Loading...
HomeMy WebLinkAboutDESIGN LOADS - 23-00435 - Precision Precast - New Commercial BldgJOB NUMBER PROJECT NAMEU23M0364A Precision Precast C1 FO R C O N S T R U C T I O N CO V E R S H E E T (4 3 5 ) 9 1 9 - 3 1 0 0 (4 3 5 ) 9 1 9 - 3 1 0 1 FA X : PH O N E : 07 / 2 4 / 2 0 2 3 07 : 3 1 : 3 3 a m DR A W I N G T I T L E SH E E T DR A W I N G S T A T U S BU Y E R N A M E St e e l V i s i o n C o n s t r u c t i o n I n c PR O J E C T N A M E Pr e c i s i o n P r e c a s t JO B N U M B E R U2 3 M 0 3 6 4 A AD D R E S S 30 0 0 W 5 2 0 0 S Re x b u r g , I D 8 3 4 4 0 # RE L E A S E / R E V I S I O N DW N / C H K DA T E EN G 0 CO N S T . A N C H O R B O L T P L A N MB S / E O P AN S 06 / 0 5 / 2 0 2 3 1 FO R B U I L D D E P T . R E V . WB B / T K L AN S 06 / 2 9 / 2 0 2 3 2 FI N A L S WB B / T K L AN S 07 / 2 6 / 2 0 2 3 DRAWING TITLE COVER SHEETS ANCHOR ROD PLANS PLANS AND ELEVATIONS STRUCTURAL DETAILS SHEETING DETAILS SHEET NUMBER C1 ~ C4 F1 ~ F2 E1 ~ E27 D1 ~ D14 SD1 ~ SD9 07/27/2023 Grant Roth Digitally signed by Grant Roth DN: C=US, E=grant.roth@nbsut.com, O=Nucor Building Systems UT, CN=Grant Roth Date: 2023.07.27 14:44:09-06'00' # RE L E A S E / R E V I S I O N DW N / C H K DA T E EN G 0 CO N S T . A N C H O R B O L T P L A N MB S / E O P AN S 06 / 0 5 / 2 0 2 3 1 FO R B U I L D D E P T . R E V . WB B / T K L AN S 06 / 2 9 / 2 0 2 3 2 FI N A L S WB B / T K L AN S 07 / 2 6 / 2 0 2 3 C2 FO R C O N S T R U C T I O N BU I L D I N G S H E E T 1 (4 3 5 ) 9 1 9 - 3 1 0 0 (4 3 5 ) 9 1 9 - 3 1 0 1 FA X : PH O N E : 07 / 2 4 / 2 0 2 3 07 : 3 1 : 3 4 a m DR A W I N G T I T L E SH E E T DR A W I N G S T A T U S BU Y E R N A M E St e e l V i s i o n C o n s t r u c t i o n I n c PR O J E C T N A M E Pr e c i s i o n P r e c a s t JO B N U M B E R U2 3 M 0 3 6 4 A AD D R E S S 30 0 0 W 5 2 0 0 S Re x b u r g , I D 8 3 4 4 0 3.BUILDING ERECTION NOTES: THE GENERAL CONTRACTOR AND/OR ERECTOR IS RESPONSIBLE TO SAFELY AND PROPERLYERECT THE METAL BUILDING SYSTEM IN CONFORMANCE WITH THESE DRAWINGS, OSHAREQUIREMENTS AND EITHER MBMA OR CSA S16 STANDARDS PERTAINING TO PROPERERECTION. TEMPORARY SUPPORTS SUCH AS GUYS, BRACES, FALSEWORK, CRIBBING OROTHER ELEMENTS FOR ERECTION ARE TO BE DETERMINED, FURNISHED AND INSTALLED BY THEERECTOR. THESE SUPPORTS MUST SECURE THE STEEL FRAMING, OR PARTLY ASSEMBLED STEEL FRAMING, AGAINST LOADS COMPARABLE IN INTENSITY TO THOSE FOR WHICH THE STRUCTURE WAS DESIGNED IN ADDITION TO LOADS RESULTING FROM THE ERECTION