HomeMy WebLinkAboutDAILY FIELD REPORTS - 22-00610 - U-Haul - New Commercial Bldg AInspection Date:
01/03/2023
File Name:
22247DFR01032023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
b8bc23e67404a7c5-1672772984035 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
U-Haul Moving and Storage
Project Number:
22-247
Start Time:
12:00 PM
Client:
Bateman-Hall
Contractor:
Jerome Bowen
End Time:
02:00 PM
Inspection Type(s):
Earthwork Inspection
Location(s):
Spot footings approximately grids 1-10 & A-C
Footings on line E.
Observations/ Remarks:
Arrived on site at 12:00 noon. Ambient was 26 degrees with overcast conditions, light snow. When I
arrived contractor was backfilling spot footings in northwest corner of building and digging footings on
line E.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
01/03/2023
File Name:
22247DFR01032023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
b8bc23e67404a7c5-1672772984035 2
Inspector's Signature:Inspector's Name:
Ben E Ball
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
01/12/2023
Inspection Date:
03/13/2023
File Name:
22247DFR03142023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1678890903268 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
U-Haul Moving and Storage
Project Number:
22-247
Start Time:
09:00 AM
Client:
Bateman-Hall
Contractor:
Steel Vision
End Time:
12:00 PM
Inspection Type(s):
Structural Steel and Bolting
Location(s):
Building B column and beam connections
Observations/ Remarks:
I arrived on site and checked in with Steel Vision rep Jeremy. I began my observations of the
structural bolting of the building. I observed that the contractor had used an impact gun to tighten the
bolted connections of the columns to beams and that they were in at least the snug tightened state.
The contractor informed me that at gridline D:5 where there is a beam to beam connection that the
bolt holes in the web did not match up and he was waiting for a fix from the structural engineer. No
other non-conforming items were observed. I notified the contractor of my observations prior to
leaving.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
03/13/2023
File Name:
22247DFR03142023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1678890903268 2
Inspection Date:
03/13/2023
File Name:
22247DFR03142023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1678890903268 3
Inspection Date:
03/13/2023
File Name:
22247DFR03142023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1678890903268 4
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
03/24/2023
File Name:
22247DFR04062023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
b8bc23e67404a7c5-1680792116819 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Jerome Bowen
Client:
Bateman-Hall
Inspection Date:
04/06/2023
Start Time:
08:30 AM
End Time:
10:45 AM
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
28
Wind:
5-15 mph
Inspection Type(s):
Earthwork Inspection
Location(s):
Building A
Observations/ Remarks:
Arrived on site at 8:30 AM. Spoke to Mike with Bateman Hall. He told me he had tried to pot hole
inside the building three days ago and hit frost at approximately 16"-20" below the surface. He is
hoping that after temperatures this weekend that the frost will be gone. He plans on starting with
some footings next week.
Jerome Bowen was not on site.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR04062023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
b8bc23e67404a7c5-1680792116819 2
File Name:
22247DFR04062023BB
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
b8bc23e67404a7c5-1680792116819 3
Inspector's Signature:Inspector's Name:
Ben E Ball
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
04/07/2023
File Name:
22247DFR05032023CH
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
511D9644-463B-4DD8-A7B0-5B7353212336 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bryan Landon Construction
Client:
Bateman-Hall
Inspection Date:
05/03/2023
Start Time:
04:30 AM
End Time:
10:00 AM
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
50
Wind:
Calm
Inspection Type(s):
Concrete Placement
Concrete Reinforcement
Location(s):
West side of interior slab of Building A.
Observations/ Remarks:
I arrived on site and began observations on the area to be poured. I observed that the pump truck was
here and ready to pour. Once the concrete arrived another technician and I received a sample and
performed a concrete test on the sample. We proceeded to perform concrete tests for every 50 yards
poured. The slump was a little high at first and we let the contractor know, but as the pour continued
the slump got better. I observed that the concrete, rebar, and forms were in general conformance to
project guidelines.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR05032023CH
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
511D9644-463B-4DD8-A7B0-5B7353212336 2
Inspector's Signature:Inspector's Name:
C Hammar
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
05/09/2023
File Name:
22247DFR06172023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1687274211707 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Boise Crane
Client:
Bateman-Hall
Inspection Date:
06/17/2023
Start Time:
10:30 AM
End Time:
01:30 PM
Current Weather Conditions:
Partly Cloudy
Ambient Temperature (°F):
64
Wind:
Calm
Inspection Type(s):
Welding
Location(s):
Building A
Observations/ Remarks:
I arrived on site and began my observations of the base plate fillet welds along the west half of the
building. Along with the base plate welds, the contractor had placed and welded the scissor plates
between each panel. I observed that the plates were welded with a fillet weld on each panel. The welds
appeared to be the right size and shape and length. No visible porosity or inclusions were noted. I
notified the contractor of my observations prior to leaving.
