Loading...
HomeMy WebLinkAboutPLANS - 23-00882 - BYUI Hart building - Facade ReplacementAPPROVAL SIGNATURES ALVIN F. MEREDITH III PRESIDENT OF BRIGHAM YOUNG UNIVERSITY-IDAHO BRETT COOK UNIVERSITY RESOURCES VICE PRESIDENT KYLE WILLIAMS MANAGING DIRECTOR, UNIVERSITY OPERATIONS ANDY JOHNSON DIRECTOR, ARCHITECTURE & CONSTRUCTION MANAGEMENT SERVICES NATHAN CARDON DIRECTOR, FACILITIES MANAGEMENT OPERATIONS DATE DATE DATE DATE DATE Applicable Codes Code Year International Building Code (IBC)2018 International Mechanical Code (IMC) 2018 International Fire Code (IFC) 2018 International Energy Conservation Code (IECC) 2018 National Electrical Code (NEC) 2017 ADA Accessibility Guidelines 2010 International Plumbing Code (IPC) 2017 International Building Code (IBC) Analysis Construction Type I-B Sect. 602 Building Occupancies A-3 Sect. 303.4 Design Building Area (Existing)170,633 Sf Allowed Building Area Unlimited Sf Sect. 506.1 Per Equation 5-1 Allowed Building Height (Ft)180 Ft Sect. 504.3 Allowed Building Height (Stories) 12 Stories Sect. 504.4 International Existing Building Code (IEBC) 2015 Design Building Height (Ft) 56 Ft Design Building Height (Stories)3 Stories THIS IS A SIMPLE EXTERIOR FACADE REPLACEMENT PROJECT, THERE ARE NO CHANGES TO THE EXISTING: • BUILDING USE • BUILDING OCCUPANCY TYPES • OCCUPANT COUNT • PLUMBING COUNT • EGRESS PATH VICINITY MAP DRAWING INDEX SITE MAP SCALE: A1 DETAIL XXX 2 XX X XX.XX ROOM NUM NAME SYMBOLS LEGEND ROOM IDENTIFICATION NUMBER DOOR NUMBER REFERENCE NOTE GLAZING TYPE PARTITON WALL TYPE INTERIOR ELEVATION WALL SECTION EXTERIOR ELEVATION DETAIL REVISION DELTA ROOM NUMBER ELEVATION NUMBER SHEET NUMBER ELEVATION NUMBER SHEET NUMBER SECTION NUMBER SHEET NUMBER SECTION NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER REVISION NUMBER BUILDING SECTION DETAIL TITLE ROOM NAME SHADE INDICATES ELEVATED WALLA1 A2A4 A3 AFF CMU EIFS ABOVE FINISH FLOOR CONCRETE MASONRY UNIT EXTERIOR INSULATED FINISH EQ EQUAL MAX MAXIMUM MIN MINIMUM NIC NOT IN CONTRACT O.C. ON CENTER SPEC SPECIFICATION SIM SIMILAR TYP TYPICAL T.O. TOP OF B.O. BOTTOM OF ABBREVIATIONS RCP REFLECTED CEILING PLAN DEMO DEMOLITION EXTG. EXISTING EQUIP. EQUIPMENT RMS ROOMS MEP MECHANICAL, ELECTRICAL & PLUMBING STRU.STRUCTURAL HT. HEIGHT WD. WIDTH FIN. FINISH CLG. CEILING F.V. FIELD VERIFY MATERIAL LEGEND CONCRETE STUD WALL GRAVEL COMPACTED FILL AND/OR EARTH BATT INSULATION RIGID INSULATION CMU (CONCRETE MASONRY UNIT) GYPSUM BOARD OR CONCRETE SURFACE PROJECT NUMBER: PROJECT ARCHITECT www.ffkr.com www.ffkr.com www.ffkr.com www.ffkr.com FFKR ARCHITECTS 730 PACIFIC AVE. SALT LAKE CITY, UT 84104 801-512-6186 BE STRUCTURAL SOLUTIONS 137 W 1900 NORTH LAYTON, UT 84041 801-698-1806 bestructuralsolutions@gmail.com - - - - - - - - STRUCTUAL ENGINEER MECHANICAL - JOHN W. HART EXTERIOR FACADE REPLACEMENT PERMIT SET Nov. 17 2023 JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 23110 PROJECT TEAM SHEET NO. SHEET NAME GENERAL INFORMATION G000 COVER ARCHITECTURAL AD101 EAST DEMO PLANS AD200 BUILDING DEMO ELEVATIONS AD300 REFERENCE WALL SECTIONS & DETAILS AE101 FLOOR AND ROOF PLANS AE200 BUILDING ELEVATIONS AE300 WALL SECTIONS AE301 WALL SECTIONS AE500 DETAILS AE600 METAL PANEL AND LOUVER SCHEDULES AE900 3-D VIEWS STRUCTURAL DRAWINGS SE-001 GENERAL NOTES SE-002 LEGEND SE-101 PLAN SE-301 ELEVATIONS SE-501 DETAILS CODE REVIEW UPUP 2 43 5 6 7 10 11 12 B C D E F G H J K L NO INTERIOR WORKS PERFORMED 02.05 TYP TYP TYP TYP 02.05 02.05 1 2 43 5 6 7 10 11 12 B C D E F G H J K L AD200 B1 AD200D6 AD200 A1 AD200 D3 NO WORKS PERFORMED IN THIS AREA 02.06 02.05 02.06 02.06 02.06 02.11 NO WORKS PERFORMED IN THIS AREA 02.05 02.07 02.07 02.63 02.63 02.63 02.63 02.63 02.87 02.87 CONSTRUCTION LIMIT LINE 02.06 02.11 2' - 6 " CO N S T R U C T I O N LI M I T L I N E 26 ' - 2 " AD200D1 GENERAL DEMO NOTES A. PROTECT ALL ADJACENT SURFACES AND EQUIPMENT DURING CONSTRUCTION. B. SET UP A CONSTRUCTION BARRIER IN EACH OF THE CONSTRUCTION AREAS. C. DUST CONTAINMENT IS MANDATORY. D. