Loading...
HomeMy WebLinkAbout23-255 5th West Combined PDFsPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04232024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/23/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Hill and Sons Excavation Total Time on Project: 7 hours Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 78653 MS: 644 Ambient Temperature (°F): 41 DS: 2416 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 East Water road crossing 1st lift 8 Pit Run 131.0 126.7 3.4 127.9 99 Pass 2 East Water Road Crossing, center of road 2nd lift 6 Pit Run 128.2 123.0 4.2 127.9 96 Pass 3 East Water Road Crossing, center of road 3rd Lift 6 Pit Run 129.4 122.8 5.4 127.9 96 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 4 East road water crossing 4th lift 6 Pit Run 130.5 123.1 6.0 127.9 96 Pass 5 Central Water Road Crossing 1st lift 6 Pit Run 131.3 125.6 4.6 127.9 98 Pass 6 Central Water Road Crossing 2nd lift 6 Pit Run 126.9 120.9 5.0 127.9 95 Pass 7 Central Water Road Crossing 3rd lift 6 Pit Run 126.8 122.4 3.6 127.9 96 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52444.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site and began testing for compaction on the waterlines in the road. I tested each lift, confirming that each one was compacted to meet required specifications. Once I tested all pit run lifts for both the eastern and central water crossings, I loaded my great into my truck and left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1C96DDFF-F83B-4A26-8F34-7CE6B78C429B 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04242024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/24/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 11:00 AM Contractor: Hill and Sons Excavation Total Time on Project: 6 hours Current Weather Conditions: Partly Cloudy Wind: Calm Instrument ID 78653 MS: 647 Ambient Temperature (°F): 68 DS: 2471 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Western Road water crossing, 10ft south of northern edge of road 1st lift 6 Pit Run 125.4 121.4 3.3 127.9 95 Pass 2 Western road water crossing, 10ft south of northern edge of road 2nd lift 6 Pit Run 128.0 121.7 5.3 127.9 95 Pass 3 Central road Top of 6 3/4" Base 128.8 123.5 4.3 130.0 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1C96DDFF-F83B-4A26-8F34-7CE6B78C429B 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result water crossing, 15ft south from northern edge of road grade 4 Eastern road water crossing, center of road Top of grade 6 3/4" Base 129.3 123.9 4.3 130.0 95 Pass 5 Eastern road water crossing, 20ft south of northern edge 3rd lift 6 Pit Run 127.0 122.1 4.0 127.9 95 Pass 6 Western road water crossing, 30ft south of northern edge of road 4th lift 6 Pit Run 128.0 122.2 4.7 127.9 96 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52610.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site at around 11:00 am and began my testing. After my testing for the day, I loaded my truck and PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1C96DDFF-F83B-4A26-8F34-7CE6B78C429B 3 left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 84757F64-35CF-412A-8F5A-E6843F2FBB35 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04252024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/25/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 09:00 AM Contractor: Hill and Sons Excavation Total Time on Project: 6 hours Current Weather Conditions: Overcast Wind: 5-15 mph Instrument ID 78653 MS: 654 Ambient Temperature (°F): 54 DS: 2437 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Eastern Road water crossing Top of grade 6 3/4" Base 131.9 123.1 7.2 130.0 95 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52672.00 Tested By: Leland Steiner Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 84757F64-35CF-412A-8F5A-E6843F2FBB35 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site and began testing for 3/4 base. After my testing I loaded my gear and left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 84757F64-35CF-412A-8F5A-E6843F2FBB35 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04262024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 09:00 AM Contractor: Hill and Sons Excavation Total Time on Project: 9 hours Current Weather Conditions: Drizzle Wind: 5-15 mph Instrument ID 78653 MS: 649 Ambient Temperature (°F): 45 DS: 2460 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Western road water crossing, 25ft south of manhole 1st lift 8 Pit Run 127.7 120.9 5.7 127.9 95 Pass 2 Western road water crossing, center of road 2nd lift 6 Pit Run 131.8 125.7 4.8 127.9 98 Pass 3 Western road water crossing, 3rd lift 6 Pit Run 132.7 124.0 7.0 127.9 97 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 25ft south of manhole 4 Western water road crossing, 20ft south of manhole 4th lift 6 Pit Run 129.4 123.7 4.7 127.9 97 Pass 5 Western road water crossing, center of road 5th lift 6 Pit Run 129.2 123.8 4.4 127.9 97 Pass 6 Western road water crossing, 15ft north of southern manhole Top of grade 6 Pit Run 129.4 122.5 5.7 127.9 96 Pass 7 Western road water crossing, 20ft south of edge of road, in line with manhole Top of grade 6 3/4" Base 132.4 127.0 4.3 130.0 98 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52727.