HomeMy WebLinkAboutPickle Ball Options to Consider with City Council for Smith Park on 9-4-24Options with Bids for Pickle Ball at Smith Park (6 Courts)
Vendor Final Cut
Sport Surface
Pros, LLC
Koch Tennis Court
Service, LLC Sports West Final Cut
Item
Remove majority of
old Surfacing off
Asphalt and Paint on
New Acrylic
Surfacing
Remove majority
of old Surfacing
off Asphalt and
Paint on New
Acrylic Surfacing
Remove majority of
old Surfacing off
Asphalt and Paint
on New Acrylic
Surfacing
Remove majority of
old Surfacing off
Asphalt and Paint on
New Acrylic Surfacing
Repair Old Court and
Lay Down Versa
Court Tiles
Remove existing Acrylic Surface/Tennis Post 10,656$ 4,000$ Declined to bid 13,396$
Pickle Ball Posts/Nets/Install 7,020$ 15,000$ 6,720$ 6,600$
Crack Repair/Site Prep-Resurface
Products/Labor 41,142$ 26,000$ 39,538$ 34,836$
Synthetic Modular Court Tiles/Labor 72,825$
Interior Chain Link Fence material/labor/Core
Holes/Tighten and Clip old Fence 25,140$ 15,000$ 24,155$ 25,140$
Contractor Bid Net Cost 83,958$ 60,000$ -$ 83,809$ 139,401$
Contingency-10% 8,396$ 6,000$ -$ 8,381$ 13,940$
Estimated Total Cost 92,354$ 66,000$ -$ 92,190$ 153,341$
Notes/Vendor Comments
Can do 2 options:
Guardian or another
product that covers
the entire play area
with 42" fortress
polymesh rolls and
gives a smoot result.
None of them will stop
cracks permanently,
but they recommend
this process over the
Guardian one.
Resurfaced Smith 10+
years ago (felt like last
bandaid job then). Best
to save $ and put into
new courts. More
cracks likely to open as
they remove old fabric
patches. Life span of
asphalt 15 years.
Has concerns as well with
asphalt cracking and cracks
appearing back very soon.
Still highly recommends
the Sport Court SGPB
Pickleball specific surface
over this option.
When Vendor can complete the project This Fall by Mid October Spring of 2025 This Fall by Mid October This Fall by Mid October