Loading...
HomeMy WebLinkAboutREDLINED PLANS - 23-00526 - Grand Peaks Medical - AdditionAuthor Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Don Allen Don.Allen@rexburg.org 208-372-2174 Alex Owens Alex.Owens@rexburg.org 208-372-2172 Description : Grand Peaks Medical - Addition Address : 72 S 1st E Application Type : Document Filename : Grand Peaks Medical Addition - Structural Drawings (7-26-2023).pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments S100 Free Text Cody Jones : Building Open 1 36" min Frost Depth S100 Free Text Cody Jones : Building Open 1 Approved for Footing and Foundation only. S101 Callout Cody Jones : Building Open 2 Rebar: 8' Wall-Horizontal & Vertical 24" O.C. with 2 in Top 12" Rebar: 4' Wall-Horizontal & Vertical 24" O.C. with 1 in Top 6" S300 Free Text Cody Jones : Building Open 6 36" min S100 Free Text Alex Owens : Electrical Open 1 No electrical plans provided. Please submit electrical plans for review. All electrical work to comply with 2017 NEC. # 23-00526 Commercial - Addition Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 08.09.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) NONE @ 2" O.C. @ 2" O.C. @ 3" O.C. @ 4" O.C. @ 6" O.C. NONE @ 3" O.C. @ 3" O.C. @ 4" O.C. 14 GAUGE NONE @ 2" O.C. @ 3" O.C. @ 2" O.C. @ 4" O.C. NONE 16 GAUGE15 GAUGE @ 12" O.C.@ 8" O.C.@ 6" O.C.@ 8" O.C. ALTERNATE STAPLE SCHEDULE FOR APA RATED SHEATHING 0.131"øx2 1/2" NAIL SPACING AS SPECIFIED IN THE WOOD WALL OR DIAPHRAGM SCHEDULES NOTE: 1.ALL STAPLES TO HAVE 7/16" MIN. CROWN WIDTH AND MUST BE INSTALLED WITH THEIR CROWNS PARALLEL TO THE LONG DIMENSION OF THE FRAMING MEMBERS. 2.MINIMUM PENETRATION FOR ALL STAPLE GAUGES IS 1 1/2". 3.FASTENER SPACING @ 2" O.C. OR LESS REQUIRES NOMINAL 3x MEMBER. WOOD DIAPHRAGM WOOD COLUMN WOOD HEADER WOOD BEAM WD WB WC WH S100 S101 S101 S101 HOLDOWN ANCHOR SHEAR WALLSW MASONRY WALLMW HD CONCRETE WALL CONCRETE SLAB CW CS S100 S101 S100 S101 S101 LEGEND CONCRETE FOOTING CONTROL OR CONST. JT.CCJ DESCRIPTION CF S200 - - DETAIL S101 - - - - - - - - - MARK ON SHEET SCHEDULE ON SHEET WOOD JOISTWJ S101 - STRUCTURAL DRAWING NOTES GRAND PEAKS MEDICAL ADDITION I. GENERAL APPLICATION A. These drawings must be used in conjunction with the architectural drawings to clearly define the requirements for construction. B. Do not scale drawings. C. In the opinion of the Contractor, any items that appear to be deficiencies, omissions, contradictions or ambiguities in the drawings, should be brought to the attention of the Architect and/or G&S Structural Engineers. II. CODES AND SPECIFICATIONS A. International Building Code (IBC) -2018 Edition III. DESIGN CRITERIA A. Wind 3 Second Gust Wind Speed = 115 MPH (Ultimate) 89 MPH (Nominal) Exposure = B Risk Category II Enclosure Classification-Enclosed Components and Cladding Pressure = 15 psf B. Seismic SS = 36.90%g SDS = 0.371g SI = 14.30%g SDI = 0.221g Risk Category = II IE = 1.00 Site Class = D Seismic Design Category = D R = 6.5 V = Cs W = 0.057 W Bearing Wall System, Frame Wall System Light Frame Wood Walls With Structural Wood Shear Panels Equivalent Lateral Force Analysis Method Percentage of roof snow used for design = 20% C. Live Loads per IBC Sec. 1607 Uniform (psf) Concentrated (lbs.) 1. Ground snow: Pg 50 ----- 2. Roof a. Snow Load: Pf 35 ----- i. Is = 1.0 ii. Ce = 1.0 iii. Ct = 1.0 b. Drifting snow: Pd&w See Plans c. Rain Load: R ??? i. Rain Intensity i = 3in/hr d. Live Load 20 (Non-concurrent with snow load) 3. Slab on grade floor 100 4. Interior wall lateral pressure 5 D. Dead Loads Uniform (psf) 1. Framing system 20 (Roof) E. Design Assumptions 1. Soil bearing pressure used is 2500 psf for columns and wall footings as per the Geotechnical Engineering Study, by Rocksmith Engineering dated June 16, 2023. Any variation encountered, different from this report, shall be brought to the attention of G&S Structural Engineers before proceeding. F. Allowable Stresses (unless otherwise noted) 1. Concrete (Reference ACI 318-14, section 19.3-Concrete Durability Requirements) a. Footings (and interior foundation walls) i. Per ACI Table 19.3.1.1 -F0,S0,W0,C1 ii. Minimum f'c @ 28 days 3000 psi iii. W/C ratio 0.55 max iv. Slump limit 4 -8 inches with verified max slump of 3" before admixtures, (± 1") v. Air entrainmentv. 3% (± 1%) Total air content b. Exterior/perimeter foundation walls i. Per ACI Table 19.3.1.1 -F1,S0,W0,C1 ii. Minimum f'c @ 28 days 3500 psi iii. W/C ratio 0.55 max iv. Slump limit 4 -8 inches with verified max slump of 4" before admixtures, (± 1") v. Air entrainment 6% (± 1%) Total air content c. Interior slabs on grade not exposed to freeze thaw i. Per ACI Table 19.3.1.1 -F0,S0,W0,C1 ii. Minimum f'c @ 28 days 3000 psi iii. W/C ratio 0.55 max iv. Slump limit 4 -8 inches with verified max slump of 3" before admixtures, (± 1") v. Air entrainment No air additive vi. Coordinate concrete design with special slab finish requirements, see arch. drawings and/or specifications. Use the more restrictive requirements. 