OPERATION. SECONDARY WALL AND ROOF FRAMING (PURLINS, GIRTS AND/OR JOIST) ARE NOT DESIGNED TO FUNCTION AS A WORKING PLATFORM OR TO PROVIDE AS AN ANCHORAGE POINTFOR A FALL ARREST /SAFETY TIE OFF. GENERAL NOTES: 1.MATERIALS ASTM DESCRIPTION STRUCTURAL STEEL PLATE AS529 / A572 / A1011HOT ROLLED MILLS SHAPES A36 / A529 / A572 / A500 HSS ROUND A500 HSS RECTANGULAR A500 COLD FORM SHAPES A653 / A1011 ROOF AND WALL SHEETING A653 / A792 BOLTS A307 / A325 / A490 CABLE A475 RODS A529 / A572 2.STRUCTURAL PRIMER NOTE : SHOP COAT PRIMER IS INTENDED TO PROTECT THE STEEL FRAMING FOR A SHORT PERIOD OFTIME. STORAGE IN EXTREME COLD TEMPERATURES OR WINTER SNOW CONDITIONS, INCLUDINGTRANSPORTATION ON SALTED OR CHEMICALLY TREATED ROADS WILL ADVERSELY AFFECT THEDURABILITY AND LONGEVITY OF THE PRIMER. THE COAT OF SHOP PRIMER DOES NOT PROVIDETHE UNIFORMITY OF APPEARANCE, OR THE DURABILITY AND CORROSION RESISTANCE OF AFIELD APPLIED FINISH COAT OF PAINT OVER A SHOP PRIMER. MINOR ABRASIONS TO THE SHOPCOAT PRIMER CAUSED BY HANDLING, LOADING, SHIPPING, UNLOADING AND ERECTION AREUNAVOIDABLE AND ARE NOT THE RESPONSIBILITY OF THE METAL BUILDING MANUFACTURER.METAL BUILDING MANUFACTURER IS NOT RESPONSIBLE FOR THE DETERIORATION OF THEPRIMER OR CORROSION THAT MAY RESULT FROM ATMOSPHERIC AND ENVIRONMENTALCONDITIONS NOR THE COMPATIBILITY OF THE PRIMER TO ANY FIELD APPLIED COATING. 5.A325 & A490 BOLT TIGHTENING REQUIREMENTS : IT IS THE RESPONSIBILITY OF THE ERECTOR TO ENSURE PROPER BOLT TIGHTNESS IN ACCORDANCEWITH APPLICABLE REGULATIONS. FOR PROJECTS IN THE UNITED STATES SEE THE RCSCSPECIFICATION FOR STRUCTURAL JOINTS USING A325 OR A490 BOLTS OR FOR PROJECTS IN CANADA,SEE THE CAN/CSA S16 LIMIT STATES DESIGN OF STEEL STRUCTURES FOR MORE INFORMATION. THE FOLLOWING CRITERIA MAY BE USED TO DETERMINE THE BOLT TIGHTNESS (I.E., "SNUG-TIGHT"OR "FULLY-PRETENSIONED"), UNLESS REQUIRED OTHERWISE BY LOCAL JURISDICTION ORCONTRACT REQUIREMENTS: A) ALL A490 BOLTS SHALL BE "FULLY-PRETENSIONED". B) ALL A325 BOLTS IN PRIMARY FRAMING (RIGID FRAMES AND BRACING) MAY BE "SNUG-TIGHT", EXCEPT AS FOLLOWS: "FULLY-PRETENSION"A325 BOLTS IF: a) BUILDING SUPPORTS A CRANE SYSTEM WITH A CAPACITY GREATER THAN 5 TONS.b) BUILDING SUPPORTS MACHINERY THAT CREATES VIBRATION, IMPACT OR STRESS-REVERSALS ON THE CONNECTIONS. THE ENGINEER-OF- RECORD FOR THE PROJECT SHOULD BE CONSULTED TO EVALUATE FOR THIS CONDITION. c) THE PROJECT SITE IS LOCATED IN A HIGH SEISMIC AREA. FOR IBC-BASED CODES, "HIGH SEISMIC AREA" IS DEFINED AS "SEISMIC DESIGN CATEGORY" OF "D", "E", OR "F". SEE THE "BUILDING LOADS" SECTION OF THIS PAGE FOR THE DEFINED SEISMIC DESIGN CATEGORY FOR THIS PROJECT.d) ANY CONNECTION DESIGNATED IN THESE DRAWINGS AS "A325-SC". "SLIP-CRITICAL (SC)" CONNECTIONS MUST BE FREE OF PAINT, OIL, OR OTHER MATERIALS THAT REDUCE FRICTION AT CONTACT SURFACES. GALVANIZED OR LIGHTLY RUSTED SURFACES ARE ACCEPTABLE. C) IN CANADA, ALL A325 AND A490 BOLTS SHALL BE "FULLY PRE-TENSIONED", EXCEPT FORSECONDARY MEMBERS (PURLINS, GIRTS, OPENING FRAMING, ETC.) AND FLANGE BRACES. SECONDARY MEMBERS (PURLINS, GIRTS, OPENING FRAMING, ETC.) AND FLANGE BRACE CONNECTIONS MAY ALWAYS BE "SNUG-TIGHT", UNLESS INDICATED OTHERWISE IN THESE DRAWINGS. 4.SPECIAL INSPECTION : SPECIAL INSPECTIONS AND TESTING THAT MAY BE REQUIRED BY GOVERNMENTAL OR OTHERAUTHORITY DURING CONSTRUCTION AND/OR STEEL FABRICATION (COLLECTIVELY, "INSPECTIONS")ARE NOT THE RESPONSIBILITY OF NBG, AND TO THE EXTENT REQUIRED IT SHALL BE THERESPONSIBILITY OF THE BUILDER AND/OR OWNER. IN THE EVENT THE INSPECTIONS AREREQUIRED, THE BUILDER AND/OR OWNER SHALL EMPLOY A THIRD PARTY QUALITY ASSURANCE TESTING AGENCY APPROVED BY THE RELEVANT AUTHORITY. IF SUCH REQUIREMENTS ARE NOT SPECIFICALLY INCLUDED IN NBG SALES DOCUMENTS, NO INSPECTIONS BY NBG OR AT ANY NBG FACILITY SHALL BE MADE. ALL NBG FACILITIES ARE ACCREDITED BY IAS AC472. 6.GENERAL DESIGN NOTES : 1) ALL STRUCTURAL STEEL SECTIONS AND WELDED PLATE MEMBERS ARE DESIGNED IN ACCORDANCE WITH ANSI/AISC 360 “SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS” OR THE CAN/CSA S16 “LIMIT STATES DESIGN OF STEEL STRUCTURES”, AS REQUIRED BY THE SPECIFIED BUILDING CODE. 2) ALL WELDING OF STRUCTURAL STEEL IS BASED ON EITHER AWS D1.1 “STRUCTURAL WELDING CODE – STEEL” OR CAN/CSA W59 “WELDED STEEL CONSTRUCTION (METAL ARC WELDING)”, AS REQUIRED BY THE SPECIFIED BUILDING CODE.3) ALL COLD FORMED MEMBERS ARE DESIGNED IN ACCORDANCE WITH ANSI/AISI S100 OR THE CAN/CSA S136 “SPECIFICATIONS FOR THE DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS”, AS REQUIRED BY THE SPECIFIED BUILDING CODE. 4) ALL WELDING OF COLD FORMED STEEL IS BASED ON AWS D1.3 “STRUCTURAL WELDING CODE – SHEET STEEL” OR CAN/CSA W59 “WELDED STEEL CONSTRUCTION (METAL ARC WELDING)”, AS REQUIRED BY THE SPECIFIED BUILDING CODE. 6) IF JOISTS ARE INCLUDED WITH THIS PROJECT, THEY ARE SUPPLIED AS A PART OF THE SYSTEMS ENGINEERED METAL BUILDING AND ARE FABRICATED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 1926.758 OF OSHA SAFETY STANDARDS FOR STEEL ERECTION, DATED JANUARY 18, 2001. 