Loading...
HomeMy WebLinkAboutRexburg Sunrise Drive PresentationTransportation Master Plan Update: Sunrise Drive Jim Mullen & Nathan Cleaver | April 17, 2024 | City of Rexburg Introduction 2Sunrise Drive | City of Rexburg •Present what has been studied for the last 2 decades •University Blvd, East Parkway Corridor, Sunrise Drive East Parkway Corridor Historical Timeline 3 East Parkway 1979 US-20 Constructed 1979 TMP called for an arterial connecting to Sunrise 2003-4 Completed 2 Public Meetings & 2 Joint work meetings 2004 Rexburg, Sugar, Madison County adopted Joint Resolution of 2004 TMP including East Parkway Corridor 2004 TMP recommended East Parkway Corridor connection between 2nd W & 2nd E within 5 year CIP 2006 LHTAC grant for alignment study of East Parkway Corridor 2009 East Parkway Corridor Public Meetings 2013 East Parkway Plan finalized with recommended alignment 2015 TMP finalized & adopted 2022 TMP established phased projects of East Parkway Corridor Subdivisions (Near Sunrise Drive) Crest Haven Subdivision – 1977 Sunrise Drive dedicated with Plat Vista Ave. cul-de-sac built – 2003 South Vista Ave. Vacated– 2006 Sunrise Drive – 2008 Retaining Wall also completed Founder’s Square – 2008 Valley View 6-3 – 2010 Sunrise Drive | City of Rexburg Network Continuity (2004 TMP) p 6-5 4Sunrise Drive | City of Rexburg Most Effective Roadway Additions (2004 TMP) p 5-14 5 Recommendations of Most Effective Combination of Roadway Additions including Alternatives for new Roadway Links Sunrise Drive | City of Rexburg East Parkway Alignment Plan (2013) Alignment Selection 6Sunrise Drive | City of Rexburg East Parkway Alignment Plan (2013) Alignment Selection 7Sunrise Drive | City of Rexburg 8 Alignments Considered Increase traffic on 7th S. Does not add value to current system. Affects more residents. Significant terrain issues to the east. Alignment Adopted April 5, 2023 City-Owned Right-of-Way Sunrise Drive | City of Rexburg 9Sunrise Drive | City of Rexburg Sunrise Dr. - Initial Concept •2 lane roadway with stop control at 2nd E. 10Sunrise Drive | City of Rexburg Sunrise Dr. - Future Concept •When traffic warrants, convert to 2 lane + turning lane •This configuration matches design of roadway and bridge to north Summary 11Sunrise Drive | City of Rexburg •Concept has been planned for more than 2 decades •Sunrise Drive is most efficient means for traffic flow •Reduces traffic conflicts and turning movements •Right of Way has been established Contact Us 12Sunrise Drive | City of Rexburg Keller Associates, Inc. Jim Mullen, PE Nathan Cleaver, PE (208) 238-2146