Loading...
HomeMy WebLinkAbout23055 ADARA IP (4-16-24)Designed By: PAUL SNARR 1331 FREMONT AVE, IDAHO FALLS 208-542-2665 SHEET NO. PROPERTY LEGAL DESCRIPTION PHONE FILE NO. SCALE:of IMPROVEMENT DRAWINGS CONTACT PERSON NAME ADDRESS ZIP DATE PLOTTED: REVIEW NO.: DRAWN BY: CHECKED BY: 83402 VICINITY MAP 1.ANY CHANGES TO THIS SITE PLAN SHALL BE SUBMITTED TO THE CITY OF REXBURG PUBLIC WORKS DEPARTMENT FOR APPROVAL PRIOR TO CONSTRUCTION. 2.FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS PLAN MAY RESULT IN THE CITY/COUNTY WITHHOLDING BUILDING PERMITS, CERTIFICATES OF OCCUPANCY, WATER OR ELECTRICAL SERVICE. 3.A RIGHT-OF-WAY CONSTRUCTION PERMIT IS REQUIRED FROM THE MADISON COUNTY PUBLIC WORKS DEPARTMENT FOR ANY WORK IN A PUBLIC RIGHT-OF-WAY NOT INCLUDED IN THE SCOPE OF THESE IMPROVEMENT DRAWINGS. 4.A LICENSED IDAHO PROFESSIONAL ENGINEER SHALL INSPECT, CERTIFY TO COUNTY STANDARDS, AND PREPARE "AS-BUILT" DRAWINGS FOR ALL ROAD WATER, SANITARY SEWER AND STORM SEWER MAIN LINES. 5.ALL WATER SERVICE LINES LESS THAN FOUR (4) INCHES AND SANITARY SERVICE LINES LESS THAN EIGHT (8) INCHES SHALL BE INSPECTED BY SERVICE PROVIDERS PRIOR TO BACKFILLING. 6.ALL NEW CONSTRUCTION SHALL INCLUDE INSTALLATION OF A METER PIT PER FALLS WATER STANDARDS TO CAPTURE BOTH DOMESTIC AND LANDSCAPE IRRIGATION USES. COMMERCIAL BUILDINGS, WHERE POSSIBLE, SHALL BE PLUMBED FOR A METER INSIDE OF BUILDING. CONTACT THE WATER DEPARTMENT TO DETERMINE IF A METER IS REQUIRED AND FOR ANY ADDITIONAL INFORMATION. 7.ALL ELECTRICAL FACILITIES, INCLUDING NEW SERVICES OR THE RELOCATING OF EXISTING, SHALL BE IN ACCORDANCE WITH THE CURRENT ROCKY MOUNTAIN POWER SERVICE POLICY. THE DEVELOPER MUST SUBMIT TWO (2) COPIES OF THESE PLANS DIRECTLY TO ROCKY MOUNTAIN POWER FOR THE DESIGN AND/OR APPROVAL OF ELECTRIC SERVICE. CONTACT ROCKY MOUNTAIN POWER PRIOR TO CONSTRUCTION OF ELECTRICAL FACILITIES. NOTES AGLE ROCK NGINEERING CIVIL PLANNING SURVEYING IDAHO FALLS (208) 542-2665 E REXBURG (208) 359-2665 Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 c o v e r . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 4 A M 23055 N/A R. JORDAN P.SNARR 4/16/24 ---- 1 23 ADARA AT TETON LAKESCity of Rexburg, Madison County, Idaho PROJECT NO. 23055 April 2024 IMPROVEMENT DRAWINGS FOR: PROJ E C T W. 2000 N. N. 1 2 T H S t . 16410 FERRIS Ln. ROBINSON Dr LARCH Dr CYPRESS LOOP MCJON Ln APPROVED BY: ROCKY MOUNTAIN POWER APPROVED BY: LUMEN APPROVED BY: INTERMOUNTAIN GAS A SUBDIVISION OF THE CITY OF REXBURG, MADISON COUNTY, IDAHO AND PART OF THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 6 NORTH, RANGE 38 EAST, BOISE MERIDIAN SHEET INDEX SHEET No.SHEET NAME SHEET TITLE 1 G-0 COVER 2 G-1 NOTES 3 C-1 EXISTING CONDITIONS 4 C-2 PHASE MAP 5 C-3 OVERALL PLAN 6 C-4 OVERALL PLAN 7 C-5 GRADING & STORM DRAINAGE 8 C-6 GRADING & STORM DRAINAGE 9 PP-1 PLAN & PROFILE EX. LIFT STATION BYPASS & 12TH CROSSING 10 PP-2 PLAN & PROFILE NORTH 12th STREET 11 PP-3 PLAN & PROFILE ADARA AVENUE (ENTRY) 12 PP-4 PLAN & PROFILE PARKVIEW LANE 13 PP-5 PLAN & PROFILE PARKVIEW LANE 14 PP-6 PLAN & PROFILE ADARA AVENUE 15 PP-7 PLAN & PROFILE ADARA AVENUE 16 PP-8 PLAN & PROFILE RIMROCK ROAD 17 PP-9 PLAN & PROFILE CASCADE COURT & YUKON WAY 18 PP-10 PLAN & PROFILE PINNACLE LANE 19 PP-11 PLAN & PROFILE TAGGART DRIVE 20 PP-12 PLAN & PROFILE WINTER DRIVE, LASSEN LANE, & FERRIS LANE 21 D-1 DETAILS 22 D-2 DETAILS 23 D-3 DETAILS Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 n o t e s . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 4 A M 2 G- 1 NO T E S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 GIDUOYEROFEBLLA C DIG LINE 1-800-342-1585 ELECTRICAL NOTES: 1.ALL TRAFFIC SIGNAGE SHALL BE DESIGNED, CONSTRUCTED AND PLACED IN ACCORDANCE WITH THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) WITH THE FOLLOWING EXCEPTIONS: 2.ALL STOP AND YIELD SIGNS USED IN ANY SUBDIVISION SHALL BE A MINIMUM 30”X 30”. ENGINEER GRADE SHEETING SHALL NOT BE ALLOWED. 3.ALL ROAD NAME AND STREET SIGNS SHALL HAVE A MINIMUM 4” LEGEND. BOTH BACKGROUND AND LEGEND SHALL BE REFLECTIVE STANDARD COLORS WITH WHITE LEGEND AND GREEN BACKGROUND EXCEPT PRIVATE ROADS, WHICH WILL HAVE A BLUE BACKGROUND. 4.SUBSTRATE MATERIAL SHALL BE ALUMINUM; NO FIBERGLASS OR PLASTIC WILL BE ACCEPTED. 5.THE MINIMUM SIZE FOR SPEED LIMIT SIGNS SHALL BE 24”W X 30”L WITH BLACK LEGEND ON WHITE BACKGROUND. 6.POSTS SHALL BE METAL AND SHALL BE ANCHORED WITH A “SOIL TYPE” ANCHOR. NO CONCRETE SHALL BE USED AS AN ANCHOR. POSTS SHALL BE 2”X 2” SQUARE AND SHALL MEET BREAK-A-WAY STANDARDS OF THE STATE OF IDAHO. NO U-CHANNEL SHALL BE USED. 7.THE MINIMUM HEIGHT OF SIGNS SHALL BE 6' FROM THE ROAD SURFACE TO THE BOTTOM OF THE SIGN. 8.MAINTENANCE OF ALL STREET AND TRAFFIC SIGNS WILL BE THE RESPONSIBILITY OF THE DEVELOPER UNTIL THE STREETS ARE OFFICIALLY ACCEPTED FOR MAINTENANCE BY THE CITY OF REXBURG. SIGNAGE NOTES: GENERAL NOTES: 1.ALL NEW ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT ROCKY MOUNTAIN POWER SERVICE POLICY. 2.DEVELOPER SHALL BEAR ALL COSTS TO RELOCATE OR REMOVE EXISTING POWER POLES, LIGHT POLES, ANCHOR GUYS AND MISCELLANEOUS ELECTRICAL FACILITIES. 3.ALL PVC ELECTRIC CONDUITS SHALL BE PVC SCHEDULE 40. ALL FIBERGLASS CONDUITS SHALL MEET ROCKY MOUNTAIN POWER'S MARKING AND STRENGTH RATING REQUIREMENTS. CONDUIT DIAMETERS SHALL MEET ROCKY MOUNTAIN POWER'S DESIGN. ALL ELBOWS SWEEP RADII SHALL BE 36”, 48” OR 60” DEPENDING ON ROCKY MOUNTAIN POWER'S DESIGN. 4.ALL PRIMARY AND SECONDARY CONDUITS SHALL BE PROVIDED AND INSTALLED BY THE DEVELOPER. 5.TRENCH EXCAVATION AND CONDUIT PLACEMENT SHALL BE IN ACCORDANCE WITH ROCKY MOUNTAIN POWER SERVICE POLICY SPECIFICATIONS AND IN ACCORDANCE WITH OSHA STANDARDS. CONDUIT TRENCH DEPTHS SHALL BE BETWEEN 36” AND 48” (NOT TO EXCEED 60”) AND INCLUDE THE REQUIRED SAND PLACEMENT BELOW AND ABOVE THE PLACED CONDUIT. 6.THE ENGINEER SHALL PROVIDE ALL STAKING AND LAYOUT OF NEW ELECTRICAL FACILITIES INCLUDING POWER POLES. 7.THE CONTACTOR SHALL RETAIN AND PROTECT ALL EXISTING POWER POLES AND ELECTRICAL FACILITIES DURING CONSTRUCTION. 8.THE DEVELOPER SHALL COORDINATE ALL ELECTRICAL CONSTRUCTION WITH ROCKY MOUNTAIN POWER. 9.CLEARANCE BETWEEN OVERHEAD POWER AND NEW BUILDING STRUCTURES SHALL BE MAINTAINED MEETING THE CURRENT ROCKY MOUNTAIN POWER SERVICE POLICY. 10.SEE ROCKY MOUNTAIN POWER ELECTRICAL SITE PLAN FOR OFF-SITE AND ON-SITE ELECTRICAL LAYOUT AND INSTALLATION DETAILS. IN THE EVENT THE FIBER OPTIC UTILITY ELECTS TO USE THE SAME TRENCH, THEY MUST MEET NESC UNDERGROUND UTILITY CLEARANCES. 11.A 15 FOOT WIDE PUBLIC UTILITY EASEMENT IS PERPETUALLY RESERVED WITHIN EACH LOT ALONG ALL ROAD FRONTAGES FOR THE USE OF PUBLIC UTILITIES WITHIN THIS SUBDIVISION. NO PERMANENT STRUCTURES, SIDEWALKS, AND DRIVEWAYS SHALL BE CONSTRUCTED OVER SAID EASEMENT (OTHER THAN CROSSINGS) IN ORDER FOR THE UTILITY COMPANIES TO MAINTAIN. FIRE DEPARTMENT NOTES: 1.TURNING RADIUS (CUL-DE-SACS/HAMMERHEADS) SHALL MEET IFC D103.4. DEAD ENDS SHALL REQUIRE A 96' DIAMETER CUL-DE-SAC FOR TURNING EMERGENCY VEHICLES. THE CUL-DE-SAC DESIGN FOR THIS SUBDIVISION IS DESIGNED WITH A 98' DIAMETER TURNAROUND FROM BACK OF CURBS (96' TURNING WIDTH). 2.FIRE CODE SIGNAGE SHALL BE DETERMINED BY THE FIRE CODE OFFICIAL. WHEN REQUIRED, SIGNS MEETING IFC D103.6 SHALL BE INSTALLED (REQUIRED UPON OFFICIAL OR WHEN STREETS COMING INTO DEAD ENDS ARE LESS THAN 26' IN WIDTH AND THE TURNING RADIUS DOES NOT MEET 96' DIAMETER). 1.UNLESS OTHERWISE SHOWN ON THESE PLANS ALL WORK IS TO BE PERFORMED IN ACCORDANCE TO CURRENT CITY OF REXBURG STANDARD DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR IS REQUIRED TO MAINTAIN A COMPLETE COPY ON SITE AT ALL TIMES (RESOLUTION 2016-15). 2.ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF WORK. 3.BASIS OF BEARINGS CITY OF REXBURG CONTROL. 4.ELEVATIONS SHOWN ARE NAVD 88 DATUM TO FINISHED SURFACE OR PIPE INVERT UNLESS OTHERWISE NOTED. 5.GENERAL LOCATIONS AND SIZES OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT INTERFERE WITH NORMAL OPERATIONS OF ANY UTILITIES. IT SHALL ALSO BE THE CONTRACTORS RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY COMPANY FIELD-LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED DUE TO CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING SOURCES FOR GRANULAR MATERIAL, DISPOSAL SITES, AND ANY ADDITIONAL MATERIAL THAT MAY BE NECESSARY FOR PROPER CONSTRUCTION OF THIS PROJECT. 7.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE ARRANGEMENTS FOR WATER REQUIRED FOR TESTING, COMPACTION AND DUST CONTROL MEASURES. 8.ROCK EXCAVATION MAY BE ENCOUNTERED DURING UTILITY CONSTRUCTION. EVERY EFFORT WAS MADE TO REDUCE UTILITY DEPTH WHILE STILL MEETING REGULATORY REQUIREMENTS. FOR BIDDING PURPOSES CONTACT OWNER FOR TEST HOLE DEPTH OF ROCK. 9.DEMOLITION IS REQUIRED ON THIS PROJECT PRIOR TO JOB START. CONTRACTOR/BIDDER TO WALK JOB AND IDENTIFY DEMOLITION WORK PRIOR TO BIDDING. 10.ALL UTILITY MAIN LINES (WATER, SANITARY SEWER AND STORM DRAINAGE) WITHIN PUBLIC STREETS WILL BE OWNED AND MAINTAINED BY THE CITY AND CONSTRUCTED TO CURRENT CITY OF REXBURG STANDARD DRAWINGS AND SPECIFICATIONS; INSPECTED AND CERTIFIED BY AN ENGINEER, LICENSED IN THE STATE OF IDAHO; AND HAVE “AS-BUILT” DRAWINGS PROVIDED TO THE CITY ENGINEER. FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS PLAN MAY RESULT IN THE CITY'S WITHHOLDING OF BUILDING PERMITS, CERTIFICATE OF OCCUPANCY, AND WATER OR ELECTRICAL SERVICE. 11.LANDSCAPING SIGNS NOT TO EXCEED 3 FEET IN HEIGHT IN THE CLEAR SIGHT TRIANGLE. 12.THERE SHALL BE A 15-FOOT WIDE PUBLIC UTILITY EASEMENT WITHIN EACH LOT ALONG ALL ROAD/STREET FRONTAGES FOR POWER, PHONE, CABLE, GAS, ETC. (GAS REQUIRES SEPARATE TRENCH). THE EXACT LOCATION OF TRANSFORMERS AND PHONE BOXES WILL BE FIELD DETERMINED BY EACH UTILITY COMPANY AFTER ROADS/STREETS HAVE BEEN CONSTRUCTED TO SUBGRADE AND SIDE SLOPES HAVE BEEN COMPLETED. 13.ALL FRONTAGE PUBLIC UTILITY EASEMENTS (PUE) SHALL BE 15 FEET FROM BACK OF SIDEWALK UNLESS NOTED OTHERWISE. 14.LUMEN/CENTURY LINK/SPARKLIGHT USES THE SAME TRENCH AS ROCKY MOUNTAIN POWER AND REQUIRES CONDUITS (CONTRACTOR SHALL NOTIFY ALL FOR SCHEDULING). POWER DESIGN SHOWN IS PRELIMINARY AND ANY CONSTRUCTION STAKING OF POWER SHALL BE CONFIRMED WITH ROCKY MOUNTAIN POWER FOR FINAL LAYOUT. VERIFY CONDUIT SIZE MEETING ROCKY MOUNTAIN POWER DESIGN PRIOR TO CONSTRUCTION. 15.ALL UTILITIES INCLUDING POWER, PHONE, CABLE, ETC. EXCEPT NATURAL GAS MAY BE IN THE SAME TRENCH. NATURAL GAS MUST BE IN A SEPARATE TRENCH. 16.A 12” SPACING SHALL BE REQUIRED BETWEEN DIFFERENT UTILITIES IN THE SAME TRENCH. 17.CONTRACTOR SHALL CONTACT DIG-LINE AT 811, (800) 342-1585 OR (208) 342-1585 PRIOR TO ANY UTILITY CONSTRUCTION. WATER NOTES: 1.ALL WATER MAINS, SERVICES, AND ALL APPURTENANCES SHALL MEET CURRENT CITY OF REXBURG STANDARD DRAWINGS AND SPECIFICATIONS. THIS SHALL INCLUDE ALL MATERIALS, LABOR, AND INSTALLATION INCLUDING VERTICAL AND HORIZONTAL SEPARATION DISTANCES AND SLOPE REQUIREMENTS. 2.ALL WATER MAIN LINE SHALL BE CLASS 50 DUCTILE IRON MEETING AWWA C-151. 3.MINIMUM COVER OVER ALL WATER LINES SHALL BE 6 FEET. 4.WATER LINE SHALL HAVE A MINIMUM SEPARATION DISTANCE OF TEN (10) FEET FROM ANY SANITARY SEWER OR STORM SEWER MEASURED FROM THE OUTSIDE OF EACH PIPE AS OUTLINED IN THE ISPWC 2020 STANDARD DRAWING SD-407. CROSS AT APPROXIMATELY RIGHT ANGLES WITH FULL PIPE SECTIONS AND MINIMUM OF 1.5 FEET OF VERTICAL SEPARATION. 5.THRUST BLOCKS SHALL BE PLACED AT ALL DIRECTION CHANGES FOR PRESSURE PIPE. 6.FIRE HYDRANTS SHALL HAVE TWO 2-1/2” DIAMETER HOSE NOZZLES AND ONE 4-1/2” DIAMETER HOSE NOZZLE PER CITY STANDARDS. 6.1.FIRE HYDRANT TO BE MUELLER, WATEROUS, OR CLOW BRANDS WITH ADAPTER KOCHEK MODEL SZMC5045-3-Y 6.2.FIRE HYDRANTS MUST BE INSTALLED PER ISPWC AND OTHER APPLICABLE CODES. 7.WATER AND SEWER SERVICE LINES ARE SHOWN AT APPROXIMATE LOCATIONS. CONTRACTOR TO CONTACT DIG LINE PRIOR TO ALL EXCAVATION AND FIELD VERIFY LOCATION AND WITH ARCHITECTURAL DRAWINGS (IF APPLICABLE) FOR ANY ADDITIONAL SERVICES REQUIRED. 8.WATER METERS AND PRESSURE REDUCING VALVES - SEE PLUMBING DRAWINGS FOR DETAILS. ALL PLUMBING SHALL MEET THE STATE OF IDAHO PLUMBING CODE. COMMERCIAL BUILDINGS SHALL REQUIRE THE WATER METERS TO BE INSTALLED ON THE INTERIOR AND MOUNTED IN A HORIZONTAL POSITION WITHIN A HEATED MECHANICAL ROOM. 9.CONTRACTOR SHALL INSTALL FIRE LINES/SPRINKLERS MEETING THE CURRENT VERSION OF THE INTERNATIONAL FIRE CODE AND SHALL INCLUDE ALL APPURTENANCES (IF APPLICABLE). 10.IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE AND INSTALL ALL REQUIRED BACKFLOW PREVENTION DEVICES ON WATER SERVICES. 11.ALL WATER MAINS AND APPURTENANCES SHALL BE TESTED FOR PRESSURE, LEAKAGE, AND BACTERIA MEETING CITY AND AWWA STANDARDS AND SHALL BE CLEANED AND DISINFECTED PRIOR TO ACCEPTANCE BY THE CITY FOR DOMESTIC USE. TESTING AND DISINFECTION OF WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH AWWA C651 STANDARDS. AWWA STANDARDS REQUIRE EACH STREET TO BE TESTED INDIVIDUALLY FOR PRESSURE, LEAKAGE, AND BACTERIA. STORM SEWER NOTES: 1.ALL STORM SEWER SHALL MEET CURRENT CITY OF REXBURG STANDARD DRAWINGS AND SPECIFICATIONS. THIS SHALL INCLUDE ALL MATERIALS, LABOR, AND INSTALLATION INCLUDING VERTICAL AND HORIZONTAL SEPARATION DISTANCES AND SLOPE REQUIREMENTS. 2.SEPARATION REQUIREMENTS: WATER LINE SHALL HAVE A MINIMUM SEPARATION DISTANCE OF TEN (10) FEET FROM ANY SANITARY SEWER OR STORM SEWER MEASURED FROM THE OUTSIDE OF EACH PIPE AS OUTLINED IN THE ISPWC 2020 STANDARD DRAWING SD-407, CROSS AT APPROXIMATELY RIGHT ANGLES WITH FULL PIPE SECTIONS, AND MINIMUM OF 1.5 FEET OF VERTICAL SEPARATION. 3.STORM DRAIN PIPE SHALL MEET ONE OF THE FOLLOWING: PVC SDR 26 MEETING THE REQUIREMENTS OF ASTM D 3034 FOR DIAMETERS 18” OR LESS, ASTM F 679 FOR DIAMETERS 18” OR GREATER, PVC RIBBED PIPE MEETING THE REQUIREMENTS OF ASTM F 794 MEETING THE CURRENT CITY OF REXBURG STANDARD SPECIFICATIONS AND DRAWINGS. 4.CONTRACTOR SHALL PERFORM TESTING AND CLEANING OF SEWER MAINS MEETING CITY STANDARDS. SANITARY SEWER NOTES: 1.ALL SEWER MAIN SHALL BE PVC SDR 35 IN ACCORDANCE WITH ASTMD3034 WATER MAIN AND SERVICE SHALL MEET CURRENT CITY OF REXBURG STANDARD DRAWINGS AND SPECIFICATIONS. THIS SHALL INCLUDE ALL MATERIALS, LABOR, AND INSTALLATION INCLUDING VERTICAL AND HORIZONTAL SEPARATION DISTANCES AND SLOPE REQUIREMENTS. 