Loading...
HomeMy WebLinkAboutRexburg Sunrise Drive Presentation (2)PowerPoint Presentation Introduction Present what has been studied for the last 2 decades University Blvd, East Parkway Corridor, Sunrise Drive Sunrise Drive | City of Rexburg East Parkway CorridorHistorical Timeline East Parkway 1979 US-20 Constructed 1979 TMP called for an arterial connecting to Sunrise 2003-4 Completed 2 Public Meetings & 2 Joint work meetings 2004 Rexburg, Sugar, Madison County adopted Joint Resolution of 2004 TMP including East Parkway Corridor 2004 TMP recommended East Parkway Corridor connection between 2nd W & 2nd E within 5 year CIP 2006 LHTAC grant for alignment study of East Parkway Corridor 2009 East Parkway Corridor Public Meetings 2013 East Parkway Plan finalized with recommended alignment 2015 TMP finalized & adopted 2022 TMP established phased projects of East Parkway Corridor Subdivisions (Near Sunrise Drive) Crest Haven Subdivision – 1977 Sunrise Drive dedicated with Plat Vista Ave. cul-de-sac built – 2003 South Vista Ave. Vacated– 2006 Sunrise Drive – 2008 Retaining Wall also completed Founder’s Square – 2008 Valley View 6-3 – 2010 Sunrise Drive | City of Rexburg Network Continuity (2004 TMP) p 6-5 Sunrise Drive | City of Rexburg Most Effective Roadway Additions (2004 TMP)p 5-14 Recommendations of Most Effective Combination of Roadway Additions including Alternatives for new Roadway Links Sunrise Drive | City of Rexburg East Parkway Alignment Plan (2013) Alignment Selection Sunrise Drive | City of Rexburg East Parkway Alignment Plan (2013) Alignment Selection Sunrise Drive | City of Rexburg Alignments Considered Increase traffic on 7th S. Does not add value to current system. Affects more residents. Significant terrain issues to the east. Alignment Adopted April 5, 2023 City-Owned Right-of-Way Sunrise Drive | City of Rexburg Sunrise Dr. - Initial Concept 2 lane roadway with stop control at 2nd E. Sunrise Drive | City of Rexburg Sunrise Dr. - Future Concept When traffic warrants, convert to 2 lane + turning lane This configuration matches design of roadway and bridge to north Sunrise Drive | City of Rexburg Summary Concept has been planned for more than 2 decades Sunrise Drive is most efficient means for traffic flow Reduces traffic conflicts and turning movements Right of Way has been established Sunrise Drive | City of Rexburg Contact Us Keller Associates, Inc. Jim Mullen, PE Nathan Cleaver, PE (208) 238-2146 Sunrise Drive | City of Rexburg