Loading...
HomeMy WebLinkAboutCOVER PAGE - 22-00610 - U-Haul - New Commercial Bldg ASITE ADDRESS: ARCHITECT LOGO: PROFESSIONAL SEAL: NO T E S 3 DA T E NO . 2 IN I T I A L S 4 5 6 71 REVISIONS: SHEET NOTES: DRAWN: CHECKED: DATE: SHEET CONTENTS: AM E R C O R E A L E S T A T E C O M P A N Y 8 718081 08/16/2022 07 . 1 8 . 2 2 BG BI D S E T 08 . 0 2 . 2 2 BG AD D E N D U M 1 08 . 1 6 . 2 2 BG AR C H I T E C T U R A L U P D A T E S / C I T Y S U B M I T T A L 09 . 1 5 . 2 2 BG UH I C O M M E N T S / C I T Y R E S U B M I I T A L - - - - - - - - XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG XXX XX A1 NAME.DWG 1 2 409 S. 8TH ST, STE 201 BOISE, ID 83702 P: 208-810-7745 3 U-HAUL MOVING AND STORAGE OF REXBURG 328 N 2ND E. REXBURG, ID 83440 BG DZ COVER PAGE T1.1 NEW BUILDING SELF-STORAGE PROJECT DESCRIPTION GOVERNING BUILDING CODES 2018 INTERNATIONAL BUILDING CODE (IBC), W/ AMENDMENTS 2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC), W/ AMENDMENTS 2017 IDAHO (UNIFORM) PLUMBING CODE 2018 IDAHO FIRE CODE (IFC) W/ AMENDMENTS 2017 NATIONAL ELECTRICAL CODE (NEC) 2018 MECHANICAL CODE (IMC) W/ AMENDMENTS 2018 FUEL AND GAS CODE (IFGC), W/ AMENDMENTS U-HAUL INTERNATIONAL U-HAUL MOVING & STORAGE OF REXBURG 328 N 2ND E REXBURG, ID 83440 AERIAL MAP GENERAL NOTES:SHEET NUMBER GENERAL1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. 2. CONTRACTOR SHALL BECOME FAMILIAR WITH ALL AMERCO'S REQUIREMENTS PRIOR TO BIDDING AND SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THOSE REQUIREMENTS. 3. FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. NOTIFY ARCHITECT/AMERCO REPRESENTATIVE OF ANY DISCREPANCIES. 4. ITEMS NOT INDICATED IN THESE DOCUMENTS THAT CAN BE LEGITIMATELY AND REASONABLY INFERRED TO COMPLETE THE WORK AT HAND SHALL BE FURNISHED BY THE CONTRACTOR AS THOUGH IT WERE DETAILED HEREIN. CHANGE REQUESTS FOR SAID ITEMS WILL NOT BE APPROVED. 5. DRAWINGS SHALL BE DISTRIBUTED TO SUB-CONTRACTORS IN COMPLETE SETS AS INDICATED BY THE SHEET INDEX. GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING SUB-CONTRACTORS BID ON ALL ITEMS ASSOCIATED WITH THEIR RESPECTIVE TRADES. NAME:CITY OF REXBURG ADDRESS:35 N. 1ST E, REXBURG, ID 83440 PHONE:208-359-3020 JURISDICTION SEPERATE SUBMITTALS • AUTOMATIC FIRE SPRINKLER SYSTEM. DESIGN/BUILDING BY LOCAL CONTRACTOR AND LOCAL FIRE SPRINKLER INSTALLER. UHI OWNER'S REPRESENTATIVE OR ENERAL CONTRACTOR TO PROCURE. SEE FIRE SPRINKLER DEFERRED NOTES ON PLUMBING DRAWINGS AND UHI SPECIFICATIONS FOR • FIRE ALARM AND DETECTION