HomeMy WebLinkAboutELEVATION CERTIFICATE SIGNED - 22-00812 - Rexburg U-Haul Building BNational Flood Insurance Program
I
Certificate
and Instructions
2022 EDITION
QARTAf,,
O
ti
�(4 ND StiLJ4
�
FEMA
OMB Control No. 1660-0008
U.S. DEPARTMENT OF HOMELAND SECURITY Expiration Date: 06/30/2026
Federal Emergency Management Agency
National Flood Insurance Program
PAPERWORK REDUCTION ACT NOTICE
Public reporting burden for this data collection is estimated to average 3.75 hours per response. The burden estimate includes the time for
reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and submitting this
form. You are not required to respond to this collection of information unless a valid OMB control number is displayed on this form. Send
comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collections
Management, Department of Homeland Security, Federal Emergency Management Agency, 500 C Street SW, Washington, DC 20742,
Paperwork Reduction Project (1660-0008). NOTE: Do not send your completed form to this address.
PRIVACY ACT STATEMENT
Authority: Title 44 CFR § 61.7 and 61.8.
Principal Purpose(s): This information is being collected for the primary purpose of documenting compliance with National Flood
Insurance Program (NFIP) floodplain management ordinances for new or substantially improved structures in designated Special Flood
Hazard Areas. This form may also be used as an optional tool for a Letter of Map Amendment (LOMA), Conditional LOMA (CLOMA),
Letter of Map Revision Based on Fill (LOMR-F), or Conditional LOMR-F (CLOMR-F), or for flood insurance rating purposes in any flood
zone.
Routine Use(s): The information on this form may be disclosed as generally permitted under 5 U.S.C. § 552a(b) of the Privacy Act of
1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/ FEMA-003
— National Flood Insurance Program Files System of Records Notice 79 Fed. Reg. 28747 (May 19, 2014) and upon written request, written
consent, by agreement, or as required by law.
Disclosure: The disclosure of information on this form is voluntary; however, failure to provide the information requested may impact the
flood -Fn thirough the NFIP. Information vVill Only be Feleased as peffigifted by '&,v.
PURPOSE OF THE ELEVATION CERTIFICATE
The Elevation Certificate is an important administrative tool of the NFIP. It can be used to provide elevation information necessary to
ensure compliance with community floodplain management ordinances, to inform the proper insurance premium, and to support a request
for a LOMA, CLOMA, LOMR-F, or CLOMR-F.
The Elevation Certificate is used to document floodplain management compliance for Post -Flood Insurance Rate Map (FIRM) buildings,
which are buildings constructed after publication of the FIRM, located in flood Zones Al—A30, AE, AH, AO, A (with Base Flood Elevation
(BFE)), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO, and A99. It may also be used to provide elevation
information for Pre -FIRM buildings or buildings in any flood zone.
As part of the agreement for making flood insurance available in a community, the NFIP requires the community to adopt floodplain
management regulations that specify minimum requirements for reducing flood losses. One such requirement is for the community to
obtain the elevation of the lowest floor (including basement) of all new and substantially improved buildings, and maintain a record of such
information. The Elevation Certificate provides a way for a community to document compliance with the community's floodplain
management ordinance.
Use of this certificate does not provide a waiver of the flood insurance purchase requirement. Only a LOMA or LOMR-F from the Federal
Emergency Management Agency (FEMA) can amend the FIRM and remove the federal mandate for a lending institution to require the
purchase of flood insurance. However, the lending institution has the option of requiring flood insurance even if a LOMA/LOMR-F has been
issued by FEMA. The Elevation Certificate may be used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. Lowest Adjacent
Grade (LAG) elevations certified by a land surveyor, engineer, or architect, as authorized by state law, will be required if the certificate is
used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. A LOMA, CLOMA, LOMR-F, or CLOMR-F request must be submitted
with either a completed FEMA MT-EZ or MT-1 application package, whichever is appropriate. If the certificate will only be completed to
support a LOMA, CLOMA, LOMR-F, or CLOMR-F request, there is an option to document the certified LAG elevation on the Elevation
Form included in the MT-EZ and MT-1 application.
This certificate is used only to certify building elevations. A separate certificate is required for floodproofing. Under the NFIP,
non-residential buildings can be floodproofed up to or above the BFE. A floodproofed building is a building that has been designed and
constructed to be watertight (substantially impermeable to floodwaters) below the BFE. Floodproofing of residential buildings is not
permitted under the NFIP unless FEMA has granted the community an exception for residential floodproofed basements. The community
must adopt standards for design and construction of floodproofed basements before FEMA will grant a basement exception. For both
floodproofed non-residential buildings and residential floodproofed basements in communities that have been granted an exception by
FEMA, a floodproofing certificate is required.
The expiration date on the form herein does not apply to certified and completed Elevation Certificates, as a completed Elevation
Certificate does not expire, unless there is a physical change to the building that invalidates information in Section A Items A8 or A9,
Section C, Section E, or Section H. In addition, this form is intended for the specific building referenced in Section A and is not invalidated
by the transfer of building ownership.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 1 of 19
U.S. DEPARTMENT OF HOMELAND SECURITY OMB Control No. 0
Expiration Date: 06/30/6/30/202626
Federal Emergency Management Agency
National Flood Insurance Program
I1 PORTANT: MUST�OL"LZtP%PTNSTRUWicial�()
ON PAGES 99
Copy all pages of this Elevation erti icate and all attachments for (1) community , insurance agent/company, and (3) building
SECTION A - PROPERTY INFORMATION
FOR INSURANCE COMPANY USE
Al. Building Owner's Name: U-HAUL Intemational Policy Number:
AN2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box Company NAIC Number:
3�1�$ North 2nd East Bldg. B
City: Rexburg State: ID ZIP Code: 83440
A3. Property Description (e.g., Lot and Block Numbers or Legal Description) and/or Tax Parcel Number:
RPR0000002001 A
A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.): Comercial
A5. Latitude/Longitude: Lat. 43.8337 Long. 111.7755 Horizontal Datum: ❑ NAD 1927 ❑✓ NAD 1983 ❑ WGS 84
A6. Attach at least two and when possible four clear photographs (one for each side) of the building (see Form pages 7 and 8).
A7. Building Diagram Number: 1B
A8. For a building with a crawlspace or enclosure(s):
a) Square footage of crawlspace or enclosure(s): sq. ft.
b) Is there at least one permanent flood opening on two different sides of each enclosed area? ❑ Yes ❑ No ✓❑ N/A
c) Enter number of permanent flood openings in the crawlspace or enclosure(s) within 1.0 foot above adjacent grade:
Non -engineered flood openings: Engineered flood openings:
d) Total net open area of non -engineered flood openings in A8.c: sq. in.
e) Total rated area of engineered flood openings in A8.c (attach documentation - see Instructions): sq. ft.
f) Sum of A8.d and A8.e rated area (if applicable - see Instructions): sq. ft.
A9. For a building with an attached garage:
a) Square footage of attached garage: sq. ft.
b) Is there at least one permanent flood opening on two different sides of the attached garage? ❑ Yes ❑ No ✓❑ N/A
c) Enter number of permanent flood openings in the attached garage within 1.0 foot above adjacent grade:
Non -engineered flood openings: Engineered flood openings:
d) Total net open area of non -engineered flood openings in A9.c: sq. in.
e) Total rated area of engineered flood openings in A9.c (attach documentation - see Instructions): sq. ft.
f) Sum of A9.d and A9.e rated area (if applicable - see Instructions): sq. ft.