7.GLOSSARY OF ABBREVIATIONS : THE DRAWINGS AND THE METAL BUILDING THEY REPRESENT ARE THE PRODUCT OF THE METAL BUILDING MANUFACTURER. THE REGISTERED PROFESSIONAL ENGINEER’S SEALPERTAINS ONLY TO THE REQUIREMENTS LISTED HEREIN FOR THE MATERIALS DESIGNED AND SUPPLIED BY THE METAL BUILDING MANUFACTURER. THE REGISTERED PROFESSIONAL ENGINEER WHOSE SEAL APPEARS ON THESE DRAWINGS IS EMPLOYED OR ENGAGED BY THEMETAL BUILDING MANUFACTURER AND DOES NOT SERVE AS OR REPRESENT THE PROJECT ENGINEER OF RECORD AND SHALL NOT BE CONSTRUED AS SUCH. 5) ALL NUCOR BUILDING GROUP FACILITIES ARE IAS AC-472 ACCREDITED FOR DESIGN AND FABRICATION OF METAL BUILDING SYSTEMS. FOR PROJECTS IN CANADA, DESIGN AND FABRICATION ARE DONE ONLY IN FACILITIES THAT ARE ALSO CAN/CSA A660 AND W47.1 CERTIFIED. 7) COLUMN BASE PLATES ARE DESIGNED NOT TO EXCEED THE ALLOWABLE BEARING STRESS OF CONCRETE THAT HAS A MINIMUM COMPRESSIVE STRENGTH OF 3000 P.S.I. AT 28 DAYS. MATERIALS ASTM DESCRIPTION APS = A-PANEL FOR THE SOFFITAPL = A-PANEL FOR THE LINER A.R. = ANCHOR RODSAPW = A-PANEL FOR THE WALL BS = BOTH SIDESB.U. = BUILT-UPCFR = CONCEALED FASTENED ROOF PANELDIA = DIAMETERFLG = FLANGE F.S = FAR SIDEGA. = GAUGEH.S.B. = HIGH STRENGTH BOLTSHT. = HEIGHTLLV = LONG LEG VERTICALLSN = LOC SEAM NON-SWAGED ROOF PANELSLSS = LOC SEAM SWAGED ROOF PANELS M.B. = MACHINE BOLTS MBS = METAL BUILDING SUPPLIERMIN = MINIMUMN/A = NOT APPLICABLENIC = NOT IN CONTRACTN.S. = NEAR SIDEO.A.L. = OVERALL LENGTHO.C. = ON CENTERPL = PLATEREQ’D = REQUIRED REV. = REVISIONRPL = R-PANEL FOR THE LINER RPS = R-PANEL FOR THE SOFFITRPR = R-PANEL FOR THE ROOF RRS = REVERSE R-PANEL FOR THE SOFFITRRL = REVERSE R-PANEL FOR THE LINERRPW = R-PANEL FOR THE WALL RRW = REVERSE R-PANEL FOR THE WALLSL = STEEL LINE SLV = SHORT LEG VERTICAL SS2 = STANDING SEAM II ROOF PANELSS3 = STANDING SEAM 360 ROOF PANEL U.N.O. = UNLESS NOTED OTHERWISEMAX = MAXIMUM SIM = SIMILAR TBD = TO BE DETERMINEDTYP = TYPICAL ?? = PART MARK TO BE DETERMINED AND WILL BE UPDATED ON CONSTRUCTION DRAWINGS 60x175 SHOP DOWNSPOUTS. COLOR: N/A (7) 3070 PREASSEMBLED WALKDOOR(S). COLOR: WHITE BUILDING LINE TRIM COLOR: REGAL WHITE SOFFIT PANEL. TYPE: REVERSE R-PANEL, 26 GAGE, FINISH: REGAL WHITE SOFFIT PANEL. TYPE: REVERSE R-PANEL, 26 GAGE, FINISH: REGAL WHITE FRAMED OPENING TRIM COLOR: REGAL WHITE TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME PROJECTION: 3'-0" PRIMARY AND SECONDARY STEEL PRIMER