2.SEPARATION REQUIREMENTS: WATER LINE SHALL HAVE A MINIMUM SEPARATION DISTANCE OF TEN (10) FEET FROM ANY SANITARY SEWER OR STORM SEWER MEASURED FROM THE OUTSIDE OF EACH PIPE AS OUTLINED IN THE ISPWC 2020 STANDARD DRAWING SD-407, CROSS AT APPROXIMATELY RIGHT ANGLES WITH FULL PIPE SECTIONS, AND MINIMUM OF 1.5 FEET OF VERTICAL SEPARATION. 3.CONTRACTOR SHALL PERFORM TESTING AND CLEANING OF SEWER MAINS MEETING CITY STANDARDS. BTM BOTTOM BLDG BUILDING CB CATCH BASIN CL CENTERLINE CONC CONCRETE DIA DIAMETER ELEV ELEVATION EO EDGE OF OIL EX EXISTING FH FIRE HYDRANT FL FLOW LINE FW FACE OF WALK HORZ HORIZONTAL HP HIGH POINT IFS CITY OF IDAHO FALLS STANDARDS INV INVERT LF LINEAR FEET LP LOW POINT MAX MAXIMUM MH MANHOLE MIN MINIMUM MX MATCH EXISTING OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION PC POINT OF CURVATURE PT POINT OF TANGENT P.U.E.PUBLIC UTILITY EASEMENT PVC POLYVINYL CHLORIDE REQ'D REQUIRED MH MANHOLE SD STORM DRAIN SSMH SANITARY SEWER MANHOLE STA STATIONING TBC TOP BACK OF CURB TBRC TOP BACK RIBBON CURB TYP TYPICAL VERT VERTICAL VG VALLEY GUTTER EX EXISTING XG EXISTING GROUND ABBREVIATIONS: DESCRIPTION PRESSURE LINE (WATER LINE) SANITARY SEWER MAIN LINETYPE GAS LINE FENCE LINE GAS UGP OHP UNDERGROUND POWER LINE OVERHEAD POWER LINE TELEPHONE LINE FIBER OPTICFO PROPOSED/EXISTING ELEVATION PROPOSED/EXISTING FIRE HYDRANT PROPOSED/EXISTING VALVE PROPOSED/EXISTING CURB AND GUTTER PROPOSED/EXISTING STREET LIGHT PROPOSED/EXISTING POWER POLE EXIST.PRO.DESCRIPTION PROPOSED/EXISTING MANHOLE PROPOSED/EXISTING STORM DRAIN INLET PROPOSED ASPHALT DRAINAGE FLOW ARROW LEGEND BOUNDARY LINE CENTERLINE SECTION LINE CONCRETE EXISTING GROUND CONTOUR4727 8" W ( 8" SS TBC 72.1 0 XG = 7 2 . 1 0 PROJECT MANAGER..............................................................................KURT ROLAND...................................................(208) 542-2665 OFFICE PROJECT ENGINEER...............................................................................PAUL SNARR......................................................(208) 542-2665 CITY ENGINEER......................................................................................KEITH DAVIDSON...............................................(208) 359-3020 PROJECT CONTACTS: PUBLIC UTILITY EASEMENT STORM DRAIN MAIN ( 12" SD IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) ...............CARLIN FEISTHAMEL, PE ...................................(208) 582-2650 DIGLINE (CALL BEFORE YOU DIG).....................................................................................................................................(800) 342-1585 MADISON FIRE DEPARTMENT................................................................STAN CRITTENDEN............................................(208) 359-3010 GRADE BREAKGBGB EP EP EP EP EP EP XXXXXXXXXX XXXX 8' ' W 8' ' W 8' ' W 8' ' W SS SS SS SS SS SS SS SS SS 4853 4852 4851 4850 4 8 5 0 4852 485 3 4851 485 2 4854 48 5 4 48 5 5 EXISTING TREE LINE EXISTING TREE EXISTING CUL-DE-SAC FERRIS Ln EXISTING TREE LINE N. 1 2 T H S t . EXISTING MANHOLE TO BE REMOVED RETAIN & PROTECT EXISTING ELECTRICAL BOX Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 e x i s t i n g c o n d i t i o n s . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 4 A M 3 C- 1 EX I S T I N G C O N D I T I O N S W E S N 0100'100'50' SCALE: 1" = 100' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 1.INSERT NOTES HERE. NOTES: EO EO EO EO EO EO EO UN P L A T T E D SUNRIS E M E A D O W S D I V I S I O N N o . 1 INSTRU M E N T N o . 2 8 5 7 9 3 SUNRISE ME A D O W S D I V I S I O N N o . 1 INSTRUMEN T N o . 2 8 5 7 9 3 COPP E R H E I G H T S INST R U M E N T N o . 4 4 2 8 5 4 UNP L A T T E D UNPLAT T E D 12 0.23 AC. 18 0.27 AC. 17 0.23 AC. 16 0.23 AC. 15 0.23 AC. 14 0.23 AC. 13 0.23 AC. 3 0.25 AC. 11 0.23 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 6 0.23 AC. 5 0.26 AC. 4 0.30 AC. 2 0.25 AC. 1 0.05 AC. 1 1.70 AC. 17 0.34 AC. 15 0.33 AC. 16 0.34 AC. 14 0.23 AC. 13 0.23 AC. 12 0.23 AC. 11 0.23 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 6 0.23 AC. 5 0.23 AC. 4 0.23 AC. 3 0.23 AC. 2 0.27 AC. 18 0.33 AC. 7 0.23 AC. 15 0.27 AC. 8 0.23 AC. 16 0.23 AC. 25 0.23 AC. 9 0.23 AC. 17 0.23 AC. 2 0.23 AC. 10 0.23 AC. 18 0.23 AC. 3 0.23 AC. 11 0.23 AC. 19 0.23 AC. 27 0.23 AC. 4 0.23 AC. 12 0.23 AC. 5 0.23 AC. 13 0.27 AC. 6 0.23 AC. 23 0.23 AC. 21 0.23 AC. 22 0.23 AC. 20 0.23 AC. 26 0.23 AC. 24 0.23 AC. 6 0.23 AC. 1 0.27 AC.2 0.23 AC. 11 0.27 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 4 0.23 AC. 5 0.23 AC. 3 0.23 AC. 5 0.23 AC. 21 0.23 AC. 4 0.23 AC. 20 0.23 AC. 11 0.27 AC. 3 0.23 AC. 18 0.23 AC. 10 0.23 AC. 2 0.23 AC. 17 0.23 AC. 9 0.23 AC. 1 0.27 AC. 16 0.23 AC. 8 0.23 AC. 12 0.93 AC. 15 0.23 AC. 7 0.23 AC. 23 0.27 AC. 14 0.23 AC. 6 0.23 AC. 13 0.27 AC. 19 0.23 AC. 21 0.32 AC. 22 0.32 AC. 23 0.24 AC. 5 0.33 AC. 6 0.33 AC. 3 0.21 AC. 4 0.24 AC. 2 0.27 AC. 25 0.26 AC. 24 0.21 AC. 20 0.20 AC. 19 0.20 AC. 18 0.20 AC. 13 0.21 AC. 11 0.25 AC. 1 1.79 AC. 8 0.20 AC. 9 0.20 AC. 7 0.20 AC. 17 0.20 AC. 16 0.25 AC. 15 0.21 AC. 14 0.21 AC. 12 0.21 AC. 4 0.23 AC. 7 0.27 AC. 6 0.23 AC. 1 0.27 AC. 5 0.23 AC. 2 0.23 AC. 3 0.23 AC. 8 0.27 AC. 9 0.23 AC. 10 0.23 AC. 11 0.23 AC. 12 0.23 AC. 13 0.23 AC. 14 0.27 AC. UNPLAT T E D 22 0.23 AC. 10 0.20 AC. UNPLA T T E D 2 0.23 AC. 1 0.25 AC. 3 0.23 AC. 1 0.23 AC. 14 1.12 AC. 2 0.25 AC. 15 0.23 AC. 3 0.25 AC. 14 0.23 AC. 4 0.25 AC. 12 0.29 AC. 5 0.25 AC. 6 0.25 AC. 11 0.25 AC. 7 0.25 AC. 10 0.25 AC. 8 0.25 AC. 1 0.25 AC. 9 0.25 AC. 12 0.23 AC. 4 0.22 AC. 11 0.23 AC. 3 0.37 AC. 18 0.29 AC. 10 0.23 AC. 2 0.37 AC. 17 0.31 AC. 9 0.23 AC. 1 0.30 AC. 16 0.38 AC. 8 0.23 AC. 15 0.25 AC.7 0.23 AC. 14 0.23 AC. 6 0.23 AC. 13 0.23 AC. 5 0.23 AC. 19 0.09 AC. 13 0.26 AC. EP EP EP EP EP EP EP OH P 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W SS SS SS SS 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W8''W8''W8''W8''W8''W 8''W (8''SS(8''SS(8''SS(8''SS(8''SS(8''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS) (12''SS (12''SS (10''SS8''PS 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS) 12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8' ' S S ) 8' ' S S ) 12''SS) (1 0 ' ' S S (1 0 ' ' S S (8 ' ' S S (8 ' ' S S 8' ' W 8' ' W 8''SS) 8''W 15 ' S S E A S E M E N T Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p h a s e m a p . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 5 A M W E S N 0100'100'50' SCALE: 1" = 100' 4 C- 2 PH A S E M A P AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 PHASE LEGEND PHASE 1 PHASE 2 12 T H W E S T FERRIS LANE 43-LF OF 12" S.D. AT 0.22% UNP L A T T E D SUNRIS E M E A D O W S D I V I S I O N N o . 1 INSTRU M E N T N o . 2 8 5 7 9 3 12 0.23 AC. 18 0.27 AC. 17 0.23 AC. 16 0.23 AC. 15 0.23 AC. 14 0.23 AC. 13 0.23 AC. 3 0.25 AC. 11 0.23 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 6 0.23 AC. 5 0.26 AC. 4 0.30 AC. 2 0.25 AC. 1 0.05 AC. 1 1.70 AC. 17 0.34 AC. 15 0.33 AC. 16 0.34 AC. 14 0.23 AC. 13 0.23 AC. 12 0.23 AC. 11 0.23 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 6 0.23 AC. 5 0.23 AC. 4 0.23 AC. 3 0.23 AC.2 0.27 AC. 18 0.33 AC. 7 0.23 AC. 15 0.27 AC. 8 0.23 AC. 16 0.23 AC. 25 0.23 AC. 9 0.23 AC. 17 0.23 AC. 2 0.23 AC. 10 0.23 AC. 18 0.23 AC. 3 0.23 AC. 11 0.23 AC. 19 0.23 AC. 27 0.23 AC. 4 0.23 AC. 12 0.23 AC. 5 0.23 AC. 13 0.27 AC. 6 0.23 AC. 23 0.23 AC. 21 0.23 AC. 22 0.23 AC. 20 0.23 AC. 26 0.23 AC. 24 0.23 AC. 1 0.27 AC. 0.23 1 0.27 AC. 23 0.27 AC. 21 0.32 AC. 20 0.20 AC. 19 0.20 AC. 18 0.20 AC. 17 0.20 AC. 16 0.25 AC. UNPLAT T E D UNPLAT T E D 1 0.23 AC. 14 1.12 AC. 1 0.30 AC. EP EP EP EP EP EP EP EP EP OHP OH P 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W SS SS SS SS SS SS SS SS SS SS SS SS SS 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W ( 1 2 ' ' S D (8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (1 2 ' ' S S 8' ' S S ) 8' ' S S ) 8' ' S S ) (12''SS (12''SS 10 ' ' S S ) (10''SS (10''SS 8''PS 8''PS 8' ' P S 8' ' S S ) 8' ' S S ) 8''SS) 12''SS)8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 10 ' ' S S ) 8' ' P S 18 ' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) (1 0 ' ' S S (1 0 ' ' S S (1 0 ' ' S S EX. SSMH #5 SSMH #3 SSMH #4 EX. LIFT STATION WET WELL SSMH #2 DROP MH SSMH #24 SSMH #23 SSMH #7 SSMH #22 SSMH #6 EX. SSMH #4 DROP SSMH #26 SSMH #8 SSMH #25 SSMH #9 SSMH #5 DROP SSMH #10 SSMH #33 EX. SSMH #3 EX. SSMH #2 SDMH #6 CB #3A CB #3C CB #3CB #6 CB #6A CB #3B SDMH #7 SDMH #4 CB #7 CB #7A CB #4 CB #4A SDMH #9 SDMH #8 SDMH #20 SDMH #5 CB #9 CB #8 CB #20A CB #5A CB #8A CB #20 CB #5 TBC: 55.76 TBC/LP: 55.50 TBC: 55.77 TBC: 55.13 TBC: 54.90 8 8 TBC: 53.90 TBC: 53.60 TBC/LP: 53.30 TBC: 53.80 TBC/LP: 52.50 TBC/LP: 52.50 TBC: 51.50 TBC/LP: 51.10 TBC: 51.60 TBC: 51.60 TBC/LP: 51.10 TBC: 51.50 TBC/LP: 51.50 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50 TBC/HP: 53.50 TBC/HP: 53.50 8 TBC: 53.80 TBC/LP: 53.20 TBC/HP: 53.75 TBC/LP: 53.20 TBC: 53.50 TBC: 53.60 TBC: 53.90 TBC: 55.13 TBC: 55.50 TBC: 55.40 TBC/LP: 55.12 TBC/LP: 55.20 TBC/LP: 53.00 TBC/LP: 53.00 TBC/LP: 52.70 TBC/LP: 52.56 TBC: 53.20 TBC: 52.89TBC/HP: 52.91 TBC: 52.60 TBC: 52.80 TBC/HP: 53.11 TBC: 52.90 TBC: 53.21 TBC: 51.70 TBC/LP: 51.30TBC/LP: 51.50 TBC: 51.90 TBC: 52.01 TBC/LP: 51.70 TBC: 52.36 TBC: 52.36 TBC/HP: 53.50 TBC: 53.34 TBC: 53.44 TBC/HP: 53.60 3 3 54 6 5 7 7 7 5 5 TBC: 53.70 4 55 TBC: 54.90 5 7 5 4 TBC: 53.80 2 2 3 1 3 2 3 3 3 2 2 6 5 7 6 5 5 4 3 2 2 5 6 1 1 1 5 6 5 6 6 MOUNTABLE VERTICAL CURB 1 1 1 CB #1 SDMH #1 CB #1A SDMH #2 CB #2 66 5 11 1 1 1 TBC/HP: 52.14 TBC: 52.27TBC: 52.29 7 9 9 999 9 9 9 9 9 4 4 TBC/LP: 53.30 Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 o v e r a l l . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 5 A M W E S N 080'80'40' SCALE: 1" = 80' 5 C- 3 OV E R A L L P L A N AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 CONNECT TO EXISTING PRESSURE MAIN PER PLANS SAW-CUT LINE MATCH LINE/PHASE LINE PH A S E 1 PH A S E 2 PHASE 1 PHASE 2 MATCH LINE/PHASE LINE PARKVIEW Ln ADARA Ave ADARA Ave RI M R O C K R d FERRIS Ln CAP 8" SANITARY LINE 10' (MIN.) PAST ASPHALT FOR PHASE 2 CONNECTION PLUG AND THRUST BLOCK WATER MAIN 10' (MIN.) PAST ASPHALT FOR PHASE 2 CONNECTION PLUG AND THRUST BLOCK WATER MAIN 10' (MIN.) PAST ASPHALT FOR PHASE 2 CONNECTION PLUG AND THRUST BLOCK WATER MAIN 10' (MIN.) PAST ASPHALT FOR PHASE 2 CONNECTION CONNECT TO EXISTING 8" WATER MAIN (FIELD VERIFY SIZE AND DEPTH) RI M R O C K R d ABANDON EXISTING SS LINE AND REMOVE EXISTING SSMH #4 LIFT STATION CONNECT TO EXISTING MANHOLE FOR SEWER REDIRECTION PER PLANS 43-LF OF 12" S.D. AT 0.22% EO EO EO EO EOEOEO EO EO EO EO EO EO EOEOEO SUNRISE ME A D O W S D I V I S I O N N o . 1 INSTRUMEN T N o . 2 8 5 7 9 3 COPP E R H E I G H T S INST R U M E N T N o . 4 4 2 8 5 4 UN P L A T T E D UNPLA T T E D 18 0.27 AC. 17 0.23 AC. 17 0.34 AC. 15 0.33 AC. 16 0.34 AC. 18 0.33 AC. 15 0.27 AC. 16 0.23 AC. 12 0.23 AC. 13 0.27 AC. 6 0.23 AC. 1 0.27 AC.2 0.23 AC. 11 0.27 AC. 10 0.23 AC. 9 0.23 AC. 8 0.23 AC. 7 0.23 AC. 4 0.23 AC. 5 0.23 AC. 3 0.23 AC. 5 0.23 AC. 21 0.23 AC. 4 0.23 AC. 20 0.23 AC. 11 0.27 AC. 3 0.23 AC. 18 0.23 AC. 10 0.23 AC. 2 0.23 AC. 17 0.23 AC. 9 0.23 AC. 1 0.27 AC. 16 0.23 AC. 8 0.23 AC. 12 0.93 AC. 15 0.23 AC. 7 0.23 AC. 23 0.27 AC. 14 0.23 AC. 6 0.23 AC. 13 0.27 AC. 19 0.23 AC. 21 0.32 AC. 22 0.32 AC. 23 0.24 AC. 5 0.33 AC. 6 0.33 AC. 3 0.21 AC. 4 0.24 AC. 2 0.27 AC. 25 0.26 AC. 24 0.21 AC. 20 0.20 AC. 19 0.20 AC. 18 0.20 AC. 13 0.21 AC. 11 0.25 AC. 1 1.79 AC. 8 0.20 AC. 9 0.20 AC. 7 0.20 AC. 17 0.20 AC. 16 0.25 AC. 15 0.21 AC. 14 0.21 AC. 12 0.21 AC. 4 0.23 AC. 7 0.27 AC. 6 0.23 AC. 1 0.27 AC. 5 0.23 AC. 2 0.23 AC. 3 0.23 AC. 8 0.27 AC. 9 0.23 AC. 10 0.23 AC. 11 0.23 AC. 12 0.23 AC. 13 0.23 AC. 14 0.27 AC. 22 0.23 AC. 10 0.20 AC. 2 0.23 AC. 1 0.25 AC. 3 0.23 AC. 2 0.25 AC. 15 0.23 AC. 3 0.25 AC. 14 0.23 AC. 4 0.25 AC. 12 0.29 AC. 5 0.25 AC. 6 0.25 AC. 11 0.25 AC. 7 0.25 AC. 10 0.25 AC. 8 0.25 AC. 1 0.25 AC. 9 0.25 AC. 12 0.23 AC. 4 0.22 AC. 11 0.23 AC. 3 0.37 AC. 18 0.29 AC. 10 0.23 AC. 2 0.37 AC. 17 0.31 AC. 9 0.23 AC. 1 0.30 AC. 16 0.38 AC. 8 0.23 AC. 15 0.25 AC.7 0.23 AC. 14 0.23 AC. 6 0.23 AC. 13 0.23 AC. 5 0.23 AC. 19 0.09 AC. 13 0.26 AC. 8''W8''W8''W8''W8''W8''W8''W8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W8''W8''W8''W8''W8''W8''W (8''SS(8''SS (12''SS 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) (1 2 ' ' S S 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS) 12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)8''PS 8''PS 18 ' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 12''SS) 8''SS) (8 ' ' S S (8 ' ' S S 8' ' W 8' ' W 8''SS)8''W 8''W DROP SSMH #26 SSMH #34 SSMH #18 SSMH #36 SSMH #32 DROP SSMH #10 SSMH #27 SSMH #33 SSMH #12SSMH #13 SSMH #30 SSMH #35 SSMH #31 SSMH #14 SSMH #28SSMH #15 SSMH #13A SDMH #9 SDMH #19 SDMH #8 SDMH #20 SDMH #5 CB #9 SDMH #12 CB #19 SDMH #10 CB #8 CB #20A CB #5A SDMH #21 CB #10A SDMH #11 CB #12 CB #8A CB #12A CB #10 SDMH #18 CB #18 CB #21 CB #21A CB #11 CB #20 CB #5 SDMH #13 CB #18A CB #11A CB #13B SDMH #17 SDMH #22 CB #13 CB #17B CB #13A SDMH #23 CB #22 CB #22A CB #17 CB #17A CB #23 CB #23A SDMH #15 SDMH #16 CB #15 CB #15A CB #16 TBC: 51.50 TBC/LP: 51.10 TBC: 51.60 TBC: 51.60 TBC/LP: 51.10 TBC: 51.50 TBC/LP: 51.50 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50 8 TBC: 53.20 TBC: 52.89TBC/HP: 52.91 TBC: 52.60 TBC: 52.80 TBC/HP: 53.11 TBC: 52.90 TBC: 53.21 TBC: 51.70 TBC/LP: 51.30TBC/LP: 51.50 TBC: 51.90 TBC: 52.01 TBC/LP: 51.70 TBC: 52.36 TBC: 52.36 TBC/HP: 53.50 TBC: 53.34 TBC: 53.44 TBC/HP: 53.60 3 3 54 6 5 6 5 7 6 5 5 4 5 6 7 6 5 5 6 5 7 3 3 3 TBC/HP: 51.80 TBC: 51.40 TBC: 51.40 TBC: 51.80 4 5 6 5 5 7 TBC: 51.55TBC: 51.52 TBC: 51.32 TBC: 51.32 TBC/HP: 52.20 2 2 2 3 15' P.U.E. (TYP.) 15' P.U.E. (TYP.) 3 1 2 1 2 4 TBC/LP: 50.46 TBC: 50.86TBC: 49.98 TBC/LP: 49.67 5 1 1 1 1 TBC/LP: 51.18 TBC/LP: 51.18 TBC/HP: 52.14 TBC/HP: 52.145 6 5TBC/HP: 51.82 TBC/HP: 51.82 TBC/LP: 50.50 TBC/LP: 50.50 TBC: 50.81 TBC/LP: 50.35 5 4 6 5 5 TBC/LP: 50.25 8 1 6 5 7 32 1 1 2 TBC/LP: 51.00 TBC/LP: 51.00 TBC/LP: 51.60 TBC/HP: 52.00TBC/LP: 50.70 TBC/HP: 50.86 TBC/HP: 50.80 4 1 1 1 1 1 1 1 1 5 55 6 4 6 5 5 8 2 5 6 5 5 6 7 6 5 7 TBC: 50.11 TBC: 50.10 TBC/LP: 49.80 TBC: 49.76 TBC: 51.06 TBC/LP: 51.06 TBC/HP: 51.30 TBC/HP: 51.30 TBC/LP: 50.70 TBC/LP: 50.70 TBC/LP: 51.46 TBC/HP: 51.85TBC/HP: 51.85 TBC: 51.00 7 TBC: 51.50 TBC: 51.80 TBC/HP: 52.06 TBC: 51.40 TBC: 51.15 TBC/HP: 51.80 TBC/LP: 51.10 TBC/HP: 52.00 TBC: 51.69 TBC: 51.70 TBC/HP: 52.30 TBC/LP: 51.00 TBC/LP: 51.35 TBC/LP: 51.30 TBC/HP: 52.00 TBC/HP: 52.00 TBC/HP: 52.40 TBC: 52.14 TBC/LP: 51.30 TBC/LP: 51.40 TBC/HP: 52.60 TBC: 52.60 TBC: 52.90 TBC: 52.52 TBC: 52.27TBC: 52.29 TBC/HP: 53.10 5 6 5TBC: 52.24TBC: 51.80 TBC: 51.50 6 5 5 7 7 7 7 7 9 9 9 CB #14 SDMH #14 CB #14A CB #14B5 SSMH #20 SSMH #21 SSMH #19 DROP SSMH #17 SSMH #16 SSMH #19A TBC: 51.00± TBC: 50.84 TBC/LP: 50.50 TBC: 50.81 TBC/LP: 50.69 TBC: 51.00± TBC: 50.70 TBC: 50.60 TBC: 51.00 TBC: 51.06 TBC/HP: 51.32 TBC: 51.10 TBC: 51.10 TBC/HP: 51.38 TBC: 51.06 8 SAW-CUT FOR REGRADE OF INTERSECTION TBC/LP: 50.58 TBC/LP: 49.70 Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 o v e r a l l . