HomeMy WebLinkAboutENERGY COMPLIANCE REPORT - 23-00793 - Starbucks - InteriorCOMcheck Software Version 4.1.5.5 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: 90.1 (2016) Standard Starbucks Alteration Construction Site: Owner/Agent: Designer/Contractor: 1060 Golden Beauty Drive Gregory Schnackel Rexburg, ID 83440 Schnackel Engineers 3035 South 72nd Street Omaha, NE 68124 (402) 391-7680 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B X C) 1-Common Space Types:Sales Area 1017 1.22 1241 Allowance: Decorative Appearance / Fix. ID: 96VA 100 (a) 0.75 75 (b) 2-Common Space Types:Food Preparation 1086 1.06 1151 Allowance: Decorative Appearance / Fix. ID: 60VA 543 (a) 0.75 120 (b) Allowance: Decorative Appearance / Fix. ID: 96VA 543 (a) 0.75 96 (b) 3-Common Space Types:Restrooms 270 0.85 230 4-Common Space Types:Office - Enclosed 69 0.93 64 5-Common Space Types:Corridor/Transition <8 ft wide 48 0.66 32 Total Allowed Watts = 3008 (a) Area claimed must not exceed the illuminated area permitted for this allowance type. (b) Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less. Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Common Space Types:Sales Area (1017 sq.ft.) 5A Current Limiter: 5A: Serves Track Lighting: Wattage based on current limiting device 0 0 600 600 capacity 96VA Remote Power Supply: 96VA: Serves LED Tape: Wattage based on low -voltage 0 0 96 96 transformer capacity Type 21772: 21772: LED Downlight: Other: 1 7 9 63 Type 22401: 22401: LED Mini Pendant: Other: 1 4 15 60 Type 20832: 20832: LED Pendant: Other: 1 2 60 120 Common Space Types:Food Preparation (1086 sq.ft.) (2) 60VA Remote Power Supply: 60VA: Serves LED Tape: Wattage based on low -voltage 0 0 120 120 transformer capacity 96VA Remote Power Supply: 96VA: Serves LED Tape: Wattage based on low -voltage 0 0 96 96 transformer capacity Type 21774: 21774: LED Downlight: Other: 1 10 9 90 Type 21772: 21772: LED Downlight: Other: 1 4 12 48 Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 1 of 9 A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures D Fixture Watt. E (C X D) Type 21783: 21783: 2x4 LED Troffer: Other: 1 8 36 288 Common Space Types:Restrooms (270 sq.ft.) Type 22249: 22249: LED Downlight: Other: 1 8 11 88 Common Space Types:Office - Enclosed (69 sq.ft.) Type 21783: 21783: 2x4 LED Troffer: Other: 1 1 36 36 Common Space Types:Corridor/Transition <8 ft wide (48 s" Type 21772: 21772: LED Downlight: Other: 1 2 12 24 Total Proposed Watts = 1729 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Chec is Gregory R. SchnackelZJanuary 5, 2024 Name - Title Signature S\C)tJAL Date S'r. I S T & Q�- � Fo � r, 9669 0 ti4pF of Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 2 of 9 n�( COMcheck Software Version 4.1.5.5 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 1060 Golden Beauty Drive Rexburg, ID 83440 Mechanical Systems List 90.1 (2016) Standard Starbucks Rexburg, Idaho 6b Alteration Owner/Agent: Designer/Contractor: Gregory Schnackel Schnackel Engineers 3035 South 72nd Street Omaha, NE 68124 (402) 391-7680 Quantity System Type & Description 1 HWH-1 Electric Storage Water Heater, Capacity: 50 gallons w/ Circulation Pump Proposed Efficiency: 0.84 SL, %/h (if > 12 kW), Required Efficiency: 0.84 SL, %/h (if > 12 kW) SWH COMPLIANCE REQUIRED. Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Gregory R. Schnackel zal� January 5, 2024 Name - Title Signature S\ONAL Ftic Q�O� G 1 S T F'S'�o F 7� 9669 _ o of Date Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 3 of 9 eCOMcheck Software Version 4.1.5.5 ,0444 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or LFComplies Requirement will be met. 7.7.1, calculations provide all information IIDoes Not 10.4.2 with which compliance can be �1Vot Observable [PR3]1 determined for the service water IINot Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. 4.2.2, Plans, specifications, and/or Complies Requirement will be met. 8.4.1.1, calculations provide all information UDoes Not 8.4.1.2, with which compliance can be �1Vot Observable 8.7 determined for the electrical systems IINot Applicable [PR6]2 and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or LFComplies Requirement will be met. 9.4.3, 9.7 calculations provide all information IIDoes Not [PR4]1 with which compliance can be �1Vot Observable determined for the interior lighting and electrical systems and equipment IINot Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Additional Comments/Assumptions: 1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 4 of 9 Section # Plumbing Rough -In Inspection Complies? Comments/Assumptions & Rea.ID 7.4.4.1 ;Temperature controls installed on ;LJComplies Requirement will be met. [PL2]3 !service water heating systems Does Not (<=120°F to maximum temperature �1Vot Observable for intended use). EFNot Applicable 7.4.4.2 lAutomatic time switches installed to ;LJComplies Requirement will be met. [PL3]1 automatically switch off the 7,Does Not recirculating hot-water system or heat trace. 