Loading...
HomeMy WebLinkAboutCOMCHECK - 23-00396 - Starbucks - New Commercial Bldg - Shell OnlyCOMcheck Software Version 4.1.5.3 Envelope Compliance Certificate Project Title: 2018 IECC Project Type:New Construction Vertical Glazing / Wall Area:15% Location:Rexburg, Idaho Climate Zone:6b Construction Site: Rexburg, ID Owner/Agent: CA Designer/Contractor: The Richardson Design Partnership 510 South 600 East Salt Lake City, UT 84102 Project Information Energy Code: Rexburg Starbucks Credits: 1.0 Required 1.0 Proposed High Performance SWH, 1.0 credit Additional Efficiency Package(s) Building Area Floor Area 1-Dining: Cafeteria/Fast Food : Nonresidential 2446 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof 1: Insulation Entirely Above Deck, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 2446 ---36.0 0.027 0.032 Floor 1: Slab-On-Grade:Unheated, Vertical 2 ft., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (c) 233 ---10.0 0.540 0.540 NORTH Exterior Wall 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 580 21.0 3.8 0.048 0.051 Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 25 ------0.700 0.370 EAST Exterior Wall 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 1416 21.0 3.8 0.048 0.051 Window 2: Metal Frame:Fixed, Perf. Specs.: Product ID Trifab VersaGlaze 451T, SHGC 0.34, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 288 ------0.390 0.360 Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.38, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 42 ------0.700 0.770 SOUTH Exterior Wall 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 580 21.0 3.8 0.048 0.051 Window 3: Metal Frame:Fixed, Perf. Specs.: Product ID Trifab VersaGlaze 451T, SHGC 0.34, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 140 ------0.390 0.360 Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.21 ------0.700 0.770 Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 101 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Specs.: Product ID NA, SHGC 0.38, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) WEST Exterior Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 1416 21.0 3.8 0.048 0.051 Window 4: Metal Frame:Fixed, Perf. Specs.: Product ID Trifab VersaGlaze 451T, SHGC 0.34, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 57 ------0.390 0.360 Window 5: Metal Frame:Operable, Perf. Specs.: Product ID Trifab VersaGlaze 451T, SHGC 0.34, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 20 ------0.390 0.430 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 0.5% better than code Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 102 ofPage Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.5.3 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2018 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable Requirement will be met. C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 103 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable Requirement will be met. C105 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.4 [FO7]2 Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. See the Envelope Assemblies table for values. C402.2.6 [FO12]3 Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 104 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 2.1 [FR19]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Exception: Doors that open directly from a space =3000 ft2. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 105 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Refernece section C403.7.7 for operational details. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 106 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.6 [EL26]2 Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.7 [EL27]2 Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). Complies Does Not Not Observable Not Applicable Requirement will be met. C405.8.2, C405.8.2. 1 [EL28]2 Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.9 [EL29]2 Total voltage drop across the combination of feeders and branch circuits <= 5%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 107 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable Requirement will be met. C402.2.1 [IN20]1 Insulation installed on a suspended ceiling having ceiling tiles is not being specified for roor/ceiling assemblies. Continuous insulation board installed in 2 or more layers with edge joints offset between layers. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.3 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C105 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 108 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C406.7, C406.7.1 [FI53]1 Enhanced Service Water Heat System efficiency package. One of the following SWH system enhancements must satisfy 60 percent of buildings annual hot water requirements, or 100 percent if the building requirements otherwise complies with heat recovery per Section C403.9.5: Waste heat recovery (from SWH, process equipment, OR on-site renewable water-heating. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.1.1 [FI57]1 Building operations and maintenance documents will be provided to the owner. Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 109 ofPage Project Title: Data filename: Rexburg Starbucks P:\PROJ\0-2022\22-127 Starbucks - Rexburg, ID\04_ADMIN\Starbucks Rexburg.cck 03/17/23Report date: 1010 ofPage