HomeMy WebLinkAboutENERGY COMPLIANCE REPORT - 23-00793 - Starbucks - InteriorCOMcheck Software Version 4.1.5.5
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
90.1 (2016) Standard
Starbucks
Alteration
Construction Site: Owner/Agent:
Designer/Contractor:
1060 Golden Beauty Drive
Gregory Schnackel
Rexburg, ID 83440
Schnackel Engineers
3035 South 72nd Street
Omaha, NE 68124
(402) 391-7680
Allowed Interior Lighting Power
A
B C
D
Area Category Floor
Area Allowed Allowed Watts
(ft2) Watts / ft2
(B X C)
1-Common Space Types:Sales Area
1017 1.22
1241
Allowance: Decorative Appearance / Fix. ID: 96VA
100 (a) 0.75
75 (b)
2-Common Space Types:Food Preparation
1086 1.06
1151
Allowance: Decorative Appearance / Fix. ID: 60VA
543 (a) 0.75
120 (b)
Allowance: Decorative Appearance / Fix. ID: 96VA
543 (a) 0.75
96 (b)
3-Common Space Types:Restrooms
270 0.85
230
4-Common Space Types:Office - Enclosed
69 0.93
64
5-Common Space Types:Corridor/Transition <8 ft wide
48 0.66
32
Total Allowed Watts =
3008
(a) Area claimed must not exceed the illuminated area permitted for this allowance type.
(b) Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less.
Proposed Interior Lighting Power
A
B C D
E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
Lamps/ # of Fixture
(C X D)
Fixture Fixtures Watt.
Common Space Types:Sales Area (1017 sq.ft.)
5A Current Limiter: 5A: Serves Track Lighting: Wattage based on current limiting device
0
0
600
600
capacity
96VA Remote Power Supply: 96VA: Serves LED Tape: Wattage based on low -voltage
0
0
96
96
transformer capacity
Type 21772: 21772: LED Downlight: Other:
1
7
9
63
Type 22401: 22401: LED Mini Pendant: Other:
1
4
15
60
Type 20832: 20832: LED Pendant: Other:
1
2
60
120
Common Space Types:Food Preparation (1086 sq.ft.)
(2) 60VA Remote Power Supply: 60VA: Serves LED Tape: Wattage based on low -voltage
0
0
120
120
transformer capacity
96VA Remote Power Supply: 96VA: Serves LED Tape: Wattage based on low -voltage
0
0
96
96
transformer capacity
Type 21774: 21774: LED Downlight: Other:
1
10
9
90
Type 21772: 21772: LED Downlight: Other:
1
4
12
48
Project Title: Starbucks
Report date:
01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck
Page
1 of 9
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
D
Fixture
Watt.
E
(C X D)
Type 21783: 21783: 2x4 LED Troffer: Other:
1
8
36
288
Common Space Types:Restrooms (270 sq.ft.)
Type 22249: 22249: LED Downlight: Other:
1
8
11
88
Common Space Types:Office - Enclosed (69 sq.ft.)
Type 21783: 21783: 2x4 LED Troffer: Other:
1
1
36
36
Common Space Types:Corridor/Transition <8 ft wide (48 s"
Type 21772: 21772: LED Downlight: Other:
1
2
12
24
Total Proposed Watts =
1729
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with
any applicable mandatory requirements listed in the Inspection Chec is
Gregory R. SchnackelZJanuary 5, 2024
Name - Title Signature S\C)tJAL Date
S'r. I S T &
Q�- � Fo �
r, 9669
0
ti4pF of
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 2 of 9
n�(
COMcheck Software Version 4.1.5.5
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
1060 Golden Beauty Drive
Rexburg, ID 83440
Mechanical Systems List
90.1 (2016) Standard
Starbucks
Rexburg, Idaho
6b
Alteration
Owner/Agent: Designer/Contractor:
Gregory Schnackel
Schnackel Engineers
3035 South 72nd Street
Omaha, NE 68124
(402) 391-7680
Quantity System Type & Description
1 HWH-1
Electric Storage Water Heater, Capacity: 50 gallons w/ Circulation Pump
Proposed Efficiency: 0.84 SL, %/h (if > 12 kW), Required Efficiency: 0.84 SL, %/h (if > 12 kW)
SWH COMPLIANCE REQUIRED.
