Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION - 22-00736 - Madison High School - Broadcast Booth May 16, 2023 Truman Peterson Headwaters Construction 900 Jet Stream Way Rexburg, ID 83440 RE: Madison High School Broadcast Booth Special Inspections Mr. Peterson: As requested by Headwaters Construction, I have reviewed the attached photographs (provided by Headwaters Construction) regarding the Structural Masonry Reinforcement. Connect Testing & Inspection was not present during the structural concrete placement nor the grouting of the masonry units, nor the installation of the epoxy dowel embeds in the interior slab and footings. In the attached photographs as well as our report from December 16, 2022 I observed vertical reinforcement coming out of the foundation walls in what appears to be spacing of +/- 32” on center. In other pictures there appears to be horizontal reinforcement in the masonry wall at the approximate elevation of the bond beams. There are also pictures showing drilled holes on the interior floor that have the appearance of being prepared for vertical reinforcement for interior walls. It is my opinion that the contractor most likely placed the required reinforcement in general conformance with the project documents, but we cannot confirm without further investigation using X-Ray type scans of each of the walls. Sincerely, Jacob Christensen Lab Manager jacob@connecttandi.com 208.970.6237 *This report is in no way a certication of the quality or completeness of the work performed. There are no warranties implied or unimplied in regards to the opinions expressed in this letter.