Loading...
HomeMy WebLinkAboutSTUD NOTCHED FOR HOLD DOWN EMAIL - 22-00610 - U-Haul - New Commercial Bldg ACody Please see attached from our structural engineer regarding hold downs. Thanks Mike Sent from my iPhone Begin forwarded message: From: David Sansotta <davids@structuraledge.com> Date: February 27, 2024 at 10:27:59 AM MST To: Mike Massey <mike.massey@bateman-hall.com> Cc: Vanessa Josephson <vanessa.josephson@bateman-hall.com> Subject: RE: Stud notched for hold down  Mike, Per our conversation regarding the photos you sent of the holdown and the notched stud, installing the CFS cap will be acceptable, please use a minimum of (5) #10 screws on each side of the cap to the sides of the CFS stud for a total of (10) #10 screws. Thanks. David Sansotta, P.E., S.E. 5509 N Glenwood St Boise, ID 83714 o: 208-501-2289 c: 208-863-8290 e: DavidS@StructuralEdge.com <mailto:DavidS@StructuralEdge.com> www.structuraledge.com <http://www.structuraledge.com/> From: Mike Massey <mike.massey@bateman-hall.com> Sent: Tuesday, February 27, 2024 10:10 AM To: David Sansotta <davids@structuraledge.com> Cc: Vanessa Josephson <vanessa.josephson@bateman-hall.com> Subject: Stud notched for hold down Dave Please see attached photos where some studs were notched to install hold downs and cap channels being installed to cover and reinforce. Can you give me a call to discuss please. Thanks Mike 208-479-2403 Sent from my iPhone