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. E. MUST REFER TO DIMENSIONS AND NOTES FOR ACTUAL DEMOLITION BOUNDARY AND SCOPE. REPLACE ANY DISPLACED EQUIPMENT BACK TO THE ORIGINAL STATE AFTER FINAL COMPLETION. F. ALL PRECAST PANELS, DISCARDED CONNECTIONS, AND FASTENERS WITHIN THE PROJECT DEMO SCOPE TO BE REMOVED AND HAULED AWAY BY THE GENERAL CONTRACTOR. AREA OF CONSTRUCTION LEGEND 1 2 43 5 6 7 10 11 12 B C D E F G H J K L NO INTERIOR WORKS PERFORMED 02.05TYP 02.05 TYP TYP 02.05 02.16 02.15 02.14 02.19 02.19 02.19 TYP GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 3 1 P M AD101 EAST DEMO PLANS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE:1/16" = 1'-0"A4 EXT-LEVEL 3 DEMO PLAN SCALE: 1/16" = 1'-0" C4 EXT-ROOF DEMO PLAN 02.05 REMOVE EXISTING VERTICAL PRECAST PANEL, CLEAN SUBSTRATE FOR NEW BUILD 02.06 REMOVE EXISTING HORIZONTAL PRECAST PANEL, CLEAN SUBSTRATE FOR NEW BUILD 02.07 REMOVE EXISTING METAL PANEL, COPING, INSULATION, AND WOOD BLOCKING; CLEAN SUBSTRATE FOR NEW BUILD 02.11 EXISTING PRECAST TO REMAIN, PROVIDE A CLEAN AND STRAIGHT EDGE 02.14 EXISTING DOOR AND FRAME, REFINISH OR REPLACE TO MATCH NEW WALL. PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.15 PROTECT DOORS, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.16 PROTECT EXISTING STOREFRONT, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.19 (NOT SHOWN, FIELD VERIFY BEFORE WORK), PROTECT EXISTING LANDSCAPING. COORDINATE WITH OWNER (BYUI ARBORISTS) FOR THEM TO TRIM TREES / SHRUBS, AS NEEDED TO ACCESS WALLS / ROOF AND PERFORM WORK. 02.63 PROTECT EXTG. ROOF W/ RIGID SHEET MATERIAL DURING WORK, PATCH AND REPAIR AS REQ'D 02.87 FIELD VERIFY AND PROTECT ALL EXISTING FIXTURES LOCATED ON ROOF SCALE: 1/16" = 1'-0" A2 EXT-LEVEL 2 DEMO PLAN B C D E F G H J K L LEVEL 2 91' -0" EXTG PARAPET 128' -0" T.O. EXTG EAST PARAPET 108' -8" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" 02.07 02.06 02.0502.0502.05 02.06 02.06 02.08 02.07 02.07 02.07 02.16 02.14 02.11 2' - 6"10" B.O. EXTG MTL. PANEL 105' -6" 02.12TYP.02.12 02.17 02.08 TYP. TYP. TYP. TYP.TYP. TYP. TYP. TYP. TYP. CONSTRUCTION LIMIT LINE LOWER WALL 3 LOWER WALL 7 UPPER WALL 3 LOWER WALL 5 1243567101112 LEVEL 2 91' -0" EXTG PARAPET 128' -0" T.O. EXTG EAST PARAPET 108' -8" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" 02.06 02.08 02.07 B.O. EXTG MTL. PANEL 105' -6" 02.06 02.18 02.18 02.18 02.05 02.05 02.12 02.1702.17 02.15 02.08 02.08 TYP. TYP. TYP.TYP.TYP. TYP.TYP. TYP. TYP. TYP. TYP. 02.08 CONSTRUCTION LIMIT LINE 02.11 4' - 4" UPPER WALL 2 LOWER WALL 2 LOWER WALL 4 1 2 LEVEL 2 91' -0" E ENTRANCE 96' -4" T.O. EXTG EAST PARAPET 108' -8" 02.0602.07 B.O. EXTG MTL. PANEL 105' -6" 02.17 02.08 TYP. CONSTRUCTION LIMIT LINE 02.06 02.05 LOWER WALL 8LOWER WALL 6 B LEVEL 2 91' -0" 107' -9" 107' -9" T.O. EXTG EAST PARAPET 108' -8" 02.06 02.08 B.O. EXTG MTL. PANEL 105' -6"02.17 02.15 CONSTRUCTION LIMIT LINE GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. BC LEVEL 2 91' -0" C1 EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" B.O. EXTG REGLET 108' -8" 02.0602.11 26' - 2" 02.08 02.63 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 3 8 P M AD200 BUILDING DEMO ELEVATIONS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE:1/8" = 1'-0"B1 EAST DEMO ELEVATION SCALE: 1/8" = 1'-0" A1 SOUTH DEMO ELEVATION SCALE: 1/8" = 1'-0" D3 NORTH DEMO ELEVATION NE SCALE: 1/8" = 1'-0" D6 WEST DEMO ELEVATION SE 02.05 REMOVE EXISTING VERTICAL PRECAST PANEL, CLEAN SUBSTRATE FOR NEW BUILD 02.06 REMOVE EXISTING HORIZONTAL PRECAST PANEL, CLEAN SUBSTRATE FOR NEW BUILD 02.07 REMOVE EXISTING METAL PANEL, COPING, INSULATION, AND WOOD BLOCKING; CLEAN SUBSTRATE FOR NEW BUILD 02.08 PROTECT EXISTING BRICK VENEER WALL 02.11 EXISTING PRECAST TO REMAIN, PROVIDE A CLEAN AND STRAIGHT EDGE 02.12 FIELD VERIFY ALL DOWNSPOUT DRAIN NOZZLES IN WALL OR PARAPET, PROTECT AND ENSURE CLEAR DRAINING, PROTECT BUILDING FROM DRAIN WATER DURING WORK 02.14 EXISTING DOOR AND FRAME, REFINISH OR REPLACE TO MATCH NEW WALL. PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.15 PROTECT DOORS, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.16 PROTECT EXISTING STOREFRONT, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.17 FIELD VERIFY AND PROTECT ANY EQUIPMENT OR WALL MOUNTED DEVICES, COORDINATE WITH OWNER. 