SYSTEM. DESIGN/BUILDING BY LOCAL CONTRACTOR AND LOCAL FIRE ALARM AND DETECTION SYSTEM INSTALLER . UHI OWNER'S REPRESENTATIVE OR GENERAL CONTRACTOR TO PROCURE. SEE FIRE ALARM DEFERRED NOTES ON ELECTRICAL DRAWINGS AND 6. THE CONTRACTOR WILL INSPECT THE PREMISES PRIOR TO BIDDING TO VERIFY EXISTING WORKING CONDITIONS; SHOULD CONDITIONS BE IDENTIFIED WHICH ARE BELIEVED TO IMPEDE INTENDED WORK, THEN SUCH CONDITIONS MUST BE DOCUMENTED AND REPORTED IMMEDIATELY TO ARCHITECT/AMERCO REPRESENTATIVE. FAILURE TO SO ADVISE WILL CONSTITUTE NOTICE THAT CONTRACTOR IS FULLY SATISFIED WITH THE EXISTING CONDITIONS AND INTENDS TO PERFORM PER 7. CONTRACTOR SHALL ISSUE WRITTEN NOTIFICATION TO ARCHITECT/AMERCO REPRESENTATIVE OF ANY DISCREPANCIES AND FOLLOW UP IN WRITING WITHIN TWO WORKING DAYS OF INSPECTION. 8. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD. IF DIMENSIONAL ERROR OCCURS OR CONDITION NOT COVERED IN THE DRAWINGS IS ENCOUNTERED, CONTRACTOR SHALL SUBMIT A CLARIFICATION REQUEST TO ARCHITECT/AMERCO REPRESENTATIVE AND OBTAIN RESOLUTION BEFORE COMMENCING THAT PORTION OF THE WORK. 9. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED, AND CONDITIONED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN SPECIFICATIONS OR INSTRUCTIONS UNLESS HEREINAFTER SPECIFIED 10. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION AND/OR INSTALLATION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES AND FOR COORDINATING ALLBUILDING CODE ANALYSIS: NATIONAL ACCOUNTS 11. DIMENSIONS TAKE PRECEDENCE OVER SCALE ON CONSTRUCTION DOCUMENTS. 12. ALL WORK SHALL BE EXECUTED IN A NEAT AND WORKMANLIKE MANNER, ACCEPTABLE TO OWNER . 13. WHEN WORK NOT SPECIFICALLY CALLED OUT IS REQUIRED TO COMPLETE THE PROJECT, THE WORK SHALL BE PROVIDED IN ACCORDANCE WITH GENERAL NOTES 12, 14 AND 16. 14. CONTRACTOR SHALL GUARANTEE, IN WRITING, ALL WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. 15. UNLESS OTHERWISE SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT AND MACHINERY, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES NECESSARY FOR PROPER EXECUTION 16. THE CONTRACTOR WARRANTS TO AMERCO AND ARCHITECT/AMERCO REPRESENTATIVE THAT ALL MATERIALS AND EQUIPMENT FURNISHED UNDER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED, AND THAT ALL WORK WILL BE GOOD QUALITY FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS. ALL WORK NOT SO CONFORMING TO THESE STANDARDS MAY BE CONSIDERED DEFECTIVE. IT IS UNDERSTOOD THAT NO INFERIOR OR NON-CONFORMING WORK OR MATERIALS WILL BE