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 5 A M W E S N 080'80'40' SCALE: 1" = 80' 6 C- 4 OV E R A L L P L A N AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 MATCH LINE/PHASE LINE PH A S E 1 PH A S E 2 PHASE 1 PHASE 2 MATCH LINE/PHASE LINE PARKVIEW Ln ADARA Ave RI M R O C K R d TA G G A R T D r YU K O N W A Y CA S C A D E CO U R T PINNACLE Ln RI M R O C K R d FERRIS Ln LA S S E N L n WINTER Dr UN P L A T T E D SUNRIS E M E A D O W S D I V I S I O N N o . 1 INSTRU M E N T N o . 2 8 5 7 9 3 UNPLA T T E D UNPLA T T E D EP EP EP EP EP EP EP EP EP OHP OH P 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W ( 1 2 ' ' S D1 2 3 4 6 TRANSITION HIGH BACK CURB TO ROLLED CURB 5 7 8 20 SDMH #6 CB #3A CB #3C CB #3 CB #6 CB #6A CB #3B SDMH #7 SDMH #4 CB #7 CB #7A CB #4 CB #4A SDMH #9 SDMH #8 SDMH #20 SDMH #5 CB #9 CB #8 CB #20A CB #5A CB #8A CB #20 CB #5 TBC: 55.76 TBC/LP: 55.50 TBC: 55.77 TBC: 55.13 TBC: 54.90TBC: 53.90 TBC/LP: 53.60 TBC: 53.30 TBC/HP: 53.80 TBC/LP: 52.50 TBC/LP: 52.50 TBC: 51.50 TBC/LP: 51.10 TBC: 51.60 TBC: 51.60 TBC/LP: 51.10 TBC: 51.50 TBC/LP: 51.50 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50 TBC/HP: 53.50 TBC/HP: 53.50 TBC/HP: 53.80 TBC/LP: 53.20 TBC/HP: 53.75 TBC/LP: 53.20 TBC: 53.50 TBC: 53.60 TBC: 53.90 TBC: 55.13 TBC: 55.50 TBC: 55.40 TBC/LP: 55.12 TBC/LP: 55.20 TBC/LP: 53.00 TBC/LP: 53.00 TBC/LP: 52.70 TBC/LP: 52.56 TBC: 53.20 TBC: 52.89TBC: 52.91 TBC: 52.60 TBC: 52.80 TBC: 53.11 TBC: 52.90 TBC: 53.21 TBC: 51.70 TBC/LP: 51.30TBC/LP: 51.50 TBC: 51.90 TBC: 52.01 TBC/LP: 51.70 TBC: 52.36 TBC: 52.36 TBC/HP: 53.50 TBC: 53.34 TBC: 53.44 TBC/HP: 53.60 TBC/HP: 53.70 TBC: 54.90 TBC/HP: 53.80 TBC/HP: 54.00 TBC/HP: 54.00 TBC/HP: 52.14 TBC: 52.27TBC: 52.29 TBC/LP: 55.50 Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 g r a d i n g & s t o r m d r a i n a g e . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 5 A M 7 C- 5 GR A D I N G & S T O R M D R A I N A G E AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 W E S N 080'80'40' SCALE: 1" = 80' MATCH LINE/PHASE LINE PH A S E 1 PH A S E 2 PHASE 1 PHASE 2 MATCH LINE/PHASE LINE INFILTRATION BED TO BE INSTALLED DURING PHASE 1 CONSTRUCTION INFILTRATION BED TO BE INSTALLED DURING PHASE 1 CONSTRUCTION STORM AREA: 1 17770 FT2 2 11695 FT2 3 121448 FT2 4 106134 FT2 5 135546 FT2 6 75153 FT2 7 108254 FT2 8 105171FT2 9 33343 FT2 10 102880 FT2 11 67994 FT2 12 47501 FT2 13 60236 FT2 14 78841 FT2 15 121505 FT2 16 42522 FT2 17 112350 FT2 18 89948 FT2 19 33739 FT2 20 62373 FT2 21 77227 FT2 22 65402 FT2 23 29443 FT2 EO EO EO EO EO EO EO EO EO EO SUNRISE ME A D O W S D I V I S I O N N o . 1 INSTRUMEN T N o . 2 8 5 7 9 3 COPP E R H E I G H T S INST R U M E N T N o . 4 4 2 8 5 4 UNP L A T T E D UNPLA T T E D (12''SS (12''SS (1 2 ' ' S S 8''PS 8''PS 5 8 8 910 11 12 13 14 15 16 17 18 19 202122 23 SDMH #9 SDMH #19 SDMH #8 SDMH #20 SDMH #5 CB #9 SDMH #12 CB #19 SDMH #10 CB #8 CB #20A CB #5A SDMH #21 CB #10A SDMH #11 CB #12 CB #8A CB #12A CB #10 SDMH #18 CB #18 CB #21 CB #21A CB #11 CB #20 CB #5 SDMH #13 CB #18A CB #11A CB #13B SDMH #17 SDMH #22 CB #13 CB #17B CB #13A SDMH #23 CB #22 CB #22A CB #17 CB #17A CB #23 CB #23A SDMH #15 SDMH #16 CB #15 CB #15A CB #16 TBC: 51.50 TBC/LP: 51.10 TBC: 51.60 TBC: 51.60 TBC/LP: 51.10 TBC: 51.50 TBC/LP: 51.50 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50 TBC: 53.20 TBC: 52.89TBC: 52.91 TBC: 52.60 TBC: 52.80 TBC: 53.11 TBC: 52.90 TBC: 53.21 TBC: 51.70 TBC/LP: 51.30TBC/LP: 51.50 TBC: 51.90 TBC: 52.01 TBC/LP: 51.70 TBC: 52.36 TBC: 52.36 TBC/HP: 53.50 TBC: 53.34 TBC: 53.44 TBC/HP: 53.60 TBC/HP: 51.80 TBC: 51.40 TBC: 51.40 TBC: 51.80 TBC: 51.55TBC: 51.52 TBC: 51.32 TBC: 51.32 TBC/HP: 52.20 TBC/LP: 50.46 TBC: 50.86TBC: 49.98 TBC/LP: 49.67 TBC/LP: 51.18 TBC/LP: 51.18 TBC/HP: 52.14 TBC/HP: 52.14 TBC/HP: 51.82 TBC/HP: 51.82 TBC/LP: 50.50 TBC/LP: 50.50 TBC/HP: 50.81 TBC/LP: 50.35 TBC/LP: 50.25 TBC/LP: 51.00 TBC/LP: 51.00 TBC/LP: 51.60 TBC/HP: 52.00 TBC/LP: 50.70 TBC/HP: 50.86 TBC/HP: 50.80 TBC: 50.11 TBC/LP: 49.80 TBC: 49.76 TBC: 51.06 TBC/LP: 51.06 TBC/HP: 51.30 TBC/HP: 51.30 TBC/LP: 50.70 TBC/LP: 50.70 TBC: 51.06 TBC/HP: 51.32 TBC/HP: 51.85TBC/HP: 51.85 TBC: 50.81 TBC/HP: 51.38 TBC: 50.69 TBC: 51.00 TBC: 51.80 TBC/HP: 52.06 TBC: 51.40 TBC: 51.15 TBC/HP: 51.80 TBC/LP: 51.10 TBC/HP: 52.00 TBC: 51.69 TBC: 51.70 TBC/HP: 52.30 TBC/LP: 51.00 TBC/LP: 51.35 TBC/LP: 51.30 TBC/HP: 52.00 TBC/HP: 52.00 TBC/HP: 52.40 TBC: 52.14 TBC/LP: 51.30 TBC/LP: 51.40 TBC/HP: 52.60 TBC: 52.60 TBC: 52.90 TBC: 52.52 TBC: 52.27TBC: 52.29 TBC/HP: 53.10 TBC: 52.24TBC: 51.80 TBC/LP: 50.47 TBC: 50.70 TBC: 50.10 TBC/HP: 51.20TBC/HP: 51.20 TBC: 50.70 TBC: 51.00± TBC: 50.83 TBC: 51.00± TBC/LP: 50.50 TBC/LP: 50.58TBC: 51.00 TBC: 51.06 CB #14A CB #14B CB #14 TBC/LP: 49.70 Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 g r a d i n g & s t o r m d r a i n a g e . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 5 A M 8 C- 6 GR A D I N G & S T O R M D R A I N A G E AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 W E S N 080'80'40' SCALE: 1" = 80' MATCH LINE/PHASE LINE PH A S E 1 PH A S E 2 PHASE 1 PHASE 2 MATCH LINE/PHASE LINE STORM AREA: 1 17770 FT2 2 11695 FT2 3 121448 FT2 4 106134 FT2 5 135546 FT2 6 75153 FT2 7 108254 FT2 8 105171FT2 9 33343 FT2 10 102880 FT2 11 67994 FT2 12 47501 FT2 13 60236 FT2 14 78841 FT2 15 121505 FT2 16 42522 FT2 17 112350 FT2 18 89948 FT2 19 33739 FT2 20 62373 FT2 21 77227 FT2 22 65402 FT2 23 29443 FT2 EO EO EO EO EO S S 8' ' W 8' ' W 8' ' W 8' ' W SS SS SS SS SS SS SS 10 ' ' S S ) (10''SS (10''SS (10''SS (10''SS 8''PS 8''PS 8''PS 8''PS 8' ' P S 10 ' ' S S ) 10 ' ' S S ) 10 ' ' S S ) 8' ' P S 8' ' P S SSMH #3 EX. LIFT STATION WET WELL SSMH #2 DROP MH EX. SSMH #2 EX. CAP AT STUB 0+00 1+00 2+00 2+80 0+ 0 0 1+ 0 0 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 0+00 1+00 2+00 2+80 10" S INV IN=4838.98 8" N INV IN=4843.81 10" W INV OUT=4838.88 SSMH #2 DROP MH STA=2+64.38, 0.00' RIM=4855.00 10" E INV IN=4838.18 10" N INV OUT=4838.08 SSMH #3 STA=0+15, 0.00' RIM=4855.30 249-LF OF 10" PVC @ 0.28% 10-LF OF 8" PRESSURE SEWER 233-LF OF 8" PRESSURE SEWER 10-LF OF 8" PRESSURE SEWER NE INV IN=4843.30 NW INV IN=4837.80 EX. LIFT STATION WET WELL STA=1+89.63, 106.18' R RIM=4855.29 N INV IN=4843.90 SW INV OUT=4843.85 S INV OUT=4843.85 EX. SSMH #2 STA=2+64.38, 10.00' L RIM=4854.95 E O EO SS SSSS SSSS SS SS SS SS SS (1 0 ' ' S S (1 0 ' ' S S (1 0 ' ' S S 8' ' P S 8' ' P S (10 ' ' S S 10''SS)10''SS)10''SS) 8''PS 8''PS 8''PS EX. SSMH #1 SSMH #1 2+ 0 0 2+ 8 0 EX. LIFT STATION WET WELL SSMH #2 DROP MH EX. SSMH #2 0+00 1+00 2+00 2+80 LIFT STATION TO BE ABANDONED EXISTING SSMH TO BE PIPED INTO NEW MH SS LINE TO BE ABANDONED 3 1 1 3 EX. PRESSURE LINE TO BE ABANDONED AFTER NEW CONNECTION IS MADE AND APPROVED EX. LIFT STATION DRY WELL 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 0+00 1+00 2+00 2+80 10" SE INV IN=4839.59 10" N INV OUT=4839.49 SSMH #1 STA=2+11.23, 0.00' RIM=4855.00 (MATCH ROAD GRADE) 181-LF OF 10" PVC @ 0.28% 10" S INV IN=4838.98 8" N INV IN=4843.81 10" W INV OUT=4838.88 SSMH #2 DROP MH STA=0+30, 0.00' RIM=4855.00 65-LF OF 10" PVC @ 0.28% 10" NW INV OUT=4839.77 EX. SSMH #1 STA=2+57.17, 45.73' L RIM=4855.57 10-LF OF 8" PRESSURE SEWER 172-LF OF 8" PRESSURE SEWER 10-LF OF 8" PRESSURE SEWER (DROP INV=4839.15) 1 0.27 AC. 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W (12''SS12''SS)12''SS) 8' ' P S 8''P S 8''PS 18 ' ' S S ) 18 ' ' S S ) (18''SS 8' ' S S ) 15 ' ' S S DROP SSMH #10 SSMH #11LIFT STA. WET WELL 3 3 3 LIFT STA. DRY WELL 4818 4820 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4818 4820 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 0+00 1+00 1+20 18" E INV IN=4826.00 FLOOR=4820.00 (PER CITY REVIEW 3-15-24) LIFT STA. WET WELL STA=0+24.31, 0.00' RIM=4852.00 18" N INV IN=4826.17 15" S INV IN=4826.52 18" W INV OUT=4826.07 SSMH #11 STA=0+81.21, 0.00' RIM=4851.50 57-LF OF 18" PVC @ 0.12% LIFT STA. DRY WELL STA=0+15.21, 0.05' L RIM=4852.00 8" N PRESSURE MAIN TOP PIPE=4845.00 (6' MIN. COVER) 79-LF OF 8" PRESSURE SEWER Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p e x i s t i n g l i f t s t a . b y p a s s & 1 2 t h c r o s s i n g . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 6 A M 9 PP - 1 PL A N & P R O F I L E E X . L I F T S T A T I O N B Y P A S S & 1 2 T H C R O S S I N G AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 W E SN 040'40'20' SCALE: 1" = 40' W E S N 040'40'20' SCALE: 1" = 40' EXISTING LIFT STATION BYPASS (NORTH SIDE) & N. 12TH CROSSINGEXISTING LIFT STATION BYPASS (EAST SIDE)NEW LIFT STATION W E S N 040'40'20' SCALE: 1" = 40' LA R C H D r N 1 2 T H W RI M R O C K R d PARKVIEW Ln SEE SHEET 23/D-3 FOR LIFT STATION DETAILS GREENSIDE LOOP SAW-CUT AND REPAIR PER CITY OF REXBURG STANDARDS 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4862 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4862 0+00 1+00 2+00 3+00 4+00 5+00 5+50 10" E INV IN=4838.18 10" N INV OUT=4838.08 SSMH #3 STA=5+22.11, 21.43' R RIM=4855.30 10" S INV IN=4837.66 10" N INV IN=4837.66 12" W INV OUT=4837.39 SSMH #4 STA=3+72.42, 20.81' R RIM=4855.20 ST A = 0 + 1 0 . 0 5 EL = 4 8 5 5 . 4 0 ST A = 0 + 7 1 . 7 9 EL = 4 8 5 5 . 1 2 ST A = 1 + 4 8 . 3 6 EL = 4 8 5 5 . 5 0 ST A = 2 + 1 8 . 1 6 EL = 4 8 5 5 . 2 0 PC S T A = 2 + 8 6 . 6 7 EL = 4 8 5 5 . 5 0 PT S T A = 3 + 1 6 . 6 7 EL = 4 8 5 5 . 1 3 PC S T A = 3 + 8 6 . 7 4 EL = 4 8 5 5 . 1 3 PT S T A = 4 + 1 6 . 7 3 EL = 4 8 5 5 . 7 7 ST A = 4 + 7 5 . 3 0 EL = 4 8 5 5 . 5 0 ST A = 5 + 3 3 . 8 6 EL = 4 8 5 5 . 7 6 -0.45%0.50%-0.43%0.44%-0.78% AL=-47.26 1.36% AL=47.00 -0.46%0.44% PC STA=3+37.96 EL=4855.70 PT STA=3+47.94 EL=4855.94 ST A = 3 + 5 1 . 6 9 EL = 4 8 5 6 . 0 0 PC STA=3+55.34 EL=4855.94 PT STA=3+65.36 EL=4855.70 PROPOSED RIGHT TBC EXISTING GRADE AT ALIGNMENT CENTERLINE 12" E INV IN=4851.50 24" S INV OUT=4850.50 SDMH #1 STA=0+71.79, 41.00' R RIM=4855.12 SUMP=4849.50 W INV OUT=4851.52 CB #1 STA=0+71.79, 33.75' R GRATE=4854.52 N INV OUT=4851.60 CB #1A STA=2+18.17, 33.75' R GRATE=4854.60 102-LF OF 12" PVC @ 0.22% 5-LF OF 24" PVC @ 2.40% W INV OUT=4851.90 CB #2 STA=4+75.30, 33.75' R GRATE=4854.90 12" E INV IN=4851.88 24" S INV OUT=4850.88 SDMH #2 STA=4+75.29, 41.00' R RIM=4855.47 SUMP=4850.88 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 40-LF OF 24" PEFORATED PIPE 25-LF OF 24" PERFORATED PIPE 5-LF OF 24" PVC @ 0.22% 150-LF OF 10" PVC @ 0.28% 370-LF OF 10" PVC @ 0.28% 20-LF OF 8" PRESSURE SEWER 132-LF OF 8" PRESSURE SEWER 10-LF OF 8" PRESSURE SEWER EX. 8" WATERLINE EX. 8" WATERLINE CAP 10' BEYOND PROPERTY LINE INV= 4838.70 EP EP EP EP EP EP EPEPEPEP EP EP EP X X X X X 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W SS SS SS S S 8' ' W 8' ' W (12''SD (12''SD (1 2 ' ' S S (1 2 ' ' S S 10''SS)10''SS) (1 0 ' ' S S (1 0 ' ' S S 8' ' P S 8' ' P S 8''PS 8''PS 8' ' P S (10''SS(10''SS(10''SS(10''SS(10''SS(10''SS SSMH #3SSMH #4 EX. SSMH #4 SDMH #2SDMH #1 CB #2CB #1ACB #1 EX. OIL: 55.31± EX. OIL: 55.40±EX. OIL: 55.47±EX. OIL: 55.50±EX. OIL: 55.70± EXISTING SSMH TO BE REMOVED FOR CURB & GUTTER CONSTRUCTION (ABANDON EXISTING SS MAIN) NOT IN USE PER CITY OF REXBURG SAW-CUT LINE (TYP.) TBC: 55.40 TBC/LP: 55.12 TBC/HP: 55.50 TBC/LP: 55.20 TBC/HP: 55.50 TBC: 55.13 TBC: 54.90 TBC: 54.90 TBC: 55.13 TBC/HP: 55.77 TBC/LP: 55.50 TBC: 55.76 1 5 7 8 8 4 4 1 CONNECT TO EXISTING WATER MAIN. CONTRACTOR TO VERIFY DEPTH AND PIPE SIZE. 5 6 7 5 15' P.U.E. (TYP.) 1 2 5 3 6 15' P.U.E. (TYP.) 5+400+00 1+00 2+00 3+00 4+00 5+00 2 2 3 3 4 5 10 PP - 2 PL A N & P R O F I L E N O R T H 1 2 T H S T R E E T Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p n . 1 2 t h s t . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 6 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 W E SN 040'40'20' SCALE: 1" = 40' NORTH 12TH STREET BLOCK 2 1 BLOCK 1 2 1 AD A R A A V E N U E N. 12TH St. 4 EP EP EP EP EP 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W SS SS 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W ( 1 2 ' ' S D (1 2 ' ' S S (1 2 ' ' S S (12''SS (12''SS (12''SS (12''SS (12''SS 10 ' ' S S ) 10 ' ' S S ) 8' ' P S 8' ' P S 8' ' P S 8''PS 8''PS 8''PS 8''PS 8''PS (1 0 ' ' S S (1 0 ' ' S S 2 4 4 2 8 8 3 3 4 4 SSMH #4 EX. SSMH #4 SSMH #5 SDMH #2 CB #2 CB #3B 1 56 7 6 86-LF OF 12" S.D. AT 0.22% 37-LF OF 12" S.D. AT 0.22% 1 23 3 234 BLOCK 1 1 BLOCK 2 EXISTING ELECTRICAL BOX. RETAIN & PROTECT EXISTING SSMH TO BE REMOVED PRIOR TO CONSTRUCTION. 1 25 2 4 4+400+00 1+00 2+00 3+00 4+00 TBC: 55.70 TBC: 55.70TBC: 54.74 TBC: 54.74 TBC: 53.90 TBC: 53.60 TBC: 54.90 TBC: 55.13 TBC: 55.77 TBC/LP: 55.50 TBC: 54.90 TBC: 55.13 TBC: 55.50 TBC: 53.90 TBC: 53.60 TBC: 53.50 TBC/HP: 53.76 TBC: 53.50 TBC/LP: 53.30 TBC/LP: 53.18 TBC/HP: 55.02 TBC/HP: 56.00 5 3 3 MOUNTABLE VERTICAL CURB PER DETAIL 4/D-2 15' P.U.E. (TYP.) 1 52 CB #3C STA: 0+49 (ADARA AVE (ENTRY)) STA: 2+14.81 (ALIGNMENT A) 14 BLOCK 3 27 1 15' P.U.E. (TYP.) 5 ADARA AVENUE PA R K V I E W L A N E AD A R A AV E N U E N. 1 2 T H W . 4844 4846 4848 4850 4852 4854 4856 4858 4860 4844 4846 4848 4850 4852 4854 4856 4858 4860 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 0+00 1+00 2+00 3+00 4+00 4+40 8" E INV OUT=4846.22 EX. SSMH #4 STA=3+65.39, 51.94' L RIM=4853.47 268-LF OF 8" PVC @ 0.47% 10" S INV IN=4837.66 10" N INV IN=4837.66 12" W INV OUT=4837.39 SSMH #4 STA=3+83.60, 20.56' R RIM=4855.2012" E INV IN=4836.65 12" S INV OUT=4836.55 SSMH #5 STA=0+49, 20.56' R RIM=4853.70 275-LF OF 8" WATERLINE 91-LF OF 8" WATERLINE PT STA=0+98.50 EL=4853.90 STA=3+34.05 EL=4854.90 PC STA=3+39.05 EL=4855.13 PT S T A = 3 + 6 9 . 