HomeMy WebLinkAboutOrd No 1309 LID 53 Creation OrdinanceInstrument # 461345
REXBURG, MADISON, IDAHO
3-14-2024 04:06:39 PM No. of Pages: 31
Recorded for: CITY OF REXBURG
KIM H. MUIR Fee: 0.00
Ex-Oflicio Recorder Deputy
pir
r
9e��SMED
LOCAL IMPROVEMENT DISTRICT 53 CREATION ORDINANCE
ORDINANCE NO. 1309
AN ORDINANCE OF THE CITY OF REXBURG, IDAHO, CREATING
LOCAL IMPROVEMENT DISTRICT NO. 53; DESCRIBING AND
SETTING FORTH THE BOUNDARIES OF SAID LOCAL
IMPROVEMENT DISTRICT; PROVIDING FOR THE
IMPROVEMENTS TO BE MADE THEREIN; APPOINTING AN
ENGINEER TO PREPARE THE NECESSARY PLANS AND
SPECIFICATIONS FOR THE WORK; AUTHORIZING THE
ADVERTISING FOR BIDS FOR SAID WORK AS AUTHORIZED BY
LAW; PROVIDING FOR THE PAYMENT OF COSTS AND EXPENSES
OF SAID IMPROVEMENTS TO BE ASSESSED AGAINST THE
PROPERTY WITHIN THE DISTRICT BENEFITTED THEREBY AND
THE METHOD OF ASSESSMENTS; PROVIDING FOR THE
ISSUANCE OF LOCAL IMPROVEMENT DISTRICT BONDS AND
WARRANTS; PROVIDING FOR RELATED MATTERS; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Rexburg, Idaho (the "City"), is a municipal
corporation organized and operating under the laws of the State of Idaho and is
authorized by Idaho Code Title 50, Chapter 17, to create local improvement
districts for public improvements, and to finance said improvements by the
issuance and sale of local improvement district bonds or warrants, which bonds
or warrants are payable solely from assessments upon the property benefitted
by said improvements; and
WHEREAS, the City Council (the "Council") of the City has determined
that it is in the best interests of the City and its residents, and of the property
and residents within the proposed local improvement district, to create a local
improvement district for the construction of certain improvements, and other
related expenses; and
WHEREAS, after proper publication and mailing of notice to the owners
of property within the proposed improvement district of intention to create the
proposed local improvement district, a public hearing was held by the Council
on February 7, 2024, at which hearing the residents and owners of property
within said proposed local improvement district had the opportunity to protest
the formation of the local improvement district.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND
COUNCIL OF THE CITY OF REXBURG, IDAHO, as follows:
Section i_ The Council hereby finds and declares:
a. That Local Improvement District No. 53 will be in the best interests of the
property affected and of the Rexburg City;
b. That there is a reasonable probability that the obligations of Local
Improvement District No. 53 will be paid;
c. That the value of the property subject to assessment within Local
Improvement District No. 53 (such value being determined by the current
ORDINANCE 1309
-1-
assessed valuation of such property for ad valorem tax purposes as shown by
the records of the Assessor of Madison County, Idaho) exceeds the sum of the
estimated costs to be assessed against the property included in Local
Improvement District No. 53; and
d. That the Council has heard, considered, and passed upon any protests which
were filed in writing in advance of the hearing held and conducted on February
7, 2024 as more fully set forth in the proceedings of said hearing, and all of such
protests are hereby overruled, except to the extent reflected in the description
of the boundaries of L.I.D. No. 53 set forth in Exhibit "A" which is annexed
hereto and by reference made a part hereof. Exhibit "A" can be viewed at the
Clerk's Office at City Hall. The boundaries of the L.I.D 53 encompass the real
property within Rexburg city limits, located primarily along North 4th East, ist
South end East, and Hillview Dr.
Section 2: There is hereby established and created a local
improvement district within the City, to be known and designated as "Local
Improvement District No. 53" ("L.I.D. No."), the boundaries of which local
improvement district, all situate in Madison County, Idaho, are particularly
described in Exhibit "A" which is annexed hereto and by reference made a part
of this Ordinance.