ACCEPTED WHETHER DISCOVERED AT THE TIME THEY ARE INCORPORATED INTO THE WORK OR AT ANY TIME BEFORE OR AFTER THE FINAL ACCEPTANCE. IF REQUIRED BY THE ARCHITECT OR AMERCO REPRESENTATIVE, THE CONTRACTOR 17. THE WARRANTIES AND GUARANTIES REQUIRED BY THE CONSTRUCTION DOCUMENTS SHALL BE IN ADDITION TO AND NOT IN LIMITATION OF ANY OTHER WARRANTY OR GUARANTY OR REMEDY REQUIRED BY LAW OR BY THE CONSTRUCTION DOCUMENTS. 18. CONTRACTOR TO COORDINATE WITH AHJ, SPRINKLER CONTRACTOR, CIVIL ENGINEER AND PLUMBING ENGINEER AS NEEDED FOR ALL BACKFLOW PREVENTER REQUIREMENTS. LOCATION SHALL BE APPROVED BY OWNER PRIOR TO INSTALLATION OR FABRICATION. PROJECT TEAM ARCHITECTURAL: HILLSIDE ARCHITECTURE 409 S. 8TH ST, STE. 201 BOISE, ID 83702 PHONE: 208- A.O.R.: DANIEL ZIMMERMAN, A.I.A. CONTACT: BRETT GULASH, AIA LEGEND X A 1 1 # X GRID LINE KEYNOTE DOOR TYPE WINDOW TYPE COLOR / FINISH WALL TYPE A N.T.S. 1 PLAN NOTES DRAWING IS NOT TO SCALE PLAN NORTH (ARCHITECTURAL DRAWINGS) X X D X C X X ENLARGED PLAN SYMBOL ENLARGED PLAN DESIGNATION LOCATION OF ENLARGED PLAN DETAIL (SHEET) DETAIL SYMBOL DETAIL DESIGNATION LOCATION OF DETAIL (SHEET) B INTERIOR ELEVATION DETAIL SYMBOL OBSERVATION DIRECTION FOR ELEVATION LOCATION OF ELEVATION DETAIL (SHEET) VAPOR BARRIER AIR BARRIER CLASS I OR II REQUIRED INTERIOR SIDE SECTION 1405.3 SECTION C 402.5 X X X X BUILDING SECTION DETAIL SYMBOL OBSERVATION DIRECTION FOR SECTION SECTION DESIGNATION LOCATION OF SECTION DETAIL (SHEET) GENERAL AREA OF "CUT" FOR SECTION WALL SECTION DETAIL SYMBOL OBSERVATION DIRECTION FOR SECTION SECTION DESIGNATION LOCATION OF SECTION DETAIL (SHEET) GENERAL AREA OF "CUT" FOR SECTION X X ELEVATION DETAIL SYMBOL OBSERVATION DIRECTION FOR ELEVATION ELEVATION DESIGNATION LOCATION OF ELEVATION DETAIL (SHEET) ACCESSIBLE SELF - SERVICE STORAGE FACILITIES LOCATION BUILDING A TOTAL LOCKERS 1,102 MINIMUM ACCESSIBLE 29 ENERGY CODE ANALYSIS: BUILDING ENVELOPE REQUIREMENTS CLIMATE ZONE INSULATION ROOF WALLS ABOVE GRADE MASS (TILT - UP) METAL BUILDING METAL FRAMED WALL S.O.G (UNHEATED) OPAQUE DOORS SWINGING NON - SWINGING FENESTRATION FIXED 6B R - 19.0 + R - 11.0 W/ R - 5 THERM. BLKS NOT REQUIRED R - 18 ci R - 18 ci NOT REQUIRED U - 0.61 R - 4.74 SHGC = 0.25 U - 0.50 COMMENTS CODE REFERENCE BUILDING THERMAL ENVELOPE CONFORMS TO THE PRESCRIPTIVE BUILDING ENVELOPE REQUIREMENTS OF SECTION C 402.1 OF THE CODE. TABLE 1108.3 SHEET NAME T1.1 COVER PAGE T1.2 TYPICAL ADA STANDARDS T2.1 FIRST FLOOR EGRESS PLAN T2.2 SECOND FLOOR EGRESS PLAN T2.3 THIRD