HomeMy WebLinkAboutCity of Rexburg Utility Rate Study - FCS, a Bowman companyCITY OF REXBURG
Utility Rate Study
August 20, 2024
7525 166th Ave. NE, Ste. D-215 / Redmond, WA 98052 / (425) 867-1802 / fcsgroup.com
August 20, 2024
Deborah Lovejoy
City Clerk
35 N 1st E
Rexburg, Idaho 83440
RE: Utility Rate Study
Dear Ms. Lovejoy,
The City of Rexburg (City) is seeking to review water, sewer, and sanitation rates and capitalization fees adequate to
fund short and long-term operational and capital needs. Rates and fees have historically been established by the City
internally. The City's exposure to rapid growth, increasing operating costs from record level inflation and continual need
for infrastructure investment make this a good time to solicit an external review. To support the City’s goals, the rate
study offers an integrated financial plan linking costs and revenues to changes in key parameters. Our FCS team will work
cohesively to bring the City options that clearly outline the cost and rate impacts of varying levels of service that will help
inform and guide long-term management decisions in the face of known and unknown challenges facing the City. The
financial plan not only establishes a framework for understanding the City’s current operational baseline, it also builds
in the flexibility to evaluate changes in key parameters. As the City works to provide essential services in a thoughtful,
reliable, responsive, and cost-effective manner, we believe that we are well positioned to help the City successfully adopt
rate and capital funding strategies that allow for maintaining service excellence while also being mindful of affordability
and equity.
Some of the distinct attributes offered by our dedicated team of industry leaders and analytical experts include the
following:
• We are rate practitioners with direct experience offering the most suitable rate approaches to advance the City’s
evolving goals and objectives.
• We bring breadth and depth in utility rate experience that is unrivaled having completed over 3,000 utility studies for
clients in the Western US. Our qualifications will show the range of experience in similar efforts.
• Our project team members are active leaders, participants, and contributors in regional associations and national
committees that set the standards for rate-setting including the American Water Works Association and American
Public Works Association.
• We provide high quality, effective and professional services to our clients. Our project team will bring fresh perspective
and guide the City through steady focus and clear communication.
• Your project managing principal, Angie Virnoche, presented at the Association of Idaho Cities conference in 2023 on
“Discovering the Power of your Rate Study” and in 2024 on “Developing a Public Infrastructure Capitalization Fee”.
We look forward to the privilege of working with the City. Finally, this letter serves to confirm that I, Angie Sanchez
Virnoche, am duly authorized to execute a contract on behalf of FCS. Please do not hesitate to contact me at
(425) 336-4157 or angies@fcsgroup.com if you have any questions.
Sincerely,
FCS, a Bowman company
Angie Sanchez Virnoche
Managing Principal
Capability to perform projeCt 1UTILITY RATE STUDY
FCS WAS ESTABLISHED IN 1988. FCS IS ONE OF THE
COUNTRY’S OLDEST AND MOST RESPECTED INDEPENDENT
PROVIDERS OF FINANCIAL, ECONOMIC, AND UTILITY
MANAGEMENT SERVICES IN THE PUBLIC SECTOR.
With over 4,000 engagements for more than 650
government clients, FCS provides best-in-class
analytical solutions that offer our clients the clarity
they need to solve their most complex issues in ways
tailored specifically to their own communities.
As a private practice dedicated exclusively to state and
local government issues, we have accumulated the
expertise and the perspective that makes a real difference
for the clients we serve. Each engagement is a highly
personalized, entirely customized experience led by one
of our most senior principals who will be your partner
in building the solutions and outcomes you need.
At FCS, we understand that every municipal agency
faces its own unique challenges. Our success and
reputation comes from the ability to listen to clients
and produce customized study results that can be
easily implemented and understood by everyone.
Our management and technical staff of 35 serve
clients throughout the U.S. from four offices
located in Redmond and Spokane, Washington,
Lake Oswego, Oregon, and Boulder, Colorado.
As of July 18, 2024, FCS has officially joined Bowman.
Bowman is a leading national professional services
firm offering multi-disciplinary engineering, planning,
surveying, geomatics, construction management,
environmental consulting, landscape architecture, and
right-of-way acquisition. This change provides a strong
foundation for our firms to merge our comprehensive
skillsets while offering the same level of commitment
to deliver outstanding project results, build long-lasting
relationships and leverage the growth of our organization
to serve the ever-changing needs of our clients.
FCS has extensive experience with cities
throughout Idaho, including Blackfoot,
Sandpoint, Moscow, and Chubbuck.
Page 10 of this proposal highlights our
experience and familiarity with Idaho.