COLOR SOFFIT PANEL. TYPE: REVERSE R-PANEL, 26 GAGE, FINISH: REGAL WHITE ROOF PANEL CLIP TYPE: N/A RAKE EXTENSION GRAY BUILDING LINE TRIM COLOR: REGAL WHITE THERMAL BLOCKS: NO EPS FOAM SPACERS: NO BUILDING LINE TRIM COLOR: REGAL WHITE ROOF SHEETING TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME ROOF LINE TRIM. COLOR: REGAL WHITE TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME PROJECTION: 3'-0" WALL SHEETING PROJECTION: 3'-0" ROOF PANEL CLIP TYPE: N/A RAKE EXTENSION TYPE: R-PANEL, 26 GAGE, FINISH: BRITE RED EAVE EXTENSION ROOF INSULATION(NOT BY NBS). THICKNESS: R-11 (3 3/4") CRANE. (SEE CRANE PLAN FOR ADDITIONAL INFORMATION) PRIMARY AND SECONDARY STEEL PRIMER COLOR GRAY ROOF SHEETING LEAN-TO SOFFIT PANEL. TYPE: REVERSE R-PANEL, 26 GAGE, FINISH: REGAL WHITE TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME THERMAL BLOCKS: NO EPS FOAM SPACERS: NO BUILDING LINE TRIM COLOR: REGAL WHITE WALL CORNER TRIM. COLOR: REGAL WHITE ROOF LINE TRIM. COLOR: REGAL WHITE TYPE: R-PANEL, 26 GAGE, FINISH: GALVALUME WALL BASE TRIM. COLOR: REGAL WHITE WALL SHEETING PROJECTION: 3'-0" WALL INSULATION(NOT BY NBS). THICKNESS: R-30 (9 1/4") TYPE: R-PANEL, 26 GAGE, FINISH: BRITE RED EAVE EXTENSIONBUILDING OPTIONS ROOF INSULATION(NOT BY NBS). THICKNESS: R-11 (3 3/4") DOWNSPOUTS. COLOR: N/A WALL CORNER TRIM. COLOR: REGAL WHITE WALL BASE TRIM. COLOR: REGAL WHITE FRAMED OPENING TRIM COLOR: REGAL WHITE WALL INSULATION(NOT BY NBS). THICKNESS: R-30 (9 1/4") 07/27/2023 C3 FO R C O N S T R U C T I O N BU I L D I N G S H E E T 2 (4 3 5 ) 9 1 9 - 3 1 0 0 (4 3 5 ) 9 1 9 - 3 1 0 1 FA X : PH O N E : 07 / 2 4 / 2 0 2 3 07 : 3 1 : 3 5 a m DR A W I N G T I T L E SH E E T DR A W I N G S T A T U S BU Y E R N A M E St e e l V i s i o n C o n s t r u c t i o n I n c PR O J E C T N A M E Pr e c i s i o n P r e c a s t JO B N U M B E R U2 3 M 0 3 6 4 A AD D R E S S 30 0 0 W 5 2 0 0 S Re x b u r g , I D 8 3 4 4 0 # RE L E A S E / R E V I S I O N DW N / C H K DA T E EN G 0 CO N S T . A N C H O R B O L T P L A N MB S / E O P AN S 06 / 0 5 / 2 0 2 3 1 FO R B U I L D D E P T . R E V . WB B / T K L AN S 06 / 2 9 / 2 0 2 3 2 FI N A L S WB B / T K L AN S 07 / 2 6 / 2 0 2 3 2'-0" 7'-6" 110.0 THE METAL BUILDING MANUFACTURER'S WALL PANELS ABOVE THE TOP OF THE MASONRY/CONCRETE WALLS MUST BE ATTACHED TO THE WALLS WITH A SPACING AS SHOWN. THE MASONRY/CONCRETE WALLS, AS WELL AS THE FASTENERS ATTACHING THE METAL BUILDING MANUFACTURER'S WALL PANELS TO THE MASONRY/CONCRETE WALLS