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B1.a. NFIP Community Name: Rexburg, City of B1.b. NFIP Community Identification Number: 160098
B2. County Name: Madison B3. State: ID B4. Map/Panel No.: 16065CO020 B5. Suffix: D
B6. FIRM Index Date: 0610311991 B7. FIRM Panel Effective/Revised Date: 06/03/1991
B8. Flood Zone(s): AE B9. Base Flood Elevation(s) (BFE) (Zone AO, use Base Flood Depth): 4867.2
B10. Indicate the source of the BFE data or Base Flood Depth entered in Item B9:
✓❑ FIS ❑ FIRM ❑ Community Determined ❑ Other:
B11. Indicate elevation datum used for BFE in Item B9: ✓❑ NGVD 1929 ❑ NAVD 1988 ❑ Other/Source:
B12. Is t #1IAft located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ✓❑ No
Date: ❑ CBRS ❑ OPA
B13. Is the building located seaward of the Limit of Moderate Wave Action (LiMWA)? ❑ Yes Z No
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 2 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.:
FOR INSURANCE COMPANY USE
Policy Number:
328 North 2nd East Bldg. 8
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
SECTION E — BUILDING MEASUREMENT INFORMATION (SURVEY NOT REQUIRED)
FOR ZONE AO, ZONE AR/AO, AND ZONE A (WITHOUT BFE)
For Zones AO, AR/AO, and A (without BFE), complete Items E1—E5. For Items E1—E4, use natural grade, if available. If the Certificate is
intended to support a Letter of Map Change request, complete Sections A, B, and C. Check the measurement used. In Puerto Rico only,
enter meters.
Building measurements are based on: ❑ Construction Drawings* ❑ Building Under Construction* ❑ Finished Construction
*A new Elevation Certificate will be required when construction of the building is complete.
Ell. Provide measurements (C.2.a in applicable Building Diagram) for the following and check the appropriate boxes to show whether the
measurement is above or below the natural HAG and the LAG.
a) Top of bottom floor (including
basement,crawlspace, or enclosure) is: ❑ feet El El ❑ above or ❑ below the HAG.
s
b) Top of bottom floor (including
basement,crawlspace, or enclosure) is: ❑ feet El El ❑ above or ❑ below the LAG.
s
E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9 (see pages 1-2 of Instructions), the
next higher floor (C2.b in applicable
Building Diagram) of the building is: ❑ feet ❑ meter ❑ above or ❑ below the HAG.
E3. Attached garage (top of slab) is: ❑ feet ❑ Pheter ❑ above or ❑ below the HAG.
s
E4. Top of platform of machinery and/or equipment
servicing the building is: El feet ❑ meter ❑ above or ❑ below the HAG.
s
E5. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's
floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown The local official must certify this information in Section G.
SECTION F — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without BFE) or Zone AO must
sign here. The statements in Sections A, B, and E are correct to the best of my knowledge
❑ Check here if attachments and describe in the Comments area.
Property Owner or Owner's Authorized Representative Name:
Address:
City: State: ZIP Code:
Signature: Date:
Telephone: Ext.: Email:
Comments:
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 4 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.:
FOR INSURANCE COMPANY USE
Policy Number:
328 North 2nd East Bldg. 8
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
FIRMA
TIRNBU14D1 G tEfffIONI IFO ATIO SUR1/
REQU RED
C1. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Construction* ❑✓ Finished Construction
*A new Elevation Certificate will be required when construction of the building is complete.
C2. Elevations — Zones Al—A30, AE, AH, AO, A (with BFE), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO,
A99. Complete Items C2.a—h below according to the Building Diagram specified in Item AT In Puerto Rico only, enter meters.
Benchmark Utilized: D228 Vertical Datum: 1929
Indicate elevation datum used for the elevations in items a) through h) below.
❑✓ NGVD 1929 ❑ NAVD 1988 ❑ Other:
Datum used for building elevations must be the same as that used for the BFE. Conversion factor used? ❑ Yes ❑✓ No
If Yes, describe the source of the conversion factor in the Section D Comments area.
Check the measurement used:
a) Top of bottom floor (including basement, crawlspace, or enclosure floor): 4,868.20 ❑✓ fee ❑ meter
b) Top of the next higher floor (see Instructions): NA ❑ fee ❑ metert
c) Bottom of the lowest horizontal structural member (see Instructions): NA Elfeefee El meter
d) Attached garage (top of slab): NA ❑ fee ❑ meter
t
s
e) Lowest elevation of Machinery and Equipment (M&E) servicing the building
fee meter
(describe type of M&E and location in Section D Comments area): 4,868.20 ❑ ❑
t
f) Lowest Adjacent Grade (LAG) next to building: ❑ Natural ❑✓ Finished 4,864.21 ❑✓ fee ❑ meter
g) Highest Adjacent Grade (HAG) next to building: ❑ Natural ❑✓ Finished 4,868.42 ❑✓ fee ❑ meter
s
h) Finished LAG at lowest elevation of attached deck or stairs, including structural NA fee meter
support: ❑ t❑
awmwpm
�SEG ION. SUR �YOR ENGINEER�OR.ARC I: - * E I ICAP °IO
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by state law to certify elevation
information. 1 certify that the information on this Certificate represents my best efforts to interpret the data available. I understand that any
false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001.
Were latitude and longitude in Section A provided by a licensed land surveyor? ❑✓ Yes ❑ No
❑ Check here if attachments and describe in the Comments area.
Certifier's Name: Clint Jolley License Number: 15571
Title: Surveyor pL L% .
Company Name: HLE c, �G} 5 r r A
Address: 101 Park Ave.
15571
City: Idaho Falls State: ID ZIP Code: 83402 s
4ti` 4i ip4
Signature: G/!�" Date: 0410912024 l�'1 A4. J0\:%''
Telephone: (208) 524- 212 Ext.: Email: clintj@hleinc.com
Copy all pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance agent/company, and (3) building
owner.
Comments (including source of conversion factor in C2; type of equipment and location per C2.e; and description of any attachments):
The equipment for C2.e is the boiler control box.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 3 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.:
FOR INSURANCE COMPANY USE
Policy Number:
328 North 2nd East Bldg. 8
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
SECTION G — COMMUNITY INFORMATION (RECOMMENDED FOR COMMUNITY OFFICIAL COMPLETION)
The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete
Section A, B, C, E, G, or H of this Elevation Certificate. Complete the applicable item(s) and sign below when:
G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor,
engineer, or architect who is authorized by state law to certify elevation information. (Indicate the source and date of the
elevation data in the Comments area below.)
G2.a. ❑ A local official completed Section E for a building located in Zone A (without a BFE), Zone AO, or Zone AR/AO, or when item
E5 is completed for a building located in Zone AO.
G2.b. ❑ A local official completed Section H for insurance purposes.
G3. ❑ In the Comments area of Section G, the local official describes specific corrections to the information in Sections A, B, E and
H
G4. ❑ The following information (Items G5—G11) is provided for community floodplain management purposes.
G5. Permit Number: G6. Date Permit Issued:
G7. Date Certificate of Compliance/Occupancy Issued:
G8. This permit has been issued for: ❑ New Construction ❑ Substantial Improvement
G9.a. Elevation of as -built lowest floor (including basement) of the
building: ❑ feet ❑ meters Datum:
G9.b. Elevation of bottom of as -built lowest horizontal structural
member: ❑ feet ❑ meters Datum:
G10.a. BFE (or depth in Zone AO) of flooding at the building site: ❑ feet ❑ meters Datum:
G10.b. Community's minimum elevation (or depth in Zone
AO)requirement for the lowest floor or lowest horizontal
structural member:
❑ feet ❑meters Datum:
G11. Variance issued? ❑ Yes ❑ No If yes, attach documentation and describe in the Comments area.
The local official who provides information in Section G must sign here. I have completed the information in Section G and certify that it is
correct to the best of my knowledge. If applicable, I have also provided specific corrections in the Comments area of this section.