0 5 EL = 4 8 5 5 . 5 0 PC S T A = 0 + 6 8 . 5 0 EL = 4 8 5 3 . 6 0 PC S T A = 0 + 6 8 . 5 0 EL = 4 8 5 3 . 6 0 PT STA=0+98.50 EL=4854.00 STA=3+34.59 EL=4854.90 PC STA=3+39.59 EL=4855.13 PT S T A = 3 + 6 9 . 5 9 EL = 4 8 5 5 . 7 7 0.64% AL=47.13 0.42% 0.78% AL=47.26 TRANSITION FROM ROLLED CURB TO HIGH BACK CURB TRANSITION FROM ROLLED CURB TO HIGH BACK CURB 0.64% AL=47.13 0.42% 1.36% AL=47.00 PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL PC STA=1+03 EL=4854.95 PT STA=1+13 EL=4854.74 PROPOSED TBC CENTER ISLAND 0.44% PC STA=3+29.34 EL=4855.70 PT S T A = 3 + 3 9 . 3 4 EL = 4 8 5 5 . 9 4 -1.44% AL=15.71 1.54% AL=15.77 PROPOSED TBC CENTER ISLAND 0.44% 308-LF OF 8" PRESSU R E S E W E R 20-LF OF 8" PRESSURE SEWER 20-LF OF 8" PRESSURE SEWER 6' M I N . BU R Y 335-LF OF 12" PVC @ 0.22% TO BE REMOVED 18 " M I N . S E P A R A T I O N 8" W A T E R L I N E B T M = 4 8 4 6 . 9 0 8" P R E S S U R E S E W E R T O P = 4 8 4 5 . 4 0 4844 4846 4848 4850 4852 4854 4856 4844 4846 4848 4850 4852 4854 4856 0+00 1+00 2+00 3+00 4+00 4+20 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 PROPOSED LEFT TBC EXISTING GRADE @ CL 96-LF OF 8" WATERLINE 52-LF OF 8" WATERLINE 54-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 8-IN GATE VALVE STA=1+86.33, 11.00' L 8-IN GATE VALVE STA=1+96.34, 11.00' L IN S T A L L F H ST A = 2 + 9 2 . 2 9 PT S T A = 0 + 8 7 . 7 1 EL = 4 8 5 3 . 3 0 ST A = 1 + 4 9 . 8 1 EL = 4 8 5 3 . 6 0 ST A = 1 + 7 9 . 8 1 EL = 4 8 5 3 . 9 0 PC STA=2+01.14 EL=4854.74 PT STA=2+11.14 EL=4854.97 ST A = 2 + 1 4 . 8 4 EL = 4 8 5 5 . 0 2 PC STA=2+18.54 EL=4854.97 PT STA=2+28.54 EL=4854.74 PC S T A = 2 + 4 9 . 8 7 EL = 4 8 5 3 . 9 0 PT S T A = 2 + 7 9 . 8 7 EL = 4 8 5 3 . 6 0 PC S T A = 3 + 3 9 . 0 1 EL = 4 8 5 3 . 3 0 PT S T A = 4 + 1 2 . 5 1 EL = 4 8 5 3 . 8 0 -0.43% AL=115.78 0.48%0.64% AL=47.13 -0.64% AL=47.13 -0.51%0.43% AL=114.97 107-LF OF 8" WATERLINE 57-LF OF 8" WATERLINE 23-LF OF 8" WATERLINE PC STA=0+14.21 EL=4853.80 INSTALL FH STA=0+20.86 W INV OUT=4850.03 CB #3 STA=0+87.71, 18.25' L GRATE=4853.05 PC S T A = 0 + 5 3 . 2 0 EL = 4 8 5 3 . 7 0 PT S T A = 0 + 8 5 . 7 0 EL = 4 8 5 3 . 2 0 ST A = 1 + 4 9 . 8 4 EL = 4 8 5 3 . 5 0 HP S T A = 2 + 1 4 . 8 1 EL = 4 8 5 3 . 7 6 ST A = 2 + 7 9 . 8 7 EL = 4 8 5 3 . 5 0 PC S T A = 3 + 4 1 EL = 4 8 5 3 . 2 0 PT STA=3+73.49 EL=4853.80 E INV IN=4849.95 W INV OUT=4849.85 CB #3A STA=0+85.70, 18.25' R GRATE=4852.95 4-LF OF 24" PVC @ 4.14% W INV OUT=4850.05 CB #3B STA=3+39.01, 18.25' L GRATE=4853.05 E INV IN=4849.97 N INV OUT=4849.87 CB #3C STA=3+41, 18.25' R GRATE=4852.95 86-LF OF 12" PVC @ 0.22% -0.98% AL=51.20 0.47%0.40%-0.40%-0.49%1.18% AL=50.84 12" E INV IN=4836.65 12" S INV OUT=4836.55 SSMH #5 STA=2+35.37, 0.00' L RIM=4853.70 8" NW INV OUT=4844.13 SSMH #22 STA=0+83.48, 0.00' RIM=4853.30 8" SE INV IN=4843.85 8" W INV OUT=4843.75 SSMH #23 STA=0+33.69, 50.00' R RIM=4853.90 12" N INV IN=4836.25 12" SW INV OUT=4836.15 SSMH #6 STA=3+70.22, 0.00' RIM=4853.30 12" NE INV IN=4836.08 12" W INV OUT=4835.98 SSMH #7 STA=3+92.80, 22.43' R RIM=4853.50 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 5-LF OF 8" WATERLINE PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 12" E INV IN=4849.84 24" S INV OUT=4848.86 SDMH #3 STA=0+85.68, 24.25' R RIM=4853.20 SUMP=4847.86 165-LF OF 24" PERFORATED PIPE 135-LF OF 12" PVC @ 0.22% 71-LF OF 8" PVC @ 0.40% 20-LF OF 8" PRESSURE SEWER 99-LF OF 8" PRESSURE SEWER 68-LF OF 8" PRESSURE SEWER 32-LF OF 12" PVC @ 0.22% 6' M I N . B U R Y 8' ' W 8' ' W 8''W8''W8''W8''W 8''W 8' ' W 8' ' W (12''SD (8 ' ' S S (1 2 ' ' S S (12''SS(12''SS (8'' S S (1 2 ' ' S S (1 2 ' ' S S 8' ' P S 8' ' P S 8''PS 8' ' P S 8' ' P S 8' ' P S SSMH #23 SSMH #7 CB #3C CB #3B SSMH #6 CB #3 CB #3A SSMH #22 SSMH #5 86-LF OF 12" S.D. AT 0.22% 37-LF OF 12" S.D. AT 0.22% 6-LF OF 12" S.D. AT 0.22% 37-LF OF 12" S.D. AT 0.22% 0+00 1+00 2+00 3+00 4+00 4+20 4 BLOCK 1 1 BLOCK 2 2 3 5 14 BLOCK 3 27 1 65 1 7 7 4 5 TBC: 53.90 TBC: 53.60 TBC: 53.90 TBC: 53.60 TBC: 53.50 TBC/HP: 53.76 TBC: 53.50 TBC/LP: 53.30 TBC/LP: 53.20 TBC/HP: 55.02 5 3 1 1 TBC: 53.80 TBC: 53.80 TBC: 53.70 TBC: 53.80 TBC/LP: 53.30 TBC/LP: 53.20 1 1 2 5 2 5 1 2 5 7 7 3 3 3 2 3 STA: 2+14.81 (ALIGNMENT A) STA: 0+49 (ADARA AVE (ENTRY)) ADARA AVENUE PARKVIEW LANE AD A R A A V E N U E 9 9 1 W E S N 040'40'20' SCALE: 1" = 40' 11 PP - 3 PL A N & P R O F I L E A D A R A A V E N U E ( E N T R Y ) Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p a d a r a ( e n t r y ) . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 6 A M W E SN 040'40'20' SCALE: 1" = 40' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 ADARA AVENUE (ENTRY)ALIGNMENT A: ADAR Ave & PARKVIEW Ln SPLIT CONNECT TO EXISTING WATER MAIN WITH 8"x8" TEE INV: XXXX.XX (FIELD VERIFY) SAW-CUT LINE. SEE 12TH N. PLAN & PROFILE 2 8''W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W (12''SS 8' ' S S ) 8' ' S S ) (1 2 ' ' S S 12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS)12''SS) 8' ' P S 8''PS 18 ' ' S S ) 18 ' ' S S ) 8' ' S S ) 8' ' S S ) 12''SS)12''SS) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 TBC/HP: 50.81 TBC/LP: 50.50 TBC/HP: 51.82 TBC/LP: 51.18 TBC/HP: 52.14 TBC: 51.50 TBC/LP: 51.10 TBC/LP: 51.10 TBC: 51.50 TBC: 51.50 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50TBC/HP: 52.14TBC/LP: 51.18TBC/HP: 51.82TBC/LP: 50.50 TBC: 51.20 TBC/HP: 51.20 TBC: 50.70 3 3 DROP SSMH #10SSMH #12SSMH #13SSMH #14 SDMH #20 SDMH #5 CB #20A CB #5A SDMH #21 CB #21 CB #21A CB #20 CB #5 SDMH #22 CB #22 CB #22A 5 6 4 4 5 7 1 2 2 2 2 2 222222 2 2 3 3 3 3 3 1 1 1 24 37-LF OF 12" S.D. AT 0.22% 11 10 9 8 7 6 5 4 3 2 1 11 10 9 8 7 6 5 4 3 2 1 13 18 BLOCK 1 3 3 3 3 3 33A333A 3 3 1 5 2 1 2 5 37-LF OF 12" S.D. AT 0.22%5 6 7 5 1 25 10' MIN. 10' MIN. SEPARATION POTABLE & NON-POTABLE WATER (TYP.) 44-LF OF 12" S.D. AT 0.22% 5 6 43-LF OF 12" S.D. AT 0.22% 44-LF OF 12" S.D. AT 0.22% 4 4 4 43-LF OF 12" S.D. AT 0.22% 5 6 5 PARKVIEW LANE TA G G A R T D R I V E RI M R O C K RO A D STA: 1+79 (PARKVIEW LN) STA: 10+86 (TAGGART DR) STA: 11+57.32 (PARKVIEW LN) STA: 10+86 (RIMROCK RD) 9 5 CAP FOR FUTURE EXPANSION. SEE PROFILE FOR INVERT 10' MIN. 9 9 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+20 PT S T A = 1 2 + 0 9 . 3 1 EL = 4 8 5 1 . 5 0 PC S T A = 1 1 + 7 6 . 8 1 EL = 4 8 5 1 . 8 0 PT S T A = 1 1 + 3 7 . 8 1 EL = 4 8 5 1 . 8 0 PC S T A = 1 1 + 0 5 . 3 1 EL = 4 8 5 1 . 5 0 HP S T A = 9 + 4 8 . 2 7 EL = 4 8 5 2 . 1 4 ST A = 7 + 0 8 . 1 5 EL = 4 8 5 1 . 1 8 HP STA=5+48.06 EL=4851.82 PT S T A = 2 + 3 0 . 9 0 EL = 4 8 5 0 . 5 0 PC S T A = 1 + 9 8 . 4 0 EL = 4 8 5 1 . 2 0 S INV OUT=4848.25 CB #5A STA=12+09.31, 18.25' L GRATE=4851.25 PT S T A = 1 2 + 0 9 . 3 3 EL = 4 8 5 1 . 5 0 PC S T A = 1 1 + 7 6 . 8 3 EL = 4 8 5 1 . 1 0 NE INV OUT=4847.85 CB #5 STA=11+75.58, 52.01' R GRATE=4850.85 12" N INV IN=4848.15 12" SW INV IN=4847.76 24" E INV OUT=4846.76 SDMH #5 STA=12+09.31, 25.50' R RIM=4851.50 SUMP=4845.76 PT S T A = 1 1 + 3 7 . 8 3 EL = 4 8 5 1 . 1 0 PC S T A = 1 1 + 0 5 . 3 3 EL = 4 8 5 1 . 5 0 HP S T A = 9 + 4 8 . 2 7 EL = 4 8 5 2 . 1 4 ST A = 7 + 0 8 . 2 0 EL = 4 8 5 1 . 1 8 HP S T A = 5 + 4 8 . 0 6 EL = 4 8 5 1 . 8 2 PT S T A = 2 + 3 1 . 1 1 EL = 4 8 5 0 . 5 0 PC S T A = 1 + 9 8 . 6 1 EL = 4 8 5 0 . 8 1 NW INV OUT=4847.85 CB #20 STA=11+39.08, 51.99' R GRATE=4850.85 12" SE INV IN=4847.76 12" N INV IN=4848.15 24" W INV OUT=4846.76 SDMH #20 STA=11+05.32, 25.50' R RIM=4851.50 SUMP=4845.76 43-LF OF 12" PVC @ 0.22% 43-LF OF 12" PVC @ 0.22% S INV OUT=4848.25 CB #20A STA=11+05.31, 18.25' L GRATE=4851.25 IN S T A L L F H ST A = 8 + 6 8 . 2 4 IN S T A L L F H ST A = 5 + 4 7 . 9 9 358-LF OF 8" WATERLINE 160-LF OF 8" WATERLINE 160-LF OF 8" WATERLINE 295-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE S INV OUT=4847.93 CB #21A STA=7+08.15, 18.25' L GRATE=4850.93 N INV IN=4847.85 S INV OUT=4847.75 CB #21 STA=7+08.20, 18.25' R GRATE=4850.93 12" N INV IN=4847.73 24" E INV OUT=4846.73 SDMH #21 STA=7+08.20, 25.50' R RIM=4851.20 SUMP=4845.73 8-IN GATE VALVE STA=11+63.31, 11.00' L -1.37% AL=50.9 8 0.42%-0.40%0.40%-0.41%0.60% AL=51.06 -0.60% AL=51.06 S INV OUT=4847.25 CB #22A STA=2+30.90, 18.25' L GRATE=4850.25 N INV IN=4847.17 S INV OUT=4847.07 CB #22 STA=2+31.11, 18.25' R GRATE=4850.25 12" N INV IN=4847.05 24" E INV OUT=4846.05 SDMH #22 STA=2+31.10, 25.50' R RIM=4850.50 SUMP=4845.06 -0.60% AL=51.12 0.42%-0.40%0.40%-0.41% -0.78% AL=51.05 0.78% AL=51.06 12" W INV IN=4826.94 12" E INV IN=4833.34 8" N INV IN=4833.64 18" S INV OUT=4826.34 DROP SSMH #10 STA=11+57.32, 0.02' R RIM=4851.80 12" W INV IN=4827.76 12" E INV OUT=4827.66 SSMH #12 STA=8+31.21, 0.00' R RIM=4851.70 12" W INV IN=4828.58 12" E INV OUT=4828.48 SSMH #13 STA=5+05.11, 0.00' R RIM=4851.70 8" N INV IN=4829.73 12" S INV IN=4829.40 12" W INV IN=4829.40 12" E INV OUT=4829.30 SSMH #14 STA=1+79, 0.00' R RIM=4851.00 277-LF OF 8" WATERLINE STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 0.42% 0.42% PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 95-LF OF 24" PERFORATED PIPE 115-LF OF 24" PEFORATED PIPE 100-LF OF 24" PERFORATED PIPE 174-LF OF 12" PVC @ 0.22% 326-LF OF 12" PVC @ 0.22% 326-LF OF 12" PVC @ 0.22% 326-LF OF 12" PVC @ 0.22% 361-LF OF 12" PVC @ 0.22% 10-LF OF 8" PRESSURE SEWER 1082-LF OF 8" PRESSURE SEWER CAP 12" SANITARY SEWER LINE FOR FUTURE EXPANSION INV= 4829.78 SEE MATCH SHEET FOR ADDITIONAL INFORMATION 6' M I N . B U R Y 6' M I N . B U R Y (DROP INV=4826.94) (DROP INV=4827.27) 18 " M I N . SE P E R A T I O N 12 PP - 4 PL A N & P R O F I L E P A R K V I E W L A N E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p p a r k v i e w l n . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 7 A M W E S N 040'40'20' SCALE: 1" = 40' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 PARKVIEW LANE STA: 0+00 TO 12+20 MA T C H L I N E ST A : 1 2 + 2 0 2 6 1 2 5 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W ( 1 2 ' ' S D (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (1 2 ' ' S S 8' ' P S 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''PS 8''P S 8' ' P S 18 ' ' S S ) 18 ' ' S S ) 8' ' S S ) 8' ' S S ) 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 23+20 TBC/LP: 51.10 TBC: 51.50 TBC: 51.50 TBC: 51.81 SSMH #7 SSMH #6 SSMH #8 SSMH #9 CB #3C CB #3B SDMH #4 CB #4 CB #4A SDMH #5 CB #5A CB #5 13 18 BLOCK 1 BLOCK 3 44-LF OF 12" S.D. AT 0.22% 4 4 43-LF OF 12" S.D. AT 0.22% 5 6 5 PARKVIEW LANE 8 BLOCK 1 7 6 5 91011121314151617 12 11 10 9 8 7 6 5 4 3 2 1 BLOCK 3 TBC/HP: 53.50 TBC/HP: 53.50 TBC/LP: 52.50 TBC/LP: 52.50 TBC/HP: 53.80 TBC/HP: 53.80 TBC/LP: 53.20 TBC: 53.30 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 333A3333A 1 2 5 3 3 1 1 5 37-LF OF 12" S.D. AT 0.22% 5 7 15' P.U.E. (TYP.) 15' P.U.E. (TYP.) 1 2 5 1 2 5 7 1 1 86-LF OF 12" S.D. AT 0.22% 5 RI M R O C K RO A D 3 3A 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4840 4842 4844 4846 4848 4850 4852 4854 4856 4840 4842 4844 4846 4848 4850 4852 4854 4856 12+20 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 23+20 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 12" E INV IN=4834.23 12" W INV OUT=4834.13 SSMH #8 STA=15+18.43, 0.00' R RIM=4852.80 12" E INV IN=4835.12 12" W INV OUT=4835.02 SSMH #9 STA=18+79.54, 0.00' R RIM=4852.70 12" NE INV IN=4836.08 12" W INV OUT=4835.98 SSMH #7 STA=22+71.87, 0.00' R RIM=4853.50 12" N INV IN=4836.25 12" SW INV OUT=4836.15 SSMH #6 STA=22+94.44, 22.43' L RIM=4853.30 54-LF OF 8" WATERLINE 182-LF OF 8" WATERLINE159-LF OF 8" WATERLINE161-LF OF 8" WATERLINE320-LF OF 8" WATERLINE 277-LF OF 8" WATERLINE STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 S INV OUT=4849.25 CB #4A STA=19+25.87, 18.25' L GRATE=4852.25 N INV IN=4849.17 S INV OUT=4849.07 CB #4 STA=19+27.12, 18.25' R GRATE=4852.25 12" N INV IN=4849.05 24" E INV OUT=4848.05 SDMH #4 STA=19+27.12, 25.50' R RIM=4852.49 SUMP=4847.05 IN S T A L L F H ST A = 2 0 + 8 5 . 8 8 IN S T A L L F H ST A = 1 7 + 6 5 . 8 6 IN S T A L L F H ST A = 1 4 + 4 5 . 8 6 PT S T A = 2 2 + 7 5 . 1 4 EL = 4 8 5 3 . 2 0 PC S T A = 2 2 + 4 2 . 6 4 EL = 4 8 5 3 . 8 0 ST A = 1 9 + 2 5 . 8 7 EL = 4 8 5 2 . 5 0 HP S T A = 1 6 + 8 5 . 9 1 EL = 4 8 5 3 . 5 0 PT S T A = 2 3 + 1 4 . 1 5 EL = 4 8 5 3 . 3 0 PC S T A = 2 2 + 4 0 . 6 5 EL = 4 8 5 3 . 8 0 ST A = 1 9 + 2 7 . 1 2 EL = 4 8 5 2 . 5 0 HP S T A = 1 6 + 8 5 . 9 1 EL = 4 8 5 3 . 5 0 0.42% -0.41%0.41% -0.43% AL=114.97 0.42% -0.42%0.41% -1.18% AL=50.84 195-LF OF 24" PERFORATED PIPE PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 361-LF OF 12" PVC @ 0.22% 361-LF OF 12" PVC @ 0.22% 392-LF OF 12" PVC @ 0.22% 32-LF OF 12" PVC @ 0.22% 1082-LF OF 8" PRESSURE SEWER 68-LF OF 8" PRESSURE SEWER 6' M I N . B U R Y 6' M I N . B U R Y 18 " M I N . SE P E R A T I O N 13 PP - 5 PL A N & P R O F I L E P A R K V I E W L A N E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p p a r k v i e w l n . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 7 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 W E S N 040'40'20' SCALE: 1" = 40' MA T C H L I N E ST A : 1 2 + 2 0 PARKVIEW LANE STA: 12+20 TO 23+20 9 9 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 12 ' ' S D ) (8''SS 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 8' ' S S ) (12''SD 13 14 15 16 17 18 19 20 21 22 23 21225 6 141 BLOCK 7 BLOCK 6 BLOCK 6 BLOCK 8 6 7 8 TBC: 50.11 TBC/LP: 49.80 TBC: 50.10 TBC: 49.76 TBC/LP: 49.67 TBC: 49.98 TBC/HP: 50.86 TBC/HP: 50.80 TBC/LP: 50.70 TBC: 51.06 TBC: 50.86 TBC/LP: 50.46 TBC/LP: 50.46 TBC/HP: 51.80 TBC/HP: 52.00 TBC/LP: 51.60 TBC: 51.80 TBC: 51.40TBC: 51.40 TBC: 52.60 TBC: 52.80 TBC/HP: 52.91 TBC: 52.89 TBC: 52.90 TBC: 53.21 TBC/HP: 53.11 TBC: 53.20 DROP SSMH #26SSMH #27SSMH #28SSMH #15 SDMH #19 CB #19 SDMH #17 CB #17B CB #17 CB #17A SDMH #15 SDMH #16 CB #15 CB #15A CB #16 7 6 5 4 5 6 7 4 1 2 39-LF OF 12" S.D. AT 0.22% 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 STA: 0+49 (ADARA AVE) STA: 7+22.22 (TAGGART DR) 2 4 1 2 5 33A 3A 3 3 3 3 3 2 2333 3 22222 2 2 3 3 3 3 3 3 3 3 3 4 4 1 5 70-LF OF 12" S.D. AT 0.22% 6 5 5 7 37-LF OF 12" S.D. AT 0.22% 1 2 54 2 ADARA AVENUE YU K O N W A Y CA S C A D E C O U R T ME A D O W B R O C K L n STA: 3+67 (ADARA AVE) STA: 7+01 (YUKON WAY) STA: 6+99.25 (ADARA AVE) STA: 3+55.40 (CASCADE CT) STA: 10+28 (ADARA AVE) STA: 7+24.34 (RIMROCK RD) 4 2 4 4 5 6 7 1 7 1 2 5 1 1 4 4 1 RI M R O C K R O A D TBC: 53.43 44 6 2 1 2 5 15 9 9 5 TBC/LP: 49.703 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4842 4844 4846 4848 4850 4852 4854 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 332-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 324-LF OF 8" WATERLINE 283-LF OF 8" WATERLINE 44-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 313-LF OF 8" WATERLINE 8" E INV IN=4839.19 8" W INV IN=4835.19 8" N INV IN=4835.19 8" S INV OUT=4835.09 DROP SSMH #26 STA=10+28, 0.00' RIM=4853.30 8" W INV IN=4836.60 8" N INV IN=4836.60 8" E INV OUT=4836.50 SSMH #27 STA=6+99.25, 0.00' RIM=4851.70 8" W INV IN=4838.03 8" N INV IN=4838.03 8" E INV OUT=4837.93 SSMH #28 STA=3+67, 0.00' R RIM=4850.80 8" N INV IN=4831.29 8" S INV OUT=4831.19 SSMH #15 STA=0+49, 0.00' RIM=4849.90 IN S T A L L F H ST A = 4 + 2 2 . 