CAPABILITY TO PERFORM PROJECT
Areas of Expertise
UTILITY RATE AND FEE CONSULTING
FCS has performed over 3,000 utility finance and rate
development projects for local communities including
defining revenue requirements with comprehensive
financial modeling tools, performing long-term
capital management strategies, developing full cost-
of-service rates, and legally-defensible connection
charges. We work with agencies large and small in
urban and suburban areas, rural systems, regions with
seasonal/climate sensitivities, and communities with
special commercial/industrial needs. We are experts
and educators in utility rate policies and practices,
and are attentive to legal constraints in every location
we work. We have invested time with agency staff,
policymakers, stakeholders, and customers to improve
your utility’s long-term financial health and integrity.
UTILITY MANAGEMENT
FCS offers tailored business management solutions.
We assist with the formation and merger of utilities,
perform cost-benefit analyses, develop strategic
business plans, and negotiate complicated wholesale
agreements—helping your utility maintain its
resiliency in an ever-changing environment.
ECONOMIC AND FUNDING STRATEGIES
FCS economists help governments create vibrant
sustainable communities. We model the fiscal and
social return on public investments and provide
creative ways of funding projects and services.
Challenges turn into opportunities as we support
goals aimed at fair housing and job creation.
GENERAL GOVERNMENT FINANCIAL ANALYSIS
FCS financial consultants specialize in helping local
and state governments, regional agencies and public
safety entities address and solve issues involving
policy objectives, public finance, cost recovery,
facility financing and long-term facility reinvestment
funding, and organizational performance. We have a
broad understanding and specific expertise on local
and state government policymaking; how the many
different governmental functions are performed; and
what role elected officials, the public, community
organizations and employees have in making
governments responsive to community needs.
QualifiCations of projeCt team 2UTILITY RATE STUDY
QUALIFICATIONS OF PROJECT TEAM
Matt Hobson TECHNICAL ADVISOR
Matt Hobson is an FCS senior project manager with 16 years of experience in solid waste cost-of-
service and rate analysis, operations management, comprehensive solid waste planning, and expert
technical review. Matt has completed rate studies for solid waste collection and disposal utilities
across the western United States and Canada. He is the incoming president for the Evergreen
Chapter of the Solid Waste Association of North America (SWANA) and has presented at regional
and national solid waste conferences since 2013 on topics such as rate-setting principles in waste
management, recycling economics, and collection route performance metrics. Matt is located at our
Redmond, Washington office.
Matt’s project experience includes rate studies for the Idaho communities of Blackfoot, Great Falls,
Lewiston, and Moscow, as well as rate study work for the cities of Cheney, Richland, Toppenish, and Walla
Walla, Washington, Peoria, Arizona, Sacramento, California, Cheyenne, Wyoming, and Toronto, Ontario.
role: Matt will provide technical support as needed on the solid waste rate study.
Amanda Levine PROJECT CONSULTANT
Amanda Levine is an FCS project consultant with experience in water, sewer, solid waste, and stormwater
rate studies. Amanda has assisted clients throughout the Pacific Northwest with revenue requirement
and cost-of-service studies, multi-year financial planning, and connection fee development. Amanda has
extensive experience analyzing customer billing records, performing in-depth analysis of rate structures,
reviewing landfill disposal service agreements, and developing detailed operating expense forecasting.
She has worked with communities to develop multi-utility rate studies as well as create customized rate
models with infographics and reporting modules specific to clients’ needs. Amanda is located at our
Redmond, Washington office.
Amanda’s project experience includes rate studies for the Idaho communities of Blackfoot, Coeur d'Alene,
and Moscow, as well as the cities of Cheney, Kelso, Pasco, Richland, Toppenish, Woodland, Washington,
and Toronto, Ontario.
role: Amanda will be responsible for data management, technical analysis, rate modeling, and drafting
project deliverables.
FCS is promoting a small, focused team who will be available and committed to work on this engagement for its duration.
Managing principal Angie Sanchez Virnoche, a nationally recognized expert in utility rates, will anchor your team. She will
be supported by technical advisor Matt Hobson and project consultant Amanda Levine.
Angie Sanchez Virnoche MANAGING PRINCIPAL
Angie Sanchez Virnoche is an FCS principal with over 30 years of experience providing financial and rate
development services in a variety of capacities for water, wastewater, stormwater, solid waste and electric
utilities. Her project work includes policy development, multi-year financial plans and rate strategies,
cost-of-service equity studies, rate design restructuring and modernization, capital funding prioritization,
renewal and replacement funding evaluations, cost benefit analyses, reserve analysis, and community
education and involvement. She has presented at the Association of Idaho Cities annual conference, most
recently in 2024. Angie is located at our Spokane, Washington office.
