Loading...
HomeMy WebLinkAboutFOUNDATION CALCS - 23-00218 - Tom Luthy Storage - Shell OnlyKEYNOTES: 1.FINISHED GRADE WHERE OCCURS 2.DO NOT EXCAVATE A TRENCH CLOSER THAN A 45 DEGREE ANGLE TO BELOW BOTTOM FOOTING OR FOUNDATION 3.BOTTOM OF CONCRETE FOOTING 4.BOTTOM OF TRENCH NOTE: A.DO NOT UNDERCUT EXISTING FOOTINGS B.NO PIPE OR OTHER UTILITIES SHALL PASS THRU WALL FOOTINGS OR UNDER COLUMN FOOTINGS 1 1 1 2 3 4 FOR CONSTRUCTION ABOVE FOOTING, SEE DETAILS. T1 TRENCH PARALLEL TO CONTINUOUS STRAP FOOTING TD01 NO SCALE KEYNOTES: 1.CONCRETE FOOTING 2.SLEEVE - PROVIDE 12" MINIMUM CLEARANCE AROUND PIPE OR CONDUIT 3.PIPE OR CONDUIT 4.CONCRETE FILL TO BE PLACED BEFORE FOOTING IS POURED - FORM SAME AS FOOTING AND POUR FULL WIDTH OF PIPE TRENCH 5.STEM WALL NOTE: A.NO PIPE SHALL PASS THRU FOOTING OR UNDER COLUMN FOOTINGS. FOR TRENCHES GREATER THAN 3'-6" BELOW BOTTOM OF FOOTING, SEE PIPE PASSING BELOW WALL FOOTING DETAIL. 1 2 3 4 5 5 4 2 1 3 T2 PIPE PASSING UNDER WALL FOOTING IN SHALLOW TRENCH TD02 NO SCALE 6" M I N 8" M I N 3' - 0 " M A X 8" MIN A SECTIONA KEYNOTES: 1.STEM WALL 2.CONCRETE FOOTING 3.1'-6" MAXIMUM - WHERE TRENCH EXCEEDS 1'-6" NOTIFY STRUCTURAL ENGINEER PRIOR TO PLACEMENT OF FOOTINGS 4.BACKFILL AND RECOMPACT TRENCH PER SOILS REPORT AND SPECIFICATIONS 5.BOTTOM OF TRENCH NOTE: A.DO NOT UNDERCUT EXISTING FOOTINGS B.NO PIPES OR OTHER UTILITIES SHALL PASS THRU WALL FOOTINGS OR UNDER COLUMN FOOTINGS 1 5 4 3 2 3' - 1 " O R G R E A T E R FOR CONSTRUCTION ABOVE FOOTING, SEE DETAILS. T3 PIPE PASSING BELOW FOOTING IN DEEP TRENCH TD03 NO SCALE KEYNOTES: 1.SLOPED FINISH GRADE 2.MINIMUM FOOTING DEPTH PER G.S.N. - 12" MINIMUM 3.DEEPEN FOOTING AS REQUIRED TO ACCOUNT FOR SLOPED GRADE 4.CONCRETE FOOTING NOTE: A.FOR ADDITIONAL INFORMATION, SEE PLANS AND DETAILS 1 4 3 2 5'-0" T4 TYPICAL DETAIL FOR FOUNDATION EMBEDMENT TD04 NO SCALE KEYNOTES: 1.CONCRETE SLAB ON GRADE 2.CONT KEYED JOINT 3.SAWCUT 18" WIDE x 14" SLAB THICKNESS IN DEPTH - CUT SHALL BE MADE SOON ENOUGH TO PREVENT SHRINKAGE CRACKING, BUT NOT SO SOON AS TO CAUSE SPALLING OF THE CONCRETE WHILE SAWING. WORK MUST BE COMPLETE WITHIN 16 HOURS OF CONCRETE PLACEMENT. NOTE: A.KEYED JOINTS NEED ONLY OCCUR AT EXPOSED EDGES DURING PLACEMENT UNLESS SPECIFICALLY NOTED ON THE PLANS. B."TOOL WET JOINT", "ZIP STRIP", ETC SHALL MATCH SAWCUT REQUIREMENTS 1 2 3 1 12"6"6"12" X SAWCUT JOINT X KEYED JOINT T5 CONTROL JOINTS IN CONCRETE SLAB ON GRADE TD07 NO SCALE 6 MIN BAR OFFSET BAR CLEARANCE SPLICE DETAIL BEND & HOOK DETAILS COLUMN TIES BEAM STIRRUPS "d" 45° "d" "d" 1 2 4 5 6 10 9 8 7 3 1 5 5 9 10 8 KEYNOTES: 1.LAP - SEE G.S.N. 2.MAXIMUM 15 LAP BUT NOT MORE THAN 6" 3.WIRE TIES 4.1d (1" MINIMUM) 5.RADIUS = 3d FOR BARS NOT OVER #8; 4d FOR #9, #10, AND #1 BARS; 5d FOR #14 AND #18 BARS, 5d FOR ALL GRADE 40 BARS WITH 180 DEGREE HOOK 6.4D (4" MINIMUM) 7.12d (90 DEGREE HOOK) 8.6d (4" MINIMUM) 9.135 DEGREE BEND 10.BEND AROUND 112" PIN FOR #3 BARS. BEND AROUND 2" PIN FOR #4 BARS. BEND AROUND 212" PIN FOR #5 BARS. T6 TYPICAL REINFORCING DETAILS TD10 NO SCALE NOTES: 1.TOP BARS ARE ANY HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF FRESH CONCRETE IS CAST IN THE MEMBER BELOW THE REINFORCEMENT. 