Local Official's Name: Title:
NFIP Community Name:
Telephone: Ext.: Email:
Address:
City: State: ZIP Code:
Signature: Date:
Comments (including type of equipment and location, per C2.e; description of any attachments; and corrections to specific information in
Sections A, B, D, E, or H):
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 5 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.:
FOR INSURANCE COMPANY USE
Policy Number:
328 North 2nd East Bldg. 8
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
SECTION H — BUILDING'S FIRST FLOOR HEIGHT INFORMATION FOR ALL ZONES
(SURVEY NOT REQUIRED) (FOR INSURANCE PURPOSES ONLY)
The property owner, owner's authorized representative, or local floodplain management official may complete Section H for all flood zones
to determine the building's first floor height for insurance purposes. Sections A, B, and I must also be completed. Enter heights to the
nearest tenth of a foot (nearest tenth of a meter in Puerto Rico). Reference the Foundation Type Diagrams (at the end of Section H
Instructions) and the appropriate Building Diagrams (at the end of Section I Instructions) to complete this section.
H1. Provide the height of the top of the floor (as indicated in Foundation Type Diagrams) above the Lowest Adjacent Grade (LAG):
a) For Building Diagrams 1A, 1B, 3, and 5-9. Top of bottom ❑ feet ❑ meters ❑ above the LAG
floor (include above -grade floors only for buildings with
subgrade crawlspaces or enclosure floors)is:
b) For Building Diagrams 2A, 26, 4, and 6-9. Top of next ❑ feet ❑ meters ❑ above the LAG
higher floor (i.e., the floor above basement, crawlspace, or
enclosure floor) is:
H2. Is all Machinery and Equipment servicing the building (as listed in Item H2 instructions) elevated to or above the floor indicated by the
H2 arrow (shown in the Foundation Type Diagrams at end of Section H instructions) for the appropriate Building Diagram?
❑ Yes ❑ No
SECTION I — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Sections A, B, and H must sign here. The statements in Sections
A, B, and H are correct to the best of my knowledge. Note: If the local floodplain management official completed Section H, they should
indicate in Item G2.b and sign Section G.
❑ Check here if attachments are provided (including required photos) and describe each attachment in the Comments area.
Property Owner or Owner's Authorized Representative Name:
Address:
City: State: ZIP Code:
Signature: Date:
Telephone: Ext.: Email:
Comments:
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 6 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
BUILDING PHOTOGRAPHS
See Instructions for Item A6.
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.:
FOR INSURANCE COMPANY USE
328 North 2nd East Bldg. 8
Policy Number:
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
Instructions: Insert below at least two and when possible four photographs showing each side of the
building (for example, may only be
able to take front and back pictures of townhouses/rowhouses). Identify all photographs with the date taken and "Front View," 'Rear View,"
"Right Side View," or "Left Side View." Photographs must show the foundation. When flood openings are present, include at least one
close-up photograph of representative flood openings or vents, as indicated in Sections A8 and A9.
F.
Photo One
Photo One Caption: Looking from South West of Building. Front and Left side
Clear Photo One
q
f I
"3_
X
Photo Two
Photo Two Caption: Looking From North West of Building. Front and Right Sides
Clear Photo Two
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 7 of 19
ELEVATION CERTIFICATE
IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON PAGES 9-19
BUILDING PHOTOGRAPHS
Continuation Page
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR INSURANCE COMPANY USE
328 North 2nd East Bldg. 8
Policy Number:
City: Rexburg State: ID ZIP Code: 83440
Company NAIC Number:
Insert the third and fourth photographs below. Identify all photographs with the date taken and "Front View," "Rear View," 'Right Side
View," or "Left Side View." When flood openings are present, include at least one close-up photograph of representative flood openings or
vents, as indicated in Sections A8 and A9.
SOL
Photo Three
Photo Three Caption: Looking From North East of Building. Right and Rear View of building. Clear Photo Three
I�
Photo Four
Photo Four Caption: Looking From South East Side of Building. Left and Rear Views of Building. Clear Photo Four
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 8 of 19
DEPARTMENT OF HOMELAND SECURITY
Federal Emergency Management Agency
The Elevation Certificate is to be completed by a land surveyor, engineer, or architect who is authorized by state law to certify elevation
information when elevation information is required or used for Zones Al-A30, AE, AH, AO, A (with Base Flood Elevation (BFE)), VE,
V1-V30, V (with BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, or A99.
Community officials who are authorized by law or ordinance to provide floodplain management information (herein referred to as "local
floodplain management official") may also complete this form. For Zones AO, AR/AO, and A (without BFE), a local floodplain management
official, a property owner, or an owner's authorized representative may provide floodplain management compliance information on this
certificate in Section E, unless the elevations are intended for use in supporting a request for a LOMA, CLOMA, LOMR-F, or CLOMR-F.
Certified elevations must be included if the purpose of completing the Elevation Certificate is to obtain a LOMA, CLOMA, LOMR-F, or
CLOMR-F.
The property owner, the owner's authorized representative, or local floodplain management official can complete Section A and Section B.
The partially completed form can then be given to the land surveyor, engineer, or architect to complete Section C. The land surveyor,
engineer, or architect should verify the information provided by the property owner or owner's representative to ensure that this certificate
is complete.
For insurance purposes only, a local floodplain management official, a property owner, or an owner's authorized representative may
provide First Floor Height details in Section H for any zone.
In Puerto Rico only, elevations for building information and flood hazard information may be entered in meters.
Note: Section C can be used for insurance and compliance in any zone; however, Section E can be used only for compliance in Zone AO
and Zone A.
SECTION A - PROPERTY INFORMATION
Items Al-A4. This section identifies the building, its location, and its owner. Enter the name(s) of the building owner(s), the building's
complete street address or property description (e.g., lot and block numbers or legal description), and/or tax parcel number. If the
building's address is different from the owner's address, enter the address of the building being certified. If the address is a rural route or a
Post Office box number, enter the lot and block numbers, the tax parcel number, the legal description, or an abbreviated location
description based on distance and direction from a fixed point of reference. For the purposes of this certificate, "building" means both a
building and a manufactured (mobile) home. For properties with multiple buildings, include a description for the specific building.
A map may be attached to this certificate to show the location of the building on the property. A tax map, Flood Insurance Rate Map
(FIRM), or detailed community map is appropriate. If no map is available, provide a sketch of the property location, and the location of the
building on the property. Include appropriate landmarks such as nearby roads, intersections, and bodies of water. For building use,
indicate whether the building is residential, non-residential, an addition to an existing residential or non- residential building, an accessory
building (e.g., garage), or other type of structure. Use the Comments area of the appropriate section if needed, or attach additional
comments.
Item A5. Provide latitude and longitude coordinates for the center of the front of the building. Use either decimal degrees (e.g.,
39.504322°,-110.758522°) or degrees, minutes, seconds (e.g., 39' 30' 15.56", -110' 45' 30.68") format. If decimal degrees are used,
provide coordinates to at least six decimal places or better. When using degrees, minutes, seconds, provide seconds to at least two
decimal places or better. Provide the datum of the latitude and longitude coordinates (FEMA prefers the use of NAD 1983). Indicate the
method or source used to determine the latitude and longitude in the Comments area of the appropriate section. When the latitude and
longitude are provided by a land surveyor, check the "Yes" box in Section D.
Item A6. The certifier must provide at least two and when possible four photographs showing each side of the building taken within 90
days from the date of certification. The photographs must be taken with views confirming the building description and Building Diagram
number provided in Item AT To the extent possible, these photographs should show the entire building including foundation. In addition,
when applicable, provide a photograph of the foundation showing a representative example of the flood openings or vents. All photographs
must be in color and measure at least 3"X3". Digital photographs are acceptable. Additional photographs may be requested by local
floodplain management officials or for insurance purposes to show additional detail regarding the building characteristics or features.
Item A7. Select the Building Diagram (shown on pages 17-19) that best represents the building. Then enter the diagram number and use
the diagram to identify and determine the appropriate elevations requested in Items C2.a-h. If you are unsure of the correct diagram,
select the diagram that most closely resembles the building being certified.