FLOOR EGRESS PLAN T4.2 FIRE-RATED WALL SECTIONS T4.3 FIRE RATED ASSEMBLY CIVIL LANDSCAPE C1 COVER SHEET L1 LANDSCAPE LAYOUT 1 ARCHITECTURAL A1.1 BUILDING SITE PLAN A2.1 FIRST FLOOR LOCKER PLAN A2.2 SECOND FLOOR LOCKER PLAN A2.3 THIRD FLOOR LOCKER PLAN A2.4 FIRST FLOOR DIMENSION PLAN A2.5 SECOND FLOOR DIMENSION PLAN A2.6 THIRD FLOOR DIMENSION PLAN A3.1 ROOF PLAN & NOTES A4.1 BUILDING ELEVATIONS A5.1 BUILDING SECTIONS A5.2 WALL SECTIONS A6.4 ENLARGED STAIR PLANS AND SECTIONS A6.5 ENLARGED EXTERIOR STAIR PLANS AND SECTIONS A7.0 DOOR TYPES A7.1 DOOR SCHEDULE AND DOOR DETAILS A7.2 FINISH SCHEDULES A7.5 ENLARGED RESTROOM PLAN AND MOP/COOM ROOM A8.1 TYPICAL AISLE LAYOUT A8.2 ARCHITECTURAL BUILDING DETAILS A8.3 ARCHITECTURAL BUILDING DETAILS A8.4 ARCHITECTURAL BUILDING DETAILS A8.5 ARCHITECTURAL BUILDING DETAILS A8.6 ARCHITECTURAL BUILDING DETAILS A8.7 ARCHITECTURAL BUILDING DETAILS A9.1 SINGLE LEVEL LOAD BEARING STORAGE ASSEMBLY A9.7 STORAGE LOCKER COMPONENTS A9.8 TYPICAL LOAD BEARING PARTITION LOCKER DETAILS STRUCTURAL S0 GENERAL STRUCTURAL NOTES S0.1 SPECIAL INSPECTION S1 FOUNDATION PLAN S1.1 FIRST FLOOR SHEARWALL PLAN S2 SECOND FLOOR FRAMING PLAN S2.1 SECOND FLOOR SHEARWALL PLAN S3.0 THRID FLOOR FRAMING PLAN S3.1 THIRD FLOOR SHEARWALL PLAN S4.0 ROOF FRAMING PLAN SHEET NUMBER SHEET NAME S5.1 FOUNDATION DETAILS S5.2 FOUNDATION DETAILS S6.0 FLOOR FRAMING DETAILS S7.0 ROOF FRAMING DETAILS S8.0 STAIR FRAMING PLANS S8.1 STAIR FRAMING AND DETAILS S9.0 CANOPY FRAME S10.0 COMPOSITE TILT-UP PANEL WALL ELEVATIONS S10.1 TILT-UP PANEL DETAILS MECHANICAL M0.1 MECHANICAL COVER SHEET M0.2 MECHANICAL SCHEDULES M0.3 MECHANICAL SPECIFICATIONS M1.1 MECHANICAL PLAN - FIRST FLOOR M1.2 MECHANICAL PLAN - SECOND FLOOR M1.3 MECHANICAL PLAN - THIRD FLOOR M1.4 MECHANICAL ENLARGED PLAN - SHOWROOM M2.1 MECHANICAL DETAILS ELECTRICAL E0.1 ELECTRICAL LEGENDS AND NOTES E0.2 ELECTRICAL SCHEDULES AND DETAILS E1.1 SITE ELECTRICAL PLAN - BUILDING A E1.3 SITE LIGHTING PHOTOMETRIC - BUILDING A E2.1 POWER PLAN - FIRST FLOOR E2.2 POWER PLAN - SECOND FLOOR E2.3 POWER PLAN - THIRD FLOOR E2.4 POWER PLAN - ENLARGED AREAS E3.1 HVAC AND PLUMBING POWER PLAN - FIRST FLOOR E3.2 HVAC AND PLUMBING POWER PLAN - SECOND FLOOR E3.3 HVAC AND PLUMBING POWER PLAN - THIRD FLOOR E4.1 LIGHTING PLAN - FIRST FLOOR E4.2 LIGHTING PLAN - SECOND FLOOR E4.3 LIGHTING PLAN - THIRD FLOOR E4.4 EM LIGHTING PHOTOMETRIC - FIRST FLOOR E4.5 EM LIGHTING PHOTOMETRIC - SECOND FLOOR E4.6 EM LIGHTING PHOTOMETRIC - THIRD FLOOR PLUMBING P0.1 