2.UNLESS NOTED OTHERWISE, LAP SPLICES IN CONCRETE BEAMS, SLABS AND WALLS SHALL BE CLASS "B" TENSION LAP SPLICES. BAR SIZE CLASS B TENSION SPLICE LENGTHS f'c = 3,000 PSI f'c = 4,000 PSI f'c = 5,000 PSI HOIRZONTAL BARS W/ >12" OF CONC. BELOW VERTICAL AND BOTTOM HORIZONTAL BARS HOIRZONTAL BARS W/ >12" OF CONC. BELOW VERTICAL AND BOTTOM HORIZONTAL BARS HOIRZONTAL BARS W/ >12" OF CONC. BELOW VERTICAL AND BOTTOM HORIZONTAL BARS #3 12"12"12"12"12"12" #4 19"15"17"13"15"12" #5 29"23"26"20"23"18" #6 32"25"28"21"25"19" #7 54"41"47"36"42"32" #8 70"54"61"47"54"42" #9 89"68"77"59"69"53" #10 112"87"97"75"87"67" T7 STEEL REINFORCING LAP SPLICES IN CONCRETE TD14 NO SCALE PRO F E S S I O N A L EN G I N E E R S T ATE O F I D A H O A 7/ 1 0 / 2 3 14 1 3 4 D VID B . P O R T E R L I C E N SED SHEET INDEX SHEET DESCRIPTION DETAILS S1.0 GSN-TYPICAL DETAILS T-SERIES S2.0 FOUNDATION PLAN --- S3.0 FOUNDATION DETAILS 100-SERIES GENERAL STRUCTURAL NOTES (APPLY UNLESS NOTED OTHERWISE ON PLANS/DETAILS) GENERAL REQUIREMENTS: 1.THE STRUCTURAL SYSTEMS AND MEMBERS DEPICTED HEREIN HAVE BEEN DESIGNED PRIMARILY TO SAFEGUARD AGAINST MAJOR STRUCTURAL DAMAGE AND LOSS OF LIFE, NOT TO LIMIT DAMAGE OR MAINTAIN FUNCTION (IBC SECTION 101.3). 2.THESE DRAWINGS, AND THEIR ASSOCIATED STRUCTURAL CALCULATIONS, HAVE BEEN PERFORMED USING STANDARDS OF PROFESSIONAL CARE AND COMPLETENESS NORMALLY EXERCISED UNDER SIMILAR CIRCUMSTANCES BY REPUTABLE STRUCTURAL ENGINEER'S IN THIS OR SIMILAR LOCALITIES. THEY NECESSARILY ASSUME THAT THE WORK DEPICTED WILL BE PERFORMED BY AN EXPERIENCED CONTRACTOR AND/OR WORKMEN WHO HAVE A WORKING KNOWLEDGE OF THE INTERNATIONAL BUILDING CODE CONVENTIONAL FRAMING REQUIREMENTS AND OF INDUSTRY ACCEPTED STANDARD GOOD PRACTICE. AS NOT EVERY CONDITION OR FRAMING ELEMENT IS (OR CAN BE) EXPLICITLY SHOWN ON THESE DRAWINGS, IT IS UNDERSTOOD THAT THE CONTRACTOR WILL USE INDUSTRY ACCEPTED STANDARD GOOD PRACTICE FOR ALL MISCELLANEOUS WORK NOT EXPLICITLY SHOWN. 3.THESE DRAWINGS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED CONSTRUCTION SUCH THAT DESIGN LIVE LOAD PER SQUARE FOOT AS STATED HEREIN IS NOT EXCEEDED. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. IF AN OPTION IS USED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY CHANGES, AND SHALL COORDINATE ALL DETAILS. 4.WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL STRUCTURAL NOTES AND SPECIFICATIONS, THE GREATER REQUIREMENTS SHALL GOVERN. TYPICAL DETAILS AND NOTES ARE NOT NECESSARILY INDICATED ON THE PLANS, BUT SHALL APPLY NONE-THE-LESS. WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. DETAILS MAY SHOW ONLY ONE SIDE OF CONNECTION OR MAY OMIT INFORMATION FOR CLARITY. 5.ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WITH APPROPRIATE TRADES, DRAWINGS AND SUBCONTRACTORS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS PRIOR TO START OF CONSTRUCTION. RESOLVE ANY DISCREPANCY WITH THE ARCHITECT AND STRUCTURAL ENGINEER. 