Item A8.a. Provide the square footage of the crawlspace or enclosure(s) below the lowest elevated floor of an elevated building with or
without permanent flood openings. Take the measurement from the outside of the crawlspace or enclosure(s). Examples of elevated
buildings constructed with crawlspace and enclosure(s) are shown in Diagrams 6-9 on pages 18-19. Diagram 2A, 2B, 4, or 9 should be
used for a building constructed with a crawlspace floor that is below the exterior grade on all sides. If there is no crawlspace or enclosure,
enter "N/A" for Items A8.a-f.
Item A8.1b. Indicate if there is at least one permanent flood opening within 1.0 foot of the adjacent grade on at least two exterior walls of
each enclosed area identified in A8.a. A permanent flood opening is a flood vent or other opening that allows the free passage of water
automatically in both directions without human intervention. If the crawlspace or enclosure(s) have no permanent flood openings, or if none
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 9 of 19
SECTION A — PROPERTY INFORMATION (Continued)
Item A8.c. Enter the total number of permanent non -engineered and/or engineered flood openings in the crawlspace or enclosure(s) that
are no higher than 1.0 foot above the higher of the exterior or interior grade or floor immediately below the opening. If the interior grade
elevation is used, note this in the Comments area of Section D.
Item A8.d. Enter the total measured net open area of permanent non -engineered flood openings indicated in A8.c in square inches,
excluding any bars, louvers, or other covers of the permanent flood openings. Non -engineered openings that meet the requirements of
NFIP Technical Bulletin 1 are assumed to provide one square foot of rated area for each square inch of net open area. If the net open area
cannot be measured, provide in the Comments area of the appropriate section the size of the flood openings without consideration of any
covers and indicate the type of cover that exists in the flood openings.
Item A8.e. Enter the total rated area of the permanent engineered flood openings indicated in A8.c, in square feet. Attach a copy of the
Individual Engineered Flood Openings Certification for a specific building or an Evaluation Report issued by the International Code Council
Evaluation Service (ICC ES) for all engineered openings, and indicate the manufacturer's name and model number in the Comments area
of the appropriate section, if applicable. Flood openings cannot be considered engineered flood openings without documentation. If no
documentation is available/provided, enter the net open (unobstructed) area of the flood openings in A8.d instead.
Item A8.f. Complete only if permanent engineered and permanent non -engineered flood openings are both present. Enter the sum of A8.d
(net open area of all non -engineered openings) and A8.e (total rated area of all engineered openings). Non -engineered openings that meet
the requirements of NFIP Technical Bulletin 1 are assumed to provide one square foot of rated area for each square inch of net open area.
For example, a non -engineered opening with 140 sq. in. of net open area (i.e., rated for 140 sq. ft. of enclosure area), combined with two
(2) engineered openings rated for 200 sq. ft. each, would yield 140 + 400 = 540 sq. ft. rated area. If either A8.d or A8.e is "0", then enter
"N/A" for A8.f.
Item A9.a. Provide the square footage of the attached garage with or without permanent flood openings. Take the measurement from the
outside of the garage. If there is no attached garage, enter "N/A" for items A9.a-f.
Item A9.b. Indicate if there is at least one permanent flood opening within 1.0 foot of the adjacent grade on at least two exterior walls of
the attached garage identified in A9.a. If the attached garage has no permanent flood openings, or if none of the openings are within 1.0
foot above adjacent grade, enter "0" (zero) in Items A9.c-f. If there is no attached garage, enter "N/A"._
Item A9.c. Enter the total number of permanent non -engineered and/or engineered flood openings in the attached garage that are no
higher than 1.0 foot above the higher of the exterior or interior grade or floor immediately below the opening. This includes any openings
that are in the garage door that are no higher than 1.0 foot above the adjacent grade. If the interior grade elevation is used, note this in the
Comments area of Section D.
Item A9.d. Enter the total measured net open area of permanent non -engineered flood openings indicated in A9.c in square inches,
excluding any bars, louvers, or other covers of the permanent flood openings, and enter the total in Item A9.d. Non -engineered openings
that meet the requirements of NFIP Technical Bulletin 1 are assumed to provide one square foot of rated area for each square inch of net
open area. If the net open area cannot be measured, provide in the Comments area of the appropriate section the size of the flood
openings without consideration of any covers and indicate the type of cover that exists in the flood openings.
Item A9.e. Enter the total rated area of the permanent engineered flood openings indicated in A9.c in square feet. Attach a copy of the
Individual Engineered Flood Openings Certification for a specific building or an Evaluation Report issued by the ICC ES for all engineered
openings, and indicate the manufacturer's name and model number in the Comments area of the appropriate section, if applicable. Flood
openings cannot be considered engineered flood openings without documentation. If no documentation is available/provided, enter the net
open (unobstructed) area of the flood openings in A9.d instead.
Item A9.f. Complete only if permanent engineered and permanent non -engineered flood openings are both present. Enter the sum of A9.d
(net open area of all non -engineered openings) and A9.e (total rated area of all engineered openings). Non -engineered openings that
meet the requirements of NFIP Technical Bulletin 1 are assumed to provide one square foot of rated area for each square inch of net open
area. For example, a non -engineered opening with 140 sq. in. of net open area (i.e., rated for 140 sq. ft. of enclosure area), combined with
two engineered openings c� sq� •�� I e C A zl�w MAP
�FqlTea 9.d or .e is en
enter "N/A" for A9.f. —
Complete the Elevation Certificate using the Flood Insurance Study (FIS) and FIRM in effect at the time of the certification.
The information for Section B is obtained by reviewing the FIS and the FIRM panel that includes the building's location. Information about
the current FIS and FIRM is available from FEMA by visiting or contacting the local floodplain management official. If a Letter of Map
Amendment (LOMA), Letter of Map Revision Based on Fill (LOMR-F), or Letter of Map Revision (LOMR) has been issued by FEMA,
please provide the letter date and case number in the Comments area of Section D or Section G, as appropriate.
For a building in an area that was mapped in one community but is now in another community due to annexation or dissolution, enter the
community name and six -digit Community Identification Number of the community in which the building is now located in Items B1.a and
B1.b; the name of the county or new county, if necessary, in Item 132; and the FIRM index date for the community identified in B1.a, in Item
B6. Enter information from the actual FIRM panel that shows the building location, even if it is the FIRM for the previous jurisdiction, in
Items B4, B5, B7, B8, and B9.
If the map in effect at the time of the building's construction was other than the current FIRM, and you have the past map information
pertaining to the building, provide the information in the Comments area of Section D.
Note: Indicate in the Comments area of Section D if using information based on best available data, such as base -level engineering or
advisap, flood hazard data (GontaGt tho IoGal flGodplaip management official to yaAfirM)
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 10 of 19
SECTION B — FLOOD INSURANCE RATE MAP (FIRM) INFORMATION (Continued)
Items B1.a—b NFIP Community Name and Community Identification Number. Enter the complete name of the community in which the
building is located in B1.a, and the associated six -digit Community Identification Number in B1.b. For an unincorporated area of a county,
enter the county name and "unincorporated area", and the six -digit number of the county. For a newly incorporated community, use the
name and six -digit number of the new community. Under the NFIP, a "community" is any state or area or political subdivision thereof, or
any Indian tribe or authorized native organization which has authority to adopt and enforce floodplain management regulations for the
areas within its jurisdiction. To determine the current community number, see the NFIP Community Status Book, available on FEMA's
website at .
Item 132. County Name. Enter the name of the county or counties in which the community is located. For an unincorporated area of a
county, enter the county name. For an independent city, enter "independent city."
Item 63. State. Enter the two -letter state abbreviation (for example, VA, TX, CA).
Items 64-65. Map/Panel Number and Suffix. Enter the 10-character "Map Number" or "Community Panel Number" shown on the FIRM
where the building or manufactured (mobile) home is located. For maps in a county -wide format, the sixth character of the "Map Number"
is the letter "C" followed by a four -digit map number. For maps not in a county -wide format, enter the "Community Panel Number" shown
on the FIRM.
