HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 22-00736 - Madison High School - Broadcast Booth February 14, 2024
Truman Peterson
Headwaters Construction
900 Jet Stream Way
Rexburg, ID 83440
RE: Madison High School Broadcast Booth
Special Inspections
Mr. Peterson:
Per the request from Headwaters Construction, I have conducted a thorough review of
the attached photographs concerning the Structural Masonry Reinforcement. Connect
Testing & Inspection was not onsite during the structural masonry grout placement.
Upon examination of the attached photographs and our report from December 16,
2022, it was observed that there are instances of vertical reinforcement protruding
from the foundation walls, spaced approximately +/- 32” on center. Additionally,
horizontal reinforcement is visible within the masonry wall at the approximate
elevation of the bond beams. Furthermore, there are images depicting drilled holes
on the interior floor, seemingly prepared for vertical reinforcement for interior walls .
It is reasonable to conclude that the contractor placed the reinforcement in general
conformance with the project documents.
Sincerely,
Jacob Christensen
Lab Manager
jacob@connecttandi.com
208.970.6237