Sectiong: A description of the improvements to be constructed (the
"Improvements") is as follows: the installation and/or replacement of streets,
curbs, gutters, sidewalks, water lines, sanitary sewer lines, storm sewer lines
and other improvements as necessary, together with related improvements and
costs of engineering, legal services, publication, interest on borrowed funds
during construction, bond issuance costs and reserves, and other related
expenses.
Section 4: The costs and expenses of the Improvements shall be
assessed against the abutting, adjoining, and adjacent lots, and lands and other
properties benefited by the Improvements, according to a front foot method or
a square foot method, or in proportion to the benefits derived to such property
by said improvements, or a combination thereof, subject to any variations there
from to be determined by the Council.
Section 5: Said Improvements are additional improvements.
Section 6: The total estimated cost of the Improvements is
$4,886,ioo. Approximately $4,775,600 will be paid by the City, representing
the amount of benefit to the general public resulting from the Improvements.
The balance of the cost will be paid by a levy of assessments on the property
benefited on the basis set forth in Section 4 of this Ordinance. Said assessments
may be paid in annual installments of principal and interest, over a period
which may be less than but which shall not exceed thirty (30) years, as shall be
determined by the Council, if not otherwise provided by law.
Section 7: Costs and expenses assessed as herein provided shall
include the contract price of the Improvements, engineering and clerical
services, advertising, costs of inspection, costs of collecting assessments,
interest on any warrants issued, legal services for preparing the proceedings
and in advising with regard thereto, services of financial advisors, necessary
reserves, and costs of issuance of any bonds or warrants.
Section 8: The City Engineer is hereby appointed as engineer for L.I.D.
No. 53 and shall prepare the necessary plans, specifications, and advertisement
for bids for the construction thereof. Advertisement for bids for such work shall
be published and contracts awarded in accordance with Section 50-1710, Idaho
Code.
Section 9: For the purpose of paying any contractor for the cost of the
Improvements for L.I.D. No. 53, or otherwise defraying any of the costs of the
ORDINANCE 1309
-2-
Improvements as they become due, the Mayor, the City Treasurer, and the City
Clerk are hereby authorized and directed to cause to be issued, sold, and
delivered, on behalf of the City, interim warrants of L.I.D. No. 53, which
warrants shall be in such form and amounts (not exceeding, in the aggregate,
$2oo,000), as the Council may hereafter provide by resolution, which warrants
shall be redeemed and paid in full, together with any accrued and unpaid
interest thereon, from the proceeds of the sale of the bonds or warrants or the
prepayment of assessments of L.I.D. No. 53. The first proceeds of the
prepayment of assessments and the sale of Local Improvement District No. 53
bonds or warrants are hereby pledged for the payment and redemption of the
principal and interest on each interim warrant issued pursuant hereto.
Section io: This Ordinance shall be published once in the official
newspaper of the City and shall take effect and be in full force immediately
upon its passage, approval, and publication.
Passed by the City Council of said City and approved by the Mayor on the 6tn
day of March, 2024.
CITY OF REXBURG
Madison County, Idaho
rry Merr 1, ayor
ATTEST:
J-�
Deborah Lovejoy, City Cler
t:`C,ORPp:
c ^•` k `
rn
(STATE �S� AHO)
ss:
(County of Madison)
I, Deborah Lovejoy, City Clerk of the City of Rexburg, Idaho, do hereby
certify: That the foregoing is a full, true and correct copy of an Ordinance
entitled:
AN ORDINANCE OF THE CITY OF REXBURG, IDAHO, CREATING
LOCAL IMPROVEMENT DISTRICT NO. 53 DESCRIBING AND SETTING
FORTH THE BOUNDARIES OF SAID LOCAL IMPROVEMENT DISTRICT;
PROVIDING FOR THE IMPROVEMENTS TO BE MADE THEREIN;
APPOINTING AN ENGINEER TO PREPARE THE NECESSARY PLANS AND
SPECIFICATIONS FOR THE WORK; AUTHORIZING THE ADVERTISING
FOR BIDS FOR SAID WORK AS AUTHORIZED BY LAW; PROVIDING FOR
THE PAYMENT OF COSTS AND EXPENSES OF SAID IMPROVEMENTS TO
BE ASSESSED AGAINST THE PROPERTY WITHIN THE DISTRICT
BENEFITTED THEREBY AND THE METHOD OF ASSESSMENTS;
PROVIDING FOR THE ISSUANCE OF LOCAL IMPROVEMENT DISTRICT
BONDS AND WARRANTS; PROVIDING FOR RELATED MATTERS; AND
PROVIDING AN EFFECTIVE DATE.