6.ANY INSPECTIONS, SPECIAL (IBC CHAPTER 17) OR OTHERWISE THAT ARE REQUIRED BY THE BUILDING CODES, LOCAL BUILDING DEPARTMENTS, OR BY THESE PLANS SHALL BE DONE BY AN INDEPENDENT INSPECTION COMPANY OR THE BUILDING DEPARTMENT, SITE VISITS BY THE STRUCTURAL ENGINEER DO NOT CONSTITUTE AN OFFICIAL INSPECTION, UNLESS SPECIFICALLY CONTRACTED FOR. 7.SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS IN ADDITION TO ITEMS REQUIRED BY ARCHITECTURAL SPECIFICATIONS, THE CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS PRIOR TO SUBMITTAL. ITEMS NOT IN ACCORDANCE WITH CONTRACT DRAWINGS SHALL BE FLAGGED UPON HIS REVIEW. VERIFY ALL DIMENSIONS WITH ARCHITECT. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM ORIGINAL CONTRACT DRAWINGS SHALL BE CLOUDED. ANY OF THE AFOREMENTIONED WHICH ARE NOT CLOUDED OR FLAGGED BY SUBMITTING PARTIES, SHALL NOT BE CONSIDERED APPROVED AFTER THE STRUCTURAL ENGINEER'S REVIEW, UNLESS NOTED ACCORDINGLY. ANY ENGINEERING PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW, SHALL BEAR THE SEAL OF A STRUCTURAL ENGINEER REGISTERED IN THE APPROPRIATE STATE. THE SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACT DRAWINGS. ITEMS OMITTED OR SHOWN INCORRECTLY AND ARE NOT FLAGGED BY THE STRUCTURAL ENGINEER ARE NOT TO BE CONSIDERED CHANGES TO ORIGINAL DRAWINGS. THE ADEQUACY OF ENGINEERING DESIGNS AND LAYOUT PERFORMED BY THE OTHERS RESTS WITH THE DESIGNING OR SUBMITTING AUTHORITY. REVIEWING IS INTENDED ONLY AS AN AID TO THE CONTRACTOR IN OBTAINING CORRECT SHOP DRAWINGS. RESPONSIBILITY FOR CORRECTNESS SHALL REST WITH THE CONTRACTOR. ALLOW (5) WORKING DAYS FOR THE STRUCTURAL ENGINEER'S REVIEW. ONE COPY OF EACH SUBMITTAL WILL BE RETAINED FOR THE STRUCTURAL ENGINEER'S RECORDS. BASIS FOR DESIGN: 1.BUILDING CODE: 2018 EDITION OF THE IBC WITH CITY/COUNTY AMENDMENTS. RISK CATEGORY = II 2.VERTICAL LOAD: PER PRE-ENGINEERED BUILDING MANUFACTURER 3.SEISMIC DESIGN PARAMETERS: PER PRE-ENGINEERED BUILDING MANUFACTURER 4.WIND DESIGN PARAMETERS: PER PRE-ENGINEERED BUILDING MANUFACTURER REINFORCING STEEL: 1.ASTM A615 GRADE 60 (FY = 60 KSI) DEFORMED BARS FOR ALL BARS #4 AND LARGER. ASTM A615 GRADE 40 (FY = 40 KSI) DEFORMED BARS FOR ALL BARS #3 AND SMALLER. GRADE 60 DEFORMED BARS SHALL BE USED FOR CONCRETE WALLS, BEAMS, ELEVATED SLABS AND COLUMN REINFORCING. 2.WELDING OF REINFORCING BARS SHALL BE MADE ONLY TO ASTM A706 GRADE 60 BARS AND ONLY USING E90 SERIES RODS. WELDING OF REINFORCING BARS SHALL BE MADE ONLY AT LOCATIONS SHOWN ON PLANS OR DETAILS. 3.REINFORCING BAR SPACING GIVEN ARE MAXIMUM ON CENTERS. ALL BARS PER CRSI SPECIFICATIONS AND HANDBOOK. DOWEL ALL VERTICAL REINFORCING TO FOUNDATION. SECURELY TIE ALL BARS IN LOCATION BEFORE PLACING CONCRETE. CONCRETE: 2.ALL NORMAL WEIGHT CONCRETE SHALL BE REGULAR WEIGHT OF 150 POUNDS PER CUBIC FOOT USING HARD-ROCK AGGREGATES. AGGREGATE USED IN CONCRETE SHALL CONFORM TO ASTM C33. 3.LAP SPLICES FOR BEAMS AND FLOOR SLABS SLABS SHALL BE ACCORDING TO CHAPTER 12 OF ACI 318 OR LAP SCHEDULE ON THESE DRAWINGS. STAGGER SPLICES A MINIMUM OF ONE LAP LENGTH. NO TACK WELDING OF REINFORCING BARS ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE WITH THE STRUCTURAL ENGINEER. LATEST ACI CODE AND DETAILING MANUAL APPLY. PROVIDE BENT CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT ALL CORNERS AND INTERSECTIONS PER TYPICAL DETAILS. VERTICAL WALL BARS SHALL BE SPLICED AT OR NEAR FLOOR LINES. 