HomeMy WebLinkAboutSITE PLAN - 286 Moody Rd - New Commercial Bldg SUITE - A
2,368 SQ FT
SUITE - B
1,312 SQ FT
SUITE - C
1,591 SQ FT
SUITE - D
1,301 SQ FT
SUITE - E
1,794 SQ FT
SUITE - F
1,663 SQ FT
SUITE - G
1,796 SQ FT
1+
0
0
2+
0
0
3+
0
0
3+
6
0
1+00 2+00 3+00 4+00 4+37
SOUTH DRIVE
STA:1+19.07
L1
L2
Install 82' of 12" ADS N 12 Storm Pipe @ 0.22%Install 117' of 12" ADS N 12 Storm Pipe @ 0.22%
Install 53' of 12" ADS N 12 Storm Pipe @ 0.39%
Install 124' of 12" ADS N 12 Storm Pipe @ 0.71%
Install 111' of 36" Perforated Storm Pipe @ 0.00%
CB-10.0
CB-2.0
CB-9.0
CB-8.0
CB-3.0
GRATE:4877.08
E INV IN:4873.44
W INV OUT:4873.34
SSMH-1
CB-1.0
GRATE:4877.14
E INV IN:4874.03
S INV OUT:4873.93
CB-11.0
SDMH-1
GRATE:4876.47
S INV IN:4872.10
E INV OUT:4870.47
SDMH-3
GRATE:4876.73
W INV IN:4870.47
CB-4.0
-3
.
4
2
%
-3
.
2
0
%
-2
.
5
1
%
-2
.
6
6
%
-3
.
4
7
%
-3.1
3
%
-2.
2
5
%
-3.33%
-2.05%
-2.54%
-2
.
6
6
%
-2
.
6
3
%
-2
.
5
2
%
-2
.
9
8
%
-3.3
4
%
-2.26%
-2.64%
-2
.
5
0
%
-2.24%
-3.34%
-3.35%
-2
.
0
2
%
-3.
4
9
%
-2
.
0
7
%
-
2
.
0
3
%
-1
.
9
4
%
-1
.
7
8
%
-0
.
4
8
%
-0.64%
-0.40%
-1
.
7
6
%
-1
.
7
6
%
-2.14%
-2.04%
-2.09%
-2.88%
-0.40%
-0.40%
-0.41%
-0.40%
-2
.
0
0
%
-0.46%
-0.40%
-1.90%
-1.96%
-1
.
7
6
%
-1
.
7
6
%
-2
.
4
7
%
Install 91' of 12" ADS N 12 Perforated Storm Pipe @ 0.00%
-0.40%
-0.51%
SDMH-2
GRATE:4876.69
W INV IN:4870.47
E INV OUT:4870.47
-2
.
1
7
%
4877
4877
4
8
7
8
4
8
7
8
4878
4877.31
TBC-PC
4877.53
TBC-PC
4877.81
TBC-PC
4877.58
TBC-PC
4877.73
TBC-PC
4877.66
TBC-PC
4877.68
TBC-PC
4877.74
TBC-PC
4877.53
TBC-PC
4877.59
TBC-PC
4877.39
TBC END
4877.39
TBC-PI
4877.60
TBC-PI
4877.88
TBC-PI
4877.80
TBC-PI
4877.44
TBC-PI
4877.57
TBC-PI
4877.48
TBC END
4877.85
TBC
4877.48
TOA
4877.95
TBC-PI4877.81
TBC-MATCH
4877.69
TSW-MATCH
4877.41
TBC END
4876.47
GB
4876.73
GB
4876.88
GB
4876.69
GB
4877.64
TBC
4877.77
TBC
4877.58
TBC-PC
4877.62
TBC-PC
4878.12
TSW
4878.05
TSW
4878.05
TSW
4878.12
TSW
4878.12
TSW
4878.07
TSW
4878.12
TSW4878.07
TSW4877.57
TOA
4877.62
TOA
4877.57
TOA
4877.55
TOA
4877.62
TOA
4877.55
TOA
4877.62
TOA
4877.62
TOA
BUILDING #1
FF: 4878.13
4877.44
TOA
4877.40
TSW4877.77
TSW
4877.48
TSW
4877.73
TBC-MATCH
4878.37
TBC-MATCH
4878.23
TBC-PI
4878.43
TSW4878.43
TSW-MATCH
4877.93
TOA
4877.20
TOA 4877.20
TOA
4877.58
TBC-LP
4877.34
TBC-HP
4877.64
TBC-LP
4877.54
TBC-LP
4877.70
TOA
4879.01
TBC-MATCH 4879.09
TBC-MATCH
4878.74
TBC-PC
4878.74
TBC-PC
4878.91
TOA
4878.61
TOA
4877.50
TOA4877.09
TOA
4877.31
TOA