ORDINANCE 1309
-3-
Passed by the City Council of said City and approved by the Mayor on the 6th
day of March, 2024.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the
seal of said City this 6th day of March, 2024.
'•''�� "':r" �'' Deborah Lovejoy, City Cl rk
CRPO
ill �
ORDINANCE 1309
-4-
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 1 Parcel Number: RPROCHS0030140
Physical Address: 1010 Hillview Dr
Owner Name: Tlustek, Terry
Quantities
Driveway and/or Apron Estimate (SY)
29.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
30.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
50
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$265.50
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$750.00
Concrete Installation (SQY)
$2,376.00
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$256.65
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$725.00
Concrete Installation (SQY)
$2,296.80
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$520.00
12" Excavation, Backfill, and Compaction (LF)
$250.00
Concrete Installation (Foot)
$2 925.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$10,364.95
Engineering
$1,243.79
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$2,125.95
Property Owner Estimated Cost
$9,482.80
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 2 Parcel Number: RPROCHS0030150
Physical Address: 1000 Hillview Dr
Owner Name: RIGGINS WILLIAM J
Quantities
Driveway and/or Apron Estimate (SY)
30.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
23.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
40
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$203.55
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$575.00
Concrete Installation (SQY)
$1,821.60
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$265.50
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$750.00
Concrete Installation (SQY)
$2,376.00
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$416.00
12" Excavation, Backfill, and Compaction (LF)
$200.00
Concrete Installation (Foot)
$2,340.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$8,947.65
Engineering
$1,073.72
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,666.85
Property Owner Estimated Cost
$8,354.53
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 3 Parcel Number: RPROCHS0040100
Physical Address: 1005 Hillview Dr
Owner Name: Williams, Greg K
Quantities
Driveway and/or Apron Estimate (SY)
32.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
43.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
50
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$380.55
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$1,075.00
Concrete Installation (SQY)
$3,405.60
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$283.20
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$800.00
Concrete Installation (SQY)
$2,534.40
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$520.00
12" Excavation, Backfill, and Compaction (LF)
$250.00
Concrete Installation (Foot)
$2,925.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$12,173.75
Engineering
$1,460.85
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$2,566.85
Property Owner Estimated Cost
$11,067.76
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 4 Parcel Number: RPROCHS0040110
Physical Address: 1015 Hillview Dr
Owner Name: RIGGINS WILLIAM J
Quantities
Driveway and/or Apron Estimate (SY)
30.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
21.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
50
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$185.85
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$525.00
Concrete Installation (SQY)
$1 663.20
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$265.50
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$750.00
Concrete Installation (SQY)
$2,376.00
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$520.00
12" Excavation, Backfill, and Compaction (LF)
$250.00
Concrete Installation (Foot)
$2,925.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$9,460.55
Engineering
$1,135.27
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,820.72
Property Owner Estimated Cost
$8,775.11
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 5 Parcel Number:
Physical Address:
Owner Name: City of Rexburg
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
Reinforced Concrete Installation (SQY)
New Sidewalk and Drivewav
Removal of Concrete/ Asphalt Sidewalk (SQY)
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
Reinforced Concrete Installation (SQY)
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
12" Excavation, Backfill, and Compaction (LF)
Concrete Installation (Foot)
Reinforced Concrete Installation (Foot)
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
Concrete Installation (Foot)
Reinforced Concrete Installation (Foot)
Totals
Sanitary Sewer Service Reconnection
Landscaping/ Voluntary Amounts Added
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$200,000.00
Engineering
$24,000.00
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$224,000.00
Property Owner Estimated Cost
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 26 Parcel Number: RPROCHS0030160
Physical Address: 990 Hillview Dr
Owner Name: Gatto, Michael & Kary
Quantities
Driveway and/or Apron Estimate (SY)
22.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
38.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$336.30
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$950.00
Concrete Installation (SQY)
$3,009.60
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$194.70
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$550.00
Concrete Installation (SQY)
$1,742.40
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$_
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$6,783.00
Engineering
$813.96
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,288.77
Property Owner Estimated Cost
$6,308.19
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 27 Parcel Number: RPROCHS0030190
Physical Address: 960 Hillview Dr
Owner Name: Perry, Alan & Angela
Quantities
Driveway and/or Apron Estimate (SY)
12.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
18.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
40
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$159.30
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$450.00
Concrete Installation (SQY)
$1,425.60
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Drivewav
Removal of Concrete/ Asphalt Sidewalk (SQY)
$106.20
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$300.00
Concrete Installation (SQY)
$950.40
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$416.00
12" Excavation, Backfill, and Compaction (LF)
$200.00
Concrete Installation (Foot)
$2,340.00
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$6,347.50
Engineering
$761.70
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,497.27
Property Owner Estimated Cost
$5,611.93
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 6 Parcel Number: RPROMMH0000010
Physical Address: 450 E Main St.