1 8 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 S INV OUT=4848.35 CB #19 STA=7+38.83, 18.25' R GRATE=4851.35 12" N INV IN=4848.33 24" E INV OUT=4847.33 SDMH #19 STA=7+38.83, 25.44' R RIM=4851.60 SUMP=4846.33 ST A = 7 + 3 8 . 8 3 EL = 4 8 5 1 . 6 0 PC S T A = 9 + 7 6 . 1 2 EL = 4 8 5 2 . 6 0 PT S T A = 1 0 + 0 8 . 6 2 EL = 4 8 5 2 . 9 0 PC S T A = 1 0 + 4 7 . 6 2 EL = 4 8 5 2 . 8 9 PT S T A = 1 0 + 8 0 . 1 2 EL = 4 8 5 3 . 2 0 ST A = 6 + 4 7 . 1 3 EL = 4 8 5 2 . 0 0 ST A = 4 + 1 8 . 7 8 EL = 4 8 5 1 . 0 6 ST A = 3 + 3 8 . 3 5 EL = 4 8 5 0 . 7 0 HP S T A = 3 + 1 4 . 7 8 EL = 4 8 5 0 . 8 0 PT STA=1+01.22 EL=4849.80PC S T A = 0 + 6 8 . 7 2 EL = 4 8 5 0 . 1 1 PC S T A = 0 + 6 8 . 2 8 EL = 4 8 4 9 . 6 7 PT S T A = 1 + 0 0 . 7 8 EL = 4 8 4 9 . 9 8 PC S T A = 3 + 1 4 . 7 8 EL = 4 8 5 0 . 8 6 PT S T A = 3 + 4 7 . 2 8 EL = 4 8 5 0 . 4 6 PC S T A = 3 + 8 6 . 2 8 EL = 4 8 5 0 . 4 6 PT STA=4+18.78 EL=4850.86 PC S T A = 6 + 4 7 . 1 3 EL = 4 8 5 1 . 8 0 PT S T A = 6 + 7 9 . 6 3 EL = 4 8 5 1 . 4 0 PC S T A = 7 + 1 8 . 6 3 EL = 4 8 5 1 . 4 0 PT S T A = 7 + 5 1 . 1 3 EL = 4 8 5 1 . 8 0 PC S T A = 9 + 7 5 . 8 8 EL = 4 8 5 2 . 8 0 PT S T A = 1 0 + 0 8 . 3 8 EL = 4 8 5 3 . 1 1 PC S T A = 1 0 + 4 7 . 3 8 EL = 4 8 5 2 . 9 0 PT S T A = 1 0 + 7 9 . 8 8 EL = 4 8 5 3 . 2 1 N INV OUT=4847.45 CB #17B STA=3+38.35, 18.25' R GRATE=4850.45 W INV OUT=4847.21 CB #17A STA=3+85.03, 51.86' L GRATE=4850.21 37-LF OF 12" PVC @ 0.22% E INV IN=4847.13 W INV OUT=4847.03 CB #17 STA=3+48.53, 52.14' L GRATE=4850.21 12" E INV IN=4847.01 12" S INV IN=4847.30 24" N INV OUT=4846.01 SDMH #17 STA=3+41.28, 52.11' L RIM=4850.46 SUMP=4845.01 W INV OUT=4846.42 CB #15A STA=0+67.03, 51.86' L GRATE=4849.42 S INV OUT=4846.55 CB #16 STA=1+01.22, 18.25' R GRATE=4849.55 12" N INV IN=4846.53 24" E INV OUT=4845.53 SDMH #16 STA=1+01.22, 25.43' R RIM=4849.80 SUMP=4844.53 5-LF OF 24" PVC @ 0.22% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET X/C-X -0.60% AL=51.19 0.47% -0.42%0.45% 0.41%-0.44%0.42% 0.60% AL=51.98 0.60% AL=51.13 0.60% AL=50.91 0.41%-0.78% AL=51.19 0.79% AL=50.91 0.41%-0.78% AL=51.13 0.78% AL=50.98 0.44% 0.60% AL=51.13 0.60% AL=50.98 0.51% 0.40% PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 115-LF OF 24" PERFORATED PIPE 50-LF OF 24" PERFORATED PIPE 172-LF OF 8 " P V C @ 1 . 8 0 % 8" E INV OUT=4841.12 SSMH #29 STA=1+95.10, 0.00' RIM=4850.30 332-LF OF 8" PVC @ 0.40% 329-LF OF 8" PVC @ 0.40% 6' M I N . B U R Y 6' M I N . B U R Y 18 " M I N . SE P E R A T I O N (DROP INV=4835.19) 14 PP - 6 PL A N & P R O F I L E A D A R A A V E N U E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p a d a r a a v e . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 7 A M W E S N 040'40'20' SCALE: 1" = 40' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 ADARA AVENUE STA: 0+00 TO 11+00 MA T C H L I N E ST A : 1 1 + 0 0 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 HP S T A = 1 1 + 3 7 . 0 8 EL = 4 8 5 3 . 5 0 ST A = 1 3 + 6 0 . 9 3 EL = 4 8 5 2 . 5 6 HP S T A = 1 7 + 2 0 . 9 0 EL = 4 8 5 4 . 0 0 ST A = 1 9 + 2 0 . 9 1 EL = 4 8 5 3 . 0 0 PC S T A = 2 1 + 1 3 . 1 8 EL = 4 8 5 3 . 8 0 PT S T A = 2 1 + 8 6 . 6 8 EL = 4 8 5 3 . 3 0 IN S T A L L F H ST A = 2 1 + 5 5 . 7 6 -0.42%0.40%-0.50%0.42%-0.43% AL=115.78 57-LF OF 8" WATERLINE 23-LF OF 8" WATERLINE 361-LF OF 8" WATERLINE390-LF OF 8" WATERLINE332-LF OF 8" WATERLINE 8" NW INV OUT=4844.13 SSMH #22 STA=21+67.19, 50.00' R RIM=4853.30 8" SE INV IN=4843.85 8" W INV OUT=4843.75 SSMH #23 STA=21+17.41, 0.00' RIM=4853.90 8" E INV IN=4842.29 8" W INV OUT=4842.19 SSMH #24 STA=17+51.45, 0.00' L RIM=4853.90 8" E INV IN=4840.74 8" W INV OUT=4840.64 SSMH #25 STA=13+89.73, 0.00' L RIM=4852.80 SE INV OUT=4849.75 CB #6A STA=19+20.91, 18.25' L GRATE=4852.75 54-LF OF 12" PVC @ 0.22% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 12" N INV IN=4849.51 24" E INV OUT=4848.51 SDMH #6 STA=19+60.90, 25.44' R RIM=4853.00 SUMP=4847.51 NW INV IN=4849.63 S INV OUT=4849.53 CB #6 STA=19+60.90, 18.25' R GRATE=4852.75 ST A = 1 9 + 6 0 . 9 0 EL = 4 8 5 3 . 0 0 PC S T A = 2 1 + 1 5 . 1 9 EL = 4 8 5 3 . 7 0 PT STA=21+47.68 EL=4853.20HP S T A = 1 7 + 2 0 . 9 0 EL = 4 8 5 4 . 0 0 ST A = 1 3 + 9 7 . 1 1 EL = 4 8 5 2 . 7 0 HP S T A = 1 1 + 8 0 . 9 0 EL = 4 8 5 3 . 6 0 ST A = 1 1 + 3 7 . 0 8 EL = 4 8 5 3 . 4 3 ST A = 1 1 + 8 0 . 9 0 EL = 4 8 5 3 . 3 2 0.40%-0.42%0.40%-0.42%0.45%-0.98% AL=51.20 0.40% IN S T A L L F H ST A = 1 7 + 6 0 . 9 2 IN S T A L L F H ST A = 1 3 + 7 0 . 8 7 SE INV OUT=4849.31 CB #7A STA=13+60.93, 18.25' L GRATE=4852.31 51-LF OF 12" PVC @ 0.22% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 NW INV IN=4849.20 S INV OUT=4849.10 CB #7 STA=13+97.11, 18.25' R GRATE=4852.45 12" N INV IN=4849.08 24" E INV OUT=4848.08 SDMH #7 STA=13+97.11, 25.43' R RIM=4852.70 SUMP=4847.08 -0.40%0.51% 160-LF OF 24" PERORATED PIPE 5-LF OF 24" PVC @ 0.22% 110-LF OF 24" PERFORATED PIPE 5-LF OF 24" PVC @ 0.22% PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 71-LF OF 8" PVC @ 0.40% 366-LF OF 8" PVC @ 0.40% 362-LF OF 8" PVC @ 0.40% 362-LF OF 8" PVC @ 0.40% 6' M I N . B U R Y 6' M I N . B U R Y 18 " M I N . SE P E R A T I O N 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8' ' W 8' ' W 8' ' W 1 2 ' ' S D ) 1 2 ' ' S D ) (8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS(8''SS (8''SS TBC: 52.89 SSMH #24 SSMH #23 SSMH #22 SSMH #25 SDMH #6 CB #3A CB #3 CB #6 CB #6A SDMH #7 CB #7 CB #7A 22+0011+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 TBC: 53.43 17 BLOCK 5 TBC/HP: 53.60 TBC/HP: 53.50 TBC: 53.32 TBC/LP: 52.56 TBC/LP: 52.70 TBC/HP: 54.00 TBC/HP: 54.00 TBC/LP: 53.00 TBC/LP: 53.00 TBC/HP: 53.80 TBC/HP: 53.70 TBC/LP: 53.20 TBC/LP: 53.3022222 222222 2 2333A 3A 3 3 3 333333 3 1 1 1 5 6 7 51-LF OF 12" S.D. AT 0.22% 5 10' MIN. 1 2 5 1 2 5 10' MIN.10' MIN. 5 54-LF OF 12" S.D. AT 0.22% 5 6 7 5 1 2 5 7 7 1615 18 19 20 21 22 23 24 25 26 27 1 2 3456789101112131415 BLOCK 2 ADARA AVENUE 99 9 1 2 15 PP - 7 PL A N & P R O F I L E A D A R A A V E N U E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p a d a r a a v e . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 7 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 W E S N 040'40'20' SCALE: 1" = 40' ADARA AVENUE STA: 11+00 TO 22+00 MA T C H L I N E ST A : 1 1 + 0 0 8' ' W 8' ' W 8' ' W 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8' ' W 8' ' W 8' ' W (8 ' ' S S (1 2 ' ' S S 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 12 ' ' S S ) 8''PS 8' ' P S 8' ' P S 18''SS)18''SS) (1 8 ' ' S S 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)15''SS0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+60 TBC: 52.29 TBC: 52.60 TBC: 52.60 TBC: 52.90 TBC/HP: 53.10 TBC: 52.52 TBC: 52.27 TBC: 52.01 TBC/LP: 51.70 TBC: 51.70 TBC/LP: 51.30 TBC: 51.90 TBC/LP: 51.50 TBC: 53.11 TBC: 52.90 TBC: 52.80 TBC: 52.60 TBC/HP: 52.91 TBC: 52.89 TBC: 53.20 TBC: 51.81 TBC: 51.81 TBC/LP: 51.50 TBC/LP: 51.50 TBC/LP: 51.10 TBC/LP: 51.10 TBC: 51.50TBC/LP: 51.50 TBC: 51.60 TBC: 51.60 4 DROP SSMH #26 SSMH #34 SSMH #33 SDMH #9 SDMH #8 SDMH #20 SDMH #5 CB #9 CB #8 CB #20A CB #5A CB #8A CB #20 CB #5 1 OIL: 53.24 2 2 22 2 222 7 1 2 5 3 3 3 3 1 2 5 1 2 5 37-LF OF 12" S.D. AT 0.22%5 67 18 6 5 5 4 10' MIN. 1 3 3 3 3 3 RIMROCK ROAD 1 OPEN SPACE BLOCK 6 19 20 211716 23 1 12 OPEN SPACE 1 18 17 16 15 15 13 14 OPEN SPACE 1812 3 4 FE R R I S L n AD A R A AV E N U E PA R K V I E W LA N E PI N N A C L E LA N E BLOCK 9 BLOCK 2 BLOCK 3 BLOCK 5 BLOCK 4 BLOCK 1 15' P.U.E. (TYP.) 15' P.U.E. (TYP.)15' P.U.E. (TYP.)15' P.U.E. (TYP.) 15' P.U.E. (TYP.)15' P.U.E. (TYP.) TBC: 53.21 4 4 4 4 1 2 6 1 2 5 3 STA: 7+24.37 (RIMROCK RD) STA: 10+28 (ADARA AVE)STA: 2+36.52 (RIMROCK RD) STA: 0+49 (FERRIS LN) STA: 10+86 (RIMROCK RD) STA: 11+57.32 (PARKVIEW LN) 2 6 1 43-LF OF 12" S.D. AT 0.22% 43-LF OF 12" S.D. AT 0.22% 44-LF OF 12" S.D. AT 0.22% 44-LF OF 12" S.D. AT 0.22% 4 4 4 4 5 5 6 5 8 OIL: 51.80 5 6 DROP SSMH #10 LIFT STATION 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4842 4844 4846 4848 4850 4852 4854 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+60 8" W INV IN=4838.02 8" S INV OUT=4837.92 SSMH #34 STA=0+67.30, 0.00' R RIM=4853.10 63-LF OF 8" WATERLINE 376-LF OF 8" WATERLINE 361-LF OF 8" PVC @ 0.40% 8" N INV IN=4836.73 8" S INV OUT=4836.63 SSMH #33 STA=3+63.82, 0.00' R RIM=4851.60 W INV OUT=4848.05 CB #8A STA=2+84.64, 18.25' L GRATE=4851.05 HP S T A = 0 + 3 1 . 8 0 EL = 4 8 5 3 . 1 0 PR C S T A = 0 + 8 5 . 8 0 EL = 4 8 5 2 . 5 2 PT S T A = 1 + 2 4 . 7 6 EL = 4 8 5 2 . 2 7 PC S T A = 1 + 8 8 . 6 8 EL = 4 8 5 2 . 0 1 PT S T A = 2 + 2 1 . 1 4 EL = 4 8 5 1 . 7 0 PC S T A = 2 + 5 2 . 1 4 EL = 4 8 5 1 . 7 0 PT S T A = 2 + 8 4 . 6 4 EL = 4 8 5 1 . 3 0 -0.42% -0.77% AL=75.27 -0.60% AL=40.98 -0.60% AL=50.94 -0.78% AL=51.13 0.41% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 -0.60% AL=50.94 -0.57%0.41% PC STA=0+86.62 EL=4852.60 PT STA=1+19.12 EL=4852.29 ST A = 1 + 8 8 . 6 8 EL = 4 8 5 1 . 9 0 ST A = 2 + 8 4 . 6 4 EL = 4 8 5 1 . 5 0 ST A = 2 + 3 6 . 4 7 EL = 4 8 5 1 . 7 0 -0.42%-0.42% N INV OUT=4848.45 CB #9 STA=2+22.39, 51.92' L GRATE=4851.45 7-LF OF 12" PVC @ 0.22% IN S T A L L F H ST A = 2 + 9 5 . 1 1 E INV IN=4847.97 W INV OUT=4847.87 CB #8 STA=2+84.64, 18.25' R GRATE=4851.25 12" E INV IN=4847.85 24" N INV OUT=4846.85 SDMH #8 STA=2+84.65, 25.50' R RIM=4851.50 SUMP=4845.85 5-LF OF 24" PVC @ 0.22% PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL INSTALL FH STA=6+70.82 IN S T A L L F H ST A = 1 0 + 3 2 . 4 2 PC STA=6+72.47 EL=4852.90 PT S T A = 7 + 0 4 . 9 7 EL = 4 8 5 3 . 2 1 PC S T A = 7 + 4 3 . 9 7 EL = 4 8 5 3 . 2 0 PT S T A = 7 + 7 6 . 4 7 EL = 4 8 5 2 . 8 9 PC STA=10+34.01 EL=4851.81 PT S T A = 1 0 + 6 6 . 5 1 EL = 4 8 5 1 . 5 0 PC S T A = 1 1 + 0 5 . 5 1 EL = 4 8 5 1 . 5 0 PT S T A = 1 1 + 3 8 . 0 1 EL = 4 8 5 1 . 1 0 ST A = 1 2 + 4 5 EL = 4 8 5 1 . 6 0 0.60% AL=50.98 -0.60% AL=51.13 8" E INV IN=4839.19 8" W INV IN=4835.19 8" N INV IN=4835.19 8" S INV OUT=4835.09 DROP SSMH #26 STA=7+24.34, 0.00' R RIM=4853.30 38-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 314-LF OF 8" WATERLINE 38-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 58-LF OF 8" WATERLINE 105-LF OF 8" WATERLINE 12" W INV IN=4826.94 12" E INV IN=4833.34 8" N INV IN=4833.64 18" S INV OUT=4826.34 DROP SSMH #10 STA=10+86.02, 0.00' R RIM=4851.80 S INV OUT=4848.25 CB #5A STA=10+67.76, 51.99' L GRATE=4851.25 44-LF OF 12" PVC @ 0.22% 12" N INV IN=4848.15 12" SW INV IN=4847.76 24" E INV OUT=4846.76 SDMH #5 STA=11+11.51, 51.99' L RIM=4851.50 SUMP=4845.76 43-LF OF 12" PVC @ 0.22% NE INV OUT=4847.85 CB #5 STA=11+38.01, 18.25' L GRATE=4850.85 NW INV OUT=4847.85 CB #20 STA=11+37.99, 18.25' R GRATE=4850.85 43-LF OF 12" PVC @ 0.22% 12" SE INV IN=4847.76 12" N INV IN=4848.15 24" W INV OUT=4846.76 SDMH #20 STA=11+11.49, 52.00' R RIM=4851.50 SUMP=4845.76 44-LF OF 12" PVC @ 0.22% S INV OUT=4848.25 CB #20A STA=10+67.74, 52.01' R GRATE=4851.25 PC STA=6+72.22 EL=4853.11 PT STA=7+04.72 EL=4852.80 PC STA=7+43.72 EL=4852.60 PT STA=7+76.22 EL=4852.91 PC S T A = 1 0 + 3 3 . 9 9 EL = 4 8 5 1 . 8 1 PT S T A = 1 0 + 6 6 . 4 9 EL = 4 8 5 1 . 5 0 PC S T A = 1 1 + 0 5 . 4 9 EL = 4 8 5 1 . 5 0 PT S T A = 1 1 + 3 7 . 9 9 EL = 4 8 5 1 . 1 0 ST A = 1 2 + 4 4 . 9 9 EL = 4 8 5 1 . 6 0 -0.60% AL=51.13 0.60% AL=50.98 -0.60% AL=51.06 -0.78% AL=51.05 -0.78% AL=51.06 -0.60% AL=51.05 -0.43% -0.42% 0.47% 0.47% 160-LF OF 24" PERFORATED PIPE PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 142-LF OF 18" PVC @ 0.12% 18" N INV IN=4826.17 15" S INV IN=4826.52 18" W INV OUT=4826.07 SSMH #11 STA=12+28.48, 0.00' R RIM=4851.50 297-LF OF 8" PVC @ 0.40% 362-LF OF 8" PVC @ 0.40% 79-LF OF 8" PRESSURE SEWER 67-LF OF 8" PRESSURE SEWER 10-LF OF 8" PRESSURE SEWER 6' M I N . B U R Y 6' M I N . B U R Y (DROP INV=4835.19) (DROP INV =4826.94) (DROP INV=4827.27) 175-LF OF 8" WATERLINE INSTALL FH STA=12+43.46 12-LF OF 8" WATERLINE PLUG & THRUST BLOCK 10' BEYOND PROPERTY LINE 18 " M I N . 30-LF OF 15" PVC @ 0.15% INV= 4826.56 16 PP - 8 PL A N & P R O F I L E R I M R O C K R O A D Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p r i m r o c k r d . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 7 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 W E SN 040'40'20' SCALE: 1" = 40' RIMROCK ROAD 9 9 9 99 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4842 4844 4846 4848 4850 4852 4854 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+004+00 8" S INV OUT=4842.68 SSMH #32 STA=0+35.40, 0.00' RIM=4851.90 320-LF OF 8 " P V C @ 1 . 9 0 % 8" W INV IN=4836.60 8" N INV IN=4836.60 8" E INV OUT=4836.50 SSMH #27 STA=3+55.40, 0.00' L RIM=4851.70 38-LF OF 8" WATERLINE 90-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 175-LF OF 8" WATERLINE PCC STA=0+25.97 EL=4852.20 PR C S T A = 1 + 0 1 . 4 4 EL = 4 8 5 1 . 5 8 PT S T A = 1 + 4 0 . 6 4 EL = 4 8 5 1 . 3 2 ST A = 2 + 1 1 . 4 8 EL = 4 8 5 1 . 0 0 PC STA=3+03.52 EL=4851.40 PT S T A = 3 + 3 6 . 0 2 EL = 4 8 5 1 . 8 0 INSTALL FH STA=3+01.90 IN S T A L L F H ST A = 0 + 2 3 . 0 5 -0.60% AL=103.93 -0.61% AL=42.79 -0.45%0.43%0.78% AL=50.98 -0.65% AL=104.45 -0.47% AL=42.79 -0.45%0.44%0.78% AL=51.13 PC C S T A = 0 + 2 5 . 9 7 EL = 4 8 5 2 . 2 0 PR C S T A = 1 + 0 1 . 