4.ALL DIMENSIONS SHOWING THE LOCATION OF REINFORCING STEEL NOT NOTED AS "CLEAR" OR "CLR" ARE TO CENTER OF STEEL. MINIMUM COVER FOR NON-PRESTRESSED CONCRETE REINFORCING SHALL BE AS FOLLOWS: 5.MAXIMUM SLUMP FOR ALL CONCRETE SHALL BE 6". PORTLAND CEMENT SHALL CONFORM TO ASTM C150. TYPE V CEMENT SHALL BE USED FOR CONCRETE IN CONTACT WITH ALKALINE SOIL, AND TYPE II ELSEWHERE. 6.NO MORE THAN 90 MINUTES SHALL ELAPSE BETWEEN CONCRETE BATCHING AND CONCRETE PLACEMENT UNLESS APPROVED BY THE TESTING AGENCY. 7.CONCRETE PLACEMENT AND QUALITY SHALL BE PER RECOMMENDATIONS IN ACI 614, ACI 301 AND ACI 318. MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED, EXCEPT THAT SLABS ON GRADE NEED BE VIBRATED ONLY AROUND AND UNDER FLOOR DUCTS, ETC. CAST CLOSURE POUR, WHERE SHOWN ON PLANS AROUND COLUMNS AFTER COLUMN DEAD LOAD IS APPLIED. REMOVE ALL DEBRIS FROM FORMS BEFORE PLACING CONCRETE. ALL ITEMS TO BE CAST IN CONCRETE SUCH AS REINFORCING, DOWELS, BOLTS, ANCHORS, PIPES, SLEEVES, ETC., SHALL BE SECURELY POSITIONED IN THE FORMS BEFORE PLACING THE CONCRETE. 8.ALL CONCRETE SLABS ON GRADE SHALL BE DIVIDED INTO AREAS BY CONTROL JOINTS (KEYED OR SAW CUT) SUCH THAT ONE SLAB AREA DOES NOT EXCEED A MAXIMUM LENGTH OF 24 TIMES THE SLAB THICKNESS IN BOTH DIRECTIONS (EXAMPLE: 4" SLAB = 8'-0" LENGTH). SQUARE LAYOUTS ARE PREFERRED, BUT THE SLAB GEOMETRY MAY DICTATE OTHERWISE. THE RATIO OF THE LONG TO SHORT DISTANCE SHALL NOT EXCEED 1.3. IT IS RECOMMENDED THAT SAW CUTS BE MADE WITHIN 16 HOURS OF CONCRETE BATCHING. KEYED CONTROL JOINTS NEED ONLY OCCUR AT EXPOSED EDGES DURING POURING, ALL OTHER JOINTS MAY BE SAW CUT. 9.HORIZONTAL PIPES AND ELECTRICAL CONDUITS SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE AND SLABS ON GRADE EXCEPT WHERE SPECIFICALLY APPROVED OR NOTED BY THE STRUCTURAL ENGINEER. PIPES AND CONDUITS SHALL NOT IMPAIR THE STRENGTH OF THE WORK. 10.FLY ASH MAY BE USED ONLY IF PERMITTED BY ARCHITECTURAL SPECIFICATIONS AND SHALL BE LIMITED TO 18 PERCENT OF CEMENTITIOUS MATERIALS AND SHALL HAVE A REPLACEMENT FACTOR OF 1.2 RELATIVE TO CEMENT REPLACED. NO FLY ASH ADDITIVES SHALL BE USED IN FLATWORK OR ARCHITECTURALLY EXPOSED CONCRETE. 11.COLD/HOT WEATHER CONCRETE CONSTRUCTION: PROTECT CONCRETE FROM DAMAGE OR REDUCED STRENGTH IN COMPLIANCE WITH ACI 305 AND 306. 12.CONCRETE MIXES SHALL BE DESIGNED BY A CERTIFIED LABORATORY AND APPROVED BY THE STRUCTURAL ENGINEER. 13.LIMIT ALKALI-SILICA REACTION (ASR) TO 0.1% EXPANSION AT 28 DAYS IN CONCRETE MIX AT ALL EXTERIOR CONCRETE AND INTERIOR CONCRETE EXPOSED TO MOISTURE. LOCATION:MINIMUM COVER TOLERANCE CAST AGAINST EARTH (FOOTINGS)3"± 3 8" SLABS ON GRADE 112"± 14" EXPOSED TO EARTH OR WEATHER - #5 AND SMALLER 112"± 3 8" EXPOSED TO EARTH OR WEATHER - #6 AND LARGER 2"± 3 8" NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND ROOF SLAB 1"18" STRUCTURAL SLABS AND WALLS 3 4"18" BEAMS AND COLUMNS (PRIMARY) REINFORCEMENT, TIES, STIRRUPS AND SPIRALS 112"3 8" 1. MINIMUM 28 DAY CONCRETE STRENGTH SHALL BE AS FOLLOWS: USE:CONCRETE STRENGTH: MAX W/C RATIO AIR ENTRAINMENT FOOTINGS 3500 PSI 0.50 5.5% ± 1% CONCRETE WALLS 4500 PSI 0.45 5.5% ± 1% CONCRETE SLABS ON GRADE 3500 PSI 0.45 N/A FOUNDATION NOTES: 1.IN LIEU OF A GEOTECHNICAL REPORT: THE FOUNDATION HAS BEEN DESIGNED ACCORDING TO THE RECOMMENDATIONS OF CHAPTER 