Owner Name: Madison Memorial Hospital
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
30
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$312.00
12" Excavation, Backfill, and Compaction (LF)
$150.00
Concrete Installation (Foot)
$1,755.00
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$2,217.00
Engineering
$266.04
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$665.10
Property Owner Estimated Cost
$1,817.94
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 7 Parcel Number: RPRGARN0020010
Physical Address: 40 N 4th E
Owner Name: CHRISTOPHERSEN, MICHAEL
Quantities
Driveway and/or Apron Estimate (SY)
16.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
60
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$141.60
6 " Excavation, Backfill, and Compaction (SQY)
$340.80
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
$1,267.20
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$624.00
12" Excavation, Backfill, and Compaction (LF)
$300.00
Concrete Installation (Foot)
$3,510.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$6,183.60
Engineering
$742.03
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,330.20
Property Owner Estimated Cost
$5,595.44
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 8 Parcel Number: RPRGARN0020080
Physical Address: 64 N 4th E
Owner Name: FREEMAN, TRUDY
Quantities
Driveway and/or Apron Estimate (SY)
20.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
48.00
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
20
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Drivewav
Removal of Concrete/ Asphalt Sidewalk (SQY)
$177.00
6 " Excavation, Backfill, and Compaction (SQY)
$1,448.40
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
$5,385.60
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$208.00
12" Excavation, Backfill, and Compaction (LF)
$100.00
Concrete Installation (Foot)
$1,170.00
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$8,489.00
Engineering
$1,018.68
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$443.40
Property Owner Estimated Cost
$9,064.28
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 9 Parcel Number: RPRGARN0020070
Physical Address: 76 N 4th E
Owner Name: PHILLIPS, RICHARD
Quantities
Driveway and/or Apron Estimate (SY)
20.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$177.00
6 " Excavation, Backfill, and Compaction (SQY)
$426.00
12" Excavation, Backfill, and Compaction (SQY)
Concrete Installation (SQY)
$1,584.00
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$-
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$2,187.00
Engineering
$262.44
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$-
Property Owner Estimated Cost
$2,449.44
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 10 Parcel Number:
Physical Address:
Owner Name: City of Rexburg
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
13.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
23
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$115.05
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$325.00
Concrete Installation (SQY)
$1,029.60
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$239.20
12" Excavation, Backfill, and Compaction (LF)
$115.00
Concrete Installation (Foot)
$1,345.50
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
Landscaping/ Voluntary Amounts Added
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$253,169.35
Engineering
$30,380.32
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$283,549.67
Property Owner Estimated Cost
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 11 Parcel Number: RPRRXB10370011
Physical Address: 24 S 2nd E
Owner Name: Judith Living Trust, Walgreens
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQYD)
37
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$327.45
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$925.00
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$2,960.00
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$925.00
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$3,670.40
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$_
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$8,807.85
Engineering
$1,056.94
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,263.74
Property Owner Estimated Cost
$8,601.06
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 12 Parcel Number:
Physical Address:
Owner Name: City of Rexburg
Quantities
Driveway and/or Apron Estimate (SY)
40.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
19
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
33
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$168.15
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$475.00
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$1,520.00
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$354.00
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$1,475.00
Concrete Installation (SQY)
$3,168.00
Reinforced Concrete Installation (SQY)
$1,884.80
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$343.20
12" Excavation, Backfill, and Compaction (LF)
$165.00
Concrete Installation (Foot)
$1,930.50
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$411,483.65
Engineering
$49,378.04
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$460,861.69
Property Owner Estimated Cost
$_
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 13 Parcel Number: RPRRXB10372170
Physical Address: 38 S 2nd E
Owner Name: HEB-6 LLC
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
34.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
38