4 4 EL = 4 8 5 1 . 5 2 PT S T A = 1 + 4 0 . 6 4 EL = 4 8 5 1 . 3 2 ST A = 2 + 1 1 . 3 3 EL = 4 8 5 1 . 0 0 PC S T A = 3 + 0 3 . 2 8 EL = 4 8 5 1 . 4 0 PT S T A = 3 + 3 5 . 7 8 EL = 4 8 5 1 . 8 0 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 W INV OUT=4847.75 CB #18A STA=2+11.48, 18.25' L GRATE=4850.75 12" E INV IN=4847.55 24" S INV OUT=4846.55 24" N INV OUT=4846.55 SDMH #18 STA=2+11.34, 25.50' R RIM=4851.04 SUMP=4845.55 E INV IN=4847.67 W INV OUT=4847.57 CB #18 STA=2+11.33, 18.25' R GRATE=4850.94 5-LF OF 24" PVC @ 0.22% 7-LF OF 12" PVC @ 0.22% S INV OUT=4848.35 CB #19 STA=3+73.75, 39.53' L GRATE=4851.35 12" N INV IN=4848.33 24" E INV OUT=4847.33 SDMH #19 STA=3+80.93, 39.51' L RIM=4851.60 SUMP=4846.33 6' M I N . B U R Y PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 85-LF OF 24" PERFORATED PIPE40-LF OF 24" PERFORATED PIPE PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W8''W8''W8''W8''W 8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) TBC: 51.32 TBC: 51.52 TBC/HP: 52.20 TBC: 51.58 TBC: 51.32 TBC/LP: 51.00 TBC: 51.40 TBC/LP: 51.00 TBC: 51.40 TBC/HP: 51.80 TBC/HP: 52.00 TBC/LP: 51.60 TBC: 51.65TBC: 51.80 OIL: 52.70 5 BLOCK 6 0+00 1+00 2+00 3+00 4+004+00 6 SSMH #32 SSMH #27 SDMH #19 CB #19 SDMH #18CB #18 CB #18A 5 7 5 37-LF OF 12" S.D. AT 0.22% 1 1 2 2 2 2 2 2 1 3 3 3 3 3 3 2 4 2 1 2 5 4 4 5 6 1 BLOCK 6 4 3 2 1 OPEN SPACE 25 24 23 22 BLOCK 5 20 21 19 CASCADE COURT AD A R A A V E N U E 9 7 STA: 3+55.40 (ALIGNMENT I) STA: 6+99.25 (ADARA AVE) 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+40 8" S INV OUT=4842.19 SSMH #31 STA=2+36.89, 0.00' RIM=4851.60 200-LF OF 8" P V C @ 1 . 5 0 % 8" N INV IN=4839.19 8" S INV OUT=4839.09 SSMH #30 STA=4+37.12, 0.00' RIM=4851.50 264-LF OF 8" PVC @ 0.40% 8" W INV IN=4838.03 8" N INV IN=4838.03 8" E INV OUT=4837.93 SSMH #28 STA=7+01, 0.00' RIM=4850.80 PC S T A = 0 + 6 3 . 0 2 EL = 4 8 5 2 . 3 0 HP S T A = 3 + 3 2 . 3 0 EL = 4 8 5 2 . 0 0 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 PT S T A = 0 + 9 5 . 5 2 EL = 4 8 5 1 . 7 0 ST A = 1 + 8 7 . 4 3 EL = 4 8 5 1 . 3 0 PC S T A = 6 + 4 9 . 2 2 EL = 4 8 5 0 . 4 6 PT S T A = 6 + 8 1 . 7 2 EL = 4 8 5 0 . 8 6 -1.17% AL=51.23 -0.44%0.48% -0.49% 0.79% AL=50.91 363-LF OF 8" WATERLINE 270-LF OF 8" WATERLINE W INV OUT=4848.05 CB #12A STA=1+87.43, 18.25' L GRATE=4851.05 40-LF OF 12" PVC @ 0.22% W INV OUT=4847.21 CB #17A STA=6+49.22, 18.25' L GRATE=4850.21 20-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE E INV IN=4847.96 W INV OUT=4847.86 CB #12 STA=1+72.03, 18.25' R GRATE=4851.10 12" E INV IN=4847.84 24" N INV OUT=4846.84 SDMH #12 STA=1+72.03, 25.50' R RIM=4851.39 SUMP=4845.84 5-LF OF 24" PVC @ 0.22% PC S T A = 0 + 6 2 . 4 6 EL = 4 8 5 2 . 0 0 PT S T A = 0 + 9 4 . 9 6 EL = 4 8 5 1 . 6 9 ST A = 1 + 7 2 . 0 3 EL = 4 8 5 1 . 3 5 HP S T A = 3 + 3 2 . 0 3 EL = 4 8 5 2 . 0 0 PC S T A = 6 + 4 8 . 7 8 EL = 4 8 5 0 . 4 6 PT S T A = 6 + 8 1 . 2 8 EL = 4 8 5 0 . 8 6 -0.60% AL=50.88 -0.45%0.41% -0.49% 0.78% AL=51.19 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 E INV IN=4847.13 W INV OUT=4847.03 CB #17 STA=6+48.78, 18.25' R GRATE=4850.21 12" E INV IN=4847.01 12" S INV IN=4847.30 24" N INV OUT=4846.01 SDMH #17 STA=6+48.78, 25.50' R RIM=4850.46 SUMP=4845.01 5-LF OF 24" PVC @ 0.22%70-LF OF 12" PVC @ 0.22% N INV OUT=4847.45 CB #17B STA=7+19.13, 28.73' R GRATE=4850.45 INSTALL FH STA=3+02.53 PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 75-LF OF 24" PERFORATED PIPE 170-LF OF 24" PERFORATED PIPE PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 6' M I N . B U R Y 8" W INV IN=4840.86 8" E INV OUT=4840.76 SSMH #36 STA=0+43.24, 0.00' L RIM=4852.00 8' ' W 8' ' W 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W 8' ' W 8' ' W 12''SD) 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) SSMH #36 SSMH #30SSMH #31 SSMH #28 SDMH #12 CB #12 CB #12A SDMH #17 CB #17B CB #17 CB #17A BLOCK 6 8 YUKON WAY AD A R A A V E N U E PI N N A C L E L A N E 9 8 7 61011 9 10 11 12 13 14 13 12 11 17 16 15 14 1 OPEN SPACE BLOCK 7 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+40 TBC: 51.80 TBC: 52.24 TBC/HP: 52.30 TBC: 51.70 TBC: 51.69 TBC/HP: 52.00 TBC/LP: 51.35 TBC/LP: 51.30 TBC/HP: 52.00 TBC/HP: 52.00 TBC/LP: 50.46 TBC/LP: 50.46 TBC/HP: 50.86 TBC/HP: 50.80 TBC/LP: 50.70 TBC: 51.06 TBC: 50.86 7 6 5 4 4 TBC/HP: 52.40 1 40-LF OF 12" S.D. AT 0.22%1 2 2 2 222 2 5 IRRIGATION BOX 3 2 1 6 1 10' MIN. 10' MIN. 1 2 5 3 3 3A 3 33 3 2 4 37-LF OF 12" S.D. AT 0.22% 5 67 70-LF OF 12" S.D. AT 0.22% 4 4 5 1 STA: 7+01 (YUKON WAY) STA: 3+67 (ADARA AVE) BLOCK 9 BLOCK 5 STA: 0+43.24 (YUKON WAY) STA: 3+78.01 (PINNACLE LN) 17 PP - 9 PL A N & P R O F I L E C A S C A D E C O U R T & Y U K O N W A Y Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p c a s c a d e c t & y u k o n w a y . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 8 A M W E SN 040'40'20' SCALE: 1" = 40' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 CASCADE COURT YUKON WAY W E SN 040'40'20' SCALE: 1" = 40' 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W (12 ' ' S D 8' ' S S ) 8' ' S S ) 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) 8' ' S S ) 10' MIN. BLOCK 6 1 OPEN SPACE PINNACLE LANE TBC/HP: 51.80 TBC/LP: 51.10 TBC/LP: 51.00TBC: 51.15 TBC: 51.40 TBC: 51.92 TBC/HP: 52.06 TBC: 51.80 TBC: 51.80 TBC/HP: 52.00 TBC: 51.69 TBC: 51.70 TBC/HP: 52.30 TBC: 52.24 TBC/HP: 52.40 TBC: 52.14 TBC/LP: 51.30 TBC: 51.51 TBC/LP: 51.40 TBC/HP: 52.60 TBC: 52.60 TBC: 52.90 TBC/HP: 53.10 TBC: 52.52 TBC: 52.27TBC: 52.29 11+000+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 YU K O N W A Y ME A D O W B R O C K L n RI M R O C K R O A D SSMH #34SSMH #18 SSMH #36 SSMH #35 SDMH #10 CB #10A SDMH #11 CB #10CB #11 CB #11A 51-LF OF 12" S.D. AT 0.22% 5 6 7 5 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 131211 14 15 16 1 2 5 7 3 3 3 3 3 3 3 3 3 3 3A33 3 4 4 7 1 2 6 6" REDUCER TO NORTH FOR FIRE HYDRANT CONNECTION 1 TBC: 51.40 10' MIN. 46-LF OF 12" S.D. AT 0.22% 5 6 7 5 1 5 2 1 1 7 1 2 5 1 2 34567891011161213 14 15 16 17 7 8 BLOCK 9 BLOCK 7 9 10' MIN. 9 9 9 3 SSMH #371 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4842 4844 4846 4848 4850 4852 4854 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 8" W INV IN=4838.02 8" S INV OUT=4837.92 SSMH #34 STA=10+40.26, 0.00' RIM=4853.108" W INV IN=4839.44 8" E INV OUT=4839.34 SSMH #35 STA=7+09.13, 0.00' RIM=4851.40 8" W INV IN=4840.86 8" E INV OUT=4840.76 SSMH #36 STA=3+78.01, 0.00' RIM=4852.00 19-LF OF 8" WATERLINE 312-LF OF 8" WATERLINE327-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE5-LF OF 8" WATERLINE 310-LF OF 8" WATERLINE INSTALL FH STA=10+32.54 ST A = 7 + 1 0 . 8 4 EL = 4 8 5 1 . 4 0 PC S T A = 9 + 8 3 . 1 7 EL = 4 8 5 2 . 6 0 PR C S T A = 1 0 + 2 1 . 8 6 EL = 4 8 5 2 . 9 0 HP S T A = 4 + 6 9 . 6 2 EL = 4 8 5 2 . 4 0 ST A = 3 + 2 6 . 1 6 EL = 4 8 5 1 . 8 0 ST A = 4 + 3 0 . 2 8 EL = 4 8 5 2 . 2 4 ST A = 1 + 4 7 . 9 3 EL = 4 8 5 1 . 0 0 ST A = 1 + 1 7 . 1 3 EL = 4 8 5 1 . 1 5 PR C S T A = 0 + 7 8 . 4 4 EL = 4 8 5 1 . 4 0 PC C S T A = 0 + 2 4 . 5 0 EL = 4 8 5 1 . 9 2 ST A = 6 + 8 2 . 1 9 EL = 4 8 5 1 . 5 1 HP S T A = 1 0 + 4 0 . 1 4 EL = 4 8 5 3 . 1 0 PR C S T A = 1 0 + 7 0 . 6 6 EL = 4 8 5 2 . 5 2 SW INV OUT=4848.14 CB #10A STA=7+10.84, 18.25' L GRATE=4851.1446-LF OF 12" PVC @ 0.22% IN S T A L L F H ST A = 7 + 2 1 . 0 4 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 12" N INV IN=4847.92 24" E INV OUT=4846.92 SDMH #10 STA=6+82.20, 25.44' R RIM=4851.32 SUMP=4845.92 NE INV IN=4848.04 S INV OUT=4847.94 CB #10 STA=6+82.19, 18.25' R GRATE=4851.04 5-LF OF 24" PVC @ 0.22% IN S T A L L F H ST A = 3 + 8 9 IN S T A L L F H ST A = 0 + 6 8 . 3 0 -0.70% AL=75.15 -0.61% AL=40.69 -0.49%0.45% 0.42%0.41%-0.42% -0.40% 0.44% 0.74% AL=40.69 1.04% AL=19.22 -0.77% AL=56.01 -1.37% AL=51.2 3 0.42%-0.60% AL=50.88 1.17% AL=51.23 -0.41% -0.40%0.42% -0.60% AL=50.94 PC S T A = 0 + 7 9 . 7 8 EL = 4 8 5 1 . 8 0 PT S T A = 1 + 1 2 . 2 8 EL = 4 8 5 1 . 1 0 PC S T A = 3 + 2 6 . 2 8 EL = 4 8 5 2 . 0 0 PT S T A = 3 + 5 8 . 7 8 EL = 4 8 5 1 . 6 9 PC STA=3+97.78 EL=4851.70 PT S T A = 4 + 3 0 . 2 8 EL = 4 8 5 2 . 3 0 ST A = 4 + 6 9 . 6 2 EL = 4 8 5 2 . 1 4 ST A = 6 + 8 2 . 1 9 EL = 4 8 5 1 . 3 0 PC S T A = 9 + 8 8 . 4 3 EL = 4 8 5 2 . 6 0 PT S T A = 1 0 + 2 0 . 9 3 EL = 4 8 5 2 . 2 9 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 SW INV OUT=4847.75 CB #11A STA=1+47.93, 18.25' L GRATE=4850.75 51-LF OF 12" PVC @ 0.22% 12" N INV IN=4847.52 24" E INV OUT=4846.52 SDMH #11 STA=1+12.28, 25.43' R RIM=4851.09 SUMP=4845.52 NE INV IN=4847.64 S INV OUT=4847.54 CB #11 STA=1+12.28, 18.25' R GRATE=4850.85 5-LF OF 24" PVC @ 0.22% 18 " M I N . 18 " M I N . 6' M I N . B U R Y PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL 90-LF OF 24" PERFORATED PIPE 155-LF OF 24" PERFORATED PIPE PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 264-LF OF 8" PVC @ 0.40% 8" E INV OUT=4841.91 SSMH #37 STA=1+14.29, 0.00' RIM=4851.20 331-LF OF 8" PVC @ 0.40% 331-LF OF 8" PVC @ 0.40% 3-LF OF 8" WATERLINE 8" S INV OUT=4842.55 SSMH #18 STA=0+59.95, 10.00' L RIM=4851.70 6' M I N . B U R Y 18 PP - 1 0 PL A N & P R O F I L E P I N N A C L E L A N E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p p i n n a c l e l n . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 8 A M W E S N 040'40'20' SCALE: 1" = 40' AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 PINNACLE LANE 4820 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4820 4822 4824 4826 4828 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+60 8" S INV OUT=4842.55 SSMH #18 STA=0+54.11, 0.00' L RIM=4851.70 181-LF OF 8" PVC @ 0.40% 8" N INV IN=4832.36 8" S INV OUT=4832.26 SSMH #16 STA=4+78.75, 0.00' L RIM=4850.60 243-LF OF 8" PVC @ 0.40% 8" N INV IN=4831.29 8" S INV OUT=4831.19 SSMH #15 STA=7+22.22, 0.00' RIM=4849.90 364-LF OF 8" PVC @ 0.40% 166-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 48-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 314-LF OF 8" WATERLINE 0.42% 1.37% AL=51.23 -0.45% -0.48% -0.42% 0.60% AL=50.92 0.60% AL=51.19 0.70% AL=75.15 -0.64% AL=40.69 -0.48% -1.57% AL=51. 0 5 0.71% AL=51.05 0.50% -0.46% 0.45% 0.42% PC S T A = 0 + 8 3 . 8 9 EL = 4 8 5 1 . 1 0 PT S T A = 1 + 1 6 . 3 9 EL = 4 8 5 1 . 8 0 ST A = 2 + 8 7 . 2 9 EL = 4 8 5 1 . 0 6 HP S T A = 3 + 3 5 . 2 9 EL = 4 8 5 1 . 3 0 ST A = 1 + 8 3 . 2 9 EL = 4 8 5 1 . 5 0 PC S T A = 6 + 7 0 . 4 4 EL = 4 8 4 9 . 6 7 PT STA=7+02.94 EL=4849.98 PC S T A = 7 + 4 1 . 9 4 EL = 4 8 4 9 . 8 0 PT S T A = 7 + 7 4 . 4 4 EL = 4 8 5 0 . 1 1 0.50% PC C S T A = 0 + 2 8 . 6 1 EL = 4 8 5 1 . 5 4 PR C S T A = 0 + 8 2 . 5 5 EL = 4 8 5 2 . 0 6 PT S T A = 1 + 2 1 . 2 4 EL = 4 8 5 1 . 8 0 PC S T A = 1 + 8 3 . 2 9 EL = 4 8 5 1 . 5 0 PT S T A = 2 + 1 5 . 7 9 EL = 4 8 5 0 . 7 0 PC S T A = 2 + 5 4 . 7 9 EL = 4 8 5 0 . 7 0 PT S T A = 2 + 8 7 . 2 9 EL = 4 8 5 1 . 0 6 ST A = 6 + 7 0 . 4 4 EL = 4 8 4 9 . 7 6 ST A = 6 + 8 4 . 9 3 EL = 4 8 4 9 . 7 0 ST A = 7 + 7 4 . 4 4 EL = 4 8 5 0 . 1 0 SW INV OUT=4847.75 CB #11A STA=0+46.33, 88.03' L GRATE=4850.75 51-LF OF 12" PVC @ 0.22% NE INV IN=4847.64 S INV OUT=4847.54 CB #11 STA=0+82.64, 52.18' L GRATE=4850.85 7-LF OF 12" PVC @ 0.22% 12" N INV IN=4847.52 24" E INV OUT=4846.52 SDMH #11 STA=0+89.82, 52.15' L RIM=4851.09 SUMP=4845.52 W INV OUT=4847.82 CB #13B STA=2+87.29, 18.25' L GRATE=4850.82 75-LF OF 12" PVC @ 0.22% INSTALL FH STA=2+73.66 INSTALL FH STA=6+58.75 W INV OUT=4846.42 CB #15A STA=6+70.44, 18.25' L GRATE=4849.42 39-LF OF 12" PVC @ 0.22% S INV OUT=4846.55 CB #16 STA=7+40.69, 52.14' L GRATE=4849.55 7-LF OF 12" PVC @ 0.22% 12" N INV IN=4846.53 24" E INV OUT=4845.53 SDMH #16 STA=7+47.87, 52.11' L RIM=4849.80 SUMP=4844.53 12" E INV IN=4846.21 24" N INV OUT=4845.21 SDMH #15 STA=6+84.92, 25.50' R RIM=4849.70 SUMP=4843.70 E INV IN=4846.33 W INV OUT=4846.23 CB #15 STA=6+84.93, 18.25' R GRATE=4849.455-LF OF 24" PVC @ 0.22% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 S INV OUT=4847.45 CB #13A STA=2+17.35, 52.00' R GRATE=4850.45 36-LF OF 12" PVC @ 0.22% N INV IN=4847.37 S INV OUT=4847.27 CB #13 STA=2+53.23, 52.00' R GRATE=4850.45 8-LF OF 12" PVC @ 0.22% 12" N INV IN=4847.25 12" E INV IN=4847.65 24" W INV OUT=4846.25 SDMH #13 STA=2+60.74, 52.02' R RIM=4850.70 SUMP=4844.70 PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL HP S T A = 1 0 + 3 4 . 1 1 EL = 4 8 5 1 . 2 0 ST A = 1 1 + 3 8 . 1 1 EL = 4 8 5 0 . 7 0 ST A = 1 2 + 4 4 . 9 3 EL = 4 8 5 0 . 2 5 ST A = 1 2 + 4 5 . 0 7 EL = 4 8 5 0 . 3 5 PT STA=11+38.11 EL=4850.81 PC STA=11+05.61 EL=4850.50 PT STA=10+66.61 EL=4850.50 PC STA=10+34.11 EL=4851.20 -1.37% AL=50.9 9 0.60% AL=51.12 -0.43% STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL -0.48% -0.42% INSTALL FH STA=10+30.75 S INV OUT=4847.25 CB #22A STA=10+67.86, 51.93' L GRATE=4850.25 37-LF OF 12" PVC @ 0.22% N INV IN=4847.17 S INV OUT=4847.07 CB #22 STA=11+04.36, 52.07' L GRATE=4850.25 7-LF OF 12" PVC @ 0.22% 12" N INV IN=4847.05 24" E INV OUT=4846.05 SDMH #22 STA=11+11.61, 52.05' L RIM=4850.50 SUMP=4845.06 W INV OUT=4847.10 CB #23A STA=12+43.61, 18.25' L GRATE=4850.10 8" N INV IN=4829.73 12" S INV IN=4829.40 12" W INV IN=4829.40 12" E INV OUT=4829.30 SSMH #14 STA=10+86, 0.00' RIM=4851.00 12" S INV IN=4829.83 12" N INV OUT=4829.73 SSMH #13A STA=12+35, 0.00' RIM=4850.40 40-LF OF 8" WATERLINE 175-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE PLUG & THRUST BLOCK 10' BEYOND PROPERTY LINE CAP 10' BEYOND PROPERTY LINE INV= 4829.87 180-LF OF 24" PERFORATED PIPE 12" E INV IN=4846.90 24" N INV OUT=4845.90 SDMH #23 STA=12+43.52, 25.50' R RIM=4850.25 SUMP=4844.90 12" E INV IN=4847.02 12" W INV OUT=4846.92 CB #23 STA=12+43.53, 18.25' R RIM=4850.19 SUMP=4846.92 5-LF OF 24" PVC @ 0.22% 45-LF OF 24" PERFORATED PIPE 243-LF OF 8" PVC @ 0.40% 8" N INV IN=4841.83 8" W INV IN=4833.43 8" S INV OUT=4833.33 DROP SSMH #17 STA=2+35.29, 0.00' L RIM=4851.30 20-LF OF 12" PVC @ 0.22% 49-LF OF 8" WATERLINE 385-LF OF 8" WATERLINE HP S T A = 3 + 3 5 . 2 9 EL = 4 8 5 1 . 