Loading...
HomeMy WebLinkAboutREDLINED ELEVATIONS - 23-00261 - 1203 Castle Pines Rd - PavilionAuthor Name Author Email Author Phone No.: Larry Beesley Larry.Beesley@rexburg.org 208-372-2176 Description : 1203 Castle Pines Rd - Pavilion Address : 1203 Castle Pines Rd Application Type : Document Filename : Elevations of Outdoor living.png Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments Pg 1 Free Text Larry Beesley : Building Open 1 This patio needs to have plans that show details and measurements from the footings. columns, beam sizes, roof designed to carry the 35# snow loads. Footings must be 36" deep for frost level. All of the post to beam connections must meet the 2018 IRC code for Building and seismic and wind conditions. If needed a design professional might be required to provide stamped plans with all details. Also show footings and foundation for the masonry fire place. Pg 1 Free Text Larry Beesley : Building Open 1 roof pitches Pg 1 Free Text Larry Beesley : Building Open 1 patio Pg 1 Free Text Larry Beesley : Building Open 1 patio material ? # 23-00261 Residential Accessory Structure Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 05.16.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) patio material ? roof pitc h es p T h is patio n eed s to h av e plan s th at s h ow d etails an d meas u remen ts from th e footin g s . c olu mn s , b eam s iz es , roof d es ig n ed to c arry th e 3 5 # s n ow load s . F ootin g s mu s t b e 3 6 " d eep for fros t lev el. A ll of th e pos t to b eam c on n ec tion s mu s t meet th e 2 0 1 8 IR C c od e for B u ild in g an d s eis mic an d w in d c on d ition s . If n eed ed a d es ig n profes s ion al mig h t b e req u ired to prov id e s tamped plan s w ith all d etails . A ls o s h ow footin g s an d fou n d ation for th e mas on ry fire plac e.