02.18 REMOVE EXISTING LOUVERS IN COORDINATION WITH FACILITIES OPERATIONS TO MAINTAIN NECESSARY VENTILATION FOR BUILDING USE DURING CONSTRUCTION 02.63 PROTECT EXTG. ROOF W/ RIGID SHEET MATERIAL DURING WORK, PATCH AND REPAIR AS REQ'D SCALE: 1/8" = 1'-0" D1 WEST DEMO ELEVATION ROOF MEMBRANE RIGID INSULATION TYP. PRESSURE TREATED NAILER, CONTRUCTED BY PRECAST MENUFACTURE METAL FLASHING CAP PRECAST CONC. PANEL 24 GA. METAL FLASHING 4" BRICK VENEER EXT'G CMU WALL GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. SCALE:1" = 1'-0"C3 EXT'G PRECAST CONC. PANEL @ PARAPET 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 4 1 P M AD300 REFERENCE WALL SECTIONS & DETAILS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 1/2" = 1'-0" A1 1967 WALL SECTION @ L REFERENCE SCALE: 1/2" = 1'-0" A2 1967 WALL SECTION @ B REFERENCE SCALE: 3" = 1'-0" A3 1967 WALL SECTION @ PRECAST S S S SS S SS S S S S S M M M M M M M MM S S S S S S S S S S S S S S S S UP F.E.C. F. E . C . UP AREA OF CONSTRUCTION LEGEND 1 2 43 5 6 7 10 11 12 B C D E F G H J K L AE200 B1 NO WORKS PERFORMED IN THIS AREA NO WORKS PERFORMED IN THIS AREA AE500 C3 A1 AE300 AE200 D3 AE200D6 AE200 A1 AE500 D3 109' - 8" 129' - 0" 129' - 0" 109' - 8" 128' - 0" EXTG. PARAPET NEW PARAPET NEW PARAPET NEW PARAPET NEW PARAPET A2 AE301 A1 AE301 AE500 C4 AE200D1 CONSTRUCTION LIMIT LINE 4' - 4" AE500 C4 SIM AE200 B6 UPPER WALL 1 UP P E R 2 NEW PARAPET LOWER WALL 1 LOWER WALL 2 LO W E R W A L L 3 LO W E R W A L L 7 LO W E R W A L L 5 LOWER WALL 4 LOWER WALL 6 LOWER WALL 8 A1 AE301 2 43 5 6 7 10 11 12 B C D E F G H J K L NO INTERIOR WORKS PERFORMED TYP TYP TYP TYP AE500 E2 AE500 E2 AE500 E2 07.42.G 07.42.G 1 2 43 5 6 7 10 11 12 B C D E F G H J K L NO INTERIOR WORKS PERFORMED TYPTYP AE500 D2 02.14 02.15 07.42.G GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 4 8 P M AE101 FLOOR AND ROOF PLANS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 1/16" = 1'-0" C4 ROOF PLAN SCALE: 1/16" = 1'-0" A4 LEVEL 3 FLOOR PLAN SCALE: 1/16" = 1'-0" A2 LEVEL 2 FLOOR PLAN 02.14 EXISTING DOOR AND FRAME, REFINISH OR REPLACE TO MATCH NEW WALL. PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.15 PROTECT DOORS, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 07.42.G METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. B C D E F G H J K L LEVEL 2 91' -0" J1C1 E ENTRANCE 96' -4" D1 EXTG PARAPET 128' -0" T.O. EXTG EAST PARAPET 108' -8" A5 AE300 B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" A1 AE300 B.O. EXTG MTL. PANEL 105' -6" T.O. NEW PARAPET 129' -0" AE500 D4 22.14.V 3' - 6"10" 07.42.B 07.42.G 07.42.B 07.42.N 07.42.G 07.42.G 07.42.B 02.14 07.71.W 07.71.W 07.71.W TY P . 3' - 0 " TO B . O . B R I C K 9' - 0 " 05.12.D 1' - 0" 05.12.D TYP. TYP. ALIGN TYP. ALIGN TYP. CCBA ABCB BCCB BCAA ABCC ACAB BABC CBCB CAAB CACB CABB BACB CACA CBBC BABA ALIGN TYP. EQ EQ EQ EQ ALIGN TYP. EQ EQ AE200 B6 ALIGN TYP. TYP. C/L (TYP)C/L (TYP) ALIGN TYP. A4 AE300 A4 AE300 SIM.SIM. BCCABAC CBAACBC 9' - 0" ACABABC EQ CABACBB EQ BBACCAB 9' - 0" CABABAC EQ BABABCC EQ ACBCCBA 9' - 0" BCBBACA EQ CACBABB EQ ABCBAAC 9' - 0" AACBCCB EQ BACCABB EQ AABCCBA 9' - 0" CBACABB EQ ACBCBAA EQ BCACBCA 9' - 0"3' - 8" F.V. 07.42.P07.42.P 05.12.D 07.42.G 07.42.B 07.42.P 05.12.D 07.42.P LOWER WALL 3 LOWER WALL 7 UPPER WALL 3 1 1/2"3' - 6" AE500 B3 1 243567101112 LEVEL 2 91' -0" E ENTRANCE 96' -4" T.O. EXTG EAST PARAPET 108' -8" A6 AE300 A5 AE301 A4 AE301 A4 AE300 B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" A1 AE301 B.O. EXTG MTL. PANEL 105' -6" T.O. NEW PARAPET 129' -0" 07.42.B 07.42.B 07.71.W 07.71.W 07.42.B 07.71.W08.91.B 02.15 22.14.V 07.42.P 07.71.W F.V. 5 1/2"F.V. 6' - 1" F.V. 5 1/2" 9' - 0 " F. V . 6 ' - 6 " LO U V E R S F. V . 15 ' - 2 " 02.12 TY P . 3' - 0 " TO B . O . B R I C K 9' - 0 " T Y P . TY P . 3' - 0 " 1' - 0" ALIGN TYP. 9' - 0"13' - 0" CHANGE IN BUILDING PLANE AABC BBCA BAAB CBCA CBAB CBAA CBBA AACB BCBC BCCA ALIGN CABABCC AACBACB CAACBCB BCCABCA CBABABC ACABBCC BCAACBC BBCAACB CABABBC BABCBAC BCBBCAA CACBCBA ABCCABB ABBACCB BBABCAC AABCCBC ACBCBAC 9' - 0"EQEQ 9' - 0"EQEQ 9' - 0"EQEQ 9' - 0"EQEQ 9' - 0"EQEQ 9' - 0" C/L (TYP) 13' - 0"13' - 0" F.V. @ 8'-4"13' - 0"13' - 0" F.V. @ 8'-6" TO GRID 7' - 4" UPPER WALL 2 LOWER WALL 2 LOWER WALL 4 CABACBC 1 2 LEVEL 2 91' -0" E ENTRANCE 96' -4" EXTG PARAPET 128' -0" T.O. EXTG EAST PARAPET 108' -8" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" T.O. NEW PARAPET 129' -0" 07.42.B 07.42.N 07.71.W 07.71.W CHANGE IN PLANE CCAB ABBC ABBA ACBB ABCA ACBC CBAC ABABCABA F.V. @ 8'-4"13' - 0"13' - 0"7' - 4"13' - 0"9' - 0"13' - 0"ALIGN 