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Gregory R. Schnackel zal� January 5, 2024
Name - Title
Signature S\ONAL Ftic
Q�O� G 1 S T F'S'�o
F
7�
9669 _
o
of
Date
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 3 of 9
eCOMcheck Software Version 4.1.5.5
,0444 Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Req.ID
4.2.2,
Plans, specifications, and/or
LFComplies
Requirement will be met.
7.7.1,
calculations provide all information
IIDoes Not
10.4.2
with which compliance can be
�1Vot Observable
[PR3]1
determined for the service water
IINot Applicable
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
4.2.2,
Plans, specifications, and/or
Complies
Requirement will be met.
8.4.1.1,
calculations provide all information
UDoes Not
8.4.1.2,
with which compliance can be
�1Vot Observable
8.7
determined for the electrical systems
IINot Applicable
[PR6]2
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.2,
Plans, specifications, and/or
LFComplies
Requirement will be met.
9.4.3, 9.7
calculations provide all information
IIDoes Not
[PR4]1
with which compliance can be
�1Vot Observable
determined for the interior lighting
and electrical systems and equipment
IINot Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 4 of 9
Section
# Plumbing Rough -In Inspection Complies? Comments/Assumptions
& Rea.ID
7.4.4.1 ;Temperature controls installed on ;LJComplies Requirement will be met.
[PL2]3 !service water heating systems Does Not
(<=120°F to maximum temperature �1Vot Observable
for intended use).
EFNot Applicable
7.4.4.2 lAutomatic time switches installed to ;LJComplies Requirement will be met.
[PL3]1 automatically switch off the 7,Does Not
recirculating hot-water system or heat
trace. 'IINot Observable
QNot Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Starbucks
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck
Report date: 01/05/24
Page 5 of 9
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
6.4.3.4.5
1 Enclosed parking garage ventilation Complies Requirement will be met.
[ME39]3
1 has automatic contaminant detection 'QDoes Not
and capacity to stage or modulate
fans 50% less design �1Vot Observable
to or of capacity.
EFNot Applicable
6.5.3.2.1
DX cooling systems >= 75 kBtu/h (>_ Complies Requirement will be met.
[ME40]2
165 kBtu/h effective 1/2016) and 7,Does Not
chilled -water and evaporative cooling See the Mechanical Systems list for values.
Not Observable
fan motor hp >= 1/4 designed to vary
supply fan airflow as a function of load Not Applicable
and comply with operational
requirements.
,Approved field test used to evaluate Complies Requirement will be met.
6.5.7.2.4
[ME49]3
design air flow rates and demonstrate 'Does Not
proper capture and containment of
kitchen exhaust systems. �NOt Observable
QNot Applicable
7.4.2
!service water heating equipment Complies
[ME36]2
I meets efficiency requirements. TEFDoes Not
bNot Observable
QNot Applicable
6.4.3.9
Heating for vestibules and air curtains ; Complies
Requirement will be met.
[ME63]2
with integral heating include !QDoes Not
automatic controls that shut off the
Not Observable
heating system when outdoor air
IINot Applicable
temperatures > 45F. Vestibule
heating and cooling systems
controlled by a thermostat in the
vestibule with heating setpoint <_
60F and cooling setpoint >= 80F.
Doors separating conditioned space =Complies
6.5.10
Requirement will be met.
[ME73]3
;from the outdoors have controls that 7,EFDoes Not
disable/reset heating and cooling
Not Observable
system when open.
QNot Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 6 of 9
Section
#
Rough -In Electrical Inspection
Complies?