Item 66. FIRM Index Date. Enter the effective date or the map revised date shown on the FIRM Index.
Item 137. FIRM Panel Effective/Revised Date. Enter the effective date shown on the current FIRM panel. The current FIRM panel effective
date can be determined by visiting or contacting the local floodplain management official. If the area where the building is located was
revised by a LOMR, include the LOMR effective date and the LOMR case number in the comments area of Section D.
Item 68. Flood Zone(s). Enter the flood zone, or flood zones, in which the building is located. All flood zones containing the letter "A" or W"
are considered Special Flood Hazard Areas (SFHAs). Each flood zone is defined in the legend of the FIRM panel on which it appears. If
the area where the building is located was revised by a LOMA, CLOMA, LOMR-F, or CLOMR-F, include the flood zone shown on the
LOMA, CLOMA, LOMR-F, or CLOMR-F, and add the effective date and case number in the comments area of Section D.
Item 139. Base Flood Elevation(s) (BFE). Using the appropriate Flood Insurance Study (FIS) Profile, FIS Data Table (e.g. Transect,
Floodway, etc.), or FIRM panel, locate the property and enter the BFE (or base flood depth) of the building site to the nearest tenth of a
foot (nearest tenth of a meter, in Puerto Rico). If the building is located in more than one flood zone in Item B8, list all appropriate BFEs in
Item B9.
BFEs are shown in the FIS or on a FIRM for Zones Al—A30, AE, AH, V1—V30, VE, AR, AR/A, AR/AE, AR/A1—A30, and AR/AH; base flood
depths are shown for Zones AO and AR/AO. Use the AR BFE (or base flood depth) if the building is located in any of these zones: AR/A,
AR/AE, AR/A1—A30, AR/AH, or AR/AO.
In A or V zones where BFEs are not provided in the FIS or on the FIRM, BFEs may be available from another source. For example, the
community may have established BFEs or obtained BFE data from other sources (e.g., Base Level Engineering) for the building site. For
subdivisions and other developments of more than 50 lots or 5 acres in Zone A, establishment of BFEs is required by the community's
floodplain management ordinance. If a BFE is obtained from another source, enter the BFE in Item B9. The BFE entered in Item B9 must
be based on hydrologic and hydraulic analyses. In an A Zone where BFEs are not obtained from another source, enter N/A in Item B9 and
complete Section E.
Item 610. Indicate the source of the BFE or base flood depth that you entered in Item B9. If the BFE is from a source other than the FIS,
FIRM, or community, include the name of the study, the agency or company that produced it, and the date when the study was completed.
Visit msc.fema.gov or contact the local floodplain management official to access the current FIS and FIRM.
Item 1311. Indicate the elevation datum to which the elevations on the applicable FIRM are referenced as shown on the map legend. The
vertical datum is shown in the Map Legend and/or the Notes to Users on the FIRM.
Item 612. Indicate whether the building is located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area
(OPA). OPAs are portions of coastal barriers that are owned by Federal, State, or local governments or by certain non-profit organizations
and used primarily for natural resources protection. CBRS areas and OPAs are no longer shown on the FIRM; please use the maps
available at to complete Item B12. Federal flood insurance is prohibited in designated CBRS areas or OPAs for buildings or manufactured
(mobile) homes built or substantially improved after the date of the CBRS or OPA designation. For the first CBRS designations, that date is
October 1, 1983. Information about CBRS areas and OPAs may be obtained on the FEMA website at.
Item B13. Indicate whether the building is located seaward of the Limit of Moderate Wave Action (LiMWA). If the LiMWA is not shown on
the FIRM, check the TRYWckLROW REOpp FEMA website at
Complete Section C if the building is located in any of Zones Al—A30, AE, AH, A (with BFE), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE,
AR/A1—A30, AR/AH, or A99. If the Certificate is being completed to demonstrate compliance with local floodplain management
requirements, contact the local floodplain management official to find out any additional requirements. Section C may also be completed
for insurance purposes to determine the building's First Floor Height in any flood zone (including Zones AO, AR/AO, B, C, X and D). In
addition, complete Section C if this certificate is being used to support a request for a LOMA, CLOMA, LOMR-F, or CLOMR-F.
To ensure that all required elevations are obtained, it may be necessary to physically enter the building (for instance, if the building has a
basement or sunken living room, split-level construction, or Machinery and Equipment (M&E)).
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 11 of 19
SECTION C — BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) (Continued)
Land surveyors may not be able to gain access to some crawlspaces to shoot the elevation of the crawlspace floor. If access to the
crawlspace is limited or cannot be gained, follow one of these procedures.
• Use a yardstick or tape measure to measure the height from the floor of the crawlspace to the "next higher floor," and then subtract
the crawlspace height from the elevation of the "next higher floor." If there is no access to the crawlspace, use the exterior grade next
to the structure to measure the height of the crawlspace to the "next higher floor."
• Contact the local floodplain management official of the community in which the building is located. The community may have
documentation of the elevation of the crawlspace floor as part of the permit issued for the building.
• If the property owner has documentation or knows the height of the crawlspace floor to the next higher floor, try to verify this by
looking inside the crawlspace through any openings or vents.
In all three cases, use the Comments area of Section D to provide the elevation and a brief description of how the elevation was
obtained.
Note: If any item does not apply to the building, enter "N/A" for not applicable.
Item C1. Indicate whether the elevations to be entered in this section are based on construction drawings, a building under
construction, or finished construction. For either of the first two choices, a post -construction Elevation Certificate will be required when
construction is complete. If the building is under construction, include only those elevations that can be surveyed in Items C2.a—h. Use
the Comments area of Section D to provide elevations obtained from the construction plans or drawings. Select "Finished
Construction" only when all M&E such as furnaces, water heaters, heat pumps, air conditioners, and elevators and their associated
equipment have been installed and the grading around the building is completed.
Item C2. A field survey is required for Items C2.a—h. Most control networks will assign a unique identifier for each benchmark. For
example, the National Geodetic Survey uses the Permanent Identifier (PID). For the benchmark utilized, provide the PID or other
unique identifier assigned by the maintainer of the benchmark. For GPS survey, indicate the benchmark used for the base station, the
Continuously Operating Reference Stations (CORS) sites used for an Online Positioning User Service (OPUS) solution (also attach the
OPUS report), or the name of the Real Time Network used.
Also provide the vertical datum for the benchmark elevation. All elevations for the certificate, including the elevations for Items C2.a—h,
must use the same datum on which the BFE is based. Show the conversion from the field survey datum used if it differs from the
datum used for the BFE entered in Item B9 and indicate the conversion software used. Show the datum conversion, if applicable, in
the Comments area of Section D.
For property experiencing ground subsidence, the most recent reference mark elevations must be used for determining building
elevations. However, when subsidence is involved, the BFE should not be adjusted.
Note: Enter elevations in Items C2.a—h to the nearest tenth of a foot (nearest tenth of a meter, in Puerto Rico); if data is surveyed to
the nearest hundredth, round to the nearest tenth.
Item C2.a. Enter the elevation measured at the top of the bottom floor (excluding the attached garage) indicated by the selected
Building Diagram (Item A7). For buildings elevated on a crawlspace, Building Diagrams 8 and 9, enter the lowest elevation of the top of
the crawlspace floor in Item C2.a, whether or not the crawlspace has permanent flood openings (flood vents).
Item C2.b. For Building Diagrams 2A through 9 in any flood zone, including Zones B, C, X, and D, enter the elevation measured at the
top of the next higher floor (excluding the attached garage) indicated by the selected Building Diagram (Item A7). For buildings
requiring more than two floors or levels to be surveyed, such as those with multiple floors or multi -level enclosures, enter the additional
surveyed elevations and floor descriptions in the Section D Comments, and clarify which floors are entered as Item C2.a and C2.b.