07.42.P 02.08 LOWER WALL 8LOWER WALL 6 A1 AE301 B LEVEL 2 91' -0" T.O. EXTG EAST PARAPET 108' -8" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" 07.42.B 07.71.W 07.42.N 07.42.P ABAC 02.08 02.15 LOWER WALL 1 F G A2 AE301 07.42.B 07.71.WBCBAACCAACCB 1 1/2"8' - 9"8' - 9"8' - 9"1 1/2" 07.42.P 02.20 LOWER WALL 5 GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. BC LEVEL 2 91' -0" C1 EXTG PARAPET 128' -0" T.O. EXTG EAST PARAPET 108' -8" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" B.O. EXTG REGLET 108' -8" 07.42.B 07.71.WBCBCCAA 13' - 0" AACABBC 13' - 0"1 1/2" UPPER WALL 1 02.08 07.42.N 07.42.P A6 AE500 SIM AE500 D4 MIR. 02.63 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 5 6 P M AE200 BUILDING ELEVATIONS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 1/8" = 1'-0" B1 EAST ELEVATION SCALE: 1/8" = 1'-0" A1 SOUTH ELEVATION SCALE: 1/8" = 1'-0" D3 NORTH ELEVATION NE SCALE: 1/8" = 1'-0" D6 WEST ELEVATION SE 02.08 PROTECT EXISTING BRICK VENEER WALL 02.12 FIELD VERIFY ALL DOWNSPOUT DRAIN NOZZLES IN WALL OR PARAPET, PROTECT AND ENSURE CLEAR DRAINING, PROTECT BUILDING FROM DRAIN WATER DURING WORK 02.14 EXISTING DOOR AND FRAME, REFINISH OR REPLACE TO MATCH NEW WALL. PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.15 PROTECT DOORS, PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK 02.20 EXISTING STOREFRONTN 02.63 PROTECT EXTG. ROOF W/ RIGID SHEET MATERIAL DURING WORK, PATCH AND REPAIR AS REQ'D 05.12.D POWDER COATED STEEL ANGLE; RE: STRUCTURAL 07.42.B METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH 07.42.G METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. 07.42.N METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. 07.42.P METAL TRIM BY MFR. TO MATCH PANEL FINISH 07.71.W PARAPET CAP TO MATCH PANEL FINISH, BY MFR 08.91.B FIXED FIN, OPEN-ABLE LOUVERS, FUNCTION, DESIGN, AND SIZE TO MATCH EXISTING, REFER TO SPECIFICATION FOR % OF PERFORATION ALSO REFER TO AE600 22.14.V DRAIN DOWNSPOUT NOZZLE; VERIFY SIZE OF EXISTING PIPING, REPLACE OR EXTEND PIPING AND RE-ATTACH OR REPLACE (APPROVED BY OWNER) DOWNSPOUT AS NEEDED FOR NEW WALL. SCALE: 1/8" = 1'-0" B6 EAST ELEVATION - VESTIBULE SCALE: 1/8" = 1'-0" D1 WEST PARAPET ELEVATION NOTE TO CONTRACTOR: PANEL TAKEOFFS ARE FOR REFERENCE ONLY, GENERAL CONTRACTOR IS RESPONSIBLE FOR ACTUAL QUANTITY, LENGTH VERIFIED IN FIELD, AND ASSOCIATED TRIM ELEMENTS AND PARTS REQUIRED FOR COMPLETION OF WORK. SIMPLE PANEL LAYOUT EXPLANATION: CABABCC TOP PANEL BOTTOM PANEL AREA OF REMODELING WORK EXTG. TO REMAIN SECTION LEGEND B EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" T.O. NEW PARAPET 129' -0" AE500 A6 B.O. EXTG REGLET 108' -8"AE500 C1 2 LEVEL 2 91' -0" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" AE500 B1 AE500 A6 SIM 1 2 E ENTRANCE 96' -4" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" AE500 A2 AE500 A5 1' - 0 " T.O. NEW PARAPET 129' -0" B LEVEL 2 91' -0" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" AE500 A6 SIM AE500 A1 GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. ALTERNATES 1. FLUID APPLIED WATER PROOFING ON EXISTING CMU WALL(S), WHERE REQUIRED 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 2 : 5 9 P M AE300 WALL SECTIONS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 3/4" = 1'-0" A4 WALL SECTION B @ 2 & 3 SCALE: 3/4" = 1'-0" A5 WALL SECTION 2 @ K & L SCALE: 3/4" = 1'-0" A1 WALL SECTION SCALE: 3/4" = 1'-0" A6 VERTICAL PANEL METAL TRIM - WALL SECTION B @ 4 2 11/05/20 Addendum #2 AREA OF REMODELING WORK EXTG. TO REMAIN SECTION LEGEND B LEVEL 2 91' -0" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" AE500 A5 SIM B LEVEL 2 91' -0" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" B.O. EXTG MTL. PANEL 105' -6" T.O. NEW PARAPET 129' -0" AE500 E1 AE500 D1 AE500 A5 SIM AE500 A1 F E ENTRANCE 96' -4" T.O. EXTG EAST PARAPET 108' -8" T.O. NEW PARAPET (LOW) 109' -8" 1' - 0 " AE500 A3 B.O. EXTG MTL. PANEL 105' -6" B.O. EXTG REGLET 108' -8" 1 1/2" F.V. 1" E ENTRANCE 96' -4" T.O. EXTG EAST PARAPET 108' -8" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" B.O. EXTG REGLET 108' -8" 1 1/2"F.V. 1' - 1 1/2" AE500 A3 SIM GENERAL NOTES A. SEE SHEET AE600 FOR METAL PANEL TYPES. NOTES ON ELEVATIONS (EX: CBABABC OR BABA) REFERENCE TO PANEL TYPES LISTED IN PANEL SCHEDULE. B. CONTRACTOR TO PROVIDE BLOCKING AT ALL PENETRATIONS (EG: DRAIN DOWNSPOUTS), PARAPET CAPS, SOFFITS, AND AS NEEDED WHERE EQUIPMENT MAY BE MOUNTED BY OWNER. C. CONTRACTOR TO COORDINATE REMOVAL AND REINSTALLATION OF ALL EQUIPMENT WITH OWNER. EQUIPMENT TO MEET ALL MANUFACTURERS WRITTEN INSTRUCTIONS. D. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DOCUMENTS AT THE JOB SITE AND SHALL NOTIFY THE ARCHITECT OF ANY OMISSIONS, DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. E. DO NOT SCALE DRAWINGS. DIMENSIONS AND ENLARGED PLANS GOVERN OVER SMALL SCALE DRAWINGS. ALTERNATES 1. FLUID APPLIED WATER PROOFING ON EXISTING CMU WALL(S), WHERE REQUIRED SCALE: 3/4" = 1'-0" A5 LOUVERS @ VERTICAL PANEL - WALL SECTION B @ 10 & 11 SCALE: 3/4" = 1'-0" A4 BRICK FINISH WALL - WALL SECTION B @ 3 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 3 : 0 2 P M AE301 WALL SECTIONS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 3/4" = 1'-0" A2 WALL SECTION EAST @ G & F SCALE: 3/4" = 1'-0" A1 WALL SECTION F & G @ EAST 2 11/05/20 Addendum #2 MITER AND SEAL EXPOSED EDGE OF OVERLAPPING PARAPET CAP AND DRIP EDGE AS SHOWN TRIM INTERIOR DRIP EDGE AND FACE OF UNDER- LAPPING PARAPET CAP AND BEND AT CORNER TO PROVIDE DRAINAGE TO ROOF SIDE AWAY FROM INTERIOR OF WALL ROOF SIDE / INTERIOR EXTERIOR T.O. EXTG EAST PARAPET 108' -8" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" PARAPET CAP TO MATCH PANEL FINISH, BY MFR 2X WEATHER TREATED WOOD BLOCKING METAL STUD 3 5/8" METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. 5/8" DENS GLASS METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH EXISTING WALL ASSEMBLY INSTALL ROOF MEMBRANE UP OVER PARAPET WALL AND UNDER PARAPET CAP, TIE INTO EXISTING ROOF PER MFR DIRECTIONS, RE. TYPICAL SARANFIL PARAPET CAP DETAIL 6"6" EXISTING ROOF INSULATION EXISTING ROOF DECK NEW ROOF DECK INFILL, RE. STRU. DWG. SINGLY PLY ROOFING & INSULATON T.O. EXTG EAST PARAPET 108' -8" T.O. NEW PARAPET (LOW) 109' -8" B.O. EXTG MTL. PANEL 105' -6" PARAPET CAP TO MATCH PANEL FINISH, BY MFR 2X WEATHER TREATED WOOD BLOCKING METAL STUD 6" SHEATHING; RE: STRUCTURAL INSTALL ROOF MEMBRANE UP OVER PARAPET WALL AND UNDER PARAPET CAP, TIE INTO EXISTING ROOF PER MFR DIRECTIONS, METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH EXISTING WALL STRUCTURE ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRAIGHT LINE ALONG EXTERIOR OF EXISTING WALL METAL SOFFIT TRIM TO MATCH WALL PANEL FINISH 1 1/2"2" 1' - 0 " 1' - 0 " ST D . M T L . P A N E L H T . 1' - 0 " 1' - 0 " 4' - 2 " METAL STUD FLUID APPLIED WATER PROOFING, ALT. #1 (TYP.) PROTECT EXISTING BRICK VENEER WALL PROTECT EXTG. ROOF W/ RIGID SHEET MATERIAL DURING WORK, PATCH AND REPAIR AS REQ'D EXISTING ROOF INSULATION AT EXISTING ROOF PARAPET HEIGHT 8 1/4" 2 EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" FACE OF CMU 1' - 0" METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. PARAPET CAP TO MATCH PANEL FINISH, BY MFR SHEATHING; RE: STRUCTURAL INSTALL ROOF MEMBRANE UP OVER PARAPET WALL AND UNDER PARAPET CAP, TIE INTO EXISTING ROOF PER MFR DIRECTIONS, METAL STUD 6" EXISTING WALL STRUCTURE EXISTING DRAIN LINE PROTECT OR REPLACE AND EXTEND DRAIN LINE AS NEEDED IN FIELD PROVIDE PENETRATION OPENING IN METAL PANELS AS REQUIRED FOR DRAIN LINE. CLEAN AND SEAL EXPOSED EDGES AND PENETRATIONS TO BE WATERTIGHT SCUPPER, COLOR TO MATCH METAL PANEL ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRAIGHT LINE ALONG EXTERIOR OF EXISTING WALL 1 1 / 2 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 7' - 1 1 / 2 " 2X WEATHER TREATED WOOD BLOCKING FLUID APPLIED AIR BARRIER, ALT. #1 (TYP.) 8 1/4" B EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" 1' - 0" FACE OF CMU PARAPET CAP TO MATCH PANEL FINISH, BY MFR SHEATHING; RE: STRUCTURAL INSTALL ROOF MEMBRANE UP OVER PARAPET WALL AND UNDER PARAPET CAP, TIE INTO EXISTING ROOF PER MFR DIRECTIONS, METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL STUD 3 5/8" METAL HAT CHANNEL 7/8" METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL STUD 6" ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRIAGHT LINE ALONG EXTERIOR OF EXISTING WALL EXISTING WALL STRUCTURE 1 1 / 2 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 7' - 1 1 / 2 " POWDER COATED STEEL ANGLE; RE: STRUCTURAL 2X WEATHER TREATED WOOD