18 OF THE IBC. 2.THE SOIL DESIGN VALUES LISTED BELOW HAVE BEEN APPROVED BY THE CITY/COUNTY BUILDING DEPARTMENT, CONTINGENT THAT THE SOIL ON THE SITE PREDOMINATELY CONSISTS OF SAND AND/OR GRAVEL. SPECIFIC SOIL CLASSIFICATIONS SHOULD BE ONE OF THE FOLLOWING: SANDY GRAVEL OR GRAVEL(GW OR GP), SAND(SW AND SP), SILTY SAND(SM), CLAYEY SAND(SC), SILTY GRAVEL(GM), OR CLAYEY GRAVEL(GC). THESE SOIL CLASSIFICATIONS CAN BE FOUND IN TABLE 1806.2 OF CHAPTER 18 OF THE IBC. VERIFICATION OF SOIL CLASSIFICATION IS THE RESPONSIBILITY OF THE CONTRACTOR. 3.A ONE-THIRD INCREASE IN BEARING PRESSURES IS ALLOWED WITH SEISMIC OR WIND LOAD COMBINATIONS. LATERAL BEARING AND LATERAL SLIDING RESISTANCE MAY BE COMBINED. 4.ALL FOUNDATIONS SHALL BEAR ON COMPACTED ENGINEERED FILL OR COMPETENT NATIVE SOIL SUBBASE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR). GRADE IS DEFINED AS LOWEST ADJACENT GRADE WITHIN 5 FEET OF THE BUILDING FOR PERIMETER FOOTINGS. WHERE EXTERIOR PAVING OR CONCRETE IS DIRECTLY ADJACENT TO BUILDING, GRADE IS DEFINED AS TOP OF EXTERIOR PAVING AT LEAST 5 FEET FROM BUILDING. CONCRETE FOOTING EXCAVATIONS SHALL BE CLEAN AND FREE OF LOOSE DEBRIS OR UN-COMPACTED MATERIAL AT TIME OF CONCRETE PLACEMENT. 5.CONCRETE SLABS ON GRADE SHALL BE SUPPORTED ON A 4 INCH (MIN) LAYER OF FREE-DRAINING GRANULAR MAT (DRAINAGE FILL COURSE). THE MAT SHOULD CONSIST OF A WELL GRADED SAND AND GRAVEL MIXTURE WITH MAXIMUM 3/4-INCH CRUSHED AGGREGATE. THE GRANULAR MAT SHOULD BE COMPACTED TO NO LESS THAN 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557 6.BACKFILL AGAINST RESTRAINED WALLS SHALL NOT BE PLACED UNTIL AFTER THE WALLS ARE SUPPORTED BY THE COMPLETION OF INTERIOR FLOOR SYSTEMS AND CONCRETE OR GROUT STRENGTH HAS REACHED THE 28 DAY STRENGTH LISTED BELOW. THE SOIL DESIGN VALUES FOR THE FOUNDATION ARE: ALLOWABLE BEARING PRESSURE 1500 PSF ALLOWABLE LATERAL BEARING PRESSURE 150 PSF/FT ALLOWABLE LATERAL SLIDING COEFFICIENT 0.25 FOUNDATION BEARING DEPTH 36" BELOW FINISHED GRADE PR O J E C T M A N A G E R : CA D O P E R A T O R : DATE: JO B N O . : ST R U C T U R A L E N G I N E E R S S E A L : PR O J E C T : CL I E N T : RE V . DA T E BY DE S C R I P T I O N 2 3 4 5 CURRENT REV. Th i s d r a w i n g i s t h e p r o p e r t y o f F R O S T S t r u c t u r a l E n g i n e e r i n g , In c . L e g a l l y , t h e d r a w i n g c a n N O T b e c o p i e d i n w h o l e o r i n pi e c e s . I t i s o n l y t o b e u s e d f o r t h e p r o j e c t a n d s i t e s p e c i f i c a l l y id e n t i f i e d h e r e o n a n d i s n o t t o b e u s e d o n a n y o t h e r p r o j e c t . Co n t r a c t o r s h a l l c a r e f u l l y r e v i e w a l l d i m e n s i o n s , d e t a i l s , a n d co n d i t i o n s a n d r e p o r t a t o n c e a n y e r r o r , i n c o n s i s t e n c y o r om i s s i o n d i s c o v e r e d b e f o r e c o n s t r u c t i o n . Th e c o n t r a c t o r a s s u m e s f u l l l i a b i l i t y f o r d e v i a t i o n s f r o m t h e in t e n t o f t h e s e p l a n s . 1 St r u c t u r a l E n g i n e e r i n g fa x : 2 0 8 . 2 2 7 . 8 4 0 5 10 2 0 E . L i n c o l n R o a d Id a h o F a l l s , I D 8 3 4 0 1 ph o n e : 2 0 8 . 2 2 7 . 