HomeMy WebLinkAboutAPPROVED PLANS - 23-00884 - 65 Aries St - Duplex ConversionAuthor Name Author Email Author Phone No.:
Larry Beesley Larry.Beesley@rexburg.org 208-372-2176
Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164
Description : 65 Aries St - Duplex Conversion
Address : 65 Aries St
Record Type : Duplex Conversion
Document Filename : 20231127_101841.jpg
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Approved
# 23-00884
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Free Text Larry Beesley : Building Open 1 All ceilings must have a 2 hour fire separation, add another
layer of 5/8" type x drywall
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Line Larry Beesley : Building Open 1
Pg 1 Free Text Larry Beesley : Building Open 1 All separation walls must have 5/8" type X drywall on both
sides for a 1hour rating on each side.
Pg 1 Free Text Larry Beesley : Building Open 1 2A10BC fire extinguisher
Duplex Conversion
I entered some redlines and notes of things that will need to be done. Electrical and plumbing also have requirements on this conversion. They went over most of the items when
we did the walk through with you this past summer. If you have any questions you can call any of us. The building part is good to go, Planning and Zoning just has to approve your
parking.
Approval of plans does not constitute approval of variance from code
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg 1 Free Text Larry Beesley : Building Open 1 SMOKE DETECTOR REQUIRED
Pg 1 Free Text Larry Beesley : Building Open 1 SD
Pg 1 Free Text Larry Beesley : Building Open 1 SD
Pg 1 Free Text Larry Beesley : Building Open 1 SD CM
Pg 1 Free Text Larry Beesley : Building Open 1 All of your recessed lights will have to be changed to Fire rated
canned lights or regular ceiling lights with fire rated boxes.
Pg 1 Stamp Larry Beesley : Building Open 1 Approved - Building Inspector
Pg 1 Free Text Larry Beesley : Building Open 1 Footing and foundation will both need inspections for the
rebar and size.
Pg 1 Free Text Kyle Baldwin : P&Z Open 1 Please submit Site plan for parking requirement verification
Is this a basement conversion? garage conversion?
Pg 1 Stamp Kyle Baldwin : P&Z Open 1 Corrections Required
Approval of plans does not constitute approval of variance from code
Powered by TCPDF (www.tcpdf.org)
2A10BC fire
extinguisher
All o f y o ur rec essed lights w ill ha v e to b e
c ha nged to F ire ra ted c a nned lights o r
regula r c eiling lights w ith fire ra ted b o xes.
All c eilings m ust ha v e a 2 ho ur
fire sep a ra tio n, a d d a no ther la y er
o f 5 /8 " ty p e x d ry w a ll
S D
S D
F o o ting a nd fo und a tio n w ill
b o th need insp ec tio ns fo r
the reb a r a nd siz e.
S D CM
P lea se sub m it S ite p la n fo r
p a rk ing req uirem ent v erific a tio n
Is this a b a sem ent c o nv ersio n?
ga ra ge c o nv ersio n?
S M O K E D E T E CT O R R E Q U IR E D
All sep a ra tio n w a lls m ust ha v e
5 /8 " ty p e X d ry w a ll o n b o th sid es
fo r a 1ho ur ra ting o n ea c h sid e.