Angie's project experience includes rate studies for the Idaho communities of Blackfoot, Sandpoint,
Moscow, Chubbuck, Post Falls, Coeur d'Alene, Rathdrum and Bonners Ferry. Along with other similar rate
work for communities in Cheney, Richland, and Walla Walla, Washington, Peoria, Arizona, and Toronto,
Ontario.
role: Angie will provide overall project management, analytic guidance and policy direction, budget and
schedule adherence, and serve as the City’s main point of contact. She will also participate in key meetings
with the Council and public.
relevant projeCt experienCe 3UTILITY RATE STUDY
RELEVANT PROJECT EXPERIENCE
WATER, SEWER, AND SANITATION
RATE STUDY (2021 - 2022)
CITY OF BLACKFOOT, ID
FCS performed a rate study for the water, sewer, and
sanitation utilities. The main focus of the rate study
was to develop a funding plan for the 2023-2030 study
period, update the water and sewer availability fees, and
conduct a cost-of-service analysis for all three utilities.
Project Highlights
• Developed a multi-year financial plan evaluating
sufficiency of rates to cover operating costs and
$73 million in combined future capital projects.
• The sewer CIP costs were driven by a need for
a new treatment plant and the water CIP was
driven by the need for additional storage, a new
water shop, and an additional well facility.
• Developed rate path that required 3-years of 19%
increases for water and 3-years of 25% increases
in sewer. Council approved the initial step of these
multi-year increases to be revisited annually.
• Updated water and sewer availability
fees, recommended changes for
consistency and administrative ease.
• Completed the first water and sewer cost-
of-service analysis for the City.
• Crafted a unique sewer strength analysis to calculate
the unit cost of different strength concentrations.
• Designed rates that created a 3-tiered water
rate structure for the residential class and cost
of service based industrial strength charges.
• Determined that the sanitation work included a
forecast of new collection routes, operators, and
trucks required to support varying levels of growth.
• Conducted a peer rate comparison for
both rate and availability fee survey.
• Completed multiple presentations to
the City Council at key milestones.
Key Personnel
Angie Sanchez Virnoche, Principal
Matt Hobson, Project Manager
Amanda Levine, Project Consultant
Reference
Marc Carroll, Mayor
(208) 785-2756
mayor@cityofblackfoot.org
WATER AND SEWER COST OF SERVICE RATE
STUDY AND NEW USER FACILITY FEES (2022)
CITY OF SANDPOINT, ID
FCS conducted a rate and fee study to assess revenue
sufficiency and to evaluate the equity of revenue
generation amongst existing customer classes.
Project Highlights
• Developed detailed rate models, tailored to the
City’s fund structure and fiscal policies, in order to
perform a twenty-year revenue requirement analysis
considering operating and maintenance expenditures,
capital costs, existing and future debt requirements,
and achievement of identified fiscal policies.
• Crafted capital funding scenarios to support
over $74 million in water infrastructure
investment and approximately $117 million
in sewer infrastructure investment.
• Performed a cost allocation analysis to create a defensible
basis for assigning cost shares and establishing equity
for utility customers based on facility requirements
as well as customer specific demand requirements.
• Developed a multi-year cost of service phase-in
strategy to bring customer classes in alignment with
allocated costs to serve over a 5-year phase in period.
• Updated New User Facility Fees for both utilities
to ensure connection charges are in compliance
with Idaho approved methodology and
representative of infrastructure investment.
• Rate structure changes for water included enhancing
affordability by shifting tier thresholds allowing for
more use in the first and second tiers and eliminating
the minimum usage for the residential class. Elimination
of seasonal rates for the multi-family class for
consistency with other classes and condensed the
commercial classes to streamline the rate schedule.
• Sewer utility rate changes included development of a
residential two-tier flat rate charge to acknowledge
low users. Changed the multi-family away from
a volume rate to a cost of service based fixed
rate per unit and moved the two tier commercial
rate to all usage billed at one volume rate.
• Five workshops with City Council to present
results and gain input at key milestones.
Key Personnel
Angie Sanchez Virnoche, Principal
Reference
Sarah Lynds, Finance Director
(208) 263-3557 Office
slynds@sandpointidaho.gov
relevant projeCt experienCe 4UTILITY RATE STUDY
WATER, SEWER, AND
SANITATION COST OF SERVICE
STUDY AND CONNECTION
FEE UPDATE (2012-2019)
CITY OF MOSCOW, ID
In 2012 FCS completed the initial
water, sewer and sanitation rate
study. In 2019 FCS performed a
water and sewer cost of service
rate update and connection fee
study. A sanitation rate study was
completed in 2021 with an update
for changing conditions in 2023.
Project Highlights
• Updated and analyzed the
overall multi-year revenue
requirements for each utility.