4878.55
TSW
4877.24
TSW-MATCH
4877.93
TOA
4877.84
TOA
4877.30
TOA
4877.56
TOA
4877.44
TOA
4877.34
TBC-PC
4877.30
TBC-PC
4877.43
TOA-MATCH
4877.81
TBC
4879.20
TBC
4879.16
TBC
4878.27
TSW
4877.59
TBC-MATCH
4877.39
TOA
4877.33
TOA-MATCH
4878.37
TOA-MATCH
4877.49
TBC-LP
4876.88
GB 4876.92
GB
4877.20
TOA 4877.20
TOA
100-1
200-1
404-1
504-4
601-12
602-1
602-2
706-1
706-2
706-V1
706-A1
706-S1
SEE SHEET 3 FOR MORE
INFORMATION
SEE SHEET 3 FOR MORE
INFORMATION
404-2
RETAIN AND PROTECT
SAW CUT AND ASPHALT
REMOVAL
1'' WATER SERVICE
2'' WATER SERVICE
4'' SEWER SERVICE
12'' STORM MAIN
STORM MAIN MANHOLE
STORM MAIN CATCH
BASIN
6'' VERTICAL CURB and
GUTTER
6'' LIP DOWN CURB
AND GUTTER
COMMERCIAL APPROACH
5' CONCRETE SIDEWALK
CONCRETE VALLEY
GUTTER
706-S2 INTEGRAL SIDEWALK
706-F1 FLUSH CURB
602-3 INFILTRATION MANHOLE
706-3 CURB AND GUTTER PER
REXBURG STANDARDS
502-1 SEWER MANHOLE
CONTROL POINT TABLE
Point #
1
2
3
Elevation
4877.24
4877.45
4876.72
Northing
797669.76
797661.06
797478.84
Easting
759255.91
759255.92
759256.80
Description
rbpcs
rbpcs
rbpcs
ALIGNMENT TABLE
SOUTH DRIVE
Number
L1
Begin Station
1+00.00
End Station
4+37.00
Radius Length
337.00
Line/Chord Direction
N89° 43' 48.21"E
Begin Point
N: 797459.74, E: 759237.81
End Point
N: 797461.33, E: 759574.81
N-S DRIVE
Number
L2
Begin Station
1+00.00
End Station
3+59.73
Radius Length
259.73
Line/Chord Direction
S0° 16' 11.79"E
Begin Point
N: 797699.96, E: 759552.76
End Point
N: 797440.23, E: 759553.98
CHECK BY
SHEETS
DRAWN BY
JOB NO:
OF
SHEET
BWBTJT
SHEET NAME:
PROJECT:
LOCATION:
23-052
DATEREVISIONS
SITE PLAN
286 MOODY RETAIL
REXBURG, ID C-09
ENGINEERS STAMP SHEET INFORMATION
SHEET SIZE:
VERTICAL EXAGGERATION:
PROJECT CONTACT:
TJ TOGIAI & BARRY BAME
CONNECT ENGINEERING
208-881-0081
DATE:February 29, 2024
24" X 36" (ARCH D)PRELIMINARY NOT
FOR CONSTRUCTION
C-05
N/A
MOODY RD
602-1
WITH GRATE LID
SITE INFORMATION:
TOTAL AREA: 50,615 SQ FT (1.16 ACRES)
BUILDINGS: 1
PARKING: 75 PARKING STALLS (3 ADA)
TOTAL LANDSCAPE: 4,878 SQ FT (9.63%)
BUILDING NOTES:
CONTRACTOR OR ARCHITECT RESPONSIBLE TO ENSURE
STEM WALL EXTENDS 8'' MIN ABOVE FINISH FLOOR
POWER NOTE:
SEE ROCKY MOUNTAIN POWER
CONTRACTOR'S MAP FOR
PROPOSED POWER FACILITIES.
FIRE CODE NOTE:
1.D103.6.1 ROADS ARE 20 TO 26
FEET IN WIDTH. FIRE LANE
SIGNS ARE SPECIFIED IN
SECTION D103.6 APPARATUS
ACCESS ROADS THAT ARE 20
TO 26 FEET WIDE.
2.CURBS SHALL BE PAINTED
RED FOUR FEET ON EACH
SIDE OF THE EVERY FIRE
HYDRANT.