2. Concrete masonry a. Masonry Wall (f'm) 1500 psi b. Masonry Units 1900 psi c. Mortar (@ 28 days) i. Type M 2500 psi ii. Type S 1800 psi d. Grout (@ 28 days) 2000 psi 3. Reinforcing steel a. Typical ASTM A615 Grade 60 b. Weldable ASTM A706 Grade 60 4. Structural Steel a. Angles ASTM A36 b. Misellaneous pltaes & bars ASTM A36 5. Wood framing a. Stud walls No. 2 Douglas Fir b. 2x joists No. 2 Douglas Fir c. Laminated Veneer Lumber (LVL) 2.0E d. Laminated Strand Lumber (LSL) Truss Joist or equivalent i. Stud 1.55E IV. SPECIAL INSPECTIONS A. The Owner or the Owner's Agent shall employ independent Special Inspector(s) to perform the following duties. Each Special Inspector shall submit qualifications showing competency to the Building Official for approval prior to specified duties. All special inspection is to comply with IBC Chapter 17. 1. Duties and Responsibilities of the Special Inspector: a. The Special Inspector shall observe the work assigned to be certain it conforms to the approved contract drawings. b. The Special Inspector shall furnish inspection reports to the Building Official and to the Architect of Record. All discrepancies shall be brought to the immediate attention of the Contractor for correction. 2. Concrete: a. No special inspection is required based upon the exceptions listed in IBC Section 1705.3. 3. Anchors installed in concrete or masonry: a. Drilled in adhesive (epoxy) and mechanical anchors: i. Special inspection of drilled in anchors as per ICC Evaluation Services Report and/or as required by the building department, IBC Table 1705.3 and TMS 602 Table 4. V. GENERAL STRUCTURAL NOTES A. All footings shall bear on undisturbed soil or rock. The foundation shall bear on the same soil type throughout the entire structure. A minimum distance of 3'-0" shall be maintained from finished grade to the bottom of all concrete footings. B. Caution shall be taken not to undermine existing footings. See Allowable Trenching and Utility Placement Detail 1/S101. C. Contractor shall verify all dimensions in the field: any variation from the drawings shall be brought to the attention of the Architect. Any proposed field changes shall have prior approval from the Architect. D. Adequate shoring and bracing of all structural members during construction shall be provided. F. Backfill under slabs and footings shall be with approved material. Follow the recommendations and requirements provided in the Geotechnical Engineering Stud by Rocksmith Engineering. VI. CONCRETE A. Unless otherwise noted, all concrete is to be made with Portland Cement - ASTM C150 with a maximum aggregate size less than or equal to one inch. B. Concrete shall be of ready-mix type conforming to ASTM C94. C. When the average daily temperature is expected to drop below 40° F for 3 or more successive days, the concrete shall comply with the Cold Weather Concreting Standard (ACI 306). Place no concrete against frozen earth. D. All vertical reinforcement in piers and walls shall be doweled from the footing or structure below with rebar of the same size and spacing as required above. All footing dowels shall have at least 40 diameters embedment into concrete above and shall have a 6" hook in footing below unless specified otherwise. E. Provide corner bars at all intersecting corners. Use same bar size and spacing as horizontal wall reinforcement. Where horizontal reinforcing bars join concrete columns the reinforcing shall run continuous through columns. Where continuous horizontal reinforcement terminates, use a 90° return or separate corner bar. F. Splices of reinforcement at points of maximum stress shall be avoided. All longitudinal reinforcement in beams and headers shall be continuous without splices between supports. Minimum overlap for lapped splices shall be as follows: #4 -24"; #5 -30"; #6 -36"; #7 -53" G. Reinforce all concrete walls as shown on the Concrete Wall Schedule. H. All exterior vertical concrete surfaces below finished grade, where in contact with earth, shall be protected with an asphaltic coating. I. No aluminum products shall be embedded in the concrete. J. All construction joints shall be located so as not to impair the strength of the structure. Unless noted on the drawings, all reinforcement shall be continuous through the joints. Each construction joint shall be keyed. K. Construction