• Reviewed fiscal policies and
reserve fund balances checking
adherence to target range.
• Developed capital funding plan to
facilitate expected infrastructure
investment ($11.8M for water and
$23M for sewer). Incorporated
annual system reinvestment funding
• Complete a cost of service (equity
evaluation) to determining the cost
burden that each customer class
places on each utility system
• Redesigned sewer rates from
business type to low, medium
and high strength categories.
• Calculated the maximum General
Facilities Charges for each utility.
• Evaluated rate options for multi-
family recycling collection service.
• Worked with City stakeholders
to present study findings
and incorporate input.
Key Personnel
Angie Sanchez Virnoche, Principal
Matt Hobson, PM - Sanitation
Reference
Tyler M. Palmer, MPA
Deputy City Supervisor
(208) 883-7096
tpalmer@ci.moscow.id.us
WATER, SEWER, AND SOLID
WASTE UTILITY RATE STUDY AND
SDC UPDATE (2020-2023 )
CITY OF CHENEY, WA
FCS completed a water rate and system
development charge study in 2020,
with a subsequent rate study for the
sewer and solid waste utilities in 2023.
Project Highlights
• Developed a multi-year rate revenue
strategy for each utility including unique
capital funding options ($2.7 million
from American Rescue Plan Act).
• Developed a sewer rate alternative
considering funding reclamation facility
• Wrote issue papers discussing
best practices of utility fiscal
policies for financial viability and
system development charges
(methodology, applicable code and
alternative units of assessment.)
• Determined how to improve cost equity
between customer classes through
multi-year rate strategy options.
• Completed a multi-year analysis
of water sales volumes to inform
forecast revenue and rate designs
• Aligned alternative rate structures
with City priorities – usage tiers
targeting 20% reduction of summer
peak use, usage tiers phasing in
to target use reduction. Eliminate
usage allowance for commercial,
school and industrial sewer users.
• Completed first cost of service
study for the solid waste utility
– resolved subsidy identified
between commercial and residential
through multi-year rate strategy
• Facilitated work sessions with City’s
public works advisory committee and
City Council to review results and discuss
strategies and recommendations.
Key Personnel
Angie Sanchez Virnoche, Principal
Matt Hobson, Project Manager
Amanda Levine, Project Consultant
Reference
Todd Ableman, Public Works Director
(509) 498 9293
tableman@cityofcheney.org
WATER AND SEWER
FINANCIAL PLAN AND
CAPACITY REPLACEMENT
FEES (2020-2021)
CITY OF CHUBBUCK, ID
FCS completed a water and sewer
rate study and capacity replacement
fee study for the City of Chubbuck.
The City was interested in evaluating
the sufficiency of current rates
along with ensuring the current
fees charged would meet the cost
of expected growth in the area. The
City contracted in 2024 with FCS to
complete a sanitation rate study.
Project Highlights
• Developed multi-year financial plan
(20-years with 5-year rate-setting
focus) for each utility in support of
recently completed Water Facility
Plan and Wastewater Master Plan
• Incorporated increases in
Treatment costs from Pocatello
and additional FTE’s required
to support growing systems
• Reviewed fiscal policies
for compliance with
industry best practice.
• Capital funding plan to
support $17.5M water and
$9.7M sewer capital costs
• Developed alternative rate plans
(meet operating deficiency,
rate capped, full CIP).
• Updated water and wastewater
capacity replacement fees – ensure
compliance with approved Idaho
methodology, recreate missing
system assets for both systems
and evaluated if sewer fees should
remain separate or combined.
• Completed four presentations
to Council at key milestone
review points.
Key Personnel
Angie Sanchez Virnoche, Principal
Matt Hobson, PM - Sanitation
Reference
Bridger Morrison, Public
Works Director
(208) 237-2430
bmorrison@cityofchubbuck.us
relevant projeCt experienCe 5UTILITY RATE STUDY
Additional Experience
Client Fiscal Policy Evaluation Revenue Requirement Cost of Service Rate Design Fee / Charge
Auburn, WA •••••
Aurora, CO •••••
Bainbridge Island, WA •••••
Bellingham, WA •••••
Bend, OR •••••
Blackfoot, ID • ••••
Boise, ID ••••
Bonners Ferry, ID ••••
Bozeman, MT ••••
Bremerton, WA •••••
Burley, ID •••••
Central Orchards Sewer District, ID •••
Central Point, OR •••••
Cheney, WA ••••
Centralia, WA •••••
Cheyenne, WY •••••
Chubbuck, ID ••••
Coeur d’Alene, ID •••••
Eagle Sewer District, ID ••
Eastern Idaho Regional Sewer District, ID •••
Everett, WA •••••
Gillette, WY •••••
Hayden, ID ••••
Helena, MT ••••
Kent, WA •••••
Lake Oswego, OR •••••
Lewiston, ID •••••
Loveland, CO •••••
Lynnwood, WA •••••
McCall, ID ••
Mercer Island, WA •••••
Meridian, ID •••••
Moscow, ID ••••
Nampa, ID •••••
Olympia, WA •••••
Plummer, ID ••••
Post Falls, ID ••••
Richland, WA •••••
Redmond, WA •••••
Sandpoint, ID •••••
Santa Fe, NM •••••
Scottsdale, AZ •••••
Sheridan, WY •••••
Spokane, WA •••••
Tacoma, WA •••••
Twin Falls, ID •
Walla Walla, WA •••••
projeCt approaCh and sChedule 6UTILITY RATE STUDY
PROJECT APPROACH AND SCHEDULE
We are familiar with the challenges growing communities
like Rexburg face. Planning for robust growth requires
investment in both existing and future infrastructure
along with sufficient staffing for operational efficiency.
