Loading...
HomeMy WebLinkAboutREDLINED PLANS - 23-00884 - 65 Aries St - Duplex ConversionAuthor Name Author Email Author Phone No.: Larry Beesley Larry.Beesley@rexburg.org 208-372-2176 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Description : 65 Aries St - Duplex Conversion Address : 65 Aries St Units 1 & 2 Application Type : Document Filename : 20231127_101841.jpg Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Free Text Larry Beesley : Building Open 1 All ceilings must have a 2 hour fire separation, add another layer of 5/8" type x drywall Pg 1 Free Text Larry Beesley : Building Open 1 All separation walls must have 5/8" type X drywall on both sides for a 1hour rating on each side. Pg 1 Free Text Larry Beesley : Building Open 1 2A10BC fire extinguisher Pg 1 Free Text Larry Beesley : Building Open 1 SMOKE DETECTOR REQUIRED Pg 1 Free Text Larry Beesley : Building Open 1 SD Pg 1 Free Text Larry Beesley : Building Open 1 SD Pg 1 Free Text Larry Beesley : Building Open 1 SD CM Pg 1 Free Text Larry Beesley : Building Open 1 All of your recessed lights will have to be changed to Fire rated canned lights or regular ceiling lights with fire rated boxes. Pg 1 Free Text Larry Beesley : Building Open 1 Footing and foundation will both need inspections for the rebar and size. Pg 1 Free Text Kyle Baldwin : P&Z Open 1 Please submit Site plan for parking requirement verification Is this a basement conversion? garage conversion? # 23-00884 Duplex Conversion Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. I entered some redlines and notes of things that will need to be done. Electrical and plumbing also have requirements on this conversion. They went over most of the items when we did the walk through with you this past summer. If you have any questions you can call any of us. The building part is good to go, Planning and Zoning just has to approve your parking. Report Date: 11.29.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) 2A10BC fire extinguisher All o f y o ur rec essed lights w ill ha v e to b e c ha nged to F ire ra ted c a nned lights o r regula r c eiling lights w ith fire ra ted b o xes. All c eilings m ust ha v e a 2 ho ur fire sep a ra tio n, a d d a no ther la y er o f 5 /8 " ty p e x d ry w a ll S D S D F o o ting a nd fo und a tio n w ill b o th need insp ec tio ns fo r the reb a r a nd siz e. S D CM P lea se sub m it S ite p la n fo r p a rk ing req uirem ent v erific a tio n Is this a b a sem ent c o nv ersio n? ga ra ge c o nv ersio n? S M O K E D E T E CT O R R E Q U IR E D All sep a ra tio n w a lls m ust ha v e 5 /8 " ty p e X d ry w a ll o n b o th sid es fo r a 1ho ur ra ting o n ea c h sid e.