Comments/Assumptions
& Req.ID
8.4.2
At least 50% of all 125 volt 15- and Complies Requirement will be met.
[EL10]2
20-Amp receptacles are controlled by Does Not
an automatic control device.
�1Vot Observable
EFNot Applicable
8.4.3
New buildings have electrical energy Complies
Requirement will be met.
[ELll]z
use measurement devices installed. TEFDoes Not
Where tenant spaces exist, each
Not Observable
;tenant is monitored separately. In
I buildings with a digital control system UNot Applicable
Ithe energy use is transmitted to to
;control system and displayed
graphically.
9.4.1.1
Automatic control requirements Complies Requirement will be met.
[EL1]2
prescribed in Table 9.6.1, for the TEFDoes Not
appropriate space type, are installed. 1
Not Observable
Mandatory lighting controls (labeled
'REQ') Not Applicable
as and optional choice controls
(labeled as 'ADD1' and 'ADD2') are
implemented.
Independent lighting controls installed Complies Requirement will be met.
9.4.1.1
[EL2]2
per approved lighting plans and all 'QDoes Not
manual controls readily accessible and
TJNot Observable
visible to occupants.
QNot Applicable
9.4.1.1f
Daylight areas under skylights and MEomplies
Requirement will be met.
[EL13]1
roof monitors that have more than TEFDoes Not
150 W combined input power for
Not Observable
general lighting are controlled by
;QNot Applicable
photocontrols.
9.4.1.3
Separate lighting control devices for ; Complies
Requirement will be met.
[EL4]1
specific uses installed per approved Does Not
lighting plans.
rNot Observable
EFNot Applicable
9.6.2
'Additional interior lighting power ; Complies
Requirement will be met.
[EL8]1
allowed for special functions per the Does Not
approved lighting plans and isr FNot Observable
automatically controlled and
QNot Applicable
separated from general lighting.
Electric motors meet requirements DEomplies Requirement will be met.
[EL9 z
where applicable. UDoes Not
TJNot Observable
;Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 7 of 9
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
7.4.4.3
; Public lavatory faucet water Complies Requirement will be met.
[FI11]3
!temperature <=110°F. 1,,JDoes Not
t,j1Vot Observable
EFNot Applicable
7.4.4.4
Controls are installed that limit the Complies
Requirement will be met.
[FI12]3
operation of a recirculation pump 'QDoes Not
installed to maintain temperature of a
storage tank. tJNot Observable
EFNot Applicable
8.7.1
Furnished as -built drawings for Complies
Requirement will be met.
[FI16]3
electric power systems within 30 days 13boes Not
of system acceptance.
EINot Observable
QNot Applicable
8.7.2
Furnished O&M instructions for Complies
Requirement will be met.
[FI17]3
systems and equipment to the 'QDoes Not
building owner or designated
representative. �1Vot Observable
EFNot Applicable
9.2.2.3
Interior installed lamp and fixture Complies see the Interior Lighting fixture schedule for values.
[FI18]1
lighting power is consistent with what 7,EFDoes Not
is shown on the approved lighting
Observable'
plans, demonstrating proposed watts IINot Observable
are less than or equal to allowed Applicable
watts.
9.4.4
At least 75% of all permanently Complies
Requirement will be met.
[F120]1
installed lighting fixtures in dwelling TEFDoes Not
I units have >= 55 Im/W efficacy or a
Not Observable
>= 45 Im/W total luminaire efficacy.
I TFNot Applicable
10.4.3
Elevators are designed with the tucornplies
Requirement will be met.
[F124]2
proper lighting, ventilation power, and 13boes Not
!standby mode.
FE:1Vot Observable
EFNot Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 8 of 9
Project Title: Starbucks Report date: 01/05/24
Data filename: V:\Energy_Calculation Data Files\COMcheck V4.1.5.5\230929_rl.cck Page 9 of 9