Managing these multifaceted challenges requires a
thoughtful approach that combines comprehensive
financial planning with the flexibility to adapt to changing
conditions all while maintaining equity and affordability.
The following work tasks include the rate study (revenue
requirement, cost-of-service and rate design), in addition
to the capitalization fee noted in the City’s RFP.
RECOMMENDATIONS AND COMMUNICATIONS
In performing the rate study, we propose to complete the
water, sewer and sanitation studies concurrently. Each
task noted below will be completed for each utility, unless
otherwise noted. We have organized our work efforts into
major tasks that correspond with the core technical aspects
identified in your scope of work and process points designed
to foster a smooth, informed, and interactive study. This
illustrated process has been used to successfully complete
similar rate studies and to maximize the opportunity for
input and education for involved parties. We have found
that the most successful rate studies are the ones that
emphasize regular communication and collaboration with
staff and the City Council throughout the rate study process.
Task Plan
TASK 1 | INITIAL PROJECT MEETING
An initial project meeting will be scheduled at the
commencement of the project with the consultant
and the City project team. Meeting participants would
include a representative from departments that
can address issues related to finance, engineering,
operations, customer service, and administration.
The intent of the meeting is to confirm the goals and
objectives of the overall rate study and focus the efforts
of the project team. The items covered at the meeting
include reviewing the scope of work; identifying project
objectives, expectations and deliverables; outlining
the project schedule and key milestone review points;
and discussing appropriate lines of communication.
deliverables
• Project schedule with task completion
and key milestone review points.
• Identification of project team communication leads.
• Schedule standing project check-in meetings.
• Approved project work plan.
task 1 Key point
This initial meeting will establish a foundation for
the project, focusing the efforts of the project
team on the key issues to be addressed and
resolved during the study process. It will cover the
project scope, objectives, deliverables, schedule,
and appropriate lines of communication.
TASK 2 | DATA COLLECTION & CUSTOMER STATISTICS VALIDATION
FCS will provide a data needs list encompassing
historical and projected revenue, expenses, fiscal
policies, capital plans, fund balances, comprehensive
planning documents, and customer billing
data. The data will be reviewed, analyzed, and
validated for inclusion in the study process.
This task includes a detailed customer billing statistics
validation. Individual customer data including number
of accounts, meter size, usage patterns (annual use,
peak use, etc.) will be evaluated and validated against
actual revenues collected. This revenue reconciliation
will identify anomalies to be corrected prior to
developing future revenue and customer counts and
use / demand projections. Validation of the customer
statistics data set with customer demands and revenue
generation is critical to the rate study as it establishes
the foundation for all of the major analytical phases
(revenue requirement, cost of service and rate design).
deliverables
• Validated financial, engineering, and customer usage
data that serves as the primary inputs for the study.
• Validated customer statistics with accounts,
demand and revenue generation.
• Demand profiles that tie to revenue projections.
• Revenue forecast by customer class.
task 2 Key point
Validating the data used in the study promotes analytical
consistency and integrity throughout the rate study
process. The process can uncover data anomalies that
would otherwise impact the forecast and allocations
developed in the study. The analysis completed as
part of the validation process will help address the
effectiveness of meter minimum, overage and sanitation
can charges of the City’s current rate structures.
projeCt approaCh and sChedule 7UTILITY RATE STUDY
TASK 3 | REVENUE REQUIREMENT
This task establishes a sustainable, multi-year financial
management plan that meets the projected total financial
needs of each system through the generation of sufficient,
sustainable revenue. This task analyzes annual cash flow
needs by identifying expenses incurred to operate and
manage each system including cost increases resulting
from changes in staffing and/or enhanced programs or
initiatives, existing contract cost arrangements, capital
repair/ replacement needs, new and existing debt
repayment obligations, and fiscal policy achievement.
