HomeMy WebLinkAboutRexburg Sunrise Drive Presentation (2)PowerPoint Presentation
Introduction
Present what has been studied for the last 2 decades
University Blvd, East Parkway Corridor, Sunrise Drive
Sunrise Drive | City of Rexburg
East Parkway CorridorHistorical Timeline
East Parkway
1979 US-20 Constructed
1979 TMP called for an arterial connecting to Sunrise
2003-4 Completed 2 Public Meetings & 2 Joint work meetings
2004 Rexburg, Sugar, Madison County adopted Joint Resolution of 2004 TMP including East Parkway Corridor
2004 TMP recommended East Parkway Corridor connection between 2nd W & 2nd E within 5 year CIP
2006 LHTAC grant for alignment study of East Parkway Corridor
2009 East Parkway Corridor Public Meetings
2013 East Parkway Plan finalized with recommended alignment
2015 TMP finalized & adopted
2022 TMP established phased projects of East Parkway Corridor
Subdivisions (Near Sunrise Drive)
Crest Haven Subdivision – 1977
Sunrise Drive dedicated with Plat
Vista Ave. cul-de-sac built – 2003
South Vista Ave. Vacated– 2006
Sunrise Drive – 2008
Retaining Wall also completed
Founder’s Square – 2008
Valley View 6-3 – 2010
Sunrise Drive | City of Rexburg
Network Continuity (2004 TMP) p 6-5
Sunrise Drive | City of Rexburg
Most Effective Roadway Additions (2004 TMP)p 5-14
Recommendations of Most Effective Combination of Roadway Additions including Alternatives for new Roadway Links
Sunrise Drive | City of Rexburg
East Parkway Alignment Plan (2013) Alignment Selection
Sunrise Drive | City of Rexburg
East Parkway Alignment Plan (2013) Alignment Selection
Sunrise Drive | City of Rexburg
Alignments Considered
Increase traffic on 7th S. Does not add value to current system.
Affects more residents. Significant terrain issues to the east.
Alignment Adopted April 5, 2023
City-Owned Right-of-Way
Sunrise Drive | City of Rexburg
Sunrise Dr. - Initial Concept
2 lane roadway with stop control at 2nd E.
Sunrise Drive | City of Rexburg
Sunrise Dr. - Future Concept
When traffic warrants, convert to 2 lane + turning lane
This configuration matches design of roadway and bridge to north
Sunrise Drive | City of Rexburg
Summary
Concept has been planned for more than 2 decades
Sunrise Drive is most efficient means for traffic flow
Reduces traffic conflicts and turning movements
Right of Way has been established
Sunrise Drive | City of Rexburg
Contact Us
Keller Associates, Inc.
Jim Mullen, PE
Nathan Cleaver, PE
(208) 238-2146
Sunrise Drive | City of Rexburg