BLOCKING FLUID APPLIED WATER PROOFING, ALT. #1 (TYP) HEAT WELD JOINT (TYP.) 8 1/4" EXTG PARAPET 128' -0" B.O. EXTG. CONC. PANEL (HIGH) 122' -0" T.O. NEW PARAPET 129' -0" PROVIDE FULL WIDTH FLASHING AT SIDE OF WALL, FINISH TO MATCH WALL PANEL: EXTEND UNDER NEW PARAPET CAP AND OVER EXISTING PARAPET, LAYER OVER ROOFING MEMBRANE WHERE OCCURS, SEAL EXPOSED EDGES TO BE WATERTIGHT. PARAPET CAP TO MATCH PANEL FINISH, BY MFR METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH METAL TRIM BY MFR. TO MATCH PANEL FINISH EXISTING PRECAST CONCRETE PARAPET PANEL METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. PROVIDE FLASHING AT EXPOSED SIDE OF WALL, FINISH TO MATCH WALL PANEL: SEAL EXPOSED EDGES TO BE WATERTIGHT. 2 ROOF SIDE 129' - 0" EXTG PARAPETNEW PARAPET 8" METAL TRIM BY MFR. TO MATCH PANEL FINISH METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH PARAPET CAP TO MATCH PANEL FINISH, BY MFR METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. WHERE WALL SIDE IS EXPOSED ALONG EXISTING PARAPET, PROVIDE TRIM METAL FINISH TO MATCH NEW PANELS, AND SEAL EXPOSED EDGES TO BE WATERTIGHT 128' - 0"128' -0" MITER AND SEAL EXPOSED EDGE OF OVERLAPPING PARAPET CAP AND DRIP EDGE AS SHOWN TRIM EXTERIOR FACE AND BEND UNDERLAPPING PARAPET CAP TO MATCH SLOPE OF OVERLAPPING PARAPET CAP AS SHOWN EXTERIOR ROOF SIDE / INTERIOR B 7' - 0" EXTG, F.V. METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL HAT CHANNEL 7/8" METAL STUD 3 5/8" POWDER COATED STEEL ANGLE; RE: STRUCTURAL 1' - 0"1' - 0"1' - 0"1' - 0"1' - 0" TRIM AS REQ'D < 1'-0" TRIM AS REQ'D < 1' - 0" 2 A5 AE300 METAL TRIM BY MFR. TO MATCH PANEL FINISH METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. TRIM THE END PANEL AS REQ'D B A5 AE301 1/2"F.V. 5" NEW LOUVERS TO MATCH EXISTING DIMENSIONS F.V. 6' - 1"F.V. 5"1/2" METAL TRIM BY MFR. TO MATCH PANEL FINISH POWDER COATED STEEL ANGLE; RE: STRUCTURAL FIXED FIN, OPEN-ABLE LOUVERS, FUNCTION, DESIGN, AND SIZE TO MATCH EXISTING, REFER TO SPECIFICATION FOR % OF PERFORATION ALSO REFER TO AE600 B LEVEL 2 91' -0" METAL STUD 3 5/8" METAL HAT CHANNEL 7/8" METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL TRIM BY MFR. TO MATCH PANEL FINISH POWDER COATED STEEL ANGLE; RE: STRUCTURAL EXISTING WALL F. V . WA L K W A Y VA R I E S B.O. BRICK @ EXISTING CONCRETE FOUNDATION WALL ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRAIGHT LINE ALONG EXTERIOR OF EXISTING WALL EXISTING DOOR AND FRAME, REFINISH OR REPLACE TO MATCH NEW WALL. PROVIDE STANDARD PEDESTRIAN PROTECTION AT ALL ENTRANCES DURING WORK METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH METAL STUD 3 5/8" METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. POWDER COATED STEEL ANGLE; RE: STRUCTURAL EXISTING WALL ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRAIGHT LINE ALONG EXTERIOR OF EXISTING WALL METAL TRIM BY MFR. TO MATCH PANEL FINISH 9' - 0" A B O V E B . O . B R I C K FLUID APPLIED WATER PROOFING, ALT. #1 METAL HAT CHANNEL 7/8" B B.O. EXTG REGLET 108' -8" EXISTING WALL ANGLE BRACKETS AS NEEDED TO SET STUDS VERTICALLY AT STRAIGHT LINE ALONG EXTERIOR OF EXISTING WALL METAL STUD 3 5/8" METAL HAT CHANNEL 7/8" METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. COUNTERFLASHING AT EXISTING ROOF MEMBRANE REGLET B METAL STUD 3 5/8" METAL HAT CHANNEL 7/8" METAL PANEL, VERTICAL; AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL TRIM BY MFR. TO MATCH PANEL FINISH POWDER COATED STEEL ANGLE; RE: STRUCTURAL MECHANICAL LOUVERS TO MATCH EXISTING OPENING SIZE AND MEET VENTILATION REQUIREMENTS OF BUILDING, MATCH NEW WALL PANEL FINISH B B.O. EXTG. CONC. PANEL (HIGH) 122' -0" METAL PANEL, HORIZONTAL: AS NOTED IN ELEVATIONS AND SCHEDULE. FINISH SELECTED BY OWNER. METAL STUD 6" METAL DRIP EDGE BY MFR TO MATCH PANEL FINISH FIXED FIN, OPEN-ABLE LOUVERS, FUNCTION, DESIGN, AND SIZE TO MATCH EXISTING, REFER TO SPECIFICATION FOR % OF PERFORATION ALSO REFER TO AE600 POWDER COATED STEEL ANGLE; RE: STRUCTURAL METAL TRIM BY MFR. TO MATCH PANEL FINISH EXISTING WALL AND OPENING 2' - 0" 14 GA POWDER COATED METAL PLATE SCUPPER, COLOR TO MATCH METAL PANEL METAL PANEL 3' - 0 " NOTE: VERIFY ACTUAL ROOF DRAIN LOCATION, ADJUST PLATE SIZE AS REQ'D, CONSULT WITH ARCHITECT 2" 1 " 0 " 654321 654321 E D C B A DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 