Alternative rate strategies and scenarios will be
developed that may consider operational changes,
capital prioritization, and overall infrastructure
funding approaches for long term capital needs. These
scenarios can be used to ultimately inform decision
making and optimize proposed rate strategies.
Capital costs are a significant factor when evaluating rate
needs. We regularly partner with both JUB Engineers,
Inc. and Keller Associates, Inc. who are both currently
working with the City. We would be happy to work
with the City’s consulting engineers should external
support be required to supplement the rate study.
deliverables
• Fiscal policy evaluation.
• Self-supporting multi-year financial plan.
• Capital funding plan and scenario development.
• Baseline financial plan plus up to three
(3) rate implementation scenarios.
task 3 Key point
This analysis enables the City to determine how existing rate
levels meet the current obligation of each utility on a self-
supporting basis. Revenue capacity for capital funding will
be identified and increased as needed to meet upcoming
capital needs. The financial planning toolset offers the
flexibility to evaluate and quantify the sensitivity associated
with changes in key underlying assumptions (inflation rates,
capital timing, funding, cost changes, etc.) allowing the
City to anticipate future challenges in revenue and expense
imbalances and make a plan for corrective action, if needed.
TASK 4 | COST OF SERVICE
The cost-of-service analysis (COSA) involves allocating
utility costs to customer classes based on a methodology
consistent with industry-accepted ratemaking
principles. This analysis establishes a defensible basis
for assigning cost shares and defining “cost equity”
among the City’s customers in a way that is tailored
to the unique characteristics of the City’s water,
sewer and sanitation systems and customers.
The COSA must account for differences in the character
and nature of service provided to various customer
classes when defining “equitable” cost recovery.
The COSA develops a series of functional allocations
that distribute cost pools to classes of customers linked
to a proportionate share of costs required to serve their
demand. Specific consideration will be given to total utility
costs in relationship to the functions identified below.
WATER FUNCTIONS SEWER FUNCTIONS SANITATION FUNCTIONS
Customer Customer Customer
Base capacity (avg. demand)Flow Collection
Peak capacity (peak demand)
Strength – Biochemical Oxygen Demand Transport
Meters and Services Strength – Total Suspended Solids Disposal
Fire Strength – Other (if applicable)Recycling
The COSA evaluates how existing revenue compares
to the identified cost recovery by class of service.
In addition to evaluating existing classes of service, this task
can look at alternative user groups to address any costs that
are driven by a subset of customers. This granularity can
address imbalances in areas experiencing increasing demand
or where costs are incurred to serve customers with higher
service demands. This analysis will determine whether cost
imbalances are present and develop a corrective action plan
to address imbalances over a multi-year period if necessary.
deliverables
• Water, sewer and sanitation utility
class-based equity evaluation.
• Cost based unit costs by function,
class, and/or service level.
• COSA phase-in, if warranted.
task 4 Key point
This analytical exercise will identify the cost to serve
each customer classification within each system. The
results will identify any warranted shifts in cost burden
that could improve equity between customers from
the existing rate structure. It also identifies the unit
cost for each cost category that helps to inform the
rate design process. Any new customer classifications
identified as part of the study process will be evaluated
independently for equity. We understand this may be
the first cost of service study the City has completed,
which may result in the need for significant shifts among
classes. These results can compound the impacts of
aggregate increases resulting from the financial plan.
projeCt approaCh and sChedule 8UTILITY RATE STUDY
Recognizing the need to balance the objective of
equitable cost recovery with other objectives such as
rate affordability, this task will include the development
of a plan to phase in any shifts resulting from the COSA.
Alternatively, we will work with the City to prioritize
the study objectives to be accomplished in the short-
term with others to be addressed at a future time.
TASK 5 | RATE DESIGN
The rate design process involves developing rates
(including both fixed and variable charges) for each
customer class that recovers its allocated cost. In
addition to serving as a mechanism for cost recovery, the
City’s rate structures are a valuable tool for promoting
key objectives such as revenue stability, conservation,
and affordability. Recognizing that the City’s priority
of these objectives can change over time, this task
includes the selection and development of two (2)
alternative rate structure per utility. The rate alternative
will be designed to generate sufficient revenue to
meet the revenue requirement forecast and address
any material inequities identified in the COSA findings.
In addition, rate designs will be consistent with the
City’s fiscal policies and billing system capabilities.
Finally, an affordability assessment will be performed
to understand the impact of any rate design changes
on lower income brackets. Looking at the typical
metric of median household income, in addition
to the emerging City- specific metrics related to
Hours at Minimum Wage (HM), this additional metric
will provide an additional measure of affordability
of the rate changes under consideration.
deliverables
• Two (2) preferred rate structure alternative, per
utility, aligned with identified City priorities.