8 4 0 4 co n t a c t @ f r o s t s t r u c t u r a l . c o m S1.0 7/10/23 TO M L U T H Y M E T A L B U I L D I N G TI T A N S T E E L RM S DB P IF 2 3 - 2 7 8 GS N - T Y P I C A L D E T A I L S SO U T H H I G H W A Y 1 9 1 RE X B U R G , I D A H O 8 3 4 4 0 . . . . . . . . . . . . . . . . . . . . . . WF 1 0 A 4 5" CONCRETE SLAB ON GRADE OVER COMPACTED FILL. (SEE GSN) PROVIDE SLAB JOINTS PER TYPICAL DETAIL WITHIN 16 HOURS OF BATCH TIME FINISH FLOOR = 100'-0" CONCRETE SLAB ON GRADE F66 F36 F36 2 5 A T.O.F. 98'-0" T.O.W. 102'-0" 1 WF16 / W1 WF16 / W1 WF 1 6 / W 1 WF 1 6 / W 1 A B C E G J J F 4 3 2 1 B C E G 2 1 5 4 3 D WF16 / W1 WF 1 6 / W 1 T.O.W. 101'-0" T.O.F. 98'-0" T.O.W. 102'-0" T.O.W. 101'-0" 1 1 1 1 1 1 1 1 1 11 WF 1 0 B WF 1 0 B 100'-0" 25'-0"25'-0" 1'-0" 3'-0"16'-0"1'-6"3'-0"1'-6"2'-6"3'-0"2'-0"14'-0"3'-6"3'-6"14'-0"3'-0"3'-0"1'-6"4'-0"16'-0"5'-0" 25'-0"25'-0" 1'-0" 1'-0"1'-0" 60 ' - 0 " 25 ' - 0 " 85 ' - 0 " 15 ' - 0 " 15 ' - 0 " 15 ' - 0 " 15 ' - 0 " 1'-0" 7' - 6 " 10 ' - 0 " 7' - 6 " 25'-0"25'-0"24'-0" 14'-0"6'-0"4'-0"4'-0"6'-0"15'-0"4'-0"3'-0"18'-0" 15 ' - 0 " 15 ' - 0 " 5' - 0 " 14 ' - 0 " 10 ' - 0 " 1' - 0 " 25 ' - 0 " 8'-0"10'-0"8'-0" 4 4 4 4444 2 F66 T.O.F. 99'-6" F72 F72 3 3 F72 F72 3 3 F72 F48 F72 F36 F36 F60 F42 F72F72 F42 F42 F42 T.O.F. 99'-6" TYP 101 TYP 101 TYP 101 TYP 101 102 102 102 103 103 103 103 104 104 105 106 OPP 103 OPP 103 TYP 101 TYP 101 102 102 102 102 102 102 102 102 102 OPP 103 103 103 103 103 103 104104 104 104 106 106 105 WF 1 0 B WF 1 0 B SCALE: FOUNDATION PLAN 3/16" = 1'-0" PRO F E S S I O N A L EN G I N E E R S T ATE O F I D A H O A 7/ 1 0 / 2 3 14 1 3 4 D VID B . P O R T E R L I C E N SED HEADED ANCHOR ROD EMBED SCHEDULE DIAMETER MINIMUM EMBEDMENT (FROM TOP OF PIER/WALL) 1 2"12" 5 8"14" 3 4"16" 7 8"18" 1"20" 11 4"25" WALL (W) SCHEDULE MARK THICKNESS AND TYPE VERTICAL REINFORCING HORIZONTAL REINFORCING REMARKS W1 8" CONCRETE #4 AT 18" O.C.#4 AT 18" O.C.--- PR O J E C T M A N A G E R : CA D O P E R A T O R : DATE: JO B N O . : ST R U C T U R A L E N G I N E E R S S E A L : PR O J E C T : CL I E N T : RE V . DA T E BY DE S C R I P T I O N 2 3 4 5 CURRENT REV. Th i s d r a w i n g i s t h e p r o p e r t y o f F R O S T S t r u c t u r a l E n g i n e e r i n g , In c . L e g a l l y , t h e d r a w i n g c a n N O T b e c o p i e d i n w h o l e o r i n pi e c e s . I t i s o n l y t o b e u s e d f o r t h e p r o j e c t a n d s i t e s p e c i f i c a l l y id e n t i f i e d h e r e o n a n d i s n o t t o b e u s e d o n a n y o t h e r p r o j e c t . Co n t r a c t o r s h a l l c a r e f u l l y r e v i e w a l l d i m e n s i o n s , d e t a i l s , a n d co n d i t i o n s a n d r e p o r t a t o n c e a n y e r r o r , i n c o n s i s t e n c y o r om i s s i o n d i s c o v e r e d b e f o r e c o n s t r u c t i o n . Th e c o n t r a c t o r a s s u m e s f u l l l i a b i l i t y f o r d e v i a t i o n s f r o m t h e in t e n t o f t h e s e p l a n s . 1 St r u c t u r a l E n g i n e e r i n g fa x : 2 0 8 . 2 2 7 . 8 4 0 5 10 2 0 E . L i n c o l n R o a d Id a h o F a l l s , I D 8 3 4 0 1 ph o n e : 2 0 8 . 2 2 7 . 