joints in large areas of slab on grade shall be placed in long strip construction fashion in widths as required. Control joints at 10 feet maximum shall be saw-cut longitudinal and transverse to the length. See Concrete Slab on Grade Details S101. VII. REINFORCING STEEL A. Welding or tack welding of reinforcing bars to other bars, plates, angles, etc. is prohibited unless ASTM A706 (weldable) rebar is utilized. B. All detailing, fabrication and placing of reinforcing bars shall conform to the ACI Manual of Standard Practice for Detailing Reinforcing Concrete Structures (ACI 315). C. Reinforcement shall be accurately placed as indicated on the drawings and adequately supported to prevent displacement before concrete or masonry grout is placed. D. The following minimum concrete cover for reinforcement shall be provided, unless otherwise noted. Cast against and permanently exposed to earth........3" Exposed to earth or weather -#5 and smaller... 1-1/2" Not exposed to earth or weather -slabs, walls... 3/4" VIII. PRE-ENGINEERED WOOD TRUSSES A. See architectural drawings for roof slopes and/or truss configurations. Review structural drawings for intended truss placement and support locations. B. Individual trusses and truss spacing to be designed by the Truss Manufacturer. The truss spacings shown on plan are maximum spacings. The Truss Manufacturer may combine and/or space trusses closer together as required by the individual truss design. C. The pre-engineered roof truss members shall be designed to support the following loads in addition to the dead load of the member as applicable. 1. 35 psf roof snow load plus drifting as indicated on plans. 2. 20 psf roof live load (non-concurrent with snow load). 3. 12 psf dead load top chord. 4. 8 psf dead load bottom chord. 5. Applicable wind and seismic loads. 6. A 10 psf bottom chord live load non-concurrent with any other live loads. 7. Applicable mechanical, electrical and sprinkler loads. 8. Concentrated loads with magnitude and locations as indicated in plan. D. The shop drawings and design calculations shall be produced by, or under the supervision of a registered Professional Engineer. The shop drawing submittal to the Contractor shall include the following: 1. Truss placement plan. 2. Truss design drawing for each truss, stamped and signed by a registered Professional Engineer licensed in the state in which the project will be constructed. 3. Connection requirements for truss-to-truss girder, truss ply to ply and field splices shall be designed by the Truss Manufacturer and submitted with shop drawings. Contractor shall provide such connection requirements as specified in shop submittals. E. Contractor shall provide all permanent bracing requirements for the structure, including the trusses as indicated in structural drawings and truss shop drawings. The lateral bracing shall be anchored to solid end walls or permanent diagonal bracing. F. No truss shall be modified without the Truss Manufacturer's approval. IX. TIMBER A. All wood and timber construction that is part of this project shall comply with the Timber Construction Manual of the AITC. Other members with equivalent size and strength can be substituted only if documentation is provided to substantiate capacity of new product. All wood framing members shall have a moisture content less than 19% unless otherwise noted. B. Notching of any structural member other than that shown on the drawings is prohibited. See Detail 2/S101 for Allowable Penetration In Light Framed 2x Lumber. C. There shall be at least two nails at each contact point, with 8d thru 1" material, 16d thru 2" material and 40-60d thru 3" material. D. Wherever possible nails should be driven perpendicular to the grain instead of toe nailed. E. All wood materials in direct contact with concrete or masonry or within 8" of soil shall be pressure treated wood or wood of natural resistance to decay. F. Where wood tends to split, holes for nails shall be bored a diameter smaller than that of the nails. G. Roof sheathing face grain must be perpendicular to its supports. H. All wall studs shall be continuous from floor to roof diaphragms. I. Roof and wall diaphragm sheathing nails or other approved sheathing connections shall be driven so that their head or crown is flush with the surface of the sheathing. J. All wood connection hardware shown on plans are based upon Simpson Strong Tie products. Equivalent hardware may be used upon approval of the Architect. All hangers are to match the width and depth of framing members with the correct slope and skew where applicable. Fill all nail holes unless otherwise noted. All Simpson connectors in