Item C2.c. For floodplain management compliance, this elevation is required for all Building Diagrams 5 and 6 in V Zones in areas
seaward of the LiMWA, and in other areas regulated for coastal flooding hazards. Enter the elevation measured at the bottom of the
lowest horizontal structural member of the floor indicated by the selected Building Diagram (Item A7) or the figure below. This elevation
can be entered for Building Diagrams 5 and 6 in any flood zone, including Zones B, C, X, and D. For Building Diagrams other than 5
and 6 (if applicable), enter the C2.c elevation as indicated in the figure below. If this item does not apply to the building, enter "N/A" for
not applicable.
Item C2.d. If there is an attached garage, enter the lowest elevation for top of attached garage slab. (Because elevation for top of
attached garage slab is self-explanatory, attached garages are not illustrated in the Building Diagrams.)
Item C2.e. Enter the lowest platform, floor, or ground elevation supporting the lowest electrical, heating, ventilation, plumbing, and air
conditioning M&E and other utilities servicing the building, which may be located in an attached garage or enclosure or on an open
utility platform. Note that elevations for the M&E items are required regardless of their location. Local floodplain management officials
are required to ensure that all new M&E servicing the building are protected from flooding. Thus, local officials may require that
elevation information for all M&E, including ductwork, be documented on the Elevation Certificate. If the M&E is mounted to a wall, pile,
etc., enter the platform elevation of the M&E. Indicate the lowest M&E type and its general location (e.g., on floor inside garage, on
platform affixed to exterior wall) in the Comments area of Section D or Section G, as appropriate.
Note: For more guidance on floodplain management compliance for utilities, including M&E, refer to FEMA P-348, Protecting
management compliance are different than the NFIP insurance M&E discount eligibility considerations. See Section H Instructions
FEMP1 WM*W12!ld9fP709 52 (formerly 086-0-33) (10/22) Page 12 of 19
SECTION C — BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) (Continued)
Item C2.f. Enter the finished Lowest Adjacent Grade (LAG) elevation of the ground, sidewalk, or patio slab next to and in direct contact
with the building. For a building in Zone AO, use the natural grade elevation, if available. Indicate whether the natural or finished grade
was used. If natural grade was used, attach the source of the information (e.g., a grading plan). For buildings under construction in any
flood zone, enter the LAG elevation at the time of the survey. Note: Natural grade means the undisturbed natural surface of the ground
prior to any excavation or fill.
Item C2.g. Enter the finished Highest Adjacent Grade (HAG) elevation of the ground, sidewalk, or patio slab next to and in direct contact
with the building. For a building in Zone AO, use the natural grade elevation if available. Indicate whether the natural or finished grade was
used. If natural grade was used, attach the source of the information (e.g., a grading plan). For buildings under construction in any flood
zone, enter the HAG elevation at the time of the survey.
Item C2.h. Enter the finished LAG elevation of the lowest ground, sidewalk, or patio slab next to and in direct contact with the
structurally -attached -deck supports or stairs structurally attached to the building. For buildings under construction in any flood zone, enter
the lowest LAG at the time of the survey.
BUILDING ON BUILDING WITH BUILDING ON PIERS, POSTS,
SLAB BASEMENT PILES, COLUMNS, OR
PARALLEL SHEAR WALLS
till, C2.a
C2.a=--
i/
C2.a C2.c
ADIA4N7 -,
C2.c GRADE ADIACEN�,:
GRADE.';. ..
Figures for use in determining Item C2.c
SECTION D — SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
This section of the Elevation Certificate may be signed by only a land surveyor, engineer, or architect who is authorized by state law to
certify elevation information. Complete as indicated and place your license number, your seal (as allowed by the state licensing board),
your signature, and the date in Section D. You are certifying that the information on this certificate represents your best efforts to interpret
the data available and that you understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code,
Section 1001. Use the Comments area of Section D to provide relevant and clarifying information not specified elsewhere on the
certificate, including supporting information for latitude/longitude source for A5; openings for A8/A9; LOMR data for Section B; BFE and
BFE source data for B9/B10; datum conversion for C2; grading plan for natural grade used in C2.f-g; machinery type and location for C2.e;
and any other relevant information identified in the instructions or needed for clarification. If attachments are included, check the
attachments box and describe the attachments in the Comments area.
SECTION E — BUILDING MEASUREMENT INFORMATION (SURVEY NOT REQUIRED)
FOR ZONE AO, ZONE AR/AO, AND ZONE A (WITHOUT BFE)
Complete Section E if the building is located in Zone AO, Zone AR/AO, or Zone A (without BFE) and the Certificate is being completed for
the purpose of documenting compliance with local floodplain management requirements. If the Certificate is being completed to document
compliance in other flood zones, including Zone A (with BFE), to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request, or to provide a
ground elevation for flood insurance rating, complete Section C instead of Section E. Explain in the Section F Comments area if the
measurement provided under Items El—E4 is not based on the "natural grade." Natural grade means the undisturbed natural surface of
the ground prior to any excavation or fill.
Indicate whether the measurements to be entered in this section are based on construction drawings, a building under construction, or
finished construction. For either of the first two choices, a post -construction Elevation Certificate will be required when construction is
complete. If the building is under construction, include only those measurements that can be determined in Items El—E4. Use the
Comments area of Section F to provide measurements obtained from the construction plans or drawings. Select "Finished Construction"
only when all Machinery and Equipment (M&E) such as furnaces, water heaters, heat pumps, air conditioners, and elevators and their
associated equipment have been installed and the grading around the building is completed.
Note: Enter heights in Items El—E4 to the nearest tenth of a foot (nearest tenth of a meter, in Puerto Rico).
Items E1.a and b. Enter in Item E1.a the height of the top of the bottom floor (as indicated by C2.a in the selected Building Diagram, Item
A7) above or below the natural HAG. Enter in Item E1.b the height of the top of the bottom floor (as indicated by C2.a in the selected
Building Diagram, Item A7) above or below the natural LAG. For buildings in Zone AO, the community's floodplain management ordinance
requires the lowest floor of the building be elevated above the HAG at least as high as the base flood depth on the FIRM.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 13 of 19
SECTION E — BUILDING MEASUREMENT INFORMATION (SURVEY NOT REQUIRED)FOR ZONE AO AND ZONE A
(WITHOUT BFE) (Continued)
Item E2. For Building Diagrams 6-9 with permanent flood openings (see pages 18-19), enter the height of the next higher floor or
elevated floor (as indicated by C2.b in the selected Building Diagram, Item A7) above or below the HAG.
Item E3. Enter the height, in relation to the HAG next to the building, for the top of attached garage slab. (Because elevation for top of
attached garage slab is self-explanatory, attached garages are not illustrated in the diagrams.) If this item does not apply to the building,
enter "N/A" for not applicable.
Item E4. Enter the height, in relation to the HAG next to the building, of the platform elevation that supports the M&E servicing the building.
See Item C2.e for additional details on M&E. Indicate the M&E type in the Comments area of Section F.
Item E5. For those communities where this base flood depth is not available, the community will need to determine whether the top of the
bottom floor is elevatedin accordance with the community'sfloodplain management or in n
SECTION F — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION
Complete as indicated. This section is provided for certification of measurements when completing Sections A, B, and E. If Section E is
completed by a property owner or property owner's authorized representative in Zone AO, AR/AO, or A (without BFE), then the community
should confirm the heights in Section E to ensure compliance with community floodplain management ordinances. If Section E is
completed by a local floodplain management official, then complete Item G2.a and Section G instead of Section F. The address entered in
this section must be the actual mailing address of the individual who provided the information on the certificate. Check the box as indicated
if including attachments and describe in the Comments area.
