Loading...
HomeMy WebLinkAboutFINAL INSPECTION LETTER - 22-00610 - U-Haul - New Commercial Bldg A 4103 E 605 N Suite 1, Rigby, ID 83442 208-932.4428 February 28, 2024 Building Department City of Rexburg 35 N 1st East Rexburg, ID 83440 RE: Final Report of Required Special Inspections Project: U-Haul Moving & Storage in Rexburg, ID Good Day, In accordance with Section 1704 of the International Building Code (IBC) and the project documents special inspection has been provided for the following items: 1. Soil: Structural fill under footings and foundations. 2. Concrete: Concrete testing and inspection of the reinforcement for the footings, foundations, and slabs on grade. 3. Masonry: Masonry reinforcement, grouting operations. 4. Structural Steel Bolting and Welding: Bolted Connections, Steel Decking Mechanical Connections, Welded Connections. Based upon inspections performed and our substantiating reports, it is our professional judgment that, to the best of our knowledge, the inspected work was performed in general accordance with the approved plans, specifications, and applicable workmanship provisions of the IBC. Sincerely, Jacob Christensen Lab Manager jacob@connecttandi.com 208.970.6237