exterior applications or in contact with pressure treated wood shall have a corrosion resistant coating. The coating type shall be determined by referencing the "General Corrosion Information" website at "www.strongtie.com/info" K. See the Nailing Schedule for the typical wood to wood fastening requirements of the structural components. L. For Alternate Staple Schedule for roof and wall sheathing see Sheet S100. NAILING SCHEDULE All nails in this schedule are based upon IBC Table 2304.10.1 and Truss Joist specifier's guide. See the IBC table or engineered "I" joist manufacture for additional options and requirements. All fasteners exposed to weather or moisture and/or fasteners less than 1/2"∅driven into pressure treated lumber shall be stainless steel or galvanized. Other nails with proper revised spacing may be used with written approval of the engineer. CONNECTION FASTENING LVL built-up beams & headers See beam and header schedules 2x Roof Joists or 2x trusses 4-10d box (0.128"x3") toenail to top plate or 3-16d box (0.135"x3.5") toenail Blocking between 2x joists or 2x trusses 3-10d box (0.128"x3") toenail to joist or truss each end & 10d box (0.128"x3") toenail to plate below @ 6" o.c. Double Top Plates Lower plate to top of stud 2-16d common (0.162"x3.5") end nails or 3-10d box (0.128"x3") end nails Upper plate to lower plate-staggered 16d common (0.162"x3.5") @ 16" o.c. or 10d box (0.128"x3") @ 12" o.c. Upper plate to lower plate @ intersection 2-16d common (0.162"x3.5") or 3-10d box (0.128"x3") Upper plate to lower plate @ splice point 8-16d common (0.162"x3.5") or 12-10d box (0.128"x3") @ each side of splice (Minimum lap: 4'-0" with 2'-0" each side of splice) Bottom plate to joist, rim or blocking 2-16d box (0.135"x3.5") @ each joist & 16d box (0.135"x3.5") @ 12" o.c. into rim joist Studs to bottom plate 2-16d common (0.162"x3.5") end nails or 3-10d box (0.128"x3") end nails or 4-10d box (0.128"x3") toenails Blocking between studs 2-10d box (0.128"x3") toenail or end nails @ each end Stud to Stud & Built-up corner studs 16d box (0.135"x3.5") @ 12" o.c. 2x Built-up Headers 2x12 or less in depth 2 rows of 16d box (0.135"x3.5") @ 12" o.c. @ each ply Continuous header to stud 4-10d box (0.128"x3") toenail at each stud Double 2x joists 2 rows of 16d box (0.135"x3.5") @ 12" o.c. DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 HD2 HD3 HD1 MARK REMARKS HOLDOWN SCHEDULE STHD10 A -10"2-2x6 HDU2 C 10"2-2x6 NOTE: ALL HOLDOWNS ARE BASED UPON SIMPSON STRONG-TIE CONNECTORS. FASTEN HOLDOWN AS SPECIFIED BY MANUFACTURER. MODEL NUMBER HOLDOW N TYPE ANCHOR BOLT DIAMETER MINIMUM EMBEDMENT IN CONCRETE MINIMUM COLUMN SIZE DTT2Z B 1/2" ∅ THREADED ROD 5"2-2x6 5/8" ∅ THREADED ROD HD3 MAY BE USED IN LIEU OF HD1 BLOCKED DIAPHRAGM UNBLOCKED DIAPHRAGM TYPICAL HORIZONTAL DIAPHRAGM NAILING SPAN RATINGMARK WD1 WOOD FRAMING SHEATHING PANELS 40/20 SHEATHING NONE SUPPORTED EDGES BOUNDARY INTERMEDIATE @ 12" O.C. @ 6" O.C. @ 6" O.C. WOOD DIAPHRAGM SCHEDULE BOUNDARY NAILING @ SHEAR WALLS AND BUILDING EDGES NO BLOCKING @ PANEL JOINT EDGE NAILING @ SUPPORTED PANEL EDGE INTERMEDIATE NAILING @ SUPPORTS 2x4 FLAT BLOCKING BETWEEN FRAMING MEMBERS @ SHEATHING PANEL EDGES (TYP.) PANEL JOINT BLOCKING (1) NAILING (0.131"øx2 1/2" MIN. U.O.N.) 19/32" C-D APA RATED SHEATHING WOOD WALL SCHEDULE SW 2 MARK 1 SW 1/S100 1/S1002x6YES 2x6 YES ONE SIDE @ 4" O.C.@ 12" O.C. ONE SIDE @ 6" O.C.@ 12" O.C. EDGES INTERMED. (SEE FRAMING PLAN FOR SHEAR WALL HOLDOWNS) (SEE APPROPRIATE SECTIONS FOR BOTTOM PLATE NAILING OR BOLTING) WALL STUDS (1) SILL PLATE /BOTTOM PLATE (2) ANCHOR BOLTS (3) 3x3x.229 PLATE WASHERS (4) WALL BLOCKING TOP PLATE DETAIL (5) (6) 7/16" APA RATED SHEATHING NAILING (0.131"ø x 2 1/2" MIN.) 2x6 @ 16" O.C. 2x6 @ 16" O.C. 1.USE NO. 2 DOUGLAS FIR. 2.USE PRESSURE TREATED WOOD WHEN IN CONTACT WITH CONCRETE. 3.USE A307 STEEL. DO NOT RECESS NUT AND WASHER INTO SILL PLATE. MINIMUM 2 ANCHOR BOLTS PER PIECE. LOCATE ANCHOR BOLTS 10" FROM EACH END OF PIECE. CONTRACTOR MAY USE SIMPSON TITEN HD ANCHORS OF THE SAME DIAMETER AND SPACING SPECIFIED. PROVIDE A MINIMUM EMBEDMENT OF 3 1/4" FOR 1/2"ø TITEN HD ANCHORS AND 3 3/4" FOR 5/8"ø TITEN HD ANCHORS. 4.USE A36 STEEL. DO NOT RECESS INTO SILL PLATE. IF PLATE WASHERS ARE NOT REQUIRED, USE STANDARD WASHERS. 5. 6. WHERE TOP PLATE IS CUT OR DISCONTINUOUS, STRAP ACROSS BREAK WITH SIMPSON MST37 STRAP. SHEATHING TO BE PLYWOOD OR OSB. (VERTICAL OR HORIZONTAL ORIENTATION.) PROVIDE BLOCKING AT ALL UNSUPPORTED PANEL EDGES FOR NAILING, INCLUDING PANEL EDGES ABOVE AND BELOW OPENINGS. 5/8"ø @ 4'-0" O.C. 7" EMBED 5/8"ø @ 4'-0" O.C. 7" EMBED 2x6 @ PANEL JT. 2x6 @ PANEL JT. SW 3 1/S1002x6YES ONE SIDE @ 4" O.C.