SECTION G — COMMUNITY INFORMATION (RECOMMENDED FOR COMMUNITY OFFICIAL COMPLETION)
The community official who is authorized by law or ordinance to administer the community's floodplain management ordinance can
complete Sections A, B, C, E, G or H of this Elevation Certificate and sign this section. Section C may be completed by the local official per
the instructions below for Item G1.
Item G1. Check if Section C is completed with elevation data from other documentation that has been signed and sealed by a licensed
land surveyor, engineer, or architect who is authorized by state law to certify elevation information. Indicate the source of the elevation
data and the date obtained in the Comments area of Section G. If you are both a community official and a licensed land surveyor,
engineer, or architect authorized by state law to certify elevation information, and you performed the actual survey for a building in any
flood zones (including Zones A99, B, C, X and D), you must also complete Section D.
Item G2.a. Check if information is entered in Section E by the community for a building in Zone A (without a BFE), Zone AO, or Zone
AR/AO, or when the community certifies Item E5 for a building in Zone AO.
Item G2.b. Check if information is entered in Section H by the community for insurance purposes.
Item G3. Check if the community official is correcting information provided in Sections A, B, E and H. Describe corrections in the
Comments area of Section G.
Item G4. Check if the information in Items G5—G11 has been completed for community floodplain management purposes to document the
as -built lowest floor elevation of the building. Section C of the Elevation Certificate records the elevation of various building components
but does not determine the lowest floor of the building or whether the building, as constructed, complies with the community's floodplain
management ordinance. This must be done by the community. Items G5—G11 provide a way to document these determinations.
Item G5. Permit Number. Enter the permit number or other identifier to key the Elevation Certificate to the permit issued for the building.
Item G6. Date Permit Issued. Enter the date the permit was issued for the building.
Item G7. Date Certificate of Compliance/Occupancy Issued. Enter the date that the Certificate of Compliance or Occupancy or similar
written official documentation of as -built lowest floor elevation was issued by the community as evidence that all work authorized by the
floodplain development permit has been completed in accordance with the community's floodplain management laws or ordinances.
Item G8. New Construction or Substantial Improvement. Check the applicable box. "Substantial Improvement" means any reconstruction,
rehabilitation, addition, or other improvement of a building, the cost of which equals or exceeds 50 percent of the market value of the
building before the start of construction of the improvement (or meets the community's more restrictive standards, if applicable). The term
includes buildings that have incurred substantial damage, regardless of the actual repair work performed.
Item G9.a. As -built lowest floor elevation. Enter the elevation of the lowest floor (including basement) when the construction of the building
is completed and a final inspection has been made to confirm that the building is built in accordance with the permit, the approved plans,
and the community's floodplain management laws or ordinances. Indicate the elevation datum used.
Item G9.b. As -built lowest horizontal structural member. Enter the elevation measured at the bottom of the lowest horizontal structural
Indicate the elevation datum used.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 14 of 19
SECTION G — COMMUNITY INFORMATION (RECOMMENDED FOR COMMUNITY OFFICIAL COMPLETION) (Continued)
Item G10.a. BFE. Using the appropriate FIRM panel, FIS, or other data source, locate the property and enter the BFE (or base flood
depth) of the building site. Indicate the elevation datum used.
Item G10.b. Community's minimum elevation or depth requirement. Enter the elevation (including freeboard above the BFE) to which the
community requires the lowest floor or the lowest horizontal structural member to be elevated. Indicate the elevation datum used.
Item G11. Indicate Yes if a variance from the floodplain management regulations (Title 44 CFR § 60.6) has been issued for the building,
attach the supporting documentation, and describe the attachment in the Comments area of this section. If no such variance has been
issued, indicate No.
Enter your name, title, and telephone number, and the name of the community and add any comments. Sign and enter the date in the
appropriate blanks.
SECTION H — BUILDING'S FIRST FLOOR HEIGHT INFORMATION FOR ALL ZONES(SURVEY NOT REQUIRED) (FOR
INSURANCE PURPOSES ONLY)
In any flood zone the property owner, owner's authorized representative, or local floodplain management official may complete this
certificate for rating purposes to determine the building's first floor height and identify the elevation of Machinery and Equipment (M&E)
servicing the building. Sections A, B, and I must also be completed.
Note: If Sections C and/or E and H are all completed, then information in Section C will prevail for insurance purposes and for compliance.
Item H1.a. For Building Diagrams 1A, 1 B, 3, and 5-9 shown on pages 17-19, enter in Item H1.a the height to the nearest tenth of a foot
(tenth of a meter in Puerto Rico) of the top of the bottom floor (as indicated in the selected Building Diagram, Item A7) above the LAG.
Refer to the arrows on the Foundation Type Diagrams on page 16 that indicate which floor to use to determine the height for Item H1.a.
Item H1.b. For Building Diagrams 2A, 2B, 4, and 6-9 shown on pages 17-19, enter in Item H1.b the height to the nearest tenth of a foot
(tenth of a meter in Puerto Rico) of the top of the next higher floor or elevated floor (as indicated in the selected Building Diagram, Item A7)
above the LAG. Refer to the arrows on the Foundation Type Diagrams on page 16 that indicate which floor to use to determine the height
for Item H1.b.
Note: The LAG is the lowest point of the ground level immediately next to a building.
Item H2. Indicate "Yes" if all of the following M&E servicing the building, inside or outside the building, are elevated to at least the height of
the location shown by the H2 arrow in the Foundation Type Diagrams on page 16: central air conditioner (including exterior compressor),
furnace, heat pump (including exterior compressor), water heater, and elevator M&E. For contents -only insurance coverage, all of the
following appliances will need to be elevated to at least the height of the location shown by the H2 arrow in the Foundation Type Diagrams
below: clothes washers and dryers and food freezers.
Note: For both building and contents coverage, all of the M&E and appliances listed above must be elevated per the Foundation Type
Diagrams on page 16 to be considered for the M&E mitigation discount.
Indicate "No" if any of the M&E listed above is not elevated to at least the height of the location shown by the H2 arrow in the Foundation
Type Diagrams on page 16.
The diagrams on the following page illustrate the six NFIP Foundation Type Diagrams. Each foundation type corresponds with one or more
of the eleven Building Diagrams shown at the end of this Elevation Certificate. The arrows on the diagrams indicate which floor to use to
determine,4gefflW1_bFT.pidWA b-*qj" tognAro-pW6hj2gV *120 kE�goftqf
Complete as indicated. This section is provided for certification of measurements when completing Sections A, B, and H. If Section H is
completed by a local floodplain management official, then complete Item G2.b and Section G instead of Section I. The address entered in
this section must be the actual mailing address of the individual who provided the information on the certificate.
Check the box as indicated if including attachments (e.g., required photos) and describe in the Comments area.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 15 of 19
Foundation Type Diagrams (for use in Section H):
Slab on Grade (Non -Elevated) Elevated without Enclosure on Posts, Piles, or Piers
_ Corresponds to EC `" Corresponds to EC
�H2 Diagrams 1A, 113 Diagram 5
— and 3 —
Pp A -
15
H1.a _ . ° `�
H1.a
Note: If the building has more than one floor, the Machinery and & H2
Equipment should be on the second floor or higher.
Basement (Non -Elevated) Elevated with Enclosure on Posts, Piles, or Piers
Corresponds to EC Corresponds to EC
Diagrams 2A, 213 Diagram 6
and
H1.b
H1.bT.., -
& H2..................................... H1.a & H2
Crawlspace (Elevated, including Non -Elevated Elevated with Enclosure Not on Posts, Piles, or
Sub -Grade Crawlspace) Piers (Solid Foundation Walls)
Corresponds to EC Corresponds to EC
Diagrams 8 and 9 — Diagram 7
®® ® ® mini El
H1.a ® ® ® H1.b H1.b
H1.a
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 16 of 19
BUILDING DIAGRAMS
The following diagrams illustrate various types of buildings. Compare the features of the building being certified with the features shown in
the diagrams and select the diagram most applicable. Enter the diagram number in Item A7, the square footage of crawlspace or
enclosure(s) and the area of flood openings as indicated in Items A8.a—f, the square footage of attached garage and the area of flood
openings as indicated in Items A9.a—f, and the elevations in Items C2.a—h.