I observed that at gridline 17:A.2, that the anchor bolts were bent over. I also observed some plywood
from the diamond block out that were still in place. These boards need to be removed prior to the
placement and pourback of the diamond.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06172023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1687274211707 2
File Name:
22247DFR06172023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1687274211707 3
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/23/2023
File Name:
22247DFR06152023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1686886041482 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bateman-Hall
Client:
Bateman-Hall
Inspection Date:
06/15/2023
Start Time:
05:00 PM
End Time:
07:00 PM
Current Weather Conditions:
Overcast
Ambient Temperature (°F):
65
Wind:
5-15 mph
Inspection Type(s):
Welding
Location(s):
Building A base plate welds
Observations/ Remarks:
I arrived on site and began my observations of the tilt up panel base plate welded connections. I
observed that the contractor had completed the welds on the eastern half of the building. The welds
appeared to be of adequate size and shape and were free from visible inclusions and surface porosity.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06152023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1686886041482 2
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
06/23/2023
File Name:
22247DFR06262023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
213867A2-7D69-49D5-A5B1-CDAB6B42515A 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bateman-Hall
Client:
Bateman-Hall
Inspection Date:
06/26/2023
Start Time:
01:30 PM
Time on Project:
3
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
78
Wind:
Calm
Inspection Type(s):
Structural Steel and Bolting
Welding
Location(s):
Building A
Observations/ Remarks:
I arrived at the job site and spoke with Mike (Bateman-Hall) and we looked through Building A. I
looked at the welds as well as the bolting and found the quality to be within general conformance of
the jobs standards.
Mike did inform me that there was a section that wasn’t completed yet because it couldn’t be finished
with the stairway. After we had completed our walkthrough we discussed future tasks and when we
would be needed back.
I then returned to my vehicle and began filling out my report.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06262023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
213867A2-7D69-49D5-A5B1-CDAB6B42515A 2
File Name:
22247DFR06262023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
213867A2-7D69-49D5-A5B1-CDAB6B42515A 3
Inspector's Signature:Inspector's Name:
Mark Mansfield
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/06/2023
File Name:
22247DFR06302023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
4B56A1CA-13E8-4041-ACC3-2287F97BF04F 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bateman-Hall
Client:
Bateman-Hall
Inspection Date:
06/30/2023
Start Time:
01:15 PM
Time on Project:
2 hours
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
78
Wind:
Calm
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Stairway, Building A. From 4’-8’.
Observations/ Remarks:
I arrived at the job site and the truck was already there. I checked with the driver and he had already
unloaded about half.
I looked over the rebar where I could and observed the remainder of the pour. I observed as the crew
used vibration to help with consolidation. They also moved the rebar up and down and wiggled it to
help consolidate further.
Once the pour finished I returned to my vehicle to begin filling out my report.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06302023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
4B56A1CA-13E8-4041-ACC3-2287F97BF04F 2
Inspector's Signature:Inspector's Name:
Mark Mansfield
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/06/2023
File Name:
22247DFR06282023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
4C6DED56-F935-46A3-AF2E-F534E305AFFE 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bateman-Hall
Client:
Bateman-Hall
Inspection Date:
06/28/2023
Start Time:
02:30 PM
Time on Project:
2 hours
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
72
Wind:
Calm
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Stairwell, Building A.
Observations/ Remarks:
I arrived at the job site and looked over the rebar and found the placement to be within general
conformance of the jobs standards. I reported to the crew and we then waited for the grout to arrive.
The truck arrived just after 3:00 PM and began prepping for the pour. I observed as the pour took
place. I watch the crew use vibration to help consolidate, and I also watch the crew wiggle the rebar to
help as well.
