Revision 5 Narrative:
Delta #: 4
Description: UHI Comments / City Resubmittal
Date: 10.13.2022
Architectural
Sheet# DESCRIPTION OF REVISION____________________
A1.1 Added additional notation to Knox Box NOTE “CONTRACTOR TO CONFIRM FINAL
LOCATION WITH FIRE MARSHALL.”
Structural, Mechanical, Electrical, and Plumbing
Sheet# DESCRIPTION OF REVISION____________________
No Change
Fire Protection
Sheet# DESCRIPTION OF REVISION____________________
FP101 Added Remote FDC location to plan west near door 112
Civil Design Changes after Bid Set prior to City Approval
9/29/2022
Sheet C4 General Layout
1. Sidewalk against 2nd East pushed 7’ from curb and gutter per city requirements
2. Note added to remove existing curb cuts and replace with typical high back curb
3. Sidewalk added around Building A connecting all doors to the parking stalls.
4. Sidewalk connecting from Building A to the sidewalk against 2nd East providing Pedestrian access
into the site per city request
5. Curb and gutter around rental vehicle parking against 2nd east to account for the lost stall from the
added sidewalk. Curb radius changed near West access.
6. Retaining Wall Added south of the new sidewalk connecting building A to 2nd East.
7. Retaining Wall added near the property corner North of Building A Southwest of building A
8. Sidewalk against 3rd East shown and noted to retain and protect.
9. Entrance design adjustments amended to match City standard
10. Building B dimensions changed see Architectural Drawings for details
11. Building B Loading Dock Transitions changed per U-Haul Comments
12. ADA Stall added to the south side of Building B
13. Valley gutters between storage units rerouted to account for grade changes
14. Curb and gutter all changed to rolled curb
15. Retaining pond areas adjusted
Sheet C5 Grading
1. Building Finish floor elevations Raised to meet city floodplain requirements
2. Site elevations raised in consequence to building elevation changes.
3. Swales and walls added
4. Truck dock grading changed at U-Haul Request.
Sheet C6 Utilities
1. All Water meters joined into one 2” water meter at direction from the city service lines for building
A, Building B and Landscape all tee off after meter. Service lines rerouted to meet building tie in
points.
2. Underground storm system sizing and locations changed due to grading changes for flood plain
considerations.
3. Sewer main size changed to an 8” main. Manhole depths adjusted to account for lower slope
allowance.
4. Reroute of existing sewer service connection from Bank property to the south.
5. City fiber J boxes and conduits added to all road frontages.
Sheet C7
1. Plan and profiles updated to reflect new grades
Sheet C8
1. Pipe size on sewer main updated to 8”
2. Grades changed to reflect updated grading.
3. Manholes adjusted west to stay out from under parking stalls.
Sheet C9
1. Foundation reveals and swale cross section details added
2. Rolled curb termination detail added.
10/12/2022
Sheet C3
1. Additional notes to clarify the removal of the existing entrance curb cuts
Sheet C4
1. City Lights added at the entrance onto 4th north and 3rd east per city requirements. Use City of
Rexburg standard detail sheet 9 for details. Key Note Added.
Sheet C5
1. Dimension added detailing the distance from the FDC on Building B and Building A to the nearest
Fire Hydrant both are less than 150’ away.
Sheet C6
1. Dimension added detailing the distance from the FDC on Building B and Building A to the nearest
Fire Hydrant both are less than 150’ away.
2. 4” Service Line adjusted to tie into 8” main bellow dead end manhole
3. City Lights added at the entrance onto 4th north and 3rd east per city requirements. Use City of
Rexburg standard detail sheet 9 for details.