PLUMBING COVER SHEET P0.2 PLUMBING SCHEDULES AND CALCULATIONS P0.3 PLUMBING SPECIFICATIONS P1.1 PLUMBING PLAN - FIRST FLOOR P1.2 PLUMBING PLAN - SECOND FLOOR P1.3 PLUMBING PLAN - THIRD FLOOR ADDITIONAL INFORMATION. UHI SPECIFICATIONS FOR ADDITIONAL INFORMATION. BID WITH NO ALLOWANCE EITHER IN TIME OR MONEY FOR ANY IMPEDIMENTS TO INTENDED WORK. TO THE CONTRARY. PORTIONS OF THE WORK UNDER THE CONTRACT. AND COMPLETION OF THIS PROJECT SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF MATERIALS AND EQUIPMENT. A6.6 STAIR DETAILS AND SECTIONS A6.7 STAIR DETAILS A9.10 TYPICAL LOCKER DETAILS CIVIL/LANDSCAPE: HLE, INC. 101 S. PARK AVE #210 IDAHO FALLS, ID 83402 PHONE: 208-524-0212 CONTACT: GILMORE JENKINS MECHANICAL/ PLUMBING: APEX ENGINEERING PO BOX 5221 BOISE, ID 83705 PHONE: 208-914-5087 CONTACT: CHAD PACKER FIRE PROTECTION: PROTECTION CONSULTANTS, INC. 1199 SOUTH MAIN STREET, STE 101 CENTERVILLE, UT 84014 PHONE: 801-295-6070 CONTACT: GREG JONES, P.E. OWNER: U-HAUL INT'L / AMERCO REAL ESTATE 1545 W. BROADWAY ST IDAHO FALLS, ID 83402 PHONE: 208-881-7297 CONTACT: DREX JOHNSON STRUCTURAL: STRUCTURAL EDGE 5509 N GLENWOOD ST BOISE, ID 83714 PHONE: 208-501-2289 CONTACT: DAVID SANSOTTA, P.E. N N N.T.S. CONTRACTOR: BATEMAN HALL 1405 FOOTE DRIVE IDAHO FALLS, ID 83402 PHONE: 208-523-2681 CONTACT: SHAY MOON T4.4 FIRE RATED ASSEMBLY T4.5 FIRE RATED ASSEMBLY T4.6 FIRE RATED ASSEMBLY E5.1 ONE-LINE DIAGRAM E5.2 PANEL SCHEDULES E6.1 ENERGY CODE COMPLIANCE M2.2 MECHANICAL DETAILS P2.1 PLUMBING ENGLARGED PLANS P2.2 PLUMBING DETAILS C2 GENERAL NOTES C3 DEMOLITION C4 GENERAL LAYOUT C5 GRADING PLAN C6 UTILITY PLAN C9 DETAILS C10 STORM TECH DETAILS S5.0 FOUNDATION DETAILS T4.1 ENERGY CODE COMPLIANCE S6.1 FLOOR FRAMING DETAILS S6.2 FLOOR FRAMING DETAILS S7.1 ROOF FRAMING DETAILS QTY LOCKER SIZE 5 x 10 7 x 10 10 x 10 10 x 15 TOTAL 5 x 5 INTERIOR TOTAL PROPOSED MIX SQ. FT.% 933 85 306 5 384 148 3,700 19,200 350 30,600 12,750 67,000 100 19 46 0 29 5 2nd Flr INTERIOR SQ. FT.% 335 31 112 2 134 55 1,375 6,700 140 11,200 4,650 24,145 3rd Flr SQ. FT.% 334 31 110 1 134 55 1,375 6,700 70 11,000 4,650 24,035 QTY TOTAL SQ. FT.% 1,102 85 475 5 384 148 3,700 19,200 350 47,500 12,750 83,900 % % % % % %100 19 46 1 28 6 % % % % % %100 19 46 0 28 6 % % % % % %100 15 57 0 23 4 % % % % % % 10 x 8 5 400 11803240 5 400%0 %1 %1 % 1st Flr SQ. FT.% 264 23 84 2 116 38 950 5,800 140 8,400 3,450 18,820 100 18 45 1 31 5 % % % % % % 1 80 0 % MINIS SQ. FT.