Once the pour concluded I returned to my vehicle and began filling out my report.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06282023MM
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
4C6DED56-F935-46A3-AF2E-F534E305AFFE 2
Inspector's Signature:Inspector's Name:
Mark Mansfield
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/06/2023
File Name:
22247DFR06292023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1688073502948 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
JW Masonry
Client:
Bateman-Hall
Inspection Date:
06/29/2023
Start Time:
01:30 PM
Time on Project:
3
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
80
Wind:
5-15 mph
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Building A stairwell.
Observations/ Remarks:
I arrived on-site and waited for the grout truck to arrive. The truck was an hour late, but once it
arrived, the contractor began to place the grout. I observed that the contractor had placed little
vertical and horizontal reinforcement.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR06292023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1688073502948 2
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/12/2023
File Name:
22247DFR06292023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1688073502948 3
File Name:
22247DFR07182023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1689873269203 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
Daily Field Report
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Contractor:
Bateman-Hall
Client:
Bateman-Hall
Inspection Date:
07/18/2023
Start Time:
02:00 PM
Time on Project:
3
Current Weather Conditions:
Sunny/Clear
Ambient Temperature (°F):
85
Wind:
5-15 mph
Inspection Type(s):
Structural Steel and Bolting
Welding
Location(s):
Building A steel framing.
Observations/ Remarks:
I arrived on site and began my observations of the structural framing for Building A. I observed that
the contractor had tightened the bolts to a snug tightened position. The beams that were welded to the
embed plates on the west wall were of the correct size and shape and appeared to be free from surface
inclusions and defects.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
File Name:
22247DFR07182023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1689873269203 2
File Name:
22247DFR07182023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1689873269203 3
File Name:
22247DFR07182023JPC
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1689873269203 4
Inspector's Signature:Inspector's Name:
Jacob Christensen
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2023
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
EBAA3B6F-D5E2-4E22-8237-CB41C8848B19 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File Name:
22247DFR08282023EV
Daily Field Report
Date:
08/28/2023
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Client:
Bateman-Hall
Start Time:
01:45 PM
Contractor:
JW Masonry
Current Weather Conditions:
Sunny/Clear
Wind:
Calm
Ambient Temperature (°F):
83
Results
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Building A elevator shaft. Masonry wall. 4th lift.
Observations/ Remarks:
I arrived on site and checked in with JW Masonry and we discussed todays pour. They were having issues getting
their grout pump to fire up and eventually swapped it out for a new one.
Meanwhile I was able to go look over the CMU’s and rebar. I checked for correct size, spacing, and lap length.
They appeared to be within spec and I reported that back to JW Masonry.
Eventually the pour began and I observed as they went. They used mechanical vibration to help with
consolidation and they finished the top of the grout as they went.
Generally, the process was done in accordance with project documents.
Inspector Information
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
EBAA3B6F-D5E2-4E22-8237-CB41C8848B19 2
Truck:
Mileage From Lab to Project (One Way)
12
Total Mileage
24.00
Inspector's Name:
Eric Vail
Inspector's Signature:
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
(Explanation given in Observations and/or Remarks.)
Reviewer's Name:
E. Vail
Reviewer's Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
EBAA3B6F-D5E2-4E22-8237-CB41C8848B19 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
EBAA3B6F-D5E2-4E22-8237-CB41C8848B19 4
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1694103453659 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File Name:
22247DFR08303023JPC
Daily Field Report
Date:
08/30/2023
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Client:
Bateman-Hall
Start Time:
01:00 PM
Contractor:
JW Masonry
Current Weather Conditions:
Sunny/Clear
Wind:
5-15 mph
Ambient Temperature (°F):
80
Results
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Elevator and Stairwell 2nd Floor
Observations/ Remarks:
I arrived on site and waited for the grout to arrive. While waiting I checked the reinforcement in the masonry
walls. I observed that the reinforcement was in general conformance with the project documents. The grout
arrived an hour late. The contractor vibrated and consolidated the walls to the 8' level on the second floor. I
notified the contractor of my observations prior to leaving.
Inspector Information
Truck:
ODIN
Mileage From Lab to Project (One Way)
Total Mileage
0.00
Inspector's Name:
Jacob Christensen
Inspector's Signature:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1694103453659 2
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
(Explanation given in Observations and/or Remarks.)