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 3 Observations/Remarks: I arrived at the job site and began inspecting the backfilling and compaction of the remaining water crossing within the road. After my field tests where complete for the project, I loaded my gear into my truck and left the job site Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08072024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/07/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Headwaters Construction Total Time on Project: 2 hrs Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76562 MS: 677 Ambient Temperature (°F): 67 DS: 2759 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 S 5th W, west ditch along the road. 40’ S of University Blvd. 12" below FG 8 Pit Run 134.7 130.2 3.5 127.9 102 Pass 2 S 5th W, west ditch along the road. I00’ S of University Blvd. 12" below FG 8 Pit Run 133.6 129.5 3.2 127.9 101 Pass 3 S 5th W, 12" 8 Pit Run 124.9 121.5 2.8 127.9 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result west ditch along the road. 120’ S of University Blvd. below FG Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 57331.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Standardized while waiting for the contractor to show up. Spoke with the contractor and determined where to take shots. Took multiple passing shots and observed as a loader moved material. Observed an excavator loading large rock into a dump truck. Communicated passing shots with the contractor and packed up. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08212024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/21/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 04:00 PM Contractor: Headwaters Construction Total Time on Project: 2hrs Current Weather Conditions: Sunny/Clear Wind: 5-15 mph Instrument ID 23916 MS: 631 Ambient Temperature (°F): 89 DS: 1957 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 West parking lot/ Driveway 10' east of S 5th W 6" below FG BS 3/4" Base 137.8 132.8 3.7 130.0 102 Pass 2 West parking lot/ Driveway 15' East of S 5th W 6" below FG BS 3/4" Base 137.4 129.5 6.0 130.0 100 Pass 3 West parking lot/ Driveway 6" below FG BS 3/4" Base 134.4 131.2 2.3 130.0 101 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 30' East of S 5th W 4 West parking lot/ Driveway 8' East of S 5th W 6" below FG BS 3/4" Base 131.7 128.0 2.8 130.0 98 Pass 5 West parking lot/ Driveway 4' East of S 5th W 6" below FG BS 3/4" Base 127.8 124.1 2.9 130.0 95 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 57910.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Observed a grader spreading ¾ “ base material. Took 5 passing shots. Communicated results to the contractor. Packed up gear. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 6 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 23255AD04262024LS In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 04/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Total Time on Project 9 Time Start: 09:00 AM Contractor: HK Contractors Ambient Temperature (°F): 50 Current Weather Conditions: Drizzle Wind: Calm Instrument ID 78653 Daily Standardization: MS: 649 DS: 2460 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 Eastern water road crossing, center of road Asphalt SP3 143.7 134.9 94 Pass 2 Central road water crossing, center of road 143.7 134.5 94 Pass 3 Western road water crossing, 5ft west of manhole, 20ft south. Asphalt 143.7 134.8 94 Pass 4 Western road water crossing, 5ft south of manhole, 10ft west of man hole Asphalt 143.7 133.5 93 Pass 5 Western road water crossing, in line with manhole cover, 25ft south of northern edge Asphalt 143.7 136.4 95 Pass 6 Western water road crossing, 10ft north of southern manhole Asphalt 143.7 131.9 92 Pass Asphalt SP3 SP3 SP3 SP3 SP3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 2 Field Technician Information Number of Grout Bags Used:Number of Ice bags used 0 Core Drill Used No Total Mileage 52736 Tested By: Leland Steiner Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: I arrived on site at around 9:00am and began my inspections of the site where asphalt was to be paved. After my field tests where done and paving was complete, I loaded my truck and left the job site Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1724681189059 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 23255AD08262024NLS In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 