@ 12" O.C.2x6 @ 16" O.C. 5/8"ø @ 2'-8" O.C. 7" EMBED 2x6 @ PANEL JT. WOOD COLUMN SHEAR WALL EDGE NAILING FULL HEIGHT OF HOLDOWN COLUMN SIMPSON STRAP TIE SEE SCHEDULE FASTEN PER MANUFACTURER PRESSURE TREATED SILL PLATE MI N I M U M EM B E D . WOOD COLUMN SHEAR WALL EDGE NAILING FULL HEIGHT OF HOLDOWN COLUMN SIMPSON HOLDOWN ANCHOR SEE SCHEDULE FASTEN PER MANUFACTURER F1554 G36 THREADED ROD W/ SIMPSON AT-XP ADHESIVE PRESSURE TREATED SILL PLATE TOP OF CONCRETE FOOTING MI N I M U M E M B E D . WOOD COLUMN SHEAR WALL EDGE NAILING FULL HEIGHT OF HOLDOWN COLUMN SIMPSON HOLDOWN ANCHOR SEE SCHEDULE FASTEN PER MANUFACTURER F1554 G36 THREADED ROD W/ SIMPSON AT-XP ADHESIVE PRESSURE TREATED SILL PLATE TOP OF CONCRETE WALL 4'-0" MIN. LAP FLOOR OR ROOF LINE JOIST SPACE 16d NAILS @ 4" O.C. STAGGERED DOUBLE TOP PLATE CHORD MEMBER DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 6 : 5 7 P M S100 STRUCTURAL NOTES 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O 3/4" = 1'-0" HOLDDOWN TYPE A 3/4" = 1'-0" HOLDDOWN TYPE B 3/4" = 1'-0" HOLDDOWN TYPE C S100 1LAP SPLICE OF DBL TOP PLATE REVISION SCHEDULE NAME DATE 7-26-2023 36" min Frost Depth A pprov ed for Footing a nd Fou nd a tion only . N o elec tric a l pla ns prov id ed . P lea se su b mit elec tric a l pla ns for rev iew . A ll elec tric a l w ork to c omply w ith 2 0 1 7 N E C . CONC. 9" MIN. 1'-6" MIN. 6" M I N . 6" M I N . 4" MIN. FILL TO BE SAME WIDTH AS FTG. NO EXCAVATION BELOW THIS LINE PERPENDICULAR TO FOUNDATION TRENCH 6 PARALLEL TO FOUNDATION 12 SEE NOTES FOR REINF. AROUND OPENING FOOTING NO PIPE THRU FTG. CONC. FILL TO BE IN PLACE BEFORE FTG. IS POURED IF PIPE OR DUCT INTERFERES WITH FOOTING AND PIPE OR DUCT CANNOT BE DROPPED, CONTACT ENGINEER. BACK FILL PIPE OR DUCT 2" CLR. WIDTH WIDTHMARK CW1 ON PLAN DENOTES TOP OF WALL (U.O.N.) TYPE A REMARKS CONCRETE WALL SCHEDULE PLACEMENT TYPE REINFORCEMENT VERTICALHORIZONTAL TYPE 11"A #4 @ 18" O.C. EACH FACE #4 @ 18" O.C. EACH FACE HORIZ. REINF. VERT. REINF . SL A B T H I C K N E S S 2nd. POUR EQ . TH . TH . EQ . SL A B T H I C K N E S S 1st. POUR 3/4" MIN. TH . TH . WITHIN 24 HOURS AFTER POUR TOOLED JOINT OR 1/4" MAX. SAW CUT CONCRETE SLAB ON GRADE DETAILS TH/4 COMPACTED GRANULAR FILL TYPICAL CONTROL JOINT (CCJ) CONCRETE SLAB SCHEDULE TH / 4 ( M I N I M U M ) 4" THICKNESSMARK CS1 SLAB TYPICAL CONSTRUCTION JOINT (CCJ) #4 @ 24" O.C.1"#4 @ 24" O.C. REMARKS ON PLAN DENOTES TOP OF SLAB (U.O.N.) REINFORCEMENT LONGITUDINAL TRANSVERSE(TH) PAINT JOINT W/ BOND BREAKER PRIOR TO SECOND POURUNDISTURBED OR COMPACTED SOIL REINFORCEMENT (SEE SCHED.) H/ 3 H/ 3 H/ 3 M I N . dd/3 L L/3 L/3 1 6 " d/3 1" MAX. d/ 6 d/ 4 d 2" M I N . 2" M I N . d d/ 3 M A X . 1 1/2" MIN. BEARING TYP. d/4 5/8" MIN. d/3 MAX. L/3 H d d/ 3 d/ 6 d/ 3 NO NOTCHING ALLOWED AL L O W E D N O H O L E S O R N O T C H E S NOTCHING OF DOUBLE TOP PLATE SIZE SCHEDULE NOTCHING OF ROOF OR FLOOR JOIST HOLE BORING OF ROOF OR FLOOR JOIST 2x12 2x10 2x8 2x6 2x4 MEMBER 2 3/43 5/8 2 1/43 2 3/8 1 3/4 1 3/81 3/4 7/8 d/4d/3 1 1/8 1 7/8 1 1/2 1 1/8 7/8 5/8 d/6 WOOD STUD NOTCHING & HOLE BORING OF EXT. OR BEARING WALL STUDS HOLES & NOTCHES IN BEAMS ARE NOT ALLOWED UNLESS OTHERWISE APPROVED IN WRITING BY ENGINEER 2-SIMPSON CS16 STEEL STRAPS (MIN.) DBL. TOP PLATE WB1 3-1 3/4x11 7/8 2.0E LVL MATERIAL BEAM SCHEDULE MARK BEAM SIZE REMARKS ATTACH W/ 2 ROWS OF 16d NAILS @ 12" O.C. DRIVEN FROM BOTH SIDES WB2 3-1 3/4x14 2.0E LVL ATTACH W/ 3 ROWS OF 16d NAILS @ 12" O.C. DRIVEN FROM BOTH SIDES WC3 WC5 WC4 4-1 3/4"x51/2" MATERIAL COLUMN SCHEDULE MARK WC1 WC2 COLUMN SIZE 2-2x6 3-2x6 REMARKS NO. 2 DOUG. FIR NO. 2 DOUG. FIR 1.55E LSL 4-2x6 NO. 2 DOUG. FIR 5-2x6 NO. 2 DOUG. FIR REMARKS DBL. 2x KING STUD HEADER SIZE 2-2x8 2-1 3/4x9 1/2 WH4 MARK WH1 WH3 WH2 WOOD HEADER SEE ARCH. DWGS. ROUGH OPENING 2x CRIPPLE STUD RO U G H O P E N I N G 16d NAILS @ 12" 2x KING STUD 10d NAILS @ 3" WOOD HEADER SCHEDULE MATERIAL 2.0E LVL 2-2x6 CRIPPLE STUD 1-2x6 3-1 3/4x9 1/2 2.0E LVL 4-2x6 3-1 3/4x16 2.0E LVL 4-2x6 ATTACH W/ 2 ROWS OF 16d NAILS @ 12" O.C. DRIVEN FROM ONE SIDE ATTACH W/ 2 ROWS OF 16d NAILS @ 12" O.C. DRIVEN FROM BOTH SIDES ATTACH W/ 3 ROWS OF 16d NAILS @ 12" O.C. DRIVEN FROM BOTH SIDES NO. 2 DOUG. FIR @ OPENING GREATER THAN 6'-0" ROOF SHEATHING PRE-ENGINEERED TRUSS TRUSS BLOCKING @ 2'-0" O.C. TRUSS BLOCKING TO TRANSFER 300 LBS LATERAL FORCE FROM TOP TO BOTTOM SIMPSON A35 @ EACH TRUSS BLOCK SIMPSON H2.5A @ EACH TRUSS BEARING BOUNDARY NAILING DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 16" O.C. SPACING JOIST SCHEDULE WJ1 MARK JOIST SIZE REMARKSMATERIAL 2x8 NO. 2 DOUG. FIR S101 1ALLOWABLE TRENCHING & UTILITY PLACEMENT DETAIL S101 2ALLOWABLE PENETRATION IN LIGHT FRAMED 2x LUMBER S101 