• Schedule of water, sewer and
sanitation rates for each class.
• Bill impact analysis that shows the number
of and degree to which different customers
are impacted by rate design changes.
• Affordability analysis.
• Comparative survey of sample monthly bills for up
to five (5) jurisdictions of interest to the City.
task 5 Key point
Rate design enables innovative approaches represents
the cost recovery and can be a tool for sending the
appropriate price signals to meet City priorities and
objectives. The priority of this task will be to evaluate
existing rate structures and suggest modifications to
refine alignment with the City’s current priorities such as
conservation, revenue stability, equity and affordability.
Detailed review of the City’s billing statistics will aid in
highlighting the current customer usage profiles and
how to best structure rates for maximum effectiveness.
TASK 6 | WATER AND SEWER CAPITALIZATION FEE UPDATE
Capitalization fees are one-time fees for new or
redevelopment used to recover a proportional share
of the value of facilities required to provide service.
In the 2015 Idaho Supreme Court Case: NIBCA v the
City of Hayden the Court referenced a methodology
and calculation used in Loomis v. City of Hailey for
calculation of capitalization fees. The court held
that the fee must be based on the cost of replacing
the pipe and equipment that is in the ground today
(i.e., the value of the existing system) and the value
of the system should represent that portion of the
system capacity that the new user will utilize at that
point in time. Ultimately, future capital projects
are not allowed in the capitalization fee calculation
until they are constructed and placed in service.
Since the Court’s ruling, the methodology presented
in the following table has been used by municipalities
in Idaho to update their capitalization fees:
METHODOLOGY
Gross Present Day Replacement Value of System
Less: Outstanding Bond Principal
Less: Unfunded Depreciation
= Net Present Day Replacement Value
÷ Number of Users Current System Can Support
= Total Capitalization Fee per equivalent unit
The capitalization fee analysis will calculate gross present
day replacement value of each system and identify
allowable deductions for bond principal and unfunded
depreciation to determine net present day replacement
value. FCS will then work with City staff to determine
the number of users the current systems (water and
sewer) can support. The updated Cap Fees will represent
maximum allowable charges that the City may choose
to implement. Adopting charges less than the maximum
is a viable option, particularly as part of a multi-year
strategy to phase in the full cost of the calculated fee.
deliverables
• Calculate maximum allowable capitalization fee
for the water and sewer system.
• Schedule of fees.
task 6 Key point
Capitalization fees establish an equitable and defensible
charge assessed on new development based on state
law and applicable industry guidelines. Revenue
from capitalization fees also provides a funding
source to support the utility’s capital program.
projeCt approaCh and sChedule 9UTILITY RATE STUDY
TASK 7 | PRESENTATIONS AND COMMUNICATION
The success of a rate study relies on an open and
involved process for informing and educating the City
Council and ratepayers on the rate study process.
This task includes our attendance and participation
in up to six (6) review meetings with City staff. We
propose review meetings be conducted remotely
when possible to minimize budget. Two (2) meetings
with the City Council, including development of
presentation materials. We recommend these
meetings be conducted in a workshop setting
to allow for open dialogue and discussion.
As needed, the City may request as an optional
task, assistance with public communication. We
have assisted utilities with one-page information
sheets, newsletters, frequently asked questions,
on-line bill calculators, dedicated rate study
webpages and open house forums.
deliverables
• Six (6) staff-level review meetings and
two (2) Council presentations.
• Development of presentation materials.
task 7 Key point
Our collaborative approach has outlined key milestone
review points for City staff to examine key assumptions
and alternative strategies before finalizing the study.
We will develop understandable and graphically
driven informational materials and tools to roll out
a multi-year utility rate schedules geared to help
the City achieve specified project objectives.
TASK 8 | DOCUMENTATION
A written draft and final report documenting the
rate study process, methodology, key assumptions,
results, and recommendations will be provided. The
electronic model will provide the technical exhibits.
deliverables
• An electronic copy of the draft and final reports.
• Copy of the Excel based rate model for each utility.
• Copy of the capitalization fee model
for the water and sewer utility.
task 8 Key point
The City will have a document that outlines the rate study
process for future reference and use. Although our approach
views the study process as a continual and evolving plan,
the City will have a document that outlines the study
findings as a baseline for future reference and comparison.
CHALLENGES ANTICIPATED AS PART OF THE STUDY .