8 4 0 4 co n t a c t @ f r o s t s t r u c t u r a l . c o m S2.0 7/10/23 TO M L U T H Y M E T A L B U I L D I N G TI T A N S T E E L RM S DB P IF 2 3 - 2 7 8 FO U N D A T I O N P L A N SO U T H H I G H W A Y 1 9 1 RE X B U R G , I D A H O 8 3 4 4 0 . . . . . . . . . . . . . . . . . . . . . . A.VERIFY ALL DIMENSIONS WITH ALL ARCHITECTURAL DRAWINGS. B.ALL SCHEDULED MARK DESIGNATIONS MAY NOT NECESSARILY BE FOUND ON THIS PLAN. SCHEDULES ARE TYPICAL TO THIS PROJECT. C.THE DEPTH OF FOOTING DIMENSION INDICATED IN THE G.S.N. IS A MINIMUM. FOUNDATION CONTRACTOR SHALL COORDINATE WITH THE SOILS REPORT AND OTHER TRADES TO INSURE THAT THESE MINIMUMS ARE SUFFICIENT FOR THE WORK. SEE TYPICAL DETAILS FOR ADDITIONAL REQUIREMENTS. D.W1, W2, ETC. - AS SHOWN ON PLAN INDICATES CONCRETE OR MASONRY WALLS. SEE WALL SCHEDULE FOR ADDITIONAL INFORMATION. E.WF18, WF24, ETC. - AS SHOWN ON PLAN INDICATES A CONTINUOUS WALL FOOTING. SEE WALL FOOTING SCHEDULE FOR ADDITIONAL INFORMATION. F.F36, F48, ETC. - AS SHOWN ON PLAN INDICATES A CONCRETE FOOTING. SEE FOOTING SCHEDULE FOR ADDITIONAL INFORMATION. FOUNDATION PLAN NOTES FOOTING SCHEDULE NOTES: 1. FOR CONSTRUCTION ABOVE FOOTING, SEE DETAILS. 2. FOR MINIMUM CLEARANCE (CLR) OF REINFORCING, SEE GENERAL STRUCTURAL NOTES (GSN). MARK LENGTH WIDTH THICKNE SS FOOTING REINFORCING REMARKS F36 36"36"12"(3) #4 EACH WAY TOP AND BOTTOM --- F42 42"42"12"(3) #4 EACH WAY TOP AND BOTTOM --- F48 48"48"12"(4) #4 EACH WAY TOP AND BOTTOM --- F60 60"60"12"(5) #4 EACH WAY TOP AND BOTTOM --- F66 66"66"12"(6) #5 EACH WAY TOP AND BOTTOM --- F72 72"72"12"(6) #5 EACH WAY TOP AND BOTTOM --- WF10A CONT 10"8"(2) #6 CONT BOTTOM WF10B CONT 10"8"(2) #4 CONT BOTTOM WF16 CONT 16"12"(2) #4 CONT BOTTOM MONO POUR W/ SLAB MONO POUR W/ SLAB STRIP FOOTING 1.VERIFY DOOR OPENING W/ METAL BUILDING MANUFACTURER DRAWINGS. 2.(1) #6x10'-0" LONG (10'-0" EACH LEG) HAIRPIN. WIDEN GRADE BEAM AT CONCRETE PIER AS NECESSARY TO MAINTAIN 3" CLR AROUND ALL REINFORCING 3.(1) #4x10'-0" LONG (5'-0" EACH LEG) HAIRPIN. WIDEN GRADE BEAM AT CONCRETE PIER AS NECESSARY TO MAINTAIN 3" CLR AROUND ALL REINFORCING. 4.PROVIDE 18"Ø CONCRETE PIER W/ (8) #5 HOOKED DOWELS AND (3) #3 TIES IN TOP 5" AND AT 8" O.C. REMAINDER BELOW PORTAL FRAME COLUMN, SIM TO DETAIL 104. PLAN KEYNOTESX KEYNOTES: 1.PRE-ENGINEERED BUILDING BEYOND 2.CONCRETE STEM WALL, SEE PLAN 3.SIDEWALK, PAVEMENT, OR FINISH GRADE PER ARCH 4.MINIMUM FOOTING DEPTH, SEE GSN 5.CONCRETE FOOTING, SEE PLAN 6.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 7.CONCRETE SLAB ON GRADE, SEE PLAN 8.#4 BENT DOWEL AT 18" O.C. 102 PRE-ENGINEERED BUILDING AT CONCRETE FOOTING CS_MB102 NO SCALE 3" CLR 3" CL R 1 5 6 7 8 3 2 3 4 18" 18" KEYNOTES: 1.PRE-ENGINEERED COLUMN, SEE PLAN 2.SIDEWALK, PAVEMENT, OR FINISH GRADE PER ARCH 3. CONCRETE STEM WALL BEYOND, CONT REINFORCEMENT TROUGH PIER (NOT SHOWN FOR CLARITY) 4.MINIMUM FOOTING DEPTH, SEE GSN 5.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 6.CONCRETE FOOTING, SEE PLAN 7.18"Ø CONCRETE PIER W/ (8) #5 HOOKED DOWELS AND (3) #3 TIES IN TOP 5" AND AT 8" O.C. REMAINDER 8.CONCRETE GRADE BEAM, SEE PLAN 9.HAIRPIN AS OCCURS, SEE PLAN 10.CONCRETE SLAB ON GRADE, SEE PLAN 11.ANCHOR BOLTS W/ NUT AT BOTTOM 12.CENTERLINE OF STEEL COLUMN & FOOTING 104 PRE-ENGINEERED COLUMN AT CONCRETE FOOTING NO SCALE 3" CLR 3" CL R 5 3 10 9 7 30" MIN LAP 8 22 1 12 11 4 6 KEYNOTES: 1.PRE-ENGINEERED COLUMN, SEE PLAN 2.SIDEWALK, PAVEMENT, OR FINISH GRADE PER ARCH 3.CONCRETE STEM WALL BEYOND, CONT REINFORCEMENT TROUGH PIER (NOT SHOWN FOR CLARITY) 4.MINIMUM FOOTING DEPTH, SEE GSN 5.