3 : 0 7 P M AE500 DETAILS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE: 1" = 1'-0" B2 VERTICAL PANEL PLAN DETAIL SCALE:1 1/2" = 1'-0"C3 PARAPET CORNER DETAIL SCALE: 1 1/2" = 1'-0" A3 LOW PARAPET DETAIL @ EAST ADDITION SCALE: 1 1/2" = 1'-0" E3 ROOF PATCH DETAIL SCALE: 1 1/2" = 1'-0" A2 LOW PARAPET DETAIL SCALE: 1 1/2" = 1'-0" A5 HIGH PARAPET DETAIL @ DRAIN SCALE: 1 1/2" = 1'-0" A6 HIGH PARAPET DETAIL @ PANEL SCALE: 1 1/2" = 1'-0" D4 PARAPET JOINT ELEVATION DETAIL SCALE: 1 1/2" = 1'-0" C4 PARAPET JOINT PLAN DETAIL SCALE: 1" = 1'-0" D2 VERTICAL PANEL PLAN - DOOR DETAIL SCALE: 1 1/2" = 1'-0" E1 LOUVERS HEAD DETAIL SCALE: 1 1/2" = 1'-0" D1 LOUVERS SILL DETAIL SCALE: 1 1/2" = 1'-0" D3 INSIDE CORNER DETAIL SCALE: 1" = 1'-0" E2 VERTICAL PANEL AT LOUVERS SCALE: 1 1/2" = 1'-0" B1 VERTICAL PANEL AT DOOR HEAD SCALE: 1 1/2" = 1'-0" C1 VERTICAL PANEL REGLET DETAIL SCALE: 1 1/2" = 1'-0" A1 VERTICAL PANEL SILL DETAIL SCALE: 3/4" = 1'-0" B3 ROOF DRAIN COVER PLATE SCALE: 3/4" = 1'-0" C6 TYP. SARNAFIL PARAPET DETAIL NOT TO SCALE 1 2 6 5 7 3 4 8 9 10 ELEVATION 0 11/07/2023 REV ABOULDER SERIES DETAILS HORIZONTAL JOINT 1 11/07/2023 REV ABOULDER SERIES DETAILS UNEEKE PANEL UNEEKE PANEL MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. FASTENER CLIP VERTICAL JOINT 2 UNEEKE PANELS UNEEKE PANELS T-FLASHING MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. FASTENER COLORED L-FLASHING OPTIONAL 11/07/2023 REV ABOULDER SERIES DETAILS PANEL AT PARAPET CAP 5 11/07/2023 REV ABOULDER SERIES DETAILS UNEEKE PANEL UNEEKE PANEL MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. FASTENER CLIP FASTENER WITH SEALING WASHER COPING CAP Z-FURRING WINDOW HEAD 6 MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. UNEEKE PANEL FASTENER STARTER CLIP FLASHING N.B.U. WINDOW SYSTEM N.B.U. 11/07/2023 REV ABOULDER SERIES DETAILS JAMB TERMINATION 7 J-CHANNEL UNEEKE PANEL CLIP FASTENER MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. CAULK N.B.U. COLORED L-FLASHING OPTIONAL 11/07/2023 REV ABOULDER SERIES DETAILS WINDOW SILL 8 SILL FLASHING N.B.U. BLOCKING N.B.U. MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. FASTENER UNEEKE PANEL Z-FURRING WINDOW SYSTEM N.B.U. 11/07/2023 REV ABOULDER SERIES DETAILS WINDOW JAMB 9 WINDOW SYSTEM N.B.U. SUBSTRATE N.B.U. MOISTURE BARRIER N.B.U. FASTENER CLIP UNEEKE PANEL J-CHANNEL CAULK N.B.U. COLORED L-FLAHING OPTIONAL 11/07/2023 REV ABOULDER SERIES DETAILS BASE 10 11/07/2023 REV ABOULDER SERIES DETAILS UNEEKE PANEL J-CHANNEL MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. FASTENER LOWER PARAPET LAYOUT (FIELD VERIFY ALL DIMENSIONS) WEST LOWER PARAPET LOWER WALL 1 W01 ABAC 10' 1 1/2" SOUTH LOWER PARAPET LOWER WALL 2 S01 AABC 8' -6" S02 BBCA 13' -0" S03 BAAB 13' -0" S04 CBCA 9' -0" S05 CBAB 13' -0" S06 CBAA 7' -6" EAST LOWER PARAPET LOWER WALL 3 E01 CCBA 13' -6" E02 ABCB 9' -0" E03 BCCB 13' -0" E04 BCAA 13' -0" E05 ABCC 9' -0" E06 ACAB 13' -0" E07 BABC 13' -0" E08 CBCB 9' -0" E09 CAAB 4' 10" SOUTH LOWER PARAPET LOWER WALL 4 S07 CBBA 4' -7" S08 AACB 13' -0" S09 BCBC 13' -0" S10 BCCA 8' -4" EAST LOWER PARAPET LOWER WALL 5 E10 BCBA 8' -9" E11 ACCA 8' -9" E12 ACCB 8' -9" NORTH LOWER PARAPET LOWER WALL 6 N01 CCAB 8' -4" N02 ABBC 13' -0" N03 ABBA 13' -0" N04 ACBB 6' -7" EAST LOWER PARAPET LOWER WALL 7 E13 CACB 3' -7" E14 CABB 13' -0" E15 BACB 13' -0" E16 CACA 9' -0" E17 CBBC 13' -0" E18 BABA 13' -6" NORTH LOWER PARAPET LOWER WALL 8 N05 CABA 5' -6" N06 ABCA 13' -0" N07 ACBC 9' -0" N08 CBAC 13' -0" N09 ABAB 9' -0" UPPER PARAPET LAYOUT (FIELD VERIFY ALL DIMENSIONS) WEST UPPER PARAPET UPPER WALL 1 01W BCBCCAA 13' -0" 02W AACABBC 13' -0" SOUTH UPPER PARAPET UPPER WALL 2 01S CABACBC 3' -11" 02S CABABCC 9' -0" 03S AACBACB 13' -0" 04S CAACBCB 13' -0" 05S BCCABCA 9' -0" 06S CBABABC 13' -0" 07S ACABBCC 13' -0" 08S BCAACBC 9' -0" 09S BBCAACB 13' -0" 10S CABABBC 13' -0" 11S BABCBAC 9' -0" 12S BCBBCAA 13' -0" 13S CACBCBA 13' -0" 14S ABCCABB 9' -0" 15S ABBACCB 13' -0" 16S BBABCAC 13' -0" 17S AABCCBC 9' -0" 18S ACBCBAC 4' -2" EAST UPPER PARAPET UPPER WALL 3 01E BCCABAC 3' -6" 02E CBAACBC 9' -0" 03E ACABABC 13' -0" 04E CABACBB 13' -0" 05E BBACCAB 9' -0" 06E CABABAC 13' -0" 07E BABABCC 13' -0" 08E ACBCCBA 9' -0" 09E BCBBACA 13' -0" 10E CACBABB 13' -0" 11E ABCBAAC 9' -0" 12E AACBCCB 13' -0" 13E BACCABB 