Loading...
HomeMy WebLinkAboutCity of Rexburg - ID - City PSA Expansion Proposal 7-16-24 M2 AUTOMATION 6067 Corporal Lane Boise, ID 83704 208-853-3411 www.m2security.tech City of Rexburg - ID - City PSA Expansion Premium Service Existing Equipment (Aged Depreciation Upfront): $ 5,141.69 PLEASE SELECT ONE OF THE FOLLOWING SUPPORT OR PSA PACKAGE OPTIONS  Support options are in addition to the base project price listed above  Professional Service Agreement  Please refer to the following pages for details regarding professional service agreements    See M2 T&C's for Details  Premium Support PSA  $ 5,712.98 Annually  Signature: __________________________________________________________  Date: ________________________  M2 STANDARD TERMS AND CONDITIONS V3 Date: 07/16/2024 To accept this quote, please print, scan and email a signed copy to Office@m2automation.com . You can reach us by phone at (208) 853- 3411 if you have any questions. We will bill 35% of the payment at signing for equipment and design work. The remaining balance will be billed weekly based on progress of installation. Any changes or additions to this proposal after you approve it must be in writing and may incur extra charges. This quote is valid for 45 days and is subject to the M2 Standard Terms and Conditions found in the link/QR code below. Due to global supply chain issues, we are uncertain as to when equipment will arrive. Lead times are dependent on the project and range anywhere from 2 weeks to 52 weeks. We work diligently with our manufacturers to ensure a timely delivery and will keep parties informed of equipment timetables. M2 AUTOMATION 6067 Corporal Lane Boise, ID 83704 208-853-3411 www.m2security.tech City of Rexburg - ID - City PSA Expansion SCOPE OF WORK  M2 is pleased to provide you with a proposal to expand the Professional Service Agreement to include the  existing 24 Avigilon cameras that are not being replaced with the major project.   Upon approval of this proposal all aspects of Rexburg's cameras and access control system will fall under an  M2 PSA with exception of the VM server hosting the cameras. Post conclusion of the major project, we can  assess any necessary server needs and incorporate the server(s) into any future PSA project if necessary.  However, with a VM environment, we would need the hardware completely dedicated to security applications and not carry any City production VM servers.  Equipment to be added to the PSA:  Name, Location, Model Covered  115-City Hall (Northwest Parking Lot) City Hall Northwest Corner 24C-H4A-3MH-270  117-CityHall (Back Alleyway) City Hall Southwest Corner 8.0-H4A-BO1-IR  121-CityHall (BP & Z Lobby) Building Planning & Zoning Reception 6.0C-H5A-D1-IR  122-CityHall (BP & Z Hallway) Building Planning & Zoning Hallway 6.0C-H5A-D1-IR  131-CityHall (Hatchery) Hatchery SW corner Ceiling 6.0C-H5A-D1-IR  132-CityHall (MakerSpace) Maker Space 6.0C-H5A-D1-IR  215-AnimalShelter-E (Front Lobby) AS Front Lobby 5.0L-H4A-D1-IR-B  221-PD Training Parking/Gate PD Training NE Corner 24C-H5A-3MH  231-EvidenceBay PD Training Center NE Corner 5.0L-H4A-BO1-IR-B  232-EvidenceBay PD Training Center SW Corner 5.0L-H4A-BO1-IR-B  417-Shop (FuelSys) PW Shop East Side 5.0L-H4A-BO1-IR-B  433-WWTreatment (Screw Press) Dewatering Building West inside 5.0L-H4A-BO1-IR-B  451-WWLayYard WWT Bio Salts Building West side 5.0C-H5A-BO2-IR  452-WWLayYard WWT Bio Salts Building West side 8.0C-H5A-BO1-IR  Date: 07/16/2024 514-RexburgRapids (5MP Tower) Pool Slide tower looking down 5.0L-H4A-BO1-IR  520-RexburgRapids (Comp Room) Rexburg Rapids Comp Room 3.0C-H4A-BO1-IR-B  531-RomanceTheater (Front) Romance Theater SE Lobby corner 6.0C-H5A-D1-IR  532-RomanceTheater (Lobby) Romance Theater NW Lobby corner 6.0C-H5A-D1-IR  533-RomanceTheater (Concessions) Romance Above Concessions Desk 6.0C-H5A-D1-IR  537-RomanceTheater (Basement Bathrooms) Romance Theater Bottom of Stairs 6.0C-H5A-D1-IR  561-BikePark (West) Bike Park Light Poll 6.0C-H5A-BO1-IR  562-BikePark (North) Bike Park Light Poll 6.0C-H5A-BO1-IR  563-BikePark (South) Bike Park Light Poll 6.0C-H5A-BO1-IR  564-BikePark (East) Bike Park Light Poll 6.0C-H5A-BO1-IR  PSA SUPPORT PACKAGES Response - Acknowledgement of the issue by an M2 support or service technician.  