% 169 0 169 0 0 0 0 0 0 16,900 0 16,900 100 0 100 0 0 0 % % % % % % 0 0 0 % EXTERIOR 'C' - 'M' PROPOSED LOCKER STORAGE UNIT MIX A5.3 WALL SECTIONS A6.8 ENLARGED ELEVATOR PLANS AND DETAILS A6.11 ENLARGED LOAD/UNLOAD PLAN AND ELEVATIONS A6.12 ENLARGED LOAD/UNLOAD WALL SECTION C7 STORM TECH PLAN AND PROFILES C8 SEWER PLAN AND PROFILE C11 STORM WATER POLLUTION PREVENTION PLAN L2 LANDSCAPE LAYOUT 2 E1.2 SITE ELECTRICAL PLAN - BUILDING B E1.4 SITE LIGHTING PHOTOMETRIC - BUILDING B FIRE PROTECTION FP101 FIRE SPRINKLER PLAN - BLDG A LEVEL 1 FP102 FIRE SPRINKLER PLAN - BLDG A LEVEL 2 FP103 FIRE SPRINKLER PLAN - BLDG A LEVEL 3 FP500 FIRE SPRINKLER NOTES AND DETAILS A6.1 ENLARGED SHOWROOM PLAN1 1 BUILDING HEIGHT / AREA SEPARATED MIXED OCCUPANCY SHOWROOM - M MERCANTILE STORAGE - S1 STORAGE STORIES HEIGHT (FT) AREA (SF / FLOOR) BUILDING FIRST FLOOR STORAGE SELF - STORAGE 1ST FLOOR TOTAL 2ND FLOOR TOTAL 3RD FLOOR TOTAL TOTAL ACTUAL 1/3 43.5 3,093 27,420 33,410 33,410 33,410 100,230 UL 78,000 78,000 156,000 ALLOWED 4 75 CHAPTER 5 OCCUPANCY SEPARATION FIRE PREVENTION EGRESS OCCUPANT LOAD NO SEPARATION REQUIRED FIRE SPRINKLER(S) FIRE EXTINGUISHER(S) FIRE ALARM(S) LOCATION BUILDING FIRST FLOOR TOTAL SECOND FLOOR TOTAL EGRESS ILLUMINATION EXIT ACCESS 1 FOOT - CANDLE (11 LUX) MIN OCCUPANCY:M COMMON PATH OF EGRESS TRAVEL (FT) EXIT ACCESS TRAVEL DISTANCE (FT) MAX DEAD END CORRIDOR (FT) REQUIRED PLUMPING FIXTURES OCCU - PANTS SELF-STORAGE (S-1) WATER CLOSET 3 LAVA - TORIES 3 250 50 DRINKING FOUNTAIN 2 SERVICE SINK 6 SECTION 1014.3 TABLE 1017.2 SECTION 1020.4 IPC TABLE 403.1 AND SECTION 403.2 SECTION 1006 AND 2702 PROVIDED THROUGHOUT PROVIDED THROUGHOUT PROVIDED THROUGHOUT FIRE DEPT. CONNECTION TO BE PROVIDED AREA 30,853 33,410 FACTOR OCCUPANTS 79 19 TABLE 508.4 SECTION 903 SECTION 906 SECTION 907 SECTION 912 SECTION 1004 117 MERCANTILE 2,970 MERCANTILE 2,970 60 50 STORAGE 1,460 300 5 SELF-STORAGE 8,632 500 18 STORAGE 1,633 300 6 RM 100, 101, 102, 103, RM 104, 111 RM 105, 106, 107, 108, 109, 110, 112, RM 208, 212 RM 306, 308, 312 RM 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110,111, 112, RM 208, 212 RM 306, 308, 312 WAREHOUSE*18,788 *NON-OCCUPIABLE SELF-STORAGE 9,261 500 19 WAREHOUSE*24,149 *NON-OCCUPIABLE THIRD FLOOR TOTAL 33,410 19 SELF-STORAGE 9,371 500 19 WAREHOUSE*24,039 *NON-OCCUPIABLE 75 S - 1 250 50 100 FOR MORE INFORMATION SEE SHEET T4.1 ENERGY CODE COMPLIANCE OCCUPANCY GROUP(S) CHAPTER 3 COMMENTS / CODE REFERENCE RM 100, 101, 102, 103, RM 104,105, 106, 107, 108, 109, 110, 111,112, 208, 212, 306, 308, 312 3 