08/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: HK Contractors Total Time on Project 13.5 Hrs Ambient Temperature (°F): 62 Current Weather Conditions: Partly Cloudy Wind: Calm Instrument ID 23916 Daily Standardization: MS: 634 DS: 2014 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 50 FT W and 10 FT N of NW Street Corner of Road that connects to S 5th W Asphalt SP3 143.7 134.4 94 Pass 2 20 FT E and 5 FT N of W Street Corner of Road that connects to S 5th W Asphalt SP3 143.7 138.0 96 Pass 3 50 FT W and 5 FT N of SW Corner of Road that connects to S 5th W Asphalt SP3 143.7 137.5 96 Pass 4 15 FT N and 10 Ft E of SW Corner Church Parking Lot Asphalt SP3 143.7 133.5 93 Pass 5 15 FT N and 5 FT E of Middle NW Corner With Sidewalk Asphalt SP3 143.7 133.3 93 Pass 6 45 FT N and 20 FT E of Middle NW Corner With Sidewalk Asphalt SP3 143.7 132.7 92 Pass 7 11 FT E and 13 FT S of NW Corner Asphalt 143.7 132.0 92 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1724681189059 2 Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result Church Parking Lot SP3 8 25 FT E and 10 FT N of NW Corner of parking lot that connects to S 5th W. Asphalt SP3 143.7 132.5 92 Pass 9 60 FT W and 8 FT N of SW Corner of Road that connects to S 5th W Asphalt SP3 143.7 131.6 92 Pass 10 6 FT N of SW Corner Church Parking Lot Asphalt SP3 143.7 133.4 93 Pass 11 39 FT S and 10 FT E of NW Corner Church Parking Lot Asphalt SP3 143.7 133.7 93 Pass Field Technician Information Number of Grout Bags Used: Number of Ice bags used Core Drill Used No Total Mileage 13183 Tested By: Nathaniel Speas Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: Arrived at the job site and started my report for the day. Standardized the gauge so that it would be ready. Met with the contractor to determine where we were going to be paving for the day. Observed trucks bringing in asphalt. Observed the rollers compacting the asphalt. Communicated with the roller to establish a rolling pattern. Took multiple shots throughout the day to make sure compaction was passing. After they were done for the day I filled out the rest of my report. I packed up my stuff and left the job site. Reviewed By: E. Vail Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1724681189059 3 Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1724681189059 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09062024TH Compressive Strength of Concrete Test Specimens Date: 09/06/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3hrs Start Time: 06:30 AM Contractor: Alpha Concrete Supplier: Walters Ready Mix Mix Number: 506AF Concrete Member: Sidewalk Required 28 day Strength (psi): 4,000.0 Admixtures: Plastisides Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 04235 08:15 AM Northwest sidewalk on S 5th W. 10 ft S of NW corner. 52 34.620 139.0 68 6.9 9¼ Field Technician Information Truck: STARLORD Total Trip Mileage: 18.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: Arrived on site at 6:45am. Unpacked my gear and prepared for the pour. Spoke with the concrete workers. The concrete truck showed up around 7:40am. I received the ticket and prepared to take a sample. The driver of the truck, Aaron Walt, stated that he was waiting for plasticizers to be dropped off. The pour started around 8:10am. He poured about a yard and I took my sample. I returned to my truck and performed an air entrainment test, temped the concrete, and performed a slump test. I started filling cylinders, Aaron came over and requested that I do a second slump test as the result the first time was a 9½ inch slump. The second test resulted in a 9¼ inch slump. I finished filling cylinders and cleaned up my gear. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 5 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 6 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86D08769-52E0-4FA4-82D8-5A601CDED109 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File name: 23255FB09132024JPC Compressive Strength of Concrete Test Specimens Project Number: 23-255 Cumulative Test Load Amount: 11 Project Name: Married Student Second Stake Test Location: Northwest sidewalk on S 5th W. 10 ft S of NW corner. Client: The Church of Jesus Christ of Latter-day Saints Admixtures: Plastisides Ticket Number: 4235 Contractor: Alpha Concrete Supplier: Walters Ready Mix Mix Number: 506AF Date: 9/6/2024 Cylinder Log #: 709 Set #: 1 Entrained Air (%): 6.9 Concrete Temperature (°F): 68 Ambient Temperature (°F): 52 Unit Weight (PCF): 139 Tested By: Travis Hutmacher Time Tested: 10:20 AM Pick Up Date: 9/7/2024 Picked Up By: Jense Christensen Time: 11:25 AM Max, Min Temperature: 80,60 Compressive Strength Data Initial Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 9/13/2024 4.000 12.57 40,045.0 3186 4,000.0 Type 1 Date: 09/17/2024 Reviewed By: Luke Hammar Signature: