HomeMy WebLinkAboutINFRASTRUCTURE - 23-00368 - Summerfield Phases 11-13 - PlatVICINITY MAP
SUMMERFIELD SUBDIVISION DIVISION NO.11112113
1
EAST OF THE BO�SE MERIDIAN CITY REXBURG,
MADISON COUNTY, IDAHO
INDEX SHEET
SHEET INDEX
SHEET NO.
SHEET DESCRIPTION
1
INDEX SHEET
2
UTILITY MASTER P LAN
3
2400 WEST/370 SOUTH ROAD CONSTRUCTION
4
2355 WEST/460 SOUTH ROAD CONSTRUCTION
5
2325 2275 2100 WEST ROAD CONSTRUCTION
6
GRADING/ DRAINAGE PLAN
OWNER/DEVELOPER
KARTCHNER LAND MANAGEMENT INC.
ATTN: CODY PUZEY
208-529-2116
CIVIL ENGINEER
ALLIANCE CONSULTING
ENGINEERS, INC.
150 EAST 200 NORTH SUITE P
LOGAN, UTAH 84321
435-755-5121
THE FOLLOWING PLANS DETAIL THE CONSTRUCTION FOR ALL OF DIVISION 11-13
OF SUMMERFIELD. WHILE THE PLANS OUTLINE THE CONSTRUCTION OF THESE
DIVISIONS TOGETHER THEY WILL BE CONSTRUCTED IN PHASES AS OUTLINED
BELOW. CONTRACTOR TO INSTALL ADDITIONAL FIRE HYDRANTS AND TEMP
TURN-AROUNDS (IF NECESSARY) WITH THE END OF EACH PHASE.
DIVISION 11: Install MH2-MH7 (in 370 South), MH18 (in 2275 West) and
sewer main (in 2100 West) with all laterals. Install all water main and laterals
in 2100 West, 2275 West, and 370 South inside Div 11 boundary. Install all
storm within Div 11 boundary (CB1 -CB8, SMH1 and all main lines). Curb
and asphalt all roads within Div 11.
DIVISION 12: Install all sewer in 2325
boundary. Install all storm within Div
roads withing Div 12 boundary.
West. Install all water within Div 12
12 boundary. Curb and asphalt all
DIVISION 13: Finish remainder of project.
GENERAL NOTES (APPLICABLE TO ALL CIVIL SHEETS):
1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS, AWWA STANDARDS, CITY OF REXBURG STANDARDS, ISPWC 2020, STATE
OF IDAHO AND ANY OTHER APPLICABLE STANDARDS ISSUED BY THE CONTROLLING
AGENCY.
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS BEFORE CONSTRUCTION. ANY
DISCREPANCIES BETWEEN CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS SHALL
IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE OWNER.
3. CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY AREAS AND/OR MATERIALS
DAMAGED DURING CONSTRUCTION.
4. CONTRACTOR SHALL MAINTAIN ALL ADJACENT PROPERTY (PUBLIC & PRIVATE) FROM
ALL CONSTRUCTION DEBRIS.
5. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION FROM ALL NEW CONSTRUCTION TO
EXISTING CONDITIONS.
6. CONTRACTOR SHALL PROVIDE ALL NECESSARY AUTOMOBILE AND PEDESTRIAN TRAFFIC
CONTROL DEVICES REQUIRED BY LOCAL, STATE, AND FEDERAL CODES AND ORDINANCES.
7. CONTRACTOR SHALL REPLACE SURVEY MONUMENTS DAMAGED DURING CONSTRUCTION.
SURVEY MONUMENTS TO BE REPLACED BY A REGISTERED, LICENSED LAND SURVEYOR.
8. DIMENSIONS SHOWN ARE TO THE CENTER OF THE PIPELINE UNLESS OTHERWISE
NOTED.
9. DISTANCES SHOWN ALONG PIPELINES ARE HORIZONTAL DISTANCES AND NOT ACTUAL
PIPE LENGTHS. MORE PIPE MAY BE REQUIRED TO COMPLETE CONSTRUCTION THAN IS
DIMENSIONED IN THE PLANS.
10. THRUST BLOCKS SHALL BE PLACED ON WATERLINES AT ALL DIRECTION CHANGES,
FITTINGS, BENDS, ELBOWS, FIRE HYDRANTS AND GATES VALVES AS SHOWN IN THE
PROJECT PLANS.
11. ALL CONCRETE REQUIRED ON THIS PROJECT SHALL BE 4000 PSF (28 DAY)
CONCRETE.
12. CONTRACTOR IS RESPONSIBLE FOR PROVIDING WATER NECESSARY FOR DUST
ABATEMENTK, COMPACTION, ETC.
13. THE CONTRACTOR SHALL BE RESONSIBLE FOR SECURING SOURCES FOR GRANULAR
MATERIALS, WATER, WASTE SITES, AND ANY OTHER MATERIALS SOURCES AS REQUIRED
FOR PROJECT COMPLETION.
14. ANY WORK DONE WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH
THE APPROPRIATE TRANSPORTATION AGENCY AND SHALL MEET THE REQUIREMENTS OF
THAT AGENCY AND THE REQUIREMENTS OF ANY RIGHT-OF-WAY OR SPECIAL USE
PERMITS.
15. THE CONTRACTOR SHALL COORDINATE ALL LIVE TAPS AND ANY OTHER WORK OR
MANIPULATION OF THE EXISTING WATER SYSTEM WITH THE ENGINEER AND THE WATER
SYSTEM OWNER/CITY.
16. ON SLOPING AREAS THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MITIGATE ANY
POSSIBLE EROSION PROBLEMS IN THE TRENCHES DUE TO STORM WATER THAT MIGHT
OCCUR DURING OR AFTER CONSTRUCTION AS DIRECTED OR APPROVED BY ENGINEER.
17. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL EROSION CONTROL MEASURES
AS DETAILED IN THE PROJECT PLANS UNTILL FINAL ACCEPTANCE OF THIS PROJECT.
18. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONS NECESSARY TO INSURE
THAT NO STORM WATER/SEDIMENT AND/OR CONSTRUCTION DEBRIS ARE RELEASED FROM
THE SITE. ANY RELEASES SHALL BE CLEANED AND MITIGATED AT THE CONTRACTOR'S
EXPENSE.
19. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACCESS AND RELATED TRAFFIC
CONTROL WITH THE COUNTY, CITY, AND STATE ROADWAY DEPARTMENTS. THE ENGINEER
SHALL REVIEW ALL TRAFFIC CONTROL PLANS.
20. ALL GATE VALVES SHALL BE LOCATED NEAR TO TEES OR CROSSES AND THEIR
ASSOCIATED REDUCERS AS SHOWN ON THE PROJECT PLANS.
21. CONTRACTOR SHALL PROVIDE ALL NECESSARY FITTINGS, HARDWARE, LABOR, ETC. TO
CONSTRUCT VERTICAL AND HORIZONTAL BENDS IN PIPE AS NEEDED TO MEET THE
REQUIRED GRADES, ALIGNMENTS AND COVER REQUIREMENTS.
22. ALL AIR RELEASE VALVES SHALL BE INSTALLED AT THE CREST OF THE VERTICAL
CURVATURE OF THE WATER LINE. CONTRACTOR SHALL RECORD ACTUAL LOCATION OF
VALVES ON FIELD RECORD DRAWINGS.
23. THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF REXBURG AND WITH THE
ENGINEER FOR ALL UTILITY INSPECTIONS PRIOR TO BACKFILLING.
24. THE CONTRACTOR SHALL COORDINATE ALL INSPECTIONS WITH THE ENGINEER. AT A
MINIMUM, THE ENGINEER SHALL BE NOTIFIED TO INSPECT: 1)SEWER PRIOR TO
BACKFILLING, 2)WATER PRIOR TO BACKFILLING, 3)STORM SEWER PRIOR TO BACKFILLING,
4)CURB & GUTTER AND FORMS PRIOR TO POURING, 5)ROADWAY GRADES PRIOR TO
PAVING, 6)ASPHALT DURING PAVING.
25. ALL WATER SYSTEM COMPONENTS SHALL BE INSTALLED, PRESSURE TESTED, AND
CHLORINATED PRIOR TO COMPLETING ANY ROADWAY CONSTRUCTION PER AWWA STANDARD
651.
26. CHLORINATION SHALL BE DONE BY CONTRACTOR AT THE CONTRACTORS EXPENSE.
CONTRACTOR TO DISPOSE OF CHLORINATED SOLUTION ACCORDING TO AWWA STANDARD
C651.
27. ALL SEWER SYSTEM COMPONENTS SHALL BE INSTALLED AND VIDEO INSPECTIONS
DONE AND APPROVED PRIOR TO ASPHALTING. IF NECESSARY, THE CONTRACTOR SHALL
PAY FOR THIS EXPENSE AS IT IS CONSIDERED INCIDENTAL TO SEWER CONSTRUCTION.
DIG LINE
1-800-342-1585
CALL 2 BUSINESS DAYS IN ADVANCE
BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE
MARKER OF THE UNDERGROUND MEMBER UTILITIES.
IDAHO STANDARDS FOR PUBLIC
WORKS CONSTRUCTION
I.S.P.W.C. 2020
CONSTRUCTION ON THIS PROJECT SHALL
CONFORM TO THE I.S.P.W.C. STANDARDS
AND CITY OF REXBURG STANDARDS
\ONAL £Nc
\ T
1 9
4 3-2�
\MA C K E
z
0
W
CC
N
z
o
I
�
Q
W
J
U
U
W
0
ry
n
r
i
i
ti
q
�w
CL
w
n
� N
I
oLi
� LC)
0
0
N Z Ln
ro
LnQo�
W J
O
SHEET
1
OF
6 SHEETS
SUMMERFIELD SUBDIVISION ICI VISION NO.1 � 1 � 13 EEG E N D > EXISTING WATER LINE -SIZE
E 8 DI WATER yY- AS SHOWN
NOTES: e-w EXISTING WATER LATERAL NEW ASPHALT
UTILITY MASTERPLAN I � � PROPERTY BOUNDARY
All sewer laterals to be installed at 5' below E 8 PVC SEWER EXISTING PVC SANITARY IF 8 DI WATER PROPOSED DI CLASS 50
EXISTING ASPHALT
native ground 1 0' Into property. SEWER LINE AS NOTED WATER LINE AS NOTED
PROPOSED 1" SERVICE PER
e-s EXISTING SEWER LATERAL w •',,>.1;;:.:4;;•�.:' �;: :`.'.s::::y`1' r�:
All hydrants t0 be Wate ro u s brand. ISPWC SD-401 PROPOSED CONCRETE
PROPOSED PVC SDR35 SANITARY ...:..,a•: ��' j'' '' "'`
8 PVC SEWER} SEWER LINE AS NOTED 15 E ADS SD-- EXISTING STORM LINE/CB .
>,,::;::::