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 6.CONCRETE FOOTING, SEE PLAN 7.18"Ø CONCRETE PIER W/ (8) #5 HOOKED DOWELS AND (3) #3 TIES IN TOP 5" AND AT 8" O.C. REMAINDER 8.CONCRETE GRADE BEAM, SEE PLAN 9.ANCHOR BOLTS W/ NUT AT BOTTOM 10.CONCRETE SLAB ON GRADE, SEE PLAN 103 PRE-ENGINEERED COLUMN AT CONCRETE FOOTING CS_MB106 NO SCALE 5 3 10 7 8 4 1 9 6 22 3" CLR 3" CL R KEYNOTES: 1.PRE-ENGINEERED BUILDING 2.CONCRETE STEM WALL, SEE PLAN 3.SIDEWALK, PAVEMENT, OR FINISH GRADE PER ARCH 4.MINIMUM FOOTING DEPTH, SEE GSN 5.CONCRETE FOOTING, SEE PLAN 6.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 7.CONCRETE SLAB ON GRADE, SEE PLAN 101 PRE-ENGINEERED BUILDING AT CONCRETE FOOTING CS_MB101 NO SCALE 3" CLR 3" CL R 1 5 6 7 33 2 4 105 TYPICAL STEEL COLUMN AT FOUNDATION NO SCALE 1 2 3 5 1 KEYNOTES: 1.PRE-ENGINEERED COLUMN, SEE PLAN 2.CONCRETE FOOTING, SEE PLAN 3.COMPACTED SUB-GRADE BELOW FOOTING, SEE PLAN 4.CONCRETE CLOSURE POUR, POUR AFTER DEAD LOADS ARE IN PLACE 5.CONCRETE SLAB ON GRADE, SEE PLAN 6.THICKEN FOOTING AS REQUIRED FOR ANCHOR BOLT EMBEDMENT 4 4 PLANA A 3" CLR 3" CL R 6 KEYNOTES: 1.CONCRETE SLAB ON GRADE, SEE PLAN 2.CONCRETE GRADE BEAM, SEE PLAN 106 CONCRETE GRADE BEAM AT CONCRETE SLAB NO SCALE 2 1 3" CLR 3" CL R PER PLAN PE R PL A N PRO F E S S I O N A L EN G I N E E R S T ATE O F I D A H O A 7/ 1 0 / 2 3 14 1 3 4 D VID B . P O R T E R L I C E N SED PR O J E C T M A N A G E R : CA D O P E R A T O R : DATE: JO B N O . : ST R U C T U R A L E N G I N E E R S S E A L : PR O J E C T : CL I E N T : RE V . DA T E BY DE S C R I P T I O N 2 3 4 5 CURRENT REV. Th i s d r a w i n g i s t h e p r o p e r t y o f F R O S T S t r u c t u r a l E n g i n e e r i n g , In c . L e g a l l y , t h e d r a w i n g c a n N O T b e c o p i e d i n w h o l e o r i n pi e c e s . I t i s o n l y t o b e u s e d f o r t h e p r o j e c t a n d s i t e s p e c i f i c a l l y id e n t i f i e d h e r e o n a n d i s n o t t o b e u s e d o n a n y o t h e r p r o j e c t . Co n t r a c t o r s h a l l c a r e f u l l y r e v i e w a l l d i m e n s i o n s , d e t a i l s , a n d co n d i t i o n s a n d r e p o r t a t o n c e a n y e r r o r , i n c o n s i s t e n c y o r om i s s i o n d i s c o v e r e d b e f o r e c o n s t r u c t i o n . Th e c o n t r a c t o r a s s u m e s f u l l l i a b i l i t y f o r d e v i a t i o n s f r o m t h e in t e n t o f t h e s e p l a n s . 1 St r u c t u r a l E n g i n e e r i n g fa x : 2 0 8 . 2 2 7 . 8 4 0 5 10 2 0 E . L i n c o l n R o a d Id a h o F a l l s , I D 8 3 4 0 1 ph o n e : 2 0 8 . 2 2 7 . 8 4 0 4 co n t a c t @ f r o s t s t r u c t u r a l . c o m S3.0 7/10/23 TO M L U T H Y M E T A L B U I L D I N G TI T A N S T E E L RM S DB P IF 2 3 - 2 7 8 FO U N D A T I O N D E T A I L S SO U T H H I G H W A Y 1 9 1 RE X B U R G , I D A H O 8 3 4 4 0 . . . . . . . . . . . . . . . . . . . . . .