (in) = 77 Use p =0.0010 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 4-A Use: w/ 3 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 4-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 16 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =3.43 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =30.84 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 53.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =6 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =6 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%738 >220 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:122 >49 OK q min (psf) =952 q max (psf) =952 OK qu-max (psf) =1485 qu at edge of base (psf) =1485 qu-min (psf) =1485 qu at edge of base (psf) =1485 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 2.50 Bar size =#5 p =0.0012 Fy (psi) = 60000 Mu (k-ft) = 4.64 area of bar = 0.31 Min p =0.0015 Ld1 (in) =30.0 d (in)= 8.69 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.12 Spacing (in) = 46 Use p =0.0015 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.7 OK Check Development Length L' short (ft) = 2.50 Bar size =#5 p =0.0006 Fy (psi) = 60000 Mu (k-ft) = 2.32 area of bar = 0.31 Min p =0.0008 Ld1 (in) =30.0 d (in)= 8.06 bar diameter = 0.625 Max p =0.0134 Ld2 (in) =15 As req(in^2/ft)= 0.06 Spacing (in) = 93 Use p =0.0008 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 47.1 OK 4-G Use: w/ 2 #5 Top and Bottom 6.0 feet long x 6.0 feet wide x 12'' thick Footing Each Way 4-G Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 17 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =1.24 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =11.16 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 19.3 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >78 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >14 OK q min (psf) =1378 q max (psf) =1378 OK qu-max (psf) =2149 qu at edge of base (psf) =2149 qu-min (psf) =2149 qu at edge of base (psf) =2149 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0004 Fy (psi) = 60000 Mu (k-ft) = 1.07 area of bar = 0.20 Min p =0.0006 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.04 Spacing (in) = 101 Use p =0.0006 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.54 area of bar = 0.20 Min p =0.0003 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.02 Spacing (in) = 203 Use p =0.0003 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 5-A Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 5-A Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 18 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.03 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.26 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.5 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >2 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >0 OK q min (psf) =18 q max (psf) =18 OK qu-max (psf) =28 qu at edge of base (psf) =28 qu-min (psf) =28 qu at edge of base (psf) =28 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.03 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 4456 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.02 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 8912 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 5-B Use: w/ 1 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 5-B Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 19 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =2.36 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =21.27 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 36.9 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >148 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >30 OK q min (psf) =1477 q max (psf) =1477 OK qu-max (psf) =2304 qu at edge of base (psf) =2304 qu-min (psf) =2304 qu at edge of base (psf) =2304 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0006 Fy (psi) = 60000 Mu (k-ft) = 2.59 area of bar = 0.20 Min p =0.0008 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.07 Spacing (in) = 54 Use p =0.0008 Ld3 (in) =12 Total Bars = 2 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 1.30 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.03 Spacing (in) = 109 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 5-C Use: w/ 2 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 5-C Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 20 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.04 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =0.32 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 0.6 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =4 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =4 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =12 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%744 >2 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:123 >0 OK q min (psf) =23 q max (psf) =23 OK qu-max (psf) =35 qu at edge of base (psf) =35 qu-min (psf) =35 qu at edge of base (psf) =35 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.04 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 3589 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.8 OK Check Development Length L' short (ft) = 1.50 Bar size =#4 p =0.0000 Fy (psi) = 60000 Mu (k-ft) = 0.02 area of bar = 0.20 Min p =0.0000 Ld1 (in) =24.0 d (in)= 8.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.00 Spacing (in) = 7179 Use p =0.0000 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 35.3 OK 5-E Use: w/ 1 #4 Top and Bottom 4.0 feet long x 4.0 feet wide x 12'' thick Footing Each Way 5-E Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 21 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building Concrete Pad Footing Strength Design per ACI 318-11 Mark: Material Data M DL (k-ft) =0.00 Allowable q (psf) =1500 P DL (k) =0.94 M LL (k-ft) =0.00 f'c (psi) =2500 B 1 =0.85 P LL (k) =8.43 Accidental Eccentricity =N Bars #3 and smaller, Fy (ksi) = 40 Pu (k) = 14.6 Mu (k-ft) = 0.00 Bars #4 and bigger, Fy (ksi) = 60 e (ft) = 0.00 within middle 3rd Footing Dimensions: Column/Pier Base: Shear Check: Long (ft) =3 Long Direction (in) =12 Punching Vc (psi) = 170 Short (ft) =3 Short Direction (in)=12 Wide Bm Vc (psi) = 85 Thickness (in) =10 Wide Bm Shear Cap. (lb/in) > Shear Force (lb/in) % in center band B=100%574 >59 OK Punching Shear Resistance (k) > Applied Force (k) Bearing Pressures:86 >11 OK q min (psf) =1041 q max (psf) =1041 OK qu-max (psf) =1624 qu at edge of base (psf) =1624 qu-min (psf) =1624 qu at edge of base (psf) =1624 Reinforcing: Reinforcement Top and Bottom(Y/N) =Y Base As(min) on calc'd As(4/3) (Y/N) =Y Check Development Length L' long (ft) = 1.00 Bar size =#4 p =0.0003 Fy (psi) = 60000 Mu (k-ft) = 0.81 area of bar = 0.20 Min p =0.0004 Ld1 (in) =24.0 d (in)= 6.75 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.03 Spacing (in) = 134 Use p =0.0004 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.8 OK Check Development Length L' short (ft) = 1.00 Bar size =#4 p =0.0002 Fy (psi) = 60000 Mu (k-ft) = 0.41 area of bar = 0.20 Min p =0.0002 Ld1 (in) =24.0 d (in)= 6.25 bar diameter = 0.5 Max p =0.0134 Ld2 (in) =12 As req(in^2/ft)= 0.01 Spacing (in) = 269 Use p =0.0002 Ld3 (in) =12 Total Bars = 1 Less than pmax, OK Available Ld (in) = 27.3 OK 5-G Use: w/ 1 #4 Top and Bottom 3.0 feet long x 3.0 feet wide x 10'' thick Footing Each Way 5-G Loads: (U = 1.2DL + 1.6LL) Long Direction Check p Short Direction Check p 1 22 of 22 FROST Structural Engineering Project Name:Project No. : Eng. : Date : Sheet : DBP FSE07/10/23IF23-278Tom Luthy Metal Building