13' -0" 14E AABCCBA 9' -0" 15E CBACABB 13' -0" 16E ACBCBAA 13' -0" 17E BCACBCA 9' -0" PARAPET METAL PANEL SCHEDULE METAL PANEL QUANTITIES ALL PARAPET HORIZONTAL METAL PANELS TO BE UNEEKE BOULDER SERIES PANEL TYPE A : BB2-2 PANEL TYPE B : BB3-2 PANEL TYPE C : BB4-1 (FIELD VERIFY ALL DIMENSIONS) LENGTH PANEL TYPE A B C 13' -6"3 3 2 13' -0" (EQ)68 83 67 9' -0"34 36 42 10' -1 1/2"2 1 1 8' -9" (EQ/3)4 3 5 8' -4"4 3 5 7' -6"2 1 1 6' -7"1 2 1 5' -6"2 1 1 4' -10"2 1 1 4' -7"1 2 1 4' -2"2 2 3 4' -1"2 2 3 3' -6"2 2 3 3' -7"1 1 2 TOTAL: 411 130 143 138 METAL PANEL LAYOUTS ARE TO NOT HAVE ANY RECURRING SEQUENCES OR PATTERNS BETWEEN SECTIONS. LAYOUT PROVIDED MAY BE MODIFIED BY CHANGING LOCATION OF GIVEN SEQUENCES, PROVIDED CONTRACTOR ENSURES CORRECT PANEL TYPES AND LENGTHS ARE AVAILABLE AND DOES NOT OTHERWISE INCUR DELAYS OR ADDITIONAL COSTS. SUCH CHANGES SHOULD BE COMMUNICATED TO OWNER AND ARCHITECT TO MAINTAIN UPDATED DRAWINGS AND RECORDS. PANEL TYPE A PANEL TYPE B PANEL TYPE C WALL VERTICAL METAL PANEL SCHEDULE METAL PANEL QUANTITIES ALL WALL VERTICAL METAL PANELS TO BE UNEEKE MEADOW SERIES PANEL TYPE 1 : MFP100 PANEL TYPE 2 : MB12-2V (FIELD VERIFY ALL DIMENSIONS) HEIGHT PANEL TYPE 1 2 18' -8"6 15 15' -2"6 0 10' -4"12 30 9' -0"12 27 6' -6"6 15 3' -0"18 45 2' -0"0 3 TOTAL: 195 60 135 WALL VERTICAL METAL PANEL LAYOUTS ARE TO BE CONSISTENT IN ALL SECTIONS WITH TYPE 1 PANELS AT BOTH SIDES OF A GROUP OF FIVE (5) TYPE 2 PANELS. MODIFICATIONS SHALL BE SUBMITTED TO ARCHITECT AND OWNER FOR APPROVAL PRIOR TO IMPLEMENTATION, PROVIDED CONTRACTOR ENSURES CORRECT LENGTHS ARE AVAILABLE AND DOES NOT OTHERWISE INCUR DELAYS OR ADDITIONAL COSTS. CHANGES SHOULD BE COMMUNICATED TO OWNER AND ARCHITECT TO MAINTAIN UPDATED DRAWINGS AND RECORDS. METAL LOUVERS LOUVER AND FRAMES TO FIT IN EXISTING LOUVER OPENING SIZES UNLESS OTHERWISE SPECIFIED BY BYUI FACLITIES AND MECH ENGINEER. MATCH NEW WALL FINISH (FIELD VERIFY ALL DIMENSIONS) WIDTH HEIGHT QTY 6' -1" 7' -7"6 PANEL TYPE 1 PANEL TYPE 2 OUTSIDE CORNER 3 11/07/2023 REV ABOULDER SERIES DETAILS MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. UNEEKE PANEL OUTSIDE CORNER FASTENER UNEEKE PANEL FASTENER INSIDE CORNER 4 11/07/2023 REV ABOULDER SERIES DETAILS MOISTURE BARRIER N.B.U. SUBSTRATE N.B.U. UNEEKE PANEL INSIDE CORNER FASTENER UNEEKE PANEL A. Extent of Work:At air openings in the outside wall where indicated on drawings, install AMCA rated drainable stationary extruded aluminum 6" deep weather louvers. B. Material:Blades shall be on 3-1/2" centers with integral downspouts to drain the water from the louver blades.Stationary louvers shall pass 1000 fpm free area velocity with less than 0.2" static pressure drop and shall carry less than .03 ounces of water per square foot when tested in accordance with AMCA Standard 500.Install stainless steel 1/2”mesh screens on interior face and louver. 1. Louvers shall be equal to Ruskin ELF6375DX A. Ruskin B. American Warming and Ventilating C. Greeheck D. Pottorff 2. Coordinate with the Architectural details for type of flange and structural details for actual wall opening sizes. 3. Color as selected by Architect. Contractor must coordinate louver size, flange type, and construction with structural and architectural openings to assure fit and appearance. MECHANICAL LOUVER NOTES B.O. EXTG. CONC. PANEL (HIGH) 122' -0" 7' - 0" F.V. 7' - 7 " F . V . 7' - 7 " F . V . 2" 1 " 0 " 654321 654321 E D C B A DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 3 : 0 9 P M AE600 METAL PANEL AND LOUVER SCHEDULES JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 NOTE TO CONTRACTOR: PANEL TAKEOFFS ARE FOR REFERENCE ONLY, GENERAL CONTRACTOR IS RESPONSIBLE FOR ACTUAL QUANTITY, LENGTH VERIFIED IN FIELD, AND ASSOCIATED TRIM ELEMENTS AND PARTS REQUIRED FOR COMPLETION OF WORK. SIMPLE PANEL LAYOUT EXPLANATION: CABABCC TOP PANEL BOTTOM PANEL SCALE: 1/2" = 1'-0" A3 MECHANICAL EQUIPMENT LOUVER 2" 1 " 0 " 654321 654321 E D C B A REFERENCE NOTES DATE REVISION PROJECT NUMBER 20 2 3 - 1 1 - 2 0 2 : 0 3 : 1 7 P M AE900 3-D VIEWS JO H N W . H A R T E X T E R I O R F A C A D E R E P L A C E M E N T 31 1 S . 1 S T W E S T , R E X B U R G , I D A H O 8 3 4 6 0 PE R M I T S E T - N o v . 1 7 2 0 2 3 - 23110 SCALE:D3 3D View 28 NORTHEAST CORNER SCALE:B3 3D View 30 SOUTHEAST CORNER