ARE DESIGNED AND PROVIDED BY OTHERS (NOT BY THE METAL BUILDING MANUFACTURER). THE MASONRY/CONCRETE WALL IS SELF-SUPPORTING AND MUST BE DESIGNED TO SUPPORT THE LOADS AS SHOWN. BASE ANGLE SHOWN FOR REFERENCE. ACTUAL MEMBER TYPE AT THE TOP OF THE WALL MAY VARY. MBS WALL PANEL LOADS SELF-SUPPORTED WALL BY OTHERS (TOP OF SELF- SUPPORTED WALL) (FIRST GIRT ELEV. ABOVE WALL) PRESSURE OR SUCTION DUE TO WALL PANEL ONLY (PLF) FASTEN AT 3'-0" O.C. (FASTENERS NOT BY MBS) SELF-SUPPORTED WALL BY OTHERS MBS COLUMN MBS ZEE GIRT MBS GIRT CLIP WALL PANEL BASE TRIM NOT SHOWN ST D N B G GI R T S P A C I N G STEEL LINE AND OUTSIDE FACE OF WALL 8'-0" 13'-6" 110.0 THE METAL BUILDING MANUFACTURER'S WALL PANELS ABOVE THE TOP OF THE MASONRY/CONCRETE WALLS MUST BE ATTACHED TO THE WALLS WITH A SPACING AS SHOWN. THE MASONRY/CONCRETE WALLS, AS WELL AS THE FASTENERS ATTACHING THE METAL BUILDING MANUFACTURER'S WALL PANELS TO THE MASONRY/CONCRETE WALLS ARE DESIGNED AND PROVIDED BY OTHERS (NOT BY THE METAL BUILDING MANUFACTURER). THE MASONRY/CONCRETE WALL IS SELF-SUPPORTING AND MUST BE DESIGNED TO SUPPORT THE LOADS AS SHOWN. BASE ANGLE SHOWN FOR REFERENCE. ACTUAL MEMBER TYPE AT THE TOP OF THE WALL MAY VARY. MBS WALL PANEL LOADS SELF-SUPPORTED WALL BY OTHERS (TOP OF SELF- SUPPORTED WALL) (FIRST GIRT ELEV. ABOVE WALL) PRESSURE OR SUCTION DUE TO WALL PANEL ONLY (PLF) FASTEN AT 3'-0" O.C. (FASTENERS NOT BY MBS) SELF-SUPPORTED WALL BY OTHERS MBS COLUMN MBS ZEE GIRT MBS GIRT CLIP WALL PANEL BASE TRIM NOT SHOWN ST D N B G GI R T S P A C I N G STEEL LINE AND OUTSIDE FACE OF WALL +/- 0.18 Ground Snow Load: ***Design wind pressures to be used for wall exterior component and cladding materials not provided by Nucor Building Systems. *Primary Structural Not Included distributed. When suspended sprinkler systems, lighting, HVAC equipment, Project Notes: loading conditions is determined per the specified building code. 0.114 the contract specified roof snow load, whichever is greater. This value, Pm, is only 3) **Pm is based on the minimum roof snow load calculated per building code or 20.00 1.00 the more critical effect of roof live load or roof snow load, as determined by the II - Standard Buildings 3.00 2) The design of structural members supporting gravity loads is controlled by these concentrated loads exceed 500 pounds (using the web mount detail) or applied in combination with the dead and collateral loads. Roof snow in other 35.00 Snow Cs applicable code. 20.00 significantly