A typical comprehensive rate study takes six to nine months
to complete. Some challenges that come up during the
rate study process are – quality of data provided is not
sufficient requiring multiple iterations to process data,
format of data provided – ideally data should be provided
in a format that can be cut, pasted and summed easily
(e.g. budget in excel v. pdf), data is unavailable, customer
detailed statistics difficult to access from billing system,
timely review and feedback from City staff, timely
scheduling of meetings. All of the items listed can be
worked around with proper communication, templates
examples of data being requested and standing-meetings
to ensure all team members are on the same page
regarding what is needed by a specific milestone date. Schedule
The City has communicated via the August 2nd email that a set of rate adjustments are going through the Council process for
October 1, 2024. The proposed schedule for this study assumes the project is completed for rate implementation effective
FY 2026 (10.1.2025) with notice to proceed commencing in October 2024. A final project schedule will be developed during
the initial project meeting.
Technical Tasks Mtg Oct/24 Nov/24 Dec/24 Jan/25 Feb/25 Mar/25 Apr/25 May/25 Jun/25 Jul/25 Aug/25 Sep/25
Task 1: Initial Project Meeting 1
Task 2: Data Collection & Validation (inc. customer stats)
Task 3: Revenue Requirement 2
Task 4: Cost of Service 1
Task 5: Rate Design 2
Task 6: Capitalization Fee Updates (Water and sewer)1
Task 7: Presentation and Communication 2
Task 8: Documentation (Draft and Final)0
projeCt approaCh and sChedule 10UTILITY RATE STUDY
FAMILIARITY WITH IDAHO STATUTES
For over 35 years FCS has been working with local Idaho cities to determine the best solutions for their utilities. Working
with the local jurisdiction attorneys, we work to understand the state statutes and local laws that affect our Idaho clients.
Relevant governing statutes "utilized" during the rate study process include:
• Idaho Code Title 50, Chapter 10 - Finances contains the main authorizing codes applicable to
rate studies. Section 1030 allows the City “to prescribe and collect rates, fees, tolls and charges”.
Section 1032 also states “all such works shall be and always remain self supporting”.
• 2015 Idaho Supreme Court Ruling in North Idaho Building Contractors Association v. City
of Hayden identifies the methodology to calculate capacity fees. FCS worked closely with
Given’s Pursley during this case to provide expert testimony on behalf of the City.
• Idaho Code Title 63 Section 1311(1). “The fees to be collected shall be reasonably related
to, but shall not exceed the actual cost of the service being rendered.”
• Title 63 section-63-1311A. No taxing district may make a decision approving a fee increase that is in excess of
five percent (5%) of the amount of the fee last collected or a decision imposing a new fee, unless it first holds
a hearing upon such proposed fee increase or fee imposition at a regular or special meeting of the district’s
governing body and after it gives public notice of such hearing in the manner provided in this section.”
We continue to monitor state and local laws and issues to ensure the methodologies
used and recommendations provided are in compliance.
FCS is also a bronze partner of the Association of Idaho Cities. We have exhibited and presented at numerous Association
of Idaho conferences, including in 2024 when managing principal Angie Sanchez Virnoche presented “Developing a Public
Infrastructure Capitalization Fee” and in 2023 when she presented “Discovering the Power of your Rate Study.”
Some of Angie's project experience in Idaho includes:
• Coeur d'Alene, ID - Water Rate and Capitalization Fee Studies
• Coeur d'Alene Airport - Sewer Rate Study
• Blackfoot, ID - Water, Sewer, and Sanitation Rate Study
• Boise, ID - Geothermal Rate Study
• Bonners Ferry, ID - Electric Cost of Service Rate Study, Water and Sewer Rate Study (current contract),
and Litigation Support (ongoing)
• Chubbuck, ID - Water and Wastewater Financial Plan, and Capacity Replacement
Fee Study, 2024 contract for Sanitation Rate Study.
• Hayden Area Regional Sewer Board - Financial Plan and Rate Forecast, Capacity Fees
• Hayden, ID - Sewer Operations and Maintenance Rate Study, Sewer Capacity
Fee Update, Capitalization Fee Litigation Support
• Hayden Lake Irrigation District, ID - Rate and Capitalization Fee Study
• Kootenai-Ponderay Sewer District - Financial Plan and Rate Forecast, New User Facility Fees
• Moscow, ID - Water and Sewer Cost of Service Study, Water and Sewer Rate Update,
General Facilities Connection Fee Study, Sanitation Rate Study.
• Post Falls, ID - Water and Water Reclamation Capacity Fee Study, Sewer Financial Plan, Sewer Rate Modeling
• Sandpoint, ID - Water and Sewer Cost of Service Study, Wholesale Water Analysis and New User Facility Fees
• Twin Falls, ID - Pressure Irrigation Water Connection Fee Analysis
projeCt approaCh and sChedule 11UTILITY RATE STUDY
Thank you for taking
the time to review
our qualifications.