3 0 6' M I N . B U R Y 149-LF OF 12" PVC @ 0.22% 6' M I N . B U R Y (DROP INV=4833.43) 8' ' W 8' ' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' ' W (1 2 ' ' S D 8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS)8''SS) 8' ' S S ) (12''SS (12''SS 12 ' ' S S ) 12 ' ' S S ) 12 ' ' S S ) 8 ' ' S S ) 8' ' W 8' ' W (1 2 ' ' S D ( 1 2 ' ' S D TBC: 51.80 TBC/HP: 52.06 TBC: 51.54 TBC: 51.40 TBC: 51.15 TBC/LP: 51.10 TBC: 51.80 TBC: 51.06 TBC/LP: 50.70 TBC/HP: 51.30TBC/LP: 51.06 TBC/HP: 51.30 TBC/LP: 50.70 TBC/LP: 49.67 TBC: 49.76 TBC/LP: 49.80 TBC: 49.98 TBC: 50.11 TBC: 50.10 TBC: 51.20 TBC: 51.20 TBC: 50.70 TBC/LP: 50.25 TBC/LP: 50.35 TBC: 50.81 TBC/LP: 50.50 TBC/LP: 50.50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+60 TBC/LP: 51.00 OIL: 52.41 SSMH #18 SSMH #16 SSMH #14SSMH #15 SSMH #13A SDMH #11 CB #11 SDMH #13 CB #11A CB #13B SDMH #22 CB #13 CB #13A SDMH #23 CB #22CB #22A CB #23 CB #23A SDMH #15 SDMH #16 CB #15 CB #15A CB #16 51-LF OF 12" S.D. AT 0.22%5 5 6 1 2 2 2 2 2 2 1 2 5 7 3 3 3 3 5 75-LF OF 12" S.D. AT 0.22% 1 24 2 1 2 233 3 5 4 5 4 5 6 7 2 3A 3 322 2 7 5 39-LF OF 12" S.D. AT 0.22% 3 3 3 3 4 4 5 6 6 5 1 2 2 23 2 4 5 1 2 5 1 2 2 4 1 5 4 4 5 6 37-LF OF 12" S.D. AT 0.22% 5 5 6 7 7 37-LF OF 12" S.D. AT 0.22% 1 8 4 BLOCK 7 12 OPEN SPACE BLOCK 5 11 BLOCK 9 6 BLOCK 8 5 4 3 2 1789101817 16 15 567 3 2 1 1113 TAGGART DRIVE AD A R A AV E N U E PA R K V I E W LA N E PI N N A C L E LA N E WI N T E R DR I V E 9 3 9 9 92 1112 BLOCK 8 TBC/LP: 49.70 1DROP SSMH #17 OIL: 50.55 20' SANITARY SEWER EASEMENT 19 PP - 1 1 PL A N & P R O F I L E T A G G A R T D R I V E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p t a g g a r t d r . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 8 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 TAGGART DRIVE W E SN 040'40'20' SCALE: 1" = 40' 4842 4844 4846 4848 4850 4852 4854 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 4+00 5+00 5+30 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 S INV OUT=4847.45 CB #13A STA=4+49.66, 17.94' L GRATE=4850.45S INV OUT=4847.33 CB #14B STA=1+29.19, 18.25' L GRATE=4850.33 8" N INV IN=4841.83 8" W INV IN=4833.43 8" S INV OUT=4833.33 DROP SSMH #17 STA=5+01.67, 0.00' R RIM=4851.30 224-LF OF 8" PVC @ 0.40% 8" W INV IN=4834.43 8" E INV OUT=4834.33 SSMH #19 STA=2+75.62, 3.03' R RIM=4851.30 95-LF OF 8" PVC @ 0.40% 8" W INV IN=4834.91 8" S INV IN=4834.91 8" E INV OUT=4834.81 SSMH #20 STA=1+81.03, 0.00' RIM=4850.80 121-LF OF 8" PVC @ 0.40% 8" E INV OUT=4835.39 SSMH #21 STA=0+60.04, 0.00' RIM=4850.80 33-LF OF 8" WATERLINE 47-LF OF 8" WATERLINE 16-LF OF 8" WATERLINE 8-IN GATE VALVE STA=1+75.98, 11.00' L 83-LF OF 8" WATERLINE 83-LF OF 8" WATERLIN E 150-LF OF 8" WATERLINE 8-IN GATE VALVE STA=5+07.66, 11.00' L 5-LF OF 8" WATERLINE23-LF OF 8" WATERLINE PC S T A = 0 + 7 3 . 6 5 EL = 4 8 5 1 . 0 0 PT S T A = 1 + 0 6 . 1 5 EL = 4 8 5 0 . 7 0 ST A = 1 + 2 9 . 1 9 EL = 4 8 5 0 . 5 8 ST A = 2 + 3 3 . 1 9 EL = 4 8 5 1 . 0 0 PC S T A = 2 + 4 5 . 7 0 EL = 4 8 5 1 . 0 6 PRC STA=3+02.56 EL=4851.38 PT S T A = 3 + 5 8 . 9 3 EL = 4 8 5 1 . 1 0 PC S T A = 4 + 4 9 . 6 6 EL = 4 8 5 0 . 7 0 PT S T A = 4 + 8 2 . 1 6 EL = 4 8 5 1 . 5 0 -0.60% AL=51.20 -0.52%0.40%0.48%0.65% AL=49.47 -0.44% AL=63.70 -0.44%1.57% AL=51.05 -0.40%-0.40%-0.43%0.60% AL=50.95 0.60% AL=51.16 0.42%0.40% AL=64.25 -0.45% AL=49.04 -0.44%0.71% AL=51.05 ST A = 0 + 0 5 . 7 3 EL = 4 8 5 1 . 0 0 ST A = 0 + 4 6 . 7 8 EL = 4 8 5 0 . 8 4 ST A = 1 + 0 6 . 1 5 EL = 4 8 5 0 . 6 0 PC S T A = 1 + 2 9 . 1 9 EL = 4 8 5 0 . 5 0 PT S T A = 1 + 6 1 . 6 9 EL = 4 8 5 0 . 8 1 PC STA=2+00.69 EL=4850.70 PT STA=2+33.19 EL=4851.00 PC STA=2+45.70 EL=4851.06 PRC STA=3+02.56 EL=4851.32 PT S T A = 3 + 5 8 . 9 3 EL = 4 8 5 1 . 1 0 PC STA=4+49.66 EL=4850.70 PT STA=4+82.16 EL=4851.06 W INV OUT=4847.82 CB #13B STA=5+19.91, 52.00' R GRATE=4850.82 75-LF OF 12" PVC @ 0.22% N INV IN=4847.37 S INV OUT=4847.27 CB #13 STA=4+49.66, 17.94' R GRATE=4850.45 12" N INV IN=4847.25 12" E INV IN=4847.65 24" W INV OUT=4846.25 SDMH #13 STA=4+49.64, 25.45' R RIM=4850.70 SUMP=4844.70 N INV IN=4847.25 SE INV OUT=4847.15 CB #14A STA=1+29.19, 18.25' R GRATE=4850.25 43-LF OF 12" PVC @ 0.22% 12" NW INV IN=4847.06 12" E INV IN=4847.35 24" S INV OUT=4846.06 SDMH #14 STA=1+55.69, 51.91' R RIM=4850.70 SUMP=4844.70 44-LF OF 12" PVC @ 0.22% W INV OUT=4847.45 CB #14 STA=1+99.44, 52.11' R GRATE=4850.44 5-LF OF 24" PVC @ 0.22% 98-LF OF 24" PERFORATED PIPE STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 6' M I N . B U R Y IN S T A L L F H ST A = 1 + 0 6 . 1 3 5-LF OF 8" WATERLINE (DROP INV= 4833.43) 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4860 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 4840 4842 4844 4846 4848 4850 4852 4854 4856 4858 0+00 1+00 2+00 2+40 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 PC S T A = 0 + 6 8 . 3 9 EL = 4 8 5 2 . 0 1 PT S T A = 1 + 0 0 . 8 9 EL = 4 8 5 1 . 7 0 ST A = 2 + 2 2 . 0 9 EL = 4 8 5 2 . 3 6 N INV OUT=4848.45 CB #9 STA=1+00.89, 14.25' L GRATE=4851.45 12" S INV IN=4848.43 24" E INV OUT=4847.43 SDMH #9 STA=1+00.89, 21.50' L RIM=4851.70 SUMP=4846.43 5-LF OF 24" PVC @ 0.22% 8" WATERMAIN W INV OUT=4848.05 CB #8A STA=0+67.36, 48.08' R GRATE=4851.05 E INV IN=4847.97 W INV OUT=4847.87 CB #8 STA=0+30.86, 48.16' R GRATE=4851.25 12" E INV IN=4847.85 24" N INV OUT=4846.85 SDMH #8 STA=0+23.61, 48.19' R RIM=4851.50 SUMP=4845.85 PC S T A = 0 + 6 8 . 6 1 EL = 4 8 5 1 . 3 0 PT S T A = 1 + 0 1 . 1 1 EL = 4 8 5 1 . 7 0 ST A = 2 + 2 2 . 2 1 EL = 4 8 5 2 . 3 6 37-LF OF 12" PVC @ 0.22% 7-LF OF 12" PVC @ 0.22% 0.78% AL=51.13 0.55% -0.60% AL=50.94 0.54% PROPOSED TBC RIGHT EXISTING GRADE AT ALIGNMENT CL PROPOSED TBC LEFT EXISTING GRADE AT ALIGNMENT CL 50-LF OF 24" PERFORATED PIPE EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO 8' ' W 8' ' W 8' ' W 8' ' W 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) 8''SS)8''SS) 1 2 ' ' S D ) (8 ' ' S S (8 ' ' S S 8' ' W 8' ' W 8''SS) 8''SS) 8''SS) 8''SS) 8''W 8''W 8''W 8''W 8''W 8''W 12 ' ' S D ) (12''SD (12'' S D SDMH #13 CB #13 CB #13A BLOCK 8 12 13 19 1 TBC/LP: 50.70 TBC: 51.06 TBC/LP: 51.06 5 6 5 36-LF OF 12" PVC AT 0.22% 75-LF OF 12" PVC AT 0.22% 4 4 2 2 2 12 5 15' P.U.E. (TYP.) 9 5+30 0+00 1+00 2+00 3+00 4+00 5+00 BLOCK 9 BLOCK 10 18 COPP E R H E I G H T S COPP E R HEIG H T S SDMH #14 44-LF OF 12" PVC AT 0.22% CB #14 43-LF OF 12" PVC AT 0.22% CB #14A 37-LF OF 12" PVC AT 0.22% CB #14B CB #13B DROP SSMH #17 SSMH #19SSMH #20SSMH #21 5 5 TBC/LP: 50.50TBC: 50.84TBC: 51.00± TBC: 51.00± TBC: 50.70 TBC/LP: 50.58 TBC: 51.00 TBC: 51.00 TBC: 51.06 TBC: 51.06 TBC/HP: 51.38 TBC: 51.32 TBC: 51.10 TBC: 51.50 TBC/LP: 50.70 TBC: 51.10 TBC/LP: 50.69 56 1 1 5 2 8 2 4 1 1 4 4 7 7 1 STA: 5+01.67 (WINTER DR) STA: 2+35.29 (TAGGART DR) STA: 1+81.03 (WINTER DR) STA: 0+23.32 (LASSEN LN) 2 4 5 7 SAW-CUT FOR REGRADE OF INTERSECTION 8' ' W 8' ' W 8' ' W 8' ' W 8' ' S S ) 8' ' S S ) 8' ' S S ) 8' ' S S ) SDMH #9 SDMH #8 CB #9 CB #8 CB #8A BLOCK 2 18 BLOCK 9 1 BLOCK 6 17 1 OPEN SPACE 18 16 TBC: 51.70 TBC/LP: 51.30 TBC: 52.36± TBC: 52.36± TBC/LP: 51.70 TBC: 52.01 TBC: 51.90 TBC/LP: 51.50 6 5 7 OIL: 52.56± 4 5 37-LF OF 12" PVC AT 0.22% 5 6 4 2 7 3 31 2 5 FERRIS Ln 0+00 1+00 2+00 2+40 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4830 4832 4834 4836 4838 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 4840 4842 4844 4846 4848 4850 4852 4854 0+00 1+00 2+00 3+00 3+50 PROPOSED TBC LEFT PROPOSED TBC RIGHT 8" W INV IN=4834.91 8" S INV IN=4834.91 8" E INV OUT=4834.81 SSMH #20 STA=0+23.32, 0.00' L RIM=4850.80 301-LF OF 8" PVC @ 0.40% 8" S INV IN=4836.21 8" N INV OUT=4836.11 SSMH #19A STA=3+24.12, 0.00' R RIM=4851.90 20-LF OF 8" PVC @ 0.40% N INV IN=4847.25 SE INV OUT=4847.15 CB #14A STA=0+41.41, 51.89' R GRATE=4850.25 43-LF OF 12" PVC @ 0.22% 12" NW INV IN=4847.06 12" E INV IN=4847.35 24" S INV OUT=4846.06 SDMH #14 STA=0+75.15, 25.50' R RIM=4850.70 SUMP=4844.70 5-LF OF 24" PVC @ 0.22% 80-LF OF 24" PERFORATED PIPE W INV OUT=4847.45 CB #14 STA=0+75.49, 18.25' L GRATE=4850.44 PC S T A = 0 + 4 2 . 9 9 EL = 4 8 5 1 . 0 1 PT S T A = 0 + 7 5 . 4 9 EL = 4 8 5 0 . 7 0 STA=3+29.47 EL=4851.85 0.45%-0.60% AL=64.25 0.60% AL=61.16 0.41% PC S T A = 0 + 4 2 . 6 6 EL = 4 8 5 0 . 5 0 PT S T A = 0 + 7 5 . 1 5 EL = 4 8 5 0 . 8 1 ST A = 3 + 2 9 . 1 7 EL = 4 8 5 1 . 8 5 5-LF OF 8" WATERLINE 58-LF OF 8" WATERLINE 8-LF OF 8" WATERLINE251-LF OF 8" WATERLINE INSTALL FH STA=3+26.88 STORM INFILTRATION SYSTEM SEE STORM TABLES SHEET 7/C-4 PLUG & THRUST BLOCK 10' BEYOND PROPERTY LINE CAP MIN. 10' BEYOND PROPERTY LINE INV= 4836.29 6' M I N . B U R Y EO 8' ' S S ) 8' ' S S ) 12''S D ) (8''SS (8''SS (8''SS (8''SS (8''SS 8''W8''W8''W8''W8''W 8' ' S S ) 8' ' W 8' ' W 8' ' W 12''SD) (1 2 ' ' S D SSMH #19 2 3 TBC/LP: 50.69 TBC/LP: 50.50 TBC: 50.81 TBC: 51.00 TBC: 51.00 2 TBC/HP: 51.85 TBC/HP: 51.85 15 5 6 1 1 2 0+00 1+00 2+00 3+00 3+50 STA: 0+23.32 (LASSEN LN) STA: 1+81.03 (WINTER DR) 5 3 3 2 15' P.U.E. (TYP.) 7 8 9 44-LF OF 12" PVC AT 0.22% 43-LF OF 12" PVC AT 0.22% SSMH #20 SSMH #19A SDMH #14 CB #14ACB #14B CB #14 55 37-LF OF 12" PVC AT 0.22% OIL: 52.07 2 1 1413 1 BLOCK 8 BLOCK 10 2 4 20 PP - 1 2 PL A N & P R O F I L E W I N T E R D R I V E , L A S S E N L A N E , & F E R R I S L A N E Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 p & p w i n t e r d r , l a s s e n l n , f e r r i s l n . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 9 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 KEYMAP W E S N CONSTRUCTION ITEMS: THE FOLLOWING CONSTRUCTION ITEMS ARE FOR THE PURPOSE OF DISPLAY IN THE PLAN AND PROFILE VIEW ONLY AND DO NOT SHOW EACH AND EVERY CONSTRUCTION COMPONENT IN THE DESIGN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE PLANS AND UNDERSTAND THAT ALL ELBOWS, TEES, ADA ACCESSES, FIRE HYDRANTS, ETC.... MAY NOT BE LABELED BUT ARE REQUIRED FOR A COMPLETE PROJECT. ASPHALT PAVING PER DETAIL 1ON SHEET D-1.SEWER MANHOLE TYPE A PER LATEST REVISION OF CITY OF REXBURG STANDARDS . SEE DETAIL 5 ON SHEET D-1. 4" SANITARY SEWER SERVICE PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 4 ON SHEET D-1. WATER MAIN VALVE AND VALVE BOX MEETING WATER MAIN SIZE PER LATEST REVISION OF CITY OF REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY PER LATEST REVISION OF CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2. 1" WATER SERVICE PER LATEST REVISION OF CITY OF REXBURG STANDARDS & WATER METER BOXES AS PER CITY OF REXBURG STANDARDS.2.5' ROLL BACK CURB PER DETAIL 2 ON SHEET D-1. INSTALL STORM DRAIN MANHOLE PER CITY OF REXBURG STANDARDS. SEE DETAIL 3 ON SHEET D-2 FOR ISPWC STANDARD DETAIL. 8"x8" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. PAVING AND DRAINAGE CONSTRUCTION ITEMS SEWER CONSTRUCTION ITEMS 1 2 4 6 INSTALL ADA RAMP AND TRUNCATED DOMES PER CITY OF REXBURG STANDARDS. 1 2 WATER CONSTRUCTION ITEMS 5 CATCH BASIN (30" ROUND) PER DETAIL 2 ON SHEET D-2. 1 2 3 4 5 7 INSTALL 50' RADIUS TEMPORARY GRAVEL TURN AROUND PER DETAIL X ON SHEET D-X. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 3 9 INSTALL INFILTRATION SYSTEM. SEE STORM TABLES ON SHEET 7/ C-4 FOR SYSTEM SPECIFICATIONS. SEE DETAIL 1 ON SHEET D-2. 6 7 BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 8 8"x8" CROSS WITH THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. 10 11 12 PLUG AND THRUST BLOCK. SEE DETAIL 6 ON SHEET D-1. TRANSITION CURB (HIGH BACK CURB TO ROLLED CURB).SEE DETAIL 8 ON SHEET D-1.2.5' HIGH BACK CURB PER DETAIL 3 ON SHEET D-1. 1.ALL TOP BACK OF CURB (TBC) ELEVATIONS ARE +4800'. NOTES: INSTALL STREET LIGHTING PER CITY OF REXBURG ENGINEERING STANDARDS. 1" WATER SERVICE THROUGH INFILTRATION BED. SEE DETAIL 7 ON SHEET D-1.3A 6" PRESSURE SEWER BEND (45° ELBOW) PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS.3 PRESSURE MAIN CLEANOUT PER LATEST REVISION OF THE CITY OF REXBURG STANDARDS. SEE DETAIL 5 SHEET D-2.4 WINTER DRIVE W E S N 040'40'20' SCALE: 1" = 40' FERRIS LANE CONNECTION TO EXISTING FERRIS LANE CUL-DE-SAC WILL BE REQUIRED IN PHASE 1 CONSTRUCTION. OVERLAY OF EXISTING ASPHALT MAY BE REQUIRED. CONTRACTOR TO FIELD VERIFY CONDITIONS. W E SN 040'40'20' SCALE: 1" = 40' W E S N 040'40'20' SCALE: 1" = 40' LASSEN LANE Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 d e t a i l s . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 9 A M 21 D- 1 DE T A I L S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 8" WATER MAIN STORM CHAMBER INFILTRATION SYSTEM 1" POLYETHYLENE PIPE SIDR 7 1.IF THERE IS EIGHTEEN (18) INCHES OR MORE VERTICAL SEPARATION WITH THE POTABLE WATER PIPELINE BELOW THE NON-POTABLE PIPELINE, THEN THE POTABLE PIPELINE, AND THE NON-POTABLE MUST BE AS FAR AS POSSIBLE FROM THE NON-POTABLE PIPELINE, AND THE NON-POTABLE PIPELINE MUST BE SUPPORTED THROUGH THE CROSSING TO PREVENT SETTLING. 2.IF LESS THAN 18" CONTRACTOR TO ENSURE POTABLE PIPELINE JOINT TO BE AS FAR AS POSSIBLE FROM THE NON-POTABLE PIPELINE AND SHALL SLEEVE THE POTABLE PIPELINE WITH POTABLE WATER CLASS PIPE FOR TEN (10) FEET EITHER SIDE OF CROSSING. WATER SERVICE IN INFILTRATION BED: INSTALL MINIMUM OF 6.5' DEPTH (BELOW CHAMBER) THROUGH GRAVEL DRAINAGE INFILTRATION BED. SERVICE SHALL BE SLEEVED WITH LARGER PIPE THROUGH THE INFILTRATION SYSTEM EXTENDED 10' EACH SIDE OF SAID SYSTEM MEETING DEQ REQUIREMENTS. 5' - 0 " 18 " 7 WATER SERVICE AT INFILTRATION BED SCALE: NTS 3" 6" 2'-6" 9" 3" 1'-6" 11 2" 1" BATTER 2 1 2"10" RAD = 1'-0" GRADE AS REQUIRED TO MEET EXISTING GROUND NOTE: NO CURB CUTS WILL BE REQUIRED FOR DRIVEWAYS 2 2.5' ROLLED BACK CURB & GUTTER SCALE: NTS 12 11 N.T.S. A A 11 45° FL O W SHE L F SHE L F SHE L F PLAN 12" 6" (MIN) 21" (MAX) 4" (MIN) 24" DIA 36 " ( M A X ) 24 " ( M I N ) 12" 16 " (M A X ) 48" 6" (MIN) 4" TYPE 1 BEDDING D< 2 4 " 9" (MIN) 7 6 5 4 3 2 1 8910 SHELF SLOPE 1" PER FOOT 1 CONCRETE COLLAR IN PAVED STREET SECTIONS PER SD-508. 2 GRADE RINGS GROUTED WATERTIGHT IN PLACE, NOT TO EXCEED 21" FROM FINISHED SURFACE TO TOP OF CONE. 3 PRECAST MONOLITHIC ECCENTRIC CONE SECTION. (REBAR NOT SHOWN). 4 RAMNEK OR APPROVED GASKETS AT ALL JOINTS. 5 PROPERLY ALIGN ALL INTERIOR JOINTS. 6 PRECAST CONCRETE MANHOLE BARREL SECTION (REBAR NOT SHOWN). 7 PRECAST GASKETED HUB RING OR RUBBER GASKETED COLLAR-FLEXABLE AND WATER TIGHT. 8 REPLACEMENT SURFACING TO MATCH FLUSH WITH EXISTING SURFACING (AC SHOWN). 9 FRAME TO BE GROUTED TO GRADE RINGS. 10 FRAME AND COVER PER SD-507. 