more than others.1.00 200 lbs (using the flange mount detail), or if individual members are loaded Roof Dead (PSF)*ceilings, etc., are suspended from roof members, consult the M.B.S. If 1) Collateral dead loads, unless otherwise noted, are assumed to be uniformly 4.72 (115)/ (89) 3.25 Enclosed 1.00 3.00 4.00 Lean-to 32.35 0.114 3.25 +/- 0.18 Enclosed 35.00 1.00 3.00 3.00 3.50 60x175 Shop Base Shear (KIPS) Seismic Cs Seismic R GCpi Wind Enclosure Roof Snow **Pm (PSF) Roof Snow Ps (PSF) Snow Ct Secondary Collateral (PSF) Primary Collateral (PSF) Name NoUL90: CExposure: (31) / (-41)***C & C Pressures (PSF): Wind (MPH): (Vult) / (Vasd) Ord. Moment FrameOrd. Concentrically Braced FrameBasic SFRS: Equivalent Lateral Force ProcedureAnalysis Procedure: DSeismic Design Category: 1.00Seismic Imp. Factor Ie: DSite Class: (0.371) / (0.219)Seismic Sds/Sd1: Ss: 0.370 S1: 0.142Seismic Information: 1.00Snow Importance Factor, Is: 1.00Snow Exposure Factor, Ce: 50.00 PSF REDUCIBLE PER CODE 20.00 PSFRoof Live Load: MBMA Occupancy Class: IBC 2018Design Code: Building Loads: Rainfall Intensity:4.00 obtained from the metal building manufacturer.provided by the metal building manufacturer shall be designed and detailed by others to accommodate the seismic story drifts.Seismic drift values may be ceilings and exterior wall systems have been designed to accommodate the seismic story drifts. Interior walls, partitions, ceilings or exterior wall systems not For Occupancy (Risk) Category I or II, IBC provisions indicate that single-story buildings shall have 'no drift limit' provided that interior walls, partitions, and possible building reinforcement. designed for any additional moment or catenary forces from the door. Any change to the information shown here will require an engineering investigation Framed openings have been designed to support wind load normal to the wall based on the standard building code criteria. Framed openings have not been 07/27/2023 CRANE PLAN GENERAL NOTESCP1: "*" INDICATES TAGGED END OF BEAM. CP2: FOR CRANE DETAILS REFERENCE AH____ DETAILS. GN1: REQUIRED DETAILS ARE NOT ALWAYS CALLED OUT ON THE PLAN/ELEVATION. ALL DETAILS AND INFO ON THE D & SD PAGES SHOULD BE REVIEWED PRIOR TO INSTALLATION. E7 FO R C O N S T R U C T I O N CR A N E P L A N (4 3 5 ) 9 1 9 - 3 1 0 0 (4 3 5 ) 9 1 9 - 3 1 0 1 FA X : PH O N E : 07 / 2 4 / 2 0 2 3 07 : 3 1 : 5 0 a m DR A W I N G T I T L E SH E E T DR A W I N G S T A T U S BU Y E R N A M E St e e l V i