'IINot Observable QNot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Starbucks Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Report date: 01/05/24 Page 5 of 9 Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.4.5 1 Enclosed parking garage ventilation Complies Requirement will be met. [ME39]3 1 has automatic contaminant detection 'QDoes Not and capacity to stage or modulate fans 50% less design �1Vot Observable to or of capacity. EFNot Applicable 6.5.3.2.1 DX cooling systems >= 75 kBtu/h (>_ Complies Requirement will be met. [ME40]2 165 kBtu/h effective 1/2016) and 7,Does Not chilled -water and evaporative cooling See the Mechanical Systems list for values. Not Observable fan motor hp >= 1/4 designed to vary supply fan airflow as a function of load Not Applicable and comply with operational requirements. ,Approved field test used to evaluate Complies Requirement will be met. 6.5.7.2.4 [ME49]3 design air flow rates and demonstrate 'Does Not proper capture and containment of kitchen exhaust systems. �NOt Observable QNot Applicable 7.4.2 !service water heating equipment Complies [ME36]2 I meets efficiency requirements. TEFDoes Not bNot Observable QNot Applicable 6.4.3.9 Heating for vestibules and air curtains ; Complies Requirement will be met. [ME63]2 with integral heating include !QDoes Not automatic controls that shut off the Not Observable heating system when outdoor air IINot Applicable temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <_ 60F and cooling setpoint >= 80F. Doors separating conditioned space =Complies 6.5.10 Requirement will be met. [ME73]3 ;from the outdoors have controls that 7,EFDoes Not disable/reset heating and cooling Not Observable system when open. QNot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 6 of 9 Section # Rough -In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50% of all 125 volt 15- and Complies Requirement will be met. [EL10]2 20-Amp receptacles are controlled by Does Not an automatic control device. �1Vot Observable EFNot Applicable 8.4.3 New buildings have electrical energy Complies Requirement will be met. [ELll]z use measurement devices installed. TEFDoes Not Where tenant spaces exist, each Not Observable ;tenant is monitored separately. In I buildings with a digital control system UNot Applicable Ithe energy use is transmitted to to ;control system and displayed graphically. 9.4.1.1 Automatic control requirements Complies Requirement will be met. [EL1]2 prescribed in Table 9.6.1, for the TEFDoes Not appropriate space type, are installed. 1 Not Observable Mandatory lighting controls (labeled 'REQ') Not Applicable as and optional choice controls (labeled as 'ADD1' and 'ADD2') are implemented. Independent lighting controls installed Complies Requirement will be met. 9.4.1.1 [EL2]2 per approved lighting plans and all 'QDoes Not manual controls readily accessible and TJNot Observable visible to occupants. QNot Applicable 9.4.1.1f Daylight areas under skylights and MEomplies Requirement will be met. [EL13]1 roof monitors that have more than TEFDoes Not 150 W combined input power for Not Observable general lighting are controlled by ;QNot Applicable photocontrols. 9.4.1.3 Separate lighting control devices for ; Complies Requirement will be met. [EL4]1 specific uses installed per approved Does Not lighting plans. rNot Observable EFNot Applicable 9.6.2 'Additional interior lighting power ; Complies Requirement will be met. [EL8]1 allowed for special functions per the Does Not approved lighting plans and isr FNot Observable automatically controlled and QNot Applicable separated from general lighting. Electric motors meet requirements DEomplies Requirement will be met. [EL9 z where applicable. UDoes Not TJNot Observable ;Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 7 of 9 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 7.4.4.3 ; Public lavatory faucet water Complies Requirement will be met. [FI11]3 !temperature <=110°F. 1,,JDoes Not t,j1Vot Observable EFNot Applicable 7.4.4.4 Controls are installed that limit the Complies Requirement will be met. [FI12]3 operation of a recirculation pump 'QDoes Not installed to maintain temperature of a storage tank. tJNot Observable EFNot Applicable 8.7.1 Furnished as -built drawings for Complies Requirement will be met. [FI16]3 electric power systems within 30 days 13boes Not of system acceptance. EINot Observable QNot Applicable 8.7.2 Furnished O&M instructions for Complies Requirement will be met. [FI17]3 systems and equipment to the 'QDoes Not building owner or designated representative. �1Vot Observable EFNot Applicable 9.2.2.3 Interior installed lamp and fixture Complies see the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what 7,EFDoes Not is shown on the approved lighting Observable' plans, demonstrating proposed watts IINot Observable are less than or equal to allowed Applicable watts. 9.4.4 At least 75% of all permanently Complies Requirement will be met. [F120]1 installed lighting fixtures in dwelling TEFDoes Not I units have >= 55 Im/W efficacy or a Not Observable >= 45 Im/W total luminaire efficacy. I TFNot Applicable 10.4.3 Elevators are designed with the tucornplies Requirement will be met. [F124]2 proper lighting, ventilation power, and 13boes Not !standby mode. FE:1Vot Observable EFNot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 8 of 9 Project Title: Starbucks Report date: 01/05/24 Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 9 of 9