PERMIT APPLICANT: UHC OF IDAHO 8155 CHINDEN BLDG BOISE, ID 83714 STANDING SEAM METAL ROOF SYSTEMS: BUTLER (ROOF & PURLINS) Contact: Mike Coffey mdcoffey@butlermfg.com EXTERIOR DOORS: CLOPAY (OVERHEAD DOORS) Contact: Chris Remick cremick@clopay.com STANLEY (SLIDING DOORS) Contact: Bill Gerardin william.gerardin@sbdinc.com ELECTRICAL: GRAYBAR Contact: Bruce Ledgerboard bruce.Iedgerwood@graybar.com STORAGE MATERIAL: MBCI (INT. & EXT METAL STUDS, D&U PANELS Contacts: Chris Roberts christopher.roberts@mbci.com JANUS (DOORS, TRIM & KICK PLATE) Contact: Beth Bryant bethb@janusintl.com DYNAMIC FASTENERS (ALL COLD-FORMED STEEL & SHEATHING FASTENERS) Contact: Jason Richardson JasonRichardson@Dynamicfastener.com INSULATED METAL PANEL (IMP) & NON-INSULATED EXTERIOR METAL PANELS: ATAS CONTACT: Minnie Robles mrobles@atas.com MBCI Contacts: Brian Garry brian.garry@metlspan.com GALVANIZED REINFORCING: COMMERCIAL METAL COMPANY Contact: Tim Woll Tim.Woll@cmc.com COVERED PARKING CANOPIES: BAJA CARPORTS Contact: Jeremy Cecaci jeremy@bajacarsports.com BUILDING CANOPIES: (OTHER THAN AT STORAGE ENTRANCE) SKYSCAPE CANOPIES Contact: Chase King chase@skypecanopies.com MECHANICAL: TRANE (EQUIPMENT) CONTACT: Chad Barnett chad.barnett2@trane.com AIR DISTRIBUTION CONCEPTS (FABRIC DUCT) Contacts: Chris Pavlatos cpav@adctubes.com EXTERIOR PRE-FABRICATED STORAGE LOCKERS: TRACHTE CONTACT: Kirsten Menzies kmenzies@trachte.com MILLER BUILDINGS Contacts: Louis Gilmore LouisGilmore@MillerBldgs.com 19. CONTRACTOR TO COORDINATE EXPANDABILITY OF ALL STAND ALONE PRE-ENGINEERED METAL BUILDING (PEMB) WITH OWNER REPRESENTATIVE. 20. ELEVATIONS SHOWN ARE BASED OFF THE UHI FACILITY IMAGING AND DIRECTIONAL SIGNAGE IMAGING BOOK (DSD Book). PRIOR TO ORDERING AND INSTALLATION OF MATERIAL, COORDINATION WITH THE LATEST DSD BOOK. CONTACT FACILITY IMAGING GROUP,. OWNERS REP, AND ARCHITECT IF ANY EXTERIOR MECHANICAL, ELECTRICAL, PLUMBING, OR OTHER CONFLICTS EXIST. REFER TO U-HAUL INTERNATIONAL STANDARD SPECIFICATIONS FOR MATERIAL, INSULATION AND FINISH REQUIREMENTS. ELEVATIONS SHOWN ARE BASED OFF OF THE UHI FACILITY IMAGING AND DIRECTIONAL SIGNAGE IMAGING BOOK (DSD BOOK). PRIOR TO ORDERING AND INSTALLATION OF MATERIAL, COORDINATE WITH THE LATEST DSD BOOK. CONTACT FACILITY IMAGING GROUP, OWNERS REP, AND ARCHITECT IF ANY EXTERIOR MECHANICAL, ELECTRICAL, PLUMBING, OR OTHER CONFLICTS EXIST. ALL SELECTIONS ARE SUBJECT TO APPROVAL BY OWNER - NO SUBSTITUTIONS. 3 3 1-A (FIRST FLOOR ONLY) / II-BCONSTRUCTION TYPE CHAPTER 6