Critical Issue - The outage of a critical device resulting in a life safety issue.   Non-Critical Issue - An outage that does not result in a life safety issue.   Resolution - An action plan to resolve the issue.   Standard Advanced Premium Labor Warranty Lifeme of the agreement Lifeme of the agreement Lifeme of the agreement Parts Warranty 5-Years 5-Years Lifeme of the agreement Equipment Refreshed Upon Failure -or- Every 10 Years Security Updates Lifeme of the agreement Lifeme of the agreement Lifeme of the agreement Service Parts Availability Dependent on market Dependent on market Available within 24 hours Response Times Business hours call availability Next business day response me 2-business day crical issue resoluon 5-business day non-crical issue resoluon 24/7 call availability 2-hour response me 24-hour crical issue resoluon remote or onsite 3-business day non-crical issue resoluon 24/7 call availability 2-hour response me 8-hour crical issue resoluon remote or onsite 2-busienss day non-crical issue resoluon Aer-Hours/Holidays Standard emergency rates Included Included Training Lifeme of the agreement Lifeme of the agreement Lifeme of the agreement Support & Administraon Lifeme of the agreement Lifeme of the agreement Lifeme of the agreement ***Remote access required for additional support packages***   ***M2 documents and retains administrative rights to the equipment in this proposal. Upon request from a client, we can provide designated  individuals administrative rights to the system with the signing of a separate Release of Liability document.  Any issues created by an individual who  has been permitted administrative rights will, as a result, become a billable event.*** M2 Automation Installation Standards WHAT TO EXPECT Enclosures All wiring for access control, jail control, or other types of enclosures housing M2 equipment will be installed in EMT. The wire will not be exposed for any part of the wire path. All terminaon points will be labeled with a printed label. The label may be either on the wire or on the inside of the door of the enclosure. If a numerical value is labeled on the wire, then the number will correspond to the documentaon of the site and the printed documentaon will be le in the enclosure. Data Racks All wiring will be neatly managed with Velcro. Plasc cable es are not to be used in any visible parts of the wire path for data cabling. Cables behind a patch panel will be labeled with a numerical value that corresponds to the site documentaon. Cables that are terminated directly at the network switch will be labeled with a printed label indicang the device that they connect to. Patch panels should be used on a case-by-case basis, considering the potenal scalability of the site. All patch panel ports will be documented, and the printed documentaon will be le with the equipment. Patch cables will be labeled at both ends with a printed label indicang the device that it connects. Wire Path All wire will be run in accordance with the NEC. There will be no visible wire outside the data closet. Any wire that cannot be ran within a wall or a ceiling will be ran inside of EMT for aesthecs and security. Wire ran in acs or ceilings will be supported and neat. If EMT is to be used in a sensive area such as a detenon cell or other area where detainees may be able to access it, the EMT will be ran in such a way as to make it as difficult as possible to tamper with and it will be supported with security screws placed approximately every two feet. End Devices EMT may be used to run wire to end devices such as cameras, access-controlled doors or other M2 devices. Wiring will not be exposed except for some data antennas where the design does not allow for the concealment of the wire at the end of the run. Flexible conduit will only be used when necessary to facilitate the installaon of equipment in challenging environments and only for as short a distance as possible. Any addional labor such as painng EMT, installing a client-requested specialized wire run or any other types of work not explicitly stated in the above standard, or the signed scope of work will be billed at M2 hourly rates as well as any