HomeMy WebLinkAboutSITE LAYOUT - 24-00778 - Teton River Townhomes Phase 11+
0
0
2+
0
0
3+
0
0
4+
0
0
4+
1
8
1+00 2+00 3+00 3+95L1
L2
48
7
3
48
7
4
4874
48
7
4
4871
4870
4870
4871
4872
48
7
3
48
7
4
48
7
2
SOUTH DRIVE AISLE
Number
L1
Begin Station
1+00.00
End Station
3+95.00
Radius Length
295.00
Line/Chord Direction
N89° 54' 31.99"E
Begin Point
N: 791928.62, E: 759614.27
End Point
N: 791929.09, E: 759909.27
UTILITY EXTENSION
Number
L2
Begin Station
2+26.51
End Station
4+18.00
Radius Length
191.49
Line/Chord Direction
N0° 14' 58.82"W
Begin Point
N: 791916.97, E: 759837.22
End Point
N: 792108.46, E: 759836.38
CHECK BY
SHEETS
DRAWN BY
JOB NO:
OF
SHEET
BWBTJT
SHEET NAME:
PROJECT:
LOCATION:
24-053
DATEREVISIONS
SITE OVERVIEW
TETON RIVER TOWNHOMES PHASE 1
REXBURG, ID C-13
ENGINEERS STAMP SHEET INFORMATION
SHEET SIZE:
VERTICAL EXAGGERATION:
PROJECT CONTACT:
TJ TOGIAI
CONNECT ENGINEERING
208-881-0081
DATE:August 26, 2024
24" X 36" (ARCH D)
C-07
N/A
PRELIMINARY FOR
REVIEW ONLY
PRELIMINARY NOT
FOR CONSTRUCTION
SITE INFORMATION:
TOTAL AREA OF SITE: 109,000 SQ FT (2.50 ACRES)
BUILDINGS: 1
UNITS: 8
PARKING: 16 PARKING STALLS (GARAGE) TOTAL
LANDSCAPE PHASE 1: 5,887 SQ FT
BUILDING NOTES:
CONTRACTOR OR ARCHITECT RESPONSIBLE TO ENSURE
STEM WALL EXTENDS 8'' MIN ABOVE FINISH FLOOR
POWER NOTE:
SEE ROCKY MOUNTAIN POWER
CONTRACTOR'S MAP FOR
PROPOSED POWER FACILITIES.
FIRE CODE NOTE:
1.D103.6.1 ROADS ARE 20 TO 26
FEET IN WIDTH. FIRE LANE
SIGNS ARE SPECIFIED IN
SECTION D103.6 APPARATUS
ACCESS ROADS THAT ARE 20
TO 26 FEET WIDE.
2.CURBS SHALL BE PAINTED
RED FOUR FEET ON EACH
SIDE OF THE EVERY FIRE
HYDRANT.
LANDSCAPE NOTE:
FINAL LANDSCAPE SHOULD SLOPE AWAY
FROM BUILDINGS
SHEET NOTES:
1.CONTRACTOR TO VERIFY ALL
EXISTING UTILITY LOCATIONS
AND ELEVATIONS. CONTRACTOR
TO COORDINATE WITH EACH
UTILITY COMPANY PRIOR TO
CONNECTING ANY PROPOSED
UTILITIES.
2.ENSURE 10' MINIMUM
HORIZONTAL CLEARANCE
BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET
PER IDEQ. IF MANHOLES ARE IN
AN ASPHALT PAVED AREA THE
COLLARS ARE TO BE ASPHALT
COLLARS
3.ENSURE 18" MINIMUM VERTICAL
CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE
LINES ARE MET PER IDEQ
4.ASSUMED TOP OF FOUNDATION
WALL IS FINISHED FLOOR,
CONTRACTOR TO NOTIFY
ENGINEER IF DIFFERENT.
5.ALL TBC ELEVATIONS ARE AT
FULL HEIGHT OF CURB.
LORENE ST.
CA
R
L
O
W
D
R
I
V
E
24
.
0
0
'
52
.
3
1
'
160.21'
49
.
0
5
'
5.
0
0
'
24.00'
6.91'
4.00'
TEMPORARY STORM POND TO BE
REMOVED WITH CONSTRUCTION OF PHASE
4 AND REPLACED WITH PERF PIPE/ROCK
SECTION SYSTEM
CHECK BY
SHEETS
DRAWN BY
JOB NO:
OF
SHEET
BWBTJT
SHEET NAME:
PROJECT:
LOCATION:
24-053
DATEREVISIONS
PHASING PLAN
TETON RIVER TOWNHOMES PHASE 1
REXBURG, ID C-13
ENGINEERS STAMP SHEET INFORMATION
SHEET SIZE:
VERTICAL EXAGGERATION:
PROJECT CONTACT:
TJ TOGIAI
CONNECT ENGINEERING
208-881-0081
DATE:August 26, 2024
24" X 36" (ARCH D)
C-06
N/A
PRELIMINARY FOR
REVIEW ONLY
PRELIMINARY NOT
FOR CONSTRUCTION
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 1
PHASE 2
PHASE 3
PHASE 4
STORM WATER RETENTION SYSTEM TO
BE INSTALLED IN PHASE 4 TO REPLACE
TEMPORARY STORM POND
PHASING NOTE:
1.SEWER AND WATER TO BE
STUBBED AND CAPPED AT
PHASE LINES