s i o n C o n s t r u c t i o n I n c PR O J E C T N A M E Pr e c i s i o n P r e c a s t JO B N U M B E R U2 3 M 0 3 6 4 A AD D R E S S 30 0 0 W 5 2 0 0 S Re x b u r g , I D 8 3 4 4 0 # RE L E A S E / R E V I S I O N DW N / C H K DA T E EN G 0 CO N S T . A N C H O R B O L T P L A N MB S / E O P AN S 06 / 0 5 / 2 0 2 3 1 FO R B U I L D D E P T . R E V . WB B / T K L AN S 06 / 2 9 / 2 0 2 3 2 FI N A L S WB B / T K L AN S 07 / 2 6 / 2 0 2 3 B B 1 1 8 8 A A 7 7 9 9 10 10 4 4 3 3 6 6 C CCC CT R T O C T R O F R A I L FUTURE CRANE SYSTEMS. BUILDING AND DOES NOT APPLY TOCRANE SYSTEMS SUPPLIED WITH THIS UNSTABLE. THIS APPLIES ONLY TO BRACES INSTALLED, THE BUILDING IS CRANE SYSTEM AND THE CBA- ANGLE SYSTEM FOR STABILITY. WITHOUT THE THE BUILDING RELIES ON THE CRANE AT THE TIME OF BUILDING ERECTION. AND ATTACHED TO THE CRANE SYSTEMINSTALLED ON THE FRAME COLUMNS THE CBA- ANGLE BRACES MUST BE REQUIREMENTS.4) SEE RAIL TO RUNWAY BEAM CONNECTION DETAILS FOR HOOK BOLT OR SLIDING CLAMP REQUIREMENTS. SAFE, OPERATING CONDITION. REFER TO CMAA OR AISC GUIDELINES FOR PERIODIC MAINTENANCE REQUIRED BY BUILDER OR THE BUILDING OWNER TO ENSURE THAT THE CRANE SYSTEM REMAINS IN MAINTENANCE INCLUDING BUT NOT LIMITED TO, TIGHTENING OF BOLTS AND NUTS MUST BE DONE AS 3) PERIODIC MAINTENANCE IS REQUIRED. DUE TO THE NATURE OF THE CRANE SYSTEM, THE CRANE. REFER TO CMAA OR AISC GUIDELINES FOR FURTHER INSTALLATION REQUIREMENTS.OPPOSITE RUNWAY BEAMS FOR THE CRANE AISLE ARE STAGGERED WITH RESPECT TO THE WHEEL BASE OF 2) FOR TOP RUNNING CRANE SYSTEMS, CRANE RAIL SPLICES MUST BE ARRANGED SO THAT JOINTS ON TRADES ASSOCIATED WITH THE BUILDING SYSTEM. THE BUYER SHALL BE RESPONSIBLE FOR COORDINATING THESE DIMENSIONAL REQUIREMENTS WITH OTHER CLEARANCE DIMENSIONS FOR PROPER ELEVATIONS RELATIVE TO THE CRANE SYSTEMS HAVE BEEN SHOWN. AND ARE REQUIRED AS SHOWN IN THE SECTIONS AND AS NOTED IN THESE GENERAL NOTES. NECESSARY 1) COORDINATION OF OTHER TRADES: SUPPORTS AND BRACING FOR THE CRANE SYSTEM SHALL BE PROVIDED CBA-2 RCB-13 RCB-1 CBA-2 RCB-3CBA-1 10 - T O N T R S G 30 ' - 0 RCB-8 CBW-2 RCB-2 AH1130 RCB-4 AH1101 CBA-2 CBA-1 CBW-2 CBW-2 CBW-2 CBW-2 CBW-1 RCB-11 CBW-1 CBW-1 CBW-2 CBW-2 CBW-2 CBW-1CBW-2CBW-2 RCB-6 RCB-9 ECW-1 RCB-17 52 ' - 0 CBA-1 CBA-1 175'-0 CBA-2 10 - T O N T R S G 175'-0 CBA-1 CBA-1CBA-1 RCB-12RCB-3 CBA-2 CBA-2 CBA-2 CBA-2 CBA-1 RCB-5 RCB-7 ECW-2 RCB-10 RCB-14 25'-025'-025'-0 AH0160 AH1110 30 ' - 0 30 ' - 0 60 ' - 0 30 ' - 0 60 ' - 0 25'-025'-025'-025'-0 07/27/2023