LANDSCAPE NOTE:
FINAL LANDSCAPE SHOULD SLOPE AWAY
FROM BUILDINGS
SNOW STORAGE NOTE:
ASPHALT AREA = 28,210 SQ FT
PROVIDED SNOW STORAGE = 3,451 SQ FT (12.2%)
BUILDING FOOTPRINT
CONTROL POINT 1
CONTROL POINT 3
SHEET NOTES:
1.CONTRACTOR TO VERIFY ALL
EXISTING UTILITY LOCATIONS
AND ELEVATIONS. CONTRACTOR
TO COORDINATE WITH EACH
UTILITY COMPANY PRIOR TO
CONNECTING ANY PROPOSED
UTILITIES.
2.ENSURE 10' MINIMUM
HORIZONTAL CLEARANCE
BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET
PER IDEQ. IF MANHOLES ARE IN
AN ASPHALT PAVED AREA THE
COLLARS ARE TO BE ASPHALT
COLLARS
3.ENSURE 18" MINIMUM VERTICAL
CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE
LINES ARE MET PER IDEQ
4.ASSUMED TOP OF FOUNDATION
WALL IS FINISHED FLOOR,
CONTRACTOR TO NOTIFY
ENGINEER IF DIFFERENT.
5.ALL TBC ELEVATIONS ARE AT
FULL HEIGHT OF CURB.
706-V1
CONTROL POINT 2
706-V1
602-1
WITH GRATE LID
602-2
602-2
602-2
602-2
602-2
706-S2
706-S2
504-4
404-2
602-2
602-2
602-2
3'' VENT LINE
1.25'' IRRIGATION LINE
402-6
401-8.8.6
401-8 401-8
501-8
100-1
100-1
706-S1
706-F1
706-F1
1000 GALLON GREASE INTERCEPTOR
182.00'
63
.
0
0
'
SNOW STORAGE
24.00'
13
.
0
0
'
24.00'
STORM WATER REQUIREMENTS
NOTE: SITE PLAN WILL BE RESPONSIBLE TO STORE
HALF OF THE SOUTH DRIVE AND N-S DRIVE.
REQUIRED VOLUME (CU FT) = (AREA x 1.33) / 12
AREA 1 CALCULATIONS
REQUIRED VOLUME =
(59,823 SQ FT x 1.33) / 12 = 6,630 CU FT
PERF PIPE AND ROCK SECTION PROVIDED VOLUME =
VOLUME OF PIPE (L*PI*r^2) = 202 x Pi X 1.5^2 = 1,428 CU FT
VOLUME OF ROCK SECTION (L*W*H) = 202 x 14.5 x 5 = 14,645 CU FT
STORAGE PROVIDED BY ROCK = (VOLUME OF ROCK - VOLUME OF PIPE) * 0.4 = (14,645 - 1,428) x 0.4 = 5,287 CU FT
TOTAL STORAGE PROVIDED = (5,287 + 1,428) = 6,715 CU FT
706-1 706-1
706-1
706-1
502-1
VI
C
I
N
I
T
Y
M
A
P
PROPOSED 36" PERF PIPE
GEOTEXTILE FABRIC
2"-6" ROCK
14.50'
5.
0
0
'
FINISH GRADE
2.
0
0
'
1.
0
0
'
RO
C
K
A
B
O
V
E
P
I
P
E
1.
0
0
'
RO
C
K
B
E
L
O
W
P
I
P
E
PERF PIPE - SECTION VIEW
NTS
14
.
5
0
'
RO
C
K
S
E
C
T
I
O
N
402-8 402-8
401-8.8.8
501-8
501-8
BERM TO BE INSTALLED TO
STOP IRRIGATION WATER
706-R1
706-R1
PROPOSED BOLLARD
706-R1
706-R1
706-R1
706-R1
401-8
706-R1
CONNECT TO EXISTING WATER LINE.
CONTRACTOR TO VERIFY DEPTH AND
LOCATION PRIOR TO CONSTRUCTION.
CONNECT TO EXISTING SANITARY SEWER LINE.
CONTRACTOR TO VERIFY DEPTH AND
LOCATION PRIOR TO CONSTRUCTION.
100-1
706-R1
11.00'
VAN ACCESSIBLE STALL
5.00'9.00'
9.00'
TYP. ALL20
.
0
0
'
TY
P
.
A
L
L
5.00'
9.
0
0
'
30.00'
602-1
WITH GRATE LID
706-T1