Loading...
HomeMy WebLinkAboutIDT Exit 322 Required Excavation for Fiber Facilities Relocation November 171 of 3 IDT Exit 322 Required Excavation for Fiber Facilities Relocation November 17, 2023 Revision 1) Plow ~580 ft at 36” depth to existing Hand Hole (HH) West of On Ramp a. Place (1) 1.25” and (1) 7 Way Ducts 2) Bore (B) (2) 15 ft each canal crossings at 3’ below canal bottom, ~7’ below grade. 1) Set (1) 36”x36”x 36”HH at Lat: 43.804382° Long: -111.816657° 2) Remove Existing HH at Lat: 43.804391° Long: -111.816105° 1) Set (1) 36”x36”x 36” HH at Lat: 43.804317° Long: - 111.811825° over existing fiber. 2) Bore to existing Hand Hole (HH) East of Off Ramp. a. Place (1) 1.25” and (1) 7 Way Ducts 1) Bore under culvert from existing HH to existing HH. 2) Place (2) 1.25” and (1) 7 Way Ducts 3) Place Existing SSC 144 fiber into Rexburg HH Dig existing SSC 144 fiber into existing RXBG HH (2) locations. Leave 50’ tails. 2 of 3 Abandoned Rexburg Fiber Map Abandon ~750 ft of 1.25” Duct and 7 Way Duct. Abandon `~1800 ft of 432 count fiber. Abandoned Duct is in Red. Abandoned fiber from arrow to arrow. 3 of 3 Abandoned Silver Star Fiber Map Abandon ~1015 ft of 1.25” duct and 144 count fiber. Abandoned Duct/Fiber is in Red. Abandon HH at intersection of Off Ramp and University Blvd