3TRUSS BLOCKING DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 6 : 5 8 P M S101 SCHEDULES & TYPICAL DETAILS 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O REVISION SCHEDULE NAME DATE 7-26-2023 R eb a r: 8 ' W a ll-H oriz onta l & V ertic a l 2 4 " O .C . w ith 2 in T op 1 2 " R eb a r: 4 ' W a ll-H oriz onta l & V ertic a l 2 4 " O .C . w ith 1 in T op 6" 3-#4 CONT. LONGITUDINAL CONCRETE FOOTING SCHEDULE CF3 CF2 MARK CONT. 3'-4"12" 12" 3'-4" 2'-0" LENGTHDEPTHWIDTH 5-#45-#4 - TRANSVERSE REINFORCEMENT ON PLAN DENOTES TOP OF FOOTING (U.O.N.) 3-#4 CONT.CF1 CONT.12"2'-0"#4 @ 24" O.C. DOWELED INTO EXISTING FOUNDATION CF4 9'-0"12"3'-6"13-#46-#4 GENERAL NOTES: 1.For marked description items on Plan see legend on sheet S100. 2.See Architectural Drawings for dimensions not shown. 3.See First Floor Wall Framing Plan for embeds @ top of concrete walls or piers. 4.All horizontal rebar in walls and footings to be drilled and epoxied into existing foundation. Use Simpson AT anchoring system w/ 4 1/4" minimum embedment or equivalent. 5. Provide 1-#4x4'-0" diagonal rebar in concrete slab centered on corner. D' 5'4'3' 1 2 3 4 5 E C D 97'-0"CF2 CW1 100'-0" 97'-0"CF2 CW1 99'-4" ST E P T . O . W . ST E P T . O . W . ST E P T . O . W . ST E P T . O . W . STEP T.O.W. STEP T.O.W. 97'-0"CF2 CW1 99'-4" CW1 97'-0"CF2 100'-0" 97'-0"CF2 CW1 97'-0"CF2 CW1 CW1 97'-0"CF2 97'-0"CF2 CW1 CW1 97'-0"CF2 97'-0"CF2 CW1 97'-0"CF2 CW1 97'-0"CF2 CW1 97'-0"CF2 CW1 97'-0"CF2 CW1 100'-0" 100'-0" 100'-0" 100'-0"100'-0" 100'-0" 99'-4" 100'-0" 100'-0" 97'-0"CF2 CW1 100'-0" 97'-0"CF2 CW1 100'-0" 100'-0"CF2100'-0"CF3100'-0"CF4100'-0"CF3100'-0"CF3100'-0"CF397'-0"CF3100'-0"CF34 S300 ______________________4 S300 ______________________7 S300 ______________________5 S300 ______________________7 S300 ______________________7 S300 ______________________ 7 S300 ______________________ 1 S300 ______________________2 S300 ______________________ 2 S300 ______________________ 2 S300 ______________________ 3 S300 ______________________3 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 1 S300 ______________________ 100'-0"CS1 6 S300 ______________________ 7 S300 ______________________ 7 S300 ______________________ 100'-0" 100'-0"CF1 SEE GEN. NOTE #4 SEE GEN. NOTE #4 8 1/4" 8 1/4" SEE GEN. NOTE #5 19'-11 5/8"29'-6 7/8"11'-1 3/8"15'-2 3/8" SEE GEN. NOTE #5 CCJ-TYPICAL CC J - TY P I C A L 6'-8 3/4"6'-9 7/8" F A B 6 6'-7 3/4"6'-6 3/4"63'-4"19'-11 11/16"2'-2 1/16" 98'-8 1/4" 97'-0"CF1 8 1 / 4 " 8 1 / 4 " 8 1/4" 8 1 / 4 " DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 N PLAN NORTH 1/4" = 1'-0" FOUNDATION PLAN DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 6 : 5 9 P M S200 FOUNDATION PLAN 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O REVISION SCHEDULE NAME DATE 7-26-2023 D' 5'4'3' 1 2 3 4 5 E C D SW 1 SW 2 SW 2 SW2 SW 2 SW2 . . . WH1 WH1 WH1 WH1 WH1 WH1 WH1 WH1 WH1 WH1 WH1 WH2 WH2 WH2 WH2 WH2 . . .WC3HD1HD1HD1HD1HD1HD1HD1HD1HD1HD1WC4ABOVE HEADERWC3WC3WC3SW 1 SW 1WC3WC3WH1HD2HD2HD2HD2HD2HD2WC2WC3SW 1 SW 1 SW 1 WH1 WH4WC5ABOVE HEADERWC1WC1WC1WC1WC4WC3ABOVE HEADERHD3HD3SEE GEN NOTE #4 SW3 @ EXISTING CMU WALLHD3HD3HD3HD3MASONRY COLUMNS TO REMAIN TYP. WH3 SEE GEN. NOTE #5 SEE GEN. NOTE #5 WH2 WH2 SEE GEN. NOTE #6 F A B 6 DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 GENERAL NOTES: 1.For marked description items on Plan see legend on sheet S100. 2.See Architectural Drawings for dimensions not shown. 3.All Penetrations of LVL Wood Beams shall be as per Manufacturer's Recommendations & Details. 4. Replace removed CMU wall with shear wall SW2. Anchor pressure treated plates to existing foundation and existing Masonry Columns full height. 5. Saw cut new opening into existing CMU wall. See section 7/S301 for required lintel reinforcement. 6. Saw cut new opening into existing CMU wall. See section 8/S301 for required lintel reinforcement. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 6 : 5 9 P M S201 WALL FRAMING PLAN 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O N PLAN NORTH 1/4" = 1'-0" FIRST FLOOR WALL FRAMING PLAN REVISION SCHEDULE NAME DATE 7-26-2023 DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 D' 5'4'3' 1 2 3 4 5 E C D 12 S300 ______________________12 S300 ______________________12 S300 ______________________ 8 S300 ______________________8 S300 ______________________ 9 S300 ______________________ 8 S300 ______________________ 9 S300 ______________________ 9 S300 ______________________ 9 S300 ______________________ 8 S300 ______________________ 8 S300 ______________________ 11 S300 ______________________10 S300 ______________________11 S300 ______________________10 S300 ______________________11 S300 ______________________ WB2 WB2WB2 WB1 1 S301 ______________________13 S300 ______________________ 24 " P R E -EN G I N E E R E D WO O D T R U S S @ 2 4 " O . C . 