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$300.90
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$850.00
Concrete Installation (SQY)
$2,692.80
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$395.20
12" Excavation, Backfill, and Compaction (LF)
$190.00
Concrete Installation (Foot)
$2,223.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$8,251.90
Engineering
$990.23
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,995.57
Property Owner Estimated Cost
$7,246.56
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 14 Parcel Number: RPROAAT037028A
Physical Address: 44 S 2nd E
Owner Name: AUTUMN ARBOR TOWNHOUSES
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
13
Replace Sidewalk (SY)
8.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
30
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$185.85
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$525.00
Concrete Installation (SQY)
$633.60
Reinforced Concrete Installation (SQY)
$1,040.00
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$325.00
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$1,289.60
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$312.00
12" Excavation, Backfill, and Compaction (LF)
$150.00
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$2,163.00
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$6,624.05
Engineering
$794.89
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,502.84
Property Owner Estimated Cost
$5,916.11
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 15 Parcel Number: RPRRXB10374330
Physical Address: 66 S 2nd E
Owner Name: DANIELS, KENT
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
22.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
44
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$194.70
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$550.00
Concrete Installation (SQY)
$1,742.40
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$457.60
12" Excavation, Backfill, and Compaction (LF)
$220.00
Concrete Installation (Foot)
$2 574.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$7,338.70
Engineering
$880.64
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,721.61
Property Owner Estimated Cost
$6,497.74
Local Improvement District 53 Creation Ordinance 1309 - Attachment— Property Worksheet
Item Number: 16 Parcel Number: RPRRXB10375290
Physical Address: 195 E 1ST S
Owner Name: City of Rexburg
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
g
Replace Sidewalk (SY)
48.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
77
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$495.60
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$1,400.00
Concrete Installation (SQY)
$3,801.60
Reinforced Concrete Installation (SQY)
$640.00
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$200.00
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$793.60
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$800.80
12" Excavation, Backfill, and Compaction (LF)
$385.00
Concrete Installation (Foot)
$4,504.50
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$14,621.10
Engineering
$1,754.53
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$16,375.63
Property Owner Estimated Cost
$_
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 17 Parcel Number: RPROOOR00IS720
Physical Address: 215 E 1ST S
Owner Name: MARSHALL, AARON
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
21
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
20
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$185.85
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$525.00
Concrete Installation (SQY)
$1,663.20
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$208.00
12" Excavation, Backfill, and Compaction (LF)
$100.00
Concrete Installation (Foot)
$1,170.00
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$5,452.05
Engineering
$654.25
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,155.62
Property Owner Estimated Cost
$4,950.69
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 18 Parcel Number: RPROOOR0015000
Physical Address: 71 S 2nd E
Owner Name: WALDON, WAYNE
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
14.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$123.90
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$350.00
Concrete Installation (SQY)
$1,108.80
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$_
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$3,182.70
Engineering
$381.92
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$474.81
Property Owner Estimated Cost
$3,089.82
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 19 Parcel Number: RPROOOR0014770
Physical Address: 65 S 2nd E
Owner Name: TARGHEE PROFESSIONAL OFFICES LLC
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
8.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
12
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$70.80
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$200.00
Concrete Installation (SQY)
$633.60
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$124.80
12" Excavation, Backfill, and Compaction (LF)
$60.00
Concrete Installation (Foot)
$702.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$3,391.20
Engineering
$406.94
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$537.36
Property Owner Estimated Cost
$3,260.79
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 20 Parcel Number: RPROOOR0013800
Physical Address: 55 S 2nd E
Owner Name: HINTON, PATRICIA
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
37.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
60
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$327.45
