HomeMy WebLinkAboutSTRUCTURAL STEEL 2 - 23-00396 - Starbucks - New Commercial Bldg - Shell OnlySTRUCTURAL STEEL WELDING ­00Report #: Final 10/30/2023Report Date: Atlas Technical Consultants, LLC ­ Idaho Falls 1753 E Precision Drive Idaho Falls, ID 83402 Phone: (208) 529­8242 Client: JET Real Estate Development 2880 East 14th North Ammon, ID 83401 Project: E231352c Starbucks, 1050 Golden Beauty Drive, Rexburg, ID 1050 Golden Beauty Drive Rexburg, ID 83440 NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. Page 1 of 4Page 1 of 3 Inspection Details Date Contractor Inspector Weather Permit Number 10/30/2023 Construction Solutions Kirby, Shane Cold N/A Reported to: Job Site Fabrication Shop Examined Per:  AISC 341 Chapter J AISC 360 Chapter N AWS D1.1 AWD D1.2 AWS D1.3 AWS D1.4 AWS D1.5 AWS D1.6 AWS D1.8 Other:Code Year/Edition:AWS D1.1/2021 Welder, Process, Procedures: Checked welder(s) Certifications Checked procedure qualifications Visually Inspected ­ in­progress Visually Inspected ­ completed Verified proper electrode storage Welding performed by qualified welders using: SMAW GMAW FCAW SAW Method with E 7018 filler metal(s) Material Identification: Collected/Checked mill certifications:No Weld Types: Single pass fillet welds Multi­pass fillet welds Flare bevel grove welds PJP (Partial joint penetration welds) CJP (Complete joint penetration welds) Direct Indirect butt splice on reinforcing steel Other (specify): Metal Deck/Studs: Arc spot (puddle welds)Shear studs on metal deck Button punching Stitch welds Tek screws Reference Drawing Sheet and Detail, and Approved RFI: Drawings S3, S4, SD1 and email from Victor Structural Engineering dated 9­21­2023 Type of connections and locations: Fillet and flare bevel welds adjoining HSS beams to HSS columns and HSS beams, HSS beams to steel bearings plates that are bolted to wood framing, puddle welds adjoining steel decking to canopy framing Notes:Results of today’s review was reported to Mr. Trevor Adkins with Construction Solutions. Work inspected was: in compliance in compliance, except as noted in comments section reinspection/retesting required Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. ✔✔✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ STRUCTURAL STEEL WELDING ­00Report #: Final 10/30/2023Report Date: Atlas Technical Consultants, LLC ­ Idaho Falls 1753 E Precision Drive Idaho Falls, ID 83402 Phone: (208) 529­8242 Client: JET Real Estate Development 2880 East 14th North Ammon, ID 83401 Project: E231352c Starbucks, 1050 Golden Beauty Drive, Rexburg, ID 1050 Golden Beauty Drive Rexburg, ID 83440 NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. Page 2 of 4Page 2 of 3 Inspection DetailsDateContractor Inspector Weather Permit Number10/30/2023 Construction Solutions Kirby, Shane Cold N/AReported to:Job SiteFabricationShop Examined Per: AISC 341 Chapter J AISC 360 Chapter N AWS D1.1 AWD D1.2 AWS D1.3AWS D1.4 AWS D1.5 AWS D1.6 AWS D1.8Other:Code Year/Edition:AWS D1.1/2021Welder, Process, Procedures:Checked welder(s) CertificationsChecked procedure qualificationsVisually Inspected ­ in­progressVisually Inspected ­ completedVerified proper electrode storageWelding performed by qualified welders using:SMAW GMAW FCAW SAW Methodwith E 7018 filler metal(s)Material Identification:Collected/Checked mill certifications:NoWeld Types:Single pass fillet weldsMulti­pass fillet weldsFlare bevel grove weldsPJP (Partial joint penetration welds)CJP (Complete joint penetration welds)DirectIndirect butt splice on reinforcing steelOther (specify):Metal Deck/Studs:Arc spot (puddle welds)Shear studs on metal deck Button punching Stitch welds Tek screwsReference Drawing Sheet and Detail, and Approved RFI:Drawings S3, S4, SD1 and email from Victor Structural Engineering dated 9­21­2023Type of connections and locations:Fillet and flare bevel welds adjoining HSS beams to HSS columns and HSS beams, HSS beams to steel bearings plates that are bolted to wood framing, puddle welds adjoining steel decking to canopy framing Notes:Results of today’s review was reported to Mr. Trevor Adkins with Construction Solutions. Work inspected was: in compliance in compliance, except as noted in comments section reinspection/retesting required Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. ✔✔✔✔✔✔✔✔✔ ✔ STRUCTURAL STEEL WELDING ­00Report #: Final 10/30/2023Report Date: Atlas Technical Consultants, LLC ­ Idaho Falls 1753 E Precision Drive Idaho Falls, ID 83402 Phone: (208) 529­8242 Client: JET Real Estate Development 2880 East 14th North Ammon, ID 83401 Project: E231352c Starbucks, 1050 Golden Beauty Drive, Rexburg, ID 1050 Golden Beauty Drive Rexburg, ID 83440 NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. Page 3 of 4Page 3 of 3