Reviewer's Name:
E. Vail
Reviewer's Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
1fbaea54224c7895-1694103453659 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
899C4F32-3447-46DE-8459-E07130161EFE 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File Name:
22247DFR09292023MDH
Daily Field Report
Date:
09/29/2023
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Client:
Bateman-Hall
Start Time:
01:30 PM
Contractor:
ML Masonry
Time on Project:
2 hours
Current Weather Conditions:
Sunny/Clear
Wind:
Calm
Ambient Temperature (°F):
67
Results
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Elevator shaft building A
Observations/ Remarks:
I arrived on sight and located where the masonry reinforcement was going to take place. I then observed the
masonry reinforcement everything was in general conformance of project specifications. I waited for the grout
truck to arrive.
The grout truck arrived and I observed the placement of grout on the masonry reinforcement. They used a
mechanical vibrator to consolidate material. Then I stayed and observed the remainder of the pour.
Inspector Information
Truck:
THOR
Mileage From Lab to Project (One Way)
15
Total Mileage
30.00
Inspector's Name:
Matthew Hammar
Inspector's Signature:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
899C4F32-3447-46DE-8459-E07130161EFE 2
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
(Explanation given in Observations and/or Remarks.)
Reviewer's Name:
S.Thompson
Reviewer's Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
899C4F32-3447-46DE-8459-E07130161EFE 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
B14088E5-3961-4242-ABD1-8FF24448F08D 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File Name:
22247DFR09202023EV
Daily Field Report
Date:
09/20/2023
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Client:
Bateman-Hall
Start Time:
11:00 AM
Contractor:
Bateman-Hall
Time on Project:
2 hours
Current Weather Conditions:
Sunny/Clear
Wind:
Calm
Ambient Temperature (°F):
70
Results
Inspection Type(s):
Welding
Location(s):
2nd floor. 9 line, 1 line, and C line.
Observations/ Remarks:
I arrived on site and checked in with Mike Massey of Bateman-Hall and he showed me to the various welds that
needed looked at. There were several welds at column bases that he wanted us to inspect.
Upon arrival at said columns, we noticed that the iron workers had covered up a lot of the welds with sheet metal
already and the welds could not be seen. So Mike had them remove them so we could have a good visual of the
column bases.
After the metal was removed I was able to take a good look and saw that there was no visible inclusions or
porosity. I reported my findings back to Mike prior to leaving.
Inspector Information
Truck:
ROCKET
Mileage From Lab to Project (One Way)
Total Mileage
0.00
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
B14088E5-3961-4242-ABD1-8FF24448F08D 2
Inspector's Name:
Eric Vail
Inspector's Signature:
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
(Explanation given in Observations and/or Remarks.)
Reviewer's Name:
Jacob Christensen
Reviewer's Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
B14088E5-3961-4242-ABD1-8FF24448F08D 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
23BC3307-9AD0-4A02-82CE-B81D292C8725 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File Name:
22247DFR10202023CH
Daily Field Report
Date:
10/20/2023
Project Number:
22-247
Project Name:
U-Haul Moving and Storage
Client:
Bateman-Hall
Start Time:
01:00 PM
Contractor:
Bateman-Hall
Time on Project:
2 hours
Current Weather Conditions:
Sunny/Clear
Wind:
Calm
Ambient Temperature (°F):
69
Results
Inspection Type(s):
Welding
Location(s):
Northwest Corner
Observations/ Remarks:
I arrived on site and began observations for welds on the northwest corner of the 3rd floor. I observed that the
welds were clean and consistent and free of porosity. I took pictures and reported my results to the contractor.
Inspector Information
Truck:
DEADPOOL
Mileage From Lab to Project (One Way)
10
Total Mileage
20.00
Inspector's Name:
Caleb Hammar
Inspector's Signature:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
23BC3307-9AD0-4A02-82CE-B81D292C8725 2
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
(Explanation given in Observations and/or Remarks.)
Reviewer's Name:
E. Vail
Reviewer's Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
23BC3307-9AD0-4A02-82CE-B81D292C8725 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
23BC3307-9AD0-4A02-82CE-B81D292C8725 4