24 " P R E -EN G I N E E R E D WO O D T R U S S @ 2 4 " O . C . GIRDER TRUSS GIRDER TRUSS 24 " P R E -EN G I N E E R E D W O O D T R U S S @ 2 4 " O . C . GIRDER TRUSSGIRDER TRUSS GIRDER TRUSS 1 S301 ______________________ SIM.SIM.1 S301 ______________________ SIM. EX I S T I N G G L U L A M A R C H . EX I S T I N G G L U L A M A R C H . EX I S T I N G G L U L A M A R C H . EX I S T I N G G L U L A M A R C H . 14 S300 ______________________ 1 S301 ______________________ 14 S300 ______________________ 1 S301 ______________________2 S301 ______________________ 3 S301 ______________________ 4 S301 ______________________ 5 S301 ______________________ 6 S301 ______________________ SEE GEN. NOTE #4 EXISTING MASONRY PARAPETS TO REMAIN WJ1 F A B 6 GIRDER TRUSS GENERAL NOTES: 1.For marked description items on Plan see legend on sheet S100. 2.See Architectural Drawings for dimensions and roof slopes not shown. 3.All Penetrations of LVL Wood Beams shall be as per Manufacturer's Recommendations & Details. 4.Field verify bearing condition of new beam @ existing wall. With CMU wall anchor new beam to existing CMU wall with Simposn HUC68 hanger with 14-1/4"øx2 3/4" Simpson Titen Turbo screws (Model TNT25234H) and 6-0.162x3 1/3" nails into beam. DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 6 : 5 9 P M S202 ROOF FRAMING PLAN 06/30/2023 23041 Author 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O N PLAN NORTH 1/4" = 1'-0" ROOF FRAMING PLAN REVISION SCHEDULE NAME DATE 7-26-2023 PRESSURE TREATED SILL PLATE WALL SHEATHING ARCH. VENEER GRADE REINFORCED FOOTING WOOD STUD WALL ANCHOR BOLT W/ 3x3x1/4" PLATE WASHER 11" REINFORCED CONCRETE WALL CONCRETE SLAB ON GRADE 3" C L R . FOUNDATION INSULATION SEE ARCH. 4" 4" 2'-0" 2' -0" 11" REINFORCED CONCRETE WALL REINFORCED FOOTING GRADE #4x CONT. @ OPENING CONCRETE SLAB ON GRADE #4x @ 24" O.C. 3" C L R . FOUNDATION INSULATION SEE ARCH. 3" C L R . CONCRETE SLAB ON GRADE PRESSURE TREATED SILL PLATE REINFORCED FOOTING WOOD STUD WALL WALL SHEATHING FT G . DE P T H FTG. WIDTH 5/8"øx6" SIMPSON TITEN HD ANCHOR BOLT W/ 3x3x1/4" PLATE WASHER CONCRETE SLAB ON GRADE PRESSURE TREATED SILL PLATE REINFORCED FOOTING WOOD STUD WALL WALL SHEATHING 3" C L R . FTG. WIDTH EXISTING MASONRY WALL #4x2'-0" REBAR DOWEL @ 24" O.C. W/ 4" EMBED. EXISTING CONCRETE WALL 5/8"øx6" SIMPSON TITEN HD ANCHOR BOLT W/ 3x3x1/4" PLATE WASHER EXISTING SLAB DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 DBL. TOP PLATE WALL SHEATHING CONTINUOUS ACROSS JOINT ROOF SHEATHING BOUNDARY NAILING WOOD STUD WALL PRE-ENGINEERED WOOD TRUSS 4-16d NAILS 2x4 DIAGONAL @ 4'-0" O.C. 45 DEGREE MAX ANGLE 2x6 BLOCKING @ 24" O.C. 2x8 BOTTOM PLATE FOR GYPSUM CEILING 2x6 BLOCKING @ EACH BRACE DBL. TOP PLATE 2x6 BLOCKING @ 24" O.C. WALL SHEATHING PER SW1 4-16d NAILS 2x6 @ 16" O.C. WOOD STUD PARAPET FRAMING 2x6 LEDGER W/ 2-16d (BOX OR SINKER) NAILS INTO 2x6 BLOCKING AND 2-0.22∅x4" SIMPSON SDWS SCREWS INTO EACH STUD 2x6 BLOCKING WALL SHEATHING EDGE NAILING INTO 2x6 BLOCKING DBL. TOP PLATE WALL SHEATHING CONTINUOUS ACROSS JOINT ROOF SHEATHING BOUNDARY NAILING WOOD STUD WALL PRE-ENGINEERED WOOD TRUSS SIMPSON H2.5A TRIPLE TOP PLATE WALL SHEATHING PER SW1 2x6 BLOCKING 2x8 BLOCKING 2x4 BLOCKING EDGE NAILING VERTICAL 2x6 @ EACH TRUSS FOR PARAPET PRE-ENGINEERED WOOD TRUSS PRE-ENGINEERED WOOD TRUSS BLOCKING BETWEEN EACH TRUSS SEE SECTION 4/S101 BOUNDARY NAILING ROOF SHEATHING WALL SHEATHING WOOD STUD WALL DBL. TOP PLATE LAP WOOD TRUSS AND CONNECT TOGETHER PER TRUSS MANUFACTURE SIMPSON A35 @ EACH TRUSS PRE-ENGINEERED WOOD TRUSS GRIDER TRUSS PER TRUSS MANUFACTURE BOUNDARY NAILING ROOF SHEATHING HANGER PER TRUSS MANUFACTURE PRE-ENGINEERED WOOD TRUSS GRIDER TRUSS PER TRUSS MANUFACTURE BOUNDARY NAILING ROOF SHEATHING HANGER PER TRUSS MANUFACTURE CONCRETE SLAB ON GRADE REINFORCED FOOTING EXISTING MASONRY WALL EXISTING CONCRETE WALL 3" C L R . FTG. WIDTH EXISTING SLAB #4x 2'-0" REBAR DOWEL @ 24" O.C. W/ 4" EMBED CONCRETE SLAB ON GRADE REINFORCED FOOTING 3" C L R . FTG. WIDTH EXISTING SLAB EXISTING CONCRETE WALL #4x 2'-0" REBAR DOWEL @ 24" O.C. W/ 4" EMBED SIMPSON HU68 WOOD STUD WALL 0.22"øx6" SIMPSON SDWS @ 8" O.C. STAGGERED EXISTING 1x ROOF SHEATHING EXISTING 2x10 @ 16" O.C. EXISTING 1x FURRING STRIPS EXISTING WOOD PLATE ABOVE CMU WALL TO REMAIN 2x6 CONT. FURRING AS REQUIRED TO FLUSH W/ END OF GLULAM NAIL TO WOOD BEAM W/ 16d NAILS @ 6" O.C. STAGGERED SIMPSON MSTC40 ACROSS GLULAM WOOD BEAM WALL SHEATHING PER 0.22"øx6" SIMPSON SDWS @ 16" O.C. EXISTING 8 3/4"x28" GLULAM