11 MANHOLE STEPS. SEE NOTE H. 12 CAST-IN-PLACE MANHOLE BASE. SEE SD-501A FOR PREFABRICATED BASE. LEGEND A OPTIONAL PREFABRICATED MANHOLE BASE WITH APPROVED PIPE CONNECTIONS MAY BE USED WITH ENGINEERS APPROVAL, SEE SD-501A. B PLACE VERTICAL WALL ON UPSTREAM SIDE OF MANHOLE, ROTATED 45 DEGREES. C FOR DIAMETER, D, GREATER THAN 24", SEE SD-502 OR SD-503. D MANHOLE FRAME AND COVER: a)REFER TO DRAWING NO. SD-507 b)FRAME AND COVER SHALL BE FLUSH WITH SLOPE OF PAVEMENT. E WHERE PVC PIPE IS UTILIZED, INSTALL A RUBBER RING OR GASKET COLLAR WHERE THE PIPE IS IN CONTACT WITH MANHOLE BASE AND/OR MANHOLE CHANNEL, IN ORDER TO INSURE A WATERTIGHT SEAL. F EITHER BASE ON SD-501 OR SD-501A MAY BE USED WITH EITHER MANHOLE DESIGN. G PROVIDE MANHOLE CONCRETE REINFORCING TO ACCOMMODATE TRAFFIC LOADINGS. H VERIFY WITH ENGINEER REGARDING LOCAL PREFERENCE ON INSTALLATION OF MANHOLE STEPS PRIOR TO ORDERING MATERIALS OR INSTALLATION. NOTE: N.T.S. SECTION A-A 5 STANDARD MANHOLE TYPE "A" (ISPWC SD-501) SCALE: NTS NOTES: A.GRADE AND ALIGNMENT TO BE ESTABLISHED OR APPROVED BY THE ENGINEER. B.BASE: 4-INCH COMPACTED DEPTH OF 3/4" MINUS CRUSHED AGGREGATE MATERIAL, PLACE AS SPECIFIED UNDER SECTION-802 ISPWC; COMPACTED TO EXCEED 95% OF STANDARD PROCTOR. C.1/2" PREFORMED EXPANSION JOINT MATERIAL (AASHTO M 213) AT TERMINAL POINTS OF RADII. D.CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS AT 10-FEET MAXIMUM SPACING (OR CONSISTENT WITH 2X SIDEWALK WIDTH FOR SCORE SPACING) E.MATERIALS AND CONSTRUCTION IN COMPLIANCE WITH ISPWC SPECIFICATIONS. F.BACKFILL AS PER SECTION-706. G.SECURE RIGHT-OF-WAY PERMIT BEFORE BEGINNING CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. H.CURB AND GUTTER STANDARD TO BE USED ON ALL PUBLIC ROADWAYS UNLESS APPROVED BY THE ENGINEER. AGGREGATE BASE 6"24" 30" R1/2"12 " ± R1"R1/2" R3" 6" 6" 6" 4" 0"-1" BATTER 5 3 / 4 " 4 3 / 4 " 4 " 24:1 SLOPE 3 6" VERTICAL CURB & GUTTER (ISPWC SD-701) SCALE: NTS FINISH GRADE CAP OR PLUG AND INSTALL SERVICE LINE MARKER PER SD-512 (TYP) MIN. GRADE 1/4"/FT (2%) "D" "C" "B" "A" 4" - 1/8 OR 1/16 BEND AS NEEDED 45°BEND DEEP BELL 45° BEN (GPK PART 951 OR APPROVED EQUAL). 1/8 LONG RADIUS BEND 45% TEE OR APPROVED CONNECTION TEE OR APPROVED CONNECTION TEE OR APPROVED CONNECTION TYPE "A"&"D"TYPE "B" NOTES: ALL SERVICE LINES TO BE 4" INSIDE DIAMETER UNLESS OTHERWISE NOTED. TYPE "E" ALLOWABLE FOR TRENCHES 15' DEEP OR GREATER WITH PRE-APPROVAL BY THE ENGINEER. TYPE "C" CONNECTION WILL ONLY BE ALLOWED IF APPROVED BY THE ENGINEER IN WRITING. 45° MAX45° MAX MIN. GRADE 1 4"/FT (2%) MIN. GRADE 1 8"/FT (1%) FINISH GRADE MIN. GRADE 1 4"/FT. (2%) A B C TYPE "C" (SEE NOTE B) TYPE "E" (SEE NOTE C) 4 SANITARY SEWER SERVICE SCALE: NTS B B/ 3 MI N . A TEE BEND/ELBOW REDUCER 22а BEND REDUCERS & 1'-9" 2'-5" 3'-2" 4'-0" 4'-8" 6'-6" DIMENSION FOR THRUST BLOCKING 14" 6" 10" 12" 8" FITTING SIZES 4" 1'-11" 2'-6" 3'-3" 3'-10" 3'-10"5'-5" 2'-0" 3'-4" 4'-0" 2'-8" TEES & PLUGS 1'-2" A 1'-7" B 1'-8" 1'-10" 45° BEND & WYES 2'-5" 3'-0" 4'-9" 3'-8" 2'-2" 3'-10" 4'-11" 4'-8" 3'-0" B 1'-6" 90° BEND A A 1'-7" 2'-1" 2'-9" 3'-5" 3'-3" 3'-5" 1'-9" 1'-9" 2'-2" 2'-7" 0'-10" B A 1'-7" 2'-5" 0'-10" 1'-11" 2'-3" 1'-6" 0'-6" B NOTES: 1.WRAP ALL FITTINGS W/ 8 MIL POLYETHYLENE ENCASEMENT TO PREVENT CONCRETE FROM ADHERING TO THE FITTINGS. 2.THRUST BLOCKING CONCRETE TO BE MINIMUM 3000 PSI MIX. 3.ALL THRUST BLOCKS ARE TO BE FORMED ON THE VERTICAL PLANES. 4.PLACE THRUST BLOCKS ON ALL WATERLINE BENDS AND TEES. 6 THRUST BLOCKING DETAIL SCALE: NTS 5' SIDEWALK 9'-6" LANDSCAPING 19'-6"19'-6"9'-6" LANDSCAPING 5' SIDEWALK 15' EASEMENT 15' EASEMENT 2% SLOPE 2% SLOPE 2% SLOPE 2% SLOPE 2.5' TYP. 9'-6" PARKING LANE 10' TRAFFIC LANE 9'-6" PARKING LANE 10' TRAFFIC LANE 2.5' TYP. 3'-6" 12" 68' SEAL COAT 2 1 2" ASPHALT PLANTMIX PAVEMENT 3 1 2" OF 3 4" AGGREGATE BASE 12" GRANULAR BORROW GEOTEXTILE FABRIC BELOW AND UP SIDES 1 NARROW RESIDETIAL STREET (TYPICAL SECTION 2) SCALE: NTS 5' 2.5' ROLL CURB & GUTTER CURB & GUTTER TRAN S I T I O N S E C T I O N EXPANSION JOINT 8 CURB TRANSITION SCALE: NTS Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 d e t a i l s . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 9 A M 22 D- 2 DE T A I L S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 GRATE 1'-2" INLET BOX 1'-0" ROLLED BACK CURB & GUTTER (SEE DETAIL) LANDSCAPE STRIP/SIDEWALK 3'-0" x 6" x 3/8" STEEL PLATE ADJUSTING BOLTS #4 REBAR PER MANUFACTURER KNOCKOUTS TYPICAL (4) SIDES 18" DIA. TO RECEIVE UP TO 15" DIA. PIPE GASKET FOR PLASTIC PIPE (TYP.) PLASTIC PIPE 1 2 " M I N . D I A . 1' - 0 " 3'-3" 2'-6" INSIDE DIA. BARREL SECTION 1'-8" REBAR PER MANUFACTURER RECOMMENDATION REBAR PER MANUFACTURER RECOMMENDATION 3 1 2" 2" 3' - 0 " M I N . 3 1 2" 2 CATCH BASIN SECTION SCALE: NTS 12 11 N.T.S. A A 11 45° FL O W SHE L F SHE L F SHE L F PLAN 12" 6" (MIN) 21" (MAX) 4" (MIN) 24" DIA 36 " ( M A X ) 24 " ( M I N ) 12" 16 " (M A X ) 48" 6" (MIN) 4" TYPE 1 BEDDING D< 2 4 " 9" (MIN) 7 6 5 4 3 2 1 8910 SHELF SLOPE 1" PER FOOT 1 CONCRETE COLLAR IN PAVED STREET SECTIONS PER SD-616. 2 GRADE RINGS GROUTED WATERTIGHT IN PLACE, NOT TO EXCEED 21" FROM FINISHED SURFACE TO TOP OF CONE. 3 PRECAST MONOLITHIC ECCENTRIC CONE SECTION. (REBAR NOT SHOWN). 4 RAMNEK OR APPROVED GASKETS AT ALL JOINTS. 5 PROPERLY ALIGN ALL INTERIOR JOINTS. 6 PRECAST CONCRETE MANHOLE BARREL SECTION (REBAR NOT SHOWN) 54" - 72" RCP. 7 PRECAST GASKETED HUB RING OR RUBBER GASKETED COLLAR. 8 SURFACING TO MATCH FLUSH WITH EXISTING SURFACING (AC SHOWN). 9 FRAME TO BE GROUTED TO GRADE RINGS. 10 FRAME AND COVER PER SD*617. 11 MANHOLE STEPS. SEE NOTE G. 12 CAST-IN-PLACE MANHOLE BASE. SEE SD-501A FOR PREFABRICATED BASE. LEGEND A OPTIONAL PREFABRICATED MANHOLE BASE WITH APPROVED PIPE CONNECTIONS MAY BE USED WITH ENGINEERS APPROVAL, SEE SD-501A. B PLACE VERTICAL WALL ON UPSTREAM SIDE OF MANHOLE, ROTATED 45 DEGREES. C FOR DIAMETER, D, GREATER THAN 24", SEE SD-613 OR SD-614. D MANHOLE FRAME AND COVERp A.REFER TO DRAWING NO. SD=617. B.FRAME AND COVER SHALL BE FLUSH WITH SLOPE OF PAVEMENT. C."STORM DRAIN" ON COVER. E WHERE PVC PIPE IS UTILIZED, INSTALL A RUBBER RING OR GASKET COLLAR WHERE THE PIPE IS IN CONTACT WITH MANHOLE BASE AND/OR MANHOLE CHANNEL, IN ORDER TO INSURE A WATERTIGHT SEAL. F EITHER BAE ON SD-501 OR SD-501A MAY BE USED WITH EITHER MANHOLE DESIGN. G VERIFY WITH ENGINEER REGARDING LOCAL PREFERENCE ON INSTALLATION OF MANHOLE STEPS PRIOR TO ORDERING MATERIALS OR INSTALLATION. NOTE: 3 STANDARD MANHOLE TYPE "A" (ISPWC SD-612) SCALE: NTS 1' 6' - 6 " ( T Y P . ) 24 " MI N . 36" TYP. BACKFILL WITH NATIVE TOPSOIL COMPACT TO 95% OF STANDARD PROCTOR 24" DIA. PERFORATED CORRUGATED EXTERIOR, SMOOTH INTERIOR HDPE WITH PERFORATIONS 4" O.C. 1" DIAMETER COURSE DRAIN ROCK BACKFILL 2" MIN. - 6" MAX. MEETING BONNEVILLE COUNTY STANDARDS CLEAN SAND AND GRAVEL OVER EXCAVATE TO FREE DRAINING MATERIAL SEAL END CAP OR CONCRETE (TYP.) SECTION A-A N.T.S. 36 " MI N . 3.0' TYP.10 ' VARIES 36 " MI N . AA 12" PIPE FROM CATCH BASIN MIN. SLOPE 0.22% SEE CATCH BASIN DETAIL PLAN VIEW N.T.S. 5' 48" MANHOLE IN COMPLIANCE WITH COUNTY STANDARDS *ALL DRAIN ROCK SHALL BE ENCASED IN SEPARATION FABRIC PERFORATE BOTTOM 2' OF ALL INFILTRATION MANHOLES (ENSURE 2' OF DRAIN ROCK IS INSTALLED AROUND PERIMETER OF MANHOLE) INSTALL MIRAFI 160N NON WOVEN FABRIC (OR EQUAL) SEPARATING DRAIN ROCK AND SOIL MEETING COUNTY STANDARDS * STORM INFILTRATION SYSTEM TO BE BELOW DRAINAGE SWALE AND SIDEWALK. (MAINTAIN 1.0' MIN. FROM BACK OF CURB. COARSE DRAIN ROCK COARSE DRAIN ROCK COARSE DRAIN ROCK COARSE DRAIN ROCK 1 INFILTRATION SYSYTEM SCALE: NTS 18 " 10" 2" NOTES: 1.GRADE AND ALIGNMENT TO BE ESTABLISHED BY THE ENGINEER AND PUBLIC AGENCY HAVING JURISDICTION. 2.CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS MINIMUM 8 FEET. 3.MATERIALS AND CONSTRUCTION IN COMPLIANCE WITH ISPWC SPECIFICATIONS. 4.BACKFILLS AS PER ISPWC SECTION 706. 5.SECURE RIGHT-OF-WAY PERMIT BEFORE CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. 1 2" R 1" R 2"R PAVEMENT 4 6" MOUNTABLE VERTICAL CURB (ISPWC SD-701A) SCALE: NTS MJ X FL COUPLER (TYP.) BLIND FL 8"x8" WYE TYPICAL BOTH SIDES 8" PVC PIPE TYPICAL BOTH SIDES TAP BLIND FL FOR 2" THREADED BALL VALVE DUCTILE IRON (TYP.) 4"Ø HOLE IN CENTER OF FLOOR FOR DRAINAGE W/ GRATE PIPE SUPPORT (TYP.) 6" LAYER OF OPEN GRADED ROCK MATERIAL (3" MAX SIZE) 9'-5" O.D. 8'-0" I.D. 2'Ø MH OPENING 2'Ø MH OPENING 5' - 0 " 11 " 1' - 4 " CROSS SECTION 8" CLEANOUT PLAN VIEW NO LID MH LOCATIONS 2'-0" Ø MH LOCATIONS SHOWN BY CIRCLE WITH LID OFF TO SHOW POSITION NEXT TO PIPE ASSEMBLY 5 DOUBLE CLEANOUT SCALE: NTS Fi l e L o c a t i o n : z: \ p r o j e c t s \ 2 0 2 3 \ 2 3 0 5 5 a d a r a ( p r e v i o u s l y l e g e n d s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 3 0 5 5 d e t a i l s . d w g Pl o t t e d B y : ru s s e l l Da t e P l o t t e d : Tu e s d a y , A p r i l 1 6 2 0 2 4 a t 1 0 : 4 9 A M 23 D- 3 DE T A I L S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : AA R O N R I C H A R D S AD A R A A T T E T O N L A K E S A. S N A R R R. J O R D A N P. S N A R R 23 0 5 5 LIFT STATION CONTROL CENTER 4" VENT PIPE 4'-0" 6" THICK CONCRETE PAD 6" 10 " 10 " CONCRETE PAD LAYOUT (IF PEDESTAL NOT ATTACHED TO LIFT STATION) SCALE = N.T.S. VENT PIPE DETAIL (IF LIFT STATION IS IN TRAFFIC AREA) SCALE = N.T.S. NON-SHRINK GROUT LIFT STATION LID 2' - 0 " 4" VENT PIPE W/ SCREEN ON END DISCONNECT PANEL MOUNTING FRAME SIZE AS NEEDED SPRINKLER CONTROL PANEL (OPTIONAL -12"x18" MIN. OUTSIDE DIM.) WEATHERPROOF RECEPTACLE RIGID STEEL CONDUIT TO PUMPS (SEE NOTE 8) RIGID STEEL CONDUIT TO PUMP CONTROLS (SEE NOTE 8) METER BASE LIF T S T A T I O N M O U N T E D P O W E R PED E S T A L T O B E I N S T A L L E D I N T H I S ARE A O N L Y LIFT STATION LIFT STATION ACCESS HATCH ACCESS HATCH HINGES POWER PEDESTAL LOCATION DETAIL SCALE = N.T.S. ALARM LIGHT WITH SHIELD CONTROL UNIT EMERGENCY POWER PLUG IN RECEPTACLE (SEE NOTE 7) DUPLEX PUMP CONTROLLER (SEE NOTE 5 & 6) SEAL OFF, NEMA APPROVED FOR CLASS I DIVISION I LOCATIONS REQD. NON-SHRINK GROUT PUMP POWER SUPPLY ALARM SYSTEM UNISTRUT MOUNTING FRAME RIGID COATED STEEL CONDUIT FROM MAIN POWER (SEE NOTE 8) TYPE OF CONDUIT DEPENDENT ON BURY DEPTH RIGID STEEL CONDUIT TO PUMP CONTROLS (SEE NOTE 8) PEDESTAL DETAIL SCALE = N.T.S. FRONT VIEW SIDE VIEW BACK VIEW SPRINKLER CONTROLLER (OPTIONAL) MOUNTING FRAME (SIZE AS NECESSARY) DUPLEX PUMP CONTROLLER (SEE NOTE 5 & 6) ALARM ON LIFT STATION DETAIL (STANDARD DETAIL IF-516) SCALE = N.T.S. 15 " 6" 1' - 0 " 12 0 ° ' 6' - 0 " M I N . 6' - 0 " M I N . PER CITY CONCRETE FILLER FOR CHANNELIZATION 3/4" x 8" STAINLESS STEEL ANCHOR BOLTS (2" PROJECTION) #5 REBAR ON 6" CENTERS BOTH WAYS, CENTERED ON SLAB DISCHARGE PUMP 8' DIA. PRECAST REINFORCED BARREL SECTION. ALL JOINTS SHALL BE SEALED WATERTIGHT INFLUENT PIPE INFLUENT PIPE COMMUNICATION CABLE CONDUIT LIQUID LEVEL PRESSURE TRANSDUCER, LOCATED TO MINIMIZE FALSE READINGS. DETAIL "B" SEE DETAIL "B" MASTIC TO BE FULL WIDTH ON BOTH SURFACES INTERMEDIATE GUIDE BAR BRKT. (USED FOR GUIDE BARS OVER 20' LONG) NOTE: BOTTOM SECTION AND BASE MAY BE CAST AS ONE UNIT LINK SEAL APPARATUS (PER CITY) 2" PVC PIPE FOR DRAINAGE AS NECESSARY 6" (TYP.) 4" GATE VALVE PER STANDARD SPECIFICATIONS SUBSECTION 601.02.2 AFTER WYE 4" FEMALE CAM LOCK FITTING WITH PLUG VACUUM RELIEF VALVE BALL CHECK VALVE LOCATION RESILIENT SEAT/WEDGE GATE VALVE PER STANDARD SPECIFICATIONS SUBSECTION 601.03 4" MIN. DISCHARGE PIPE (SEE NOTE 2) NON-SHRINK GROUT ECCENTRIC CONE NON-SHRINK GROUT 2" STAINLESS STEEL SLIDE RAILS 10'-0" MIN. CABLE HOLDER ACCESS COVER (SEE NOTE 1)UPPER GUIDE BAR BRKT. SLIDE RAILS MUST BE POSITIONED FOR OBSTRUCTION FREE REMOVAL OF PUMPS 4" GALVINIZED VENT PIPE WITH SCREEN ON END 2' - 0 " RIGID COATED STEEL CONDUIT PUMP POWER SUPPLY(SEE NOTE 6) 3/4" RIGID COATED STEEL CONDUIT TO EXISTING JUNCTION BOX FOR ALARM SYSTEM CURB STOP & VALVE BOX 2'-2"3" SEE NOTE 9 RESILIENT SEAT/WEDGE GATE VALVE PER STANDARD SPECIFICATIONS CITY OF REXBURG SECTION "A-A" LIFT STATION MANHOLE BALL CHECK VALVE LOCATIONS GUIDE RAILS SEE NOTE 9 NOTES: 1.ACCESS COVER FOR LIFT STATION AND MANHOLE SHALL BE DESIGNED FOR HS 25 LOADING. 2.CLASS 50 OR HIGHER DUCTILE IRON REQUIRED FOR DISCHARGE PIPES & APPURTENANCES INSIDE AND BETWEEN LIFT STATION AND VALVE VAULT. FORCE MAIN BEYOND WYE IN VAULT TO DISCHARGE SHALL BE PVC CLASS 200 PRESSURE MAIN MEETING ASTM D2241. 3.SEE PROJECT SPECIFICATIONS OR PLANS FOR PUMP CAPACITIES AND OTHER HARDWARE AS REQUIRED FOR EACH SPECIFIC INSTALLATION. 4.CITY OF REXBURG SHALL SPECIFY THE CONTROL LEVEL SETTING FOR THE FOLLOWING LIQUID LEVELS. A) PUMP OFF (MIN. LIQUID LEVEL) B) LEAD PUMP ON C) LAG PUMP ON D) ALARM ON 5.PROVIDE A 1.5' . 1.5' BLOCK OUT IN THE DUPLEX CONTROLLER CABINET. 6.INSTALL A 110 VOLT RECEPTACLE BRACKET ADJACENT TO BLOCK OUT AREA (SEE NOTE 5) IN DUPLEX PUMP CONTROLLER CABINET. 7.EMERGENCY POWER PLUG RECEPTACLE, APPLETON CAT. #ADJA6044150RS 60A 4W 4P STY. 1 OR AS REQUIRED ON ALL STORM DRAIN AND SANITARY SEWER LIFT STATIONS. MUST HAVE A MALE END INSIDE RECEPTACLE. 8.SIZE OF CONDUIT TO BE DETERMINED BY SIZE OF INSTALLED PUMPS (MIN. 2"). 9.ASPHALT ACCESS TO LIFT STATION SHALL BE 15' WIDE X 2" PLANTMIX OVER 4" OF 3/4" CRUSHED GRAVEL AND 9" PIT RUN GRAVEL 10.ALL HARDWARE (INCLUDING LIFTING CHAIN, BOLTS, NUTS, ETC.) SHAL STAINLESS STEEL. NO GALVANIZED HARDWARE WILL BE ALLOWED. 11.NO ELECTRICAL CONNECTIONS, SPLICES OR JUNCTION BOXES SHALL BE INSIDE LIFT STATION. 12.LIFT STATION CIRCULATION DEVICE REQUIRED FOR GREASE AND SEDIMENTATION CONTROL SHALL BE ATTACHED TO PUMP (APPLICABLE TO SANITARY SEWERS ONLY). 13.LIFT STATION LID AND CONTROLLER ORIENTATION AS DIRECTED BY CITY OF REXBURG. 14.SANITARY SEWER PIPES OVER 30" ARE REQUIRED TO HAVE TRASH RACKS INSTALLED. 15.ALL FORCED MAIN LINES SHALL HAVE A FLOW RATE OF 2'-0" PER SECOND MINIMUM. TRACER WIRE REQUIRED WITH CONNECTION ENDS AT VALVE VAULT AND DISCHARGE MANHOLE. 16.PUMP SPEEDS AS PER I.D.A.P.A. REQUIREMENTS. 17.CONTRACTOR TO FIELD VERIFY ALL ELEVATIONS PRIOR TO ORDERING CONCRETE BARREL SECTIONS. NON-SHRINK GROUT (TYP.) (6) 3" HOLES IN FLOOR FOR DRAINAGE CONTRACTOR TO COORDINATE WITH TETON COMMUNICATIONS FOR TELEMETRY SYSTEM INSTALLATION CONTROL CENTER SUBJECT TO ENGINEER'S SPECIFICATIONS (MOUNTED TO SIDE OF LIFT STATION) JUNCTION BOXES FOR PUMP CABLES MUST BE LOCATED ABOVE THE FLOOD ELEVATION THE TELEMETRY SYSTEM SHALL BE FURNISHED BY TETON COMMUNICATIONS INC. - ZETRON 1700 SERIES & NATIONAL INSTRUMENTS LOOKOUT SOFTWARE OR APPROVED EQUAL (SANITARY SEWER LIFT STATIONS ONLY) CONTROL PANEL