Loading...
HomeMy WebLinkAboutPages from INFRASTRUCTURE PLAN Rev (2) 8.08.22 - 22-00311 - Stonebridge Subdivision DIV 2 - Infrastructure Only-Reviewed-Corrections-Required Responses (1)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Stonebridge Subdivision DIV 2 - Infrastructure Only Address : 536 Meadowbrook St Application Type : Document Filename : INFRASTRUCTURE PLAN Rev (2) 8.08.22 - 22-00311 - Stonebridge Subdivision DIV 2 - Infrastructure Only.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 4 Callout Joel Gray : PW Open 4 Easement required for sanitary sewer line. 4 Free Text Joel Gray : PW Open 4 Storm drainage calculations are required. # 22-00311 Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Fiber optic pathway looks good. However, no handholes are indicated on the plans. Handholes should be located over the fiber optic conduit on every other property line and at the end run. Report Date: 01.18.2024 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org)