Loading...
HomeMy WebLinkAboutSITE LAYOUT - 24-00778 - Teton River Townhomes Phase 11+ 0 0 2+ 0 0 3+ 0 0 4+ 0 0 4+ 1 8 1+00 2+00 3+00 3+95L1 L2 48 7 3 48 7 4 4874 48 7 4 4871 4870 4870 4871 4872 48 7 3 48 7 4 48 7 2 SOUTH DRIVE AISLE Number L1 Begin Station 1+00.00 End Station 3+95.00 Radius Length 295.00 Line/Chord Direction N89° 54' 31.99"E Begin Point N: 791928.62, E: 759614.27 End Point N: 791929.09, E: 759909.27 UTILITY EXTENSION Number L2 Begin Station 2+26.51 End Station 4+18.00 Radius Length 191.49 Line/Chord Direction N0° 14' 58.82"W Begin Point N: 791916.97, E: 759837.22 End Point N: 792108.46, E: 759836.38 CHECK BY SHEETS DRAWN BY JOB NO: OF SHEET BWBTJT SHEET NAME: PROJECT: LOCATION: 24-053 DATEREVISIONS SITE OVERVIEW TETON RIVER TOWNHOMES PHASE 1 REXBURG, ID C-13 ENGINEERS STAMP SHEET INFORMATION SHEET SIZE: VERTICAL EXAGGERATION: PROJECT CONTACT: TJ TOGIAI CONNECT ENGINEERING 208-881-0081 DATE:August 26, 2024 24" X 36" (ARCH D) C-07 N/A PRELIMINARY FOR REVIEW ONLY PRELIMINARY NOT FOR CONSTRUCTION SITE INFORMATION: TOTAL AREA OF SITE: 109,000 SQ FT (2.50 ACRES) BUILDINGS: 1 UNITS: 8 PARKING: 16 PARKING STALLS (GARAGE) TOTAL LANDSCAPE PHASE 1: 5,887 SQ FT BUILDING NOTES: CONTRACTOR OR ARCHITECT RESPONSIBLE TO ENSURE STEM WALL EXTENDS 8'' MIN ABOVE FINISH FLOOR POWER NOTE: SEE ROCKY MOUNTAIN POWER CONTRACTOR'S MAP FOR PROPOSED POWER FACILITIES. FIRE CODE NOTE: 1.D103.6.1 ROADS ARE 20 TO 26 FEET IN WIDTH. FIRE LANE SIGNS ARE SPECIFIED IN SECTION D103.6 APPARATUS ACCESS ROADS THAT ARE 20 TO 26 FEET WIDE. 2.CURBS SHALL BE PAINTED RED FOUR FEET ON EACH SIDE OF THE EVERY FIRE HYDRANT. LANDSCAPE NOTE: FINAL LANDSCAPE SHOULD SLOPE AWAY FROM BUILDINGS SHEET NOTES: 1.CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS. CONTRACTOR TO COORDINATE WITH EACH UTILITY COMPANY PRIOR TO CONNECTING ANY PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM HORIZONTAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ. IF MANHOLES ARE IN AN ASPHALT PAVED AREA THE COLLARS ARE TO BE ASPHALT COLLARS 3.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ 4.ASSUMED TOP OF FOUNDATION WALL IS FINISHED FLOOR, CONTRACTOR TO NOTIFY ENGINEER IF DIFFERENT. 5.ALL TBC ELEVATIONS ARE AT FULL HEIGHT OF CURB. LORENE ST. CA R L O W D R I V E 24 . 0 0 ' 52 . 3 1 ' 160.21' 49 . 0 5 ' 5. 0 0 ' 24.00' 6.91' 4.00' TEMPORARY STORM POND TO BE REMOVED WITH CONSTRUCTION OF PHASE 4 AND REPLACED WITH PERF PIPE/ROCK SECTION SYSTEM CHECK BY SHEETS DRAWN BY JOB NO: OF SHEET BWBTJT SHEET NAME: PROJECT: LOCATION: 24-053 DATEREVISIONS PHASING PLAN TETON RIVER TOWNHOMES PHASE 1 REXBURG, ID C-13 ENGINEERS STAMP SHEET INFORMATION SHEET SIZE: VERTICAL EXAGGERATION: PROJECT CONTACT: TJ TOGIAI CONNECT ENGINEERING 208-881-0081 DATE:August 26, 2024 24" X 36" (ARCH D) C-06 N/A PRELIMINARY FOR REVIEW ONLY PRELIMINARY NOT FOR CONSTRUCTION PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 1 PHASE 2 PHASE 3 PHASE 4 STORM WATER RETENTION SYSTEM TO BE INSTALLED IN PHASE 4 TO REPLACE TEMPORARY STORM POND PHASING NOTE: 1.SEWER AND WATER TO BE STUBBED AND CAPPED AT PHASE LINES