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$925.00
Concrete Installation (SQY)
$2,930.40
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
$-
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$624.00
12" Excavation, Backfill, and Compaction (LF)
$300.00
Concrete Installation (Foot)
$3,510.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$1,600.00
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$10,216.85
Engineering
$1,226.02
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$2,585.06
Property Owner Estimated Cost
$8,857.82
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 21 Parcel Number: RPROOOR0011631
Physical Address: 45 S 2nd E
Owner Name: TARGHEE PROFESSIONAL OFFICES LLC
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
10.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
50
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$88.50
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$250.00
Concrete Installation (SQY)
$792.00
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
$-
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$520.00
12" Excavation, Backfill, and Compaction (LF)
$250.00
Concrete Installation (Foot)
$2,925.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$4,825.50
Engineering
$579.06
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,447.65
Property Owner Estimated Cost
$3,956.91
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 22 Parcel Number: RPROOOR0011160
Physical Address: 21 S 2nd E
Owner Name: TARGHEE PROFESSIONAL OFFICES LLC
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
4.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
44
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$35.40
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$100.00
Concrete Installation (SQY)
$316.80
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
$-
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$457.60
12" Excavation, Backfill, and Compaction (LF)
$220.00
Concrete Installation (Foot)
$2,574.00
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$3,703.80
Engineering
$444.46
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$1,111.14
Property Owner Estimated Cost
$3,037.12
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 23 Parcel Number: RPROOOR0010220
Physical Address: 206 E MAIN ST
Owner Name: SARE, KENNETH
Quantities
Driveway and/or Apron Estimate (SY)
18.00
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
29.00
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
63
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$256.65
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$725.00
Concrete Installation (SQY)
$2,296.80
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$159.30
6 " Excavation, Backfill, and Compaction (SQY)
$383.40
12" Excavation, Backfill, and Compaction (SQY)
$450.00
Concrete Installation (SQY)
$1,425.60
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$655.20
12" Excavation, Backfill, and Compaction (LF)
$315.00
Concrete Installation (Foot)
$3,685.50
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$10,352.45
Engineering
$1,242.29
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$2,380.25
Property Owner Estimated Cost
$9,214.50
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 24 Parcel Number:
Physical Address:
Owner Name: City of Rexburg North Hill Road
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$-
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$-
6 " Excavation, Backfill, and Compaction (SQY)
$-
12" Excavation, Backfill, and Compaction (SQY)
$-
Concrete Installation (SQY)
$-
Reinforced Concrete Installation (SQY)
$-
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$-
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$-
Concrete Installation (Foot)
$-
Reinforced Concrete Installation (Foot)
$-
Totals
Sanitary Sewer Service Reconnection
$-
Landscaping/ Voluntary Amounts Added
$-
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$650,000.00
Engineering
$78,000.00
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$728,000.00
Property Owner Estimated Cost
$-
Local Improvement District 53 Creation Ordinance 1309 - Attachment — Property Worksheet
Item Number: 25 Parcel Number:
Physical Address:
Owner Name: City of Rexburg Barney Dairy Road
Quantities
Driveway and/or Apron Estimate (SY)
Reinforced Driveway and/or Apron Estimate (SY)
New Reinforced Sidewalk (SQ YD)
New Sidewalk (SY)
Replace Reinforced Sidewalk (SQ YD)
Replace Sidewalk (SY)
New Reinforced C&G (Ft)
New C&G (Ft)
Replace Reinforced C&G (FT)
Replace C&G (Ft)
Existing Sidewalk
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6" Excavation, Backfill, and Compaction (SQY)
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
New Sidewalk and Driveway
Removal of Concrete/ Asphalt Sidewalk (SQY)
$_
6 " Excavation, Backfill, and Compaction (SQY)
$_
12" Excavation, Backfill, and Compaction (SQY)
$_
Concrete Installation (SQY)
$_
Reinforced Concrete Installation (SQY)
$_
Existing Curb & Gutter
Removal of Concrete Curb & Gutter (Foot)
$_
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
New Curb & Gutter
12" Excavation, Backfill, and Compaction (LF)
$_
Concrete Installation (Foot)
$_
Reinforced Concrete Installation (Foot)
$_
Totals
Sanitary Sewer Service Reconnection
$_
Landscaping/ Voluntary Amounts Added
$_
Clawback Fees (Street Construction including
Stormwater)
Asphalt Patching
Cost
$500,000.00
Engineering
$60,000.00
City Participation (50% of Replaced SW C&G,
excludes new and driveway)
$560,000.00
Property Owner Estimated Cost
$_