In A, B, C, X and D zones, the floor elevation is taken at the top finished surface of the floor indicated; in V zones, areas seaward of the
LiMWA, and in other areas regulated for coastal flooding hazards, the floor elevation is taken at the bottom of the lowest horizontal
structural member (see figure at end of instructions for Section C).
DIAGRAM 1A:
All slab -on -grade single- and multiple -floor buildings (other
than split-level) and high-rise buildings, either detached or
row type (e.g., townhouses); with or
without attached garage.
Distinguishing Feature — The bottom floor is at or above
ground level (grade) on at least one side.*
C2.b
NEXT HIGHER
C2.a i FLOOR
BOTTOM FLOOR
C2.f—h �dE{errtrrned by
niAr_Dnnn'3A•
All single- and multiple -floor buildings with basement (other
than split-level) and high-rise buildings with basement,
either detached or row type (e.g., townhouses); with or
without attached garage.
Distinguishing Feature — The bottom floor (basementor
underground garage) is below ground level (grade) onall sides.*
C2.a
GRADE
(determrned �y
DIAGRAM 1B:
All raised -slab -on -grade or slab -on -stem -wall -with -fill
single- and multiple -floor buildings (other than split- level),
either detached or row type (e.g., townhouses); with or
without attached garage.
Distinguishing Feature — The bottom floor is at or above
ground level (grade) on at least one side.*
Ea C2. b
NEXT HIGHER
FLOOR
BOTTOM FLOOR
GRADE
C2.f h Gaeterm��ted dv
niAr_DAnn'3D•
All single- and multiple -floor buildings with basement (other
than split-level) and high-rise buildings with basement,
either detached or row type (e.g., townhouses); with or
without attached garage.
Distinguishing Feature — The bottom floor (basement or
underground garage) is below ground level (grade) on all sides;
most of the height of the walls is below ground level on all sides;
and the door and area of egress are also below ground level on
all sides.*
C2.a) NEXT HIGHER I �C2.b
FLOOR
GRADE
--
--
-
------------
BOTTOMFLOOR
---
BASEMENT
- ----- -----
C2.f—h (determined by
=..:
existinggtade)
* A floor that is below ground level (grade) on all sides is considered a basement even if the floor is used for living purposes, or as an office,
garage, workshop, etc.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 17 of 19
BUILDING DIAGRAMS
DIAGRAM 5:
All buildings elevated on piers, posts, piles, columns, or
parallel shear walls. No obstructions below the elevated
floor.
Distinguishing Feature — For all zones, the area below the
elevated floor is open, with no obstruction to flow of floodwaters
(open lattice work and/or insect screening is permissible).
C2. b
NEXT HIGHER
FLOOR
C2.a
ELEVATED
FLOOR
GRADE
C2.f—h idefermined by ` (For V zones
existing grade) C2.c and other
regulated areas)
DIAGRAM 6:
All buildings elevated on piers, posts, piles, columns, or
parallel shear walls with full or partial enclosure below the
elevated floor.
Distinguishing Feature — For all zones, the area below the
elevated floor is enclosed, either partially or fully. In A Zones, the
partially or fully enclosed area below the elevated floor is with or
without openings* present in the walls of the enclosure. Indicate
information about enclosure size and openings in Section A -
Property Information.
NEXT HIGHER
FLOOR
C2.a C2.b
ELEVATED
FLOOR
A8.a—c
GRADE
EN OSURE Determine
enclosure size &
openings, if any.
-7777777
C2.f h fdia4ermmed by C2 O (For V zones
existing grade) and other
regulated areas)
* A floor that is below ground level (grade) on all sides is considered a basement even if the floor is used for living purposes, or as an office, garage,
workshop, etc.
** An 'opening" is a permanent opening that allows for the free passage of water automatically in both directions without human intervention. Under the
NFIP, a minimum of two openings is required for enclosures or crawlspaces. The openings shall provide a total net area of not less than one square inch for
every square foot of area enclosed, excluding any bars, louvers, or other covers of the opening. Alternatively, an Individual Engineered Flood Openings
Certification or an Evaluation Report issued by the ICC ES must be submitted to document that the design of the openings will allow for the automatic
equalization of hydrostatic flood forces on exterior walls. A window, a door, or a garage door is not considered an opening; openings may be installed in
doors. Openings shall be on at least two sides of the enclosed area. If a building has more than one enclosed area, each area must have openings to allow
floodwater to directly enter. The bottom of the openings must be no higher than 1.0 foot above the higher of the exterior or interior grade or floor
immediately below the opening. For more guidance on openings, see NFIP Technical Bulletin 1.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 18 of 19
BUILDING DIAGRAMS
DIAGRAM 7:
All buildings elevated on full -story foundation walls with a
partially or fully enclosed area below the elevated floor. This
includes walkout levels, where at least one side is at or
above grade. The principal use of this building is located in
the elevated floors of the building.
Distinguishing Feature — For all zones, the area below the
elevated floor is enclosed, either partially or fully. In A Zones, the
partially or fully enclosed area below the elevated floor is with or
without openings* present in the walls of the enclosure. Indicate
information about enclosure size and openings in Section A -
Property Information.
C2•a l NEXT HIGHER
f FLOOR
GRADE
C2.f) WALKOUT LEVEL
(ENCLOSURE)
F8.OPENINGS**
C2.b
C2.g
A8. b—c
OPENING**
DIAGRAM 8:
All buildings elevated on a crawlspace with the floor of the
crawlspace at or above grade on at least one side, with or
without an attached garage.
Distinguishing Feature — For all zones, the area below the first
floor is enclosed by solid or partial perimeter walls. In all A
zones, the crawlspace is with or without openings** present in
the walls of the crawlspace. Indicate information about
crawlspace size and openings in Section A - Property
Information. (If the distance from the crawlspace floor to the top
of the next higher floor is more than 5 feet, use Diagram 7.)
C2.a ) ; ( C2.b
NEXT HIGHER
FLOOR
C2.f ] I \ / I ( C2.9
b—c ]� �A8.a
/ OPENINGS**
DIAGRAM 9:
All buildings (other than split-level) elevated on a sub -grade
crawlspace, with or without attached garage.
Distinguishing Feature — The bottom (crawlspace) floor is
below ground level (grade) on all sides.* (If the distance from the
crawlspace floor to the top of the next higher floor is more than
five feet, or the crawlspace floor is more than two feet below the
grade [LAG] on all sides, use Diagram 2A or 213.)
C2.a
C2.b
GRADE NEXT HIGHER
q
FLOOR
C2.f C2.g
A8.b c A8 a
OPENINGS'
* A floor that is below ground level (grade) on all sides is considered a basement even if the floor is used for living purposes, or as an office, garage,
workshop, etc.
** An 'opening" is a permanent opening that allows for the free passage of water automatically in both directions without human intervention. Under the
NFIP, a minimum of two openings is required for enclosures or crawlspaces. The openings shall provide a total net area of not less than one square inch for
every square foot of area enclosed, excluding any bars, louvers, or other covers of the opening. Alternatively, an Individual Engineered Flood Openings
Certification or an Evaluation Report issued by the ICC ES must be submitted to document that the design of the openings will allow for the automatic
equalization of hydrostatic flood forces on exterior walls. A window, a door, or a garage door is not considered an opening; openings may be installed in
doors. Openings shall be on at least two sides of the enclosed area. If a building has more than one enclosed area, each area must have openings to allow
floodwater to directly enter. The bottom of the openings must be no higher than 1.0 foot above the higher of the exterior or interior grade or floor
immediately below the opening. For more guidance on openings, see NFIP Technical Bulletin 1.
FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (10/22) Page 19 of 19