ARCH BEYOND SIMPSON MSTC40 ACROSS GLULAM 15 S300 ______________________ 2x6 @ 16" O.C. FUR DOWN W/ DBL. BOTTOM PLATE @ BOTTOM OF GLULAM SIMPSON HU68 WOOD STUD WALL 0.22"øx6" SIMPSON SDWS @ 8" O.C. STAGGERED EXISTING 1x ROOF SHEATHING EXISTING 2x10 @ 16" O.C. EXISTING 1x FURRING STRIPS EXISTING WOOD PLATE ABOVE CMU WALL TO REMAIN 2x6 CONT. FURRING AS REQUIRED TO FLUSH W/ END OF GLULAM NAIL TO WOOD BEAM W/ 16d NAILS @ 6" O.C. STAGGERED SIMPSON MSTC40 ACROSS GLULAM WOOD BEAM WALL SHEATHING 0.22"øx6" SIMPSON SDWS @ 16" O.C. EXISTING 8 3/4"x28" GLULAM ARCH BEYOND SIMPSON MSTC40 ACROSS GLULAM 15 S300 ______________________ SIMPSON HU68 EXISTING 1x ROOF SHEATHING EXISTING 1x FURRING STRIPS EXISTING WOOD PLATE ABOVE CMU WALL TO REMAIN EXISTING 8 3/4"x28" GLULAM BEAM BEYOND 2x6 @ 16" O.C. FUR DOWN W/ DBL. BOTTOM PLATE SIMPSON MSTC40 STRAP 2x6 x CONT. FURINGWOOD BEAM EXISTING CMU COLUMN SIMPSON MSTC40 STRAP WALL SHEATHING WOOD STUD WALL DBL. 2x6 BLOCKING OPENING CONCRETE SLAB ON GRADE PRESSURE TREATED SILL PLATE REINFORCED FOOTING WOOD STUD WALL WALL SHEATHING 3" C L R . FTG. WIDTH EXISTING CONCRETE WALL #4x2'-0" REBAR DOWEL @ 24" O.C. W/ 4" EMBED. PRESSURE TREATED SILL PLATE 5/8"øx6" SIMPSON TITEN HD ANCHOR BOLT W/ 3x3x1/4" PLATE WASHER EXISTING SLAB 3/4" = 1'-0"S300 SECTION 1 3/4" = 1'-0"S300 SECTION 2 3/4" = 1'-0"S300 SECTION 3 3/4" = 1'-0"S300 SECTION 4 DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 7 : 0 1 P M S300 STRUCTURAL SECTIONS 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O 3/4" = 1'-0"S300 SECTION 8 3/4" = 1'-0"S300 SECTION 9 3/4" = 1'-0"S300 SECTION 10 3/4" = 1'-0"S300 SECTION 11 3/4" = 1'-0"S300 SECTION 12 3/4" = 1'-0"S300 SECTION 6 3/4" = 1'-0"S300 SECTION 7 3/4" = 1'-0"S300 SECTION 13 3/4" = 1'-0"S300 SECTION 14 3/4" = 1'-0"S300 SECTION 15 3/4" = 1'-0"S300 SECTION 5 REVISION SCHEDULE NAME DATE 7-26-2023 36" min DESIGNER:DRAFTER: 505 LINDSAY BOULEVARD IDAHO FALLS, IDAHO 83402 PHONE: (208) 523−6918 / FAX: (208) 523−6922 PROJECT NUMBER: &STRUCTURAL ENGINEERSSG E−MAIL: gs@gsengineers.net COPYRIGHT 2023 CHECKER:JP MA XXX 23059 EXISTING STRUCTURE - REFERENCED SECTIONS 13/S300 FOR REINFORCEMENT PRE-ENGINEERED WOOD TRUSS BLOCKING BETWEEN EACH TRUSS SEE SECTION 4/S101 ROOF OVERBUILD SEE ARCH. WOOD BEAM PRE-ENGINEERED WOOD TRUSS WALL SHEATHING DBL. TOP PLATE ROOF SHEATHING SIMPSON H2.5A PRE-ENGINEERED WOOD TRUSS WALL SHEATHING WOOD STUD WALL DBL. TOP PLATE ROOF SHEATHING EXISTING STRUCTURE - REFERENCED SECTIONS 14/S300 FOR REINFORCEMENT SIMPSON H2.5A PRE-ENGINEERED WOOD TRUSS BLOCKING BETWEEN EACH TRUSS SEE SECTION 4/S101 ROOF OVERBUILD SEE ARCH. PRE-ENGINEERED WOOD TRUSS WALL SHEATHING DBL. TOP PLATE ROOF SHEATHING SIMPSON H2.5A PRE-ENGINEERED WOOD TRUSS BLOCKING BETWEEN EACH TRUSS SEE SECTION 4/S101 ROOF OVERBUILD SEE ARCH. ROOF SHEATHING WOOD JOIST WOOD BEAM WOOD JOIST ROOF SHEATHINGEXISTING ROOF STRUCTURE ELEVATION VARIES EXISTING MASONRY WALL SIMPSON LUS 15 lb TAR PAPER BETWEEN WALL AND LEDGER 2x8 LEDGER W/ 1/2"øx5" SIMPSON TITEN HD @ 16" O.C. WOOD JOIST ROOF SHEATHING EXISTING MASONRY WALL 15 lb TAR PAPER BETWEEN WALL AND LEDGER 2x8 LEDGER W/ 1/2"øx5" SIMPSON TITEN HD @ 16" O.C. WOOD JOIST ROOF SHEATHING WALL SHEATHING SIMPSON LUS WOOD STUD WALL 2x8 LEDGER W/ 2-16d (BOX OR SINKER) NAILS INTO 2x6 BLOCKING AND 2-0.22"øx4" SIMPSON SDWS SCREWS INTO EACH STUD. DBL. TOP PLATE WALL SHEATHING PER SW1 2x6 BLOCKING EDGE NAILING 2-L6x4x5/16 LLVMASONRY WALL 1/2"ø BOLTS 4" 2" L6x4x5/16 LLV MASONRY WALL 1/2"ø BOLTS EQ EQ EQ 4" 2" INSERT ANGLES INTO SAW CUT AND SHIM OR GROUT TIGHT 9 S301 ______________________ 4" BEARING 2-L6x4x5/16 LLV L6x4x5/16x0'-8" LLV W/ 3/4"x6" SIMPSON TITEN HD ANCHOR INTO GROUTED CMU 1/2"ø BOLTS 9 S301 ______________________ 2'-0"2'-0" Note: 1) Field verify existing ceiling attachment and top of saw cut opening. 2) Field verify grout filled CMU at Simpson HD anchors. MASONRY WALL 2" 4" 1/4 110'-8" V.I.F. 5'-8" (V.I.F.) DATE: PROJECT: OTHER: DRAWN BY: A B C D E F G A B C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Architecture Planning Interior Design 11 12 H I 11 12 H I FOUNDATION PERMIT 7/26/2023 Ithaca . Syracuse . Albany p 607 273 7600 www.holt.com 7/ 2 6 / 2 0 2 3 2 : 3 7 : 0 1 P M S301 STRUCTURAL SECTIONS 06/30/2023 23041 JP 72 S 1 S T E , R E X B U R G , I D A H O 8 3 4 4 0 GR A N D P E A K S M E D I C A L RE X B U R G C L I N I C AD D I T I O N A N D A L T E R A T I O N T O 3/4" = 1'-0"S301 SECTION 2 3/4" = 1'-0"S301 SECTION 1 3/4" = 1'-0"S301 SECTION 3 3/4" = 1'-0"S301 SECTION 4 3/4" = 1'-0"S301 SECTION 5 3/4" = 1'-0"S301 SECTION 6 3/4" = 1'-0"S301 SECTION 9 3/4" = 1'-0"S301 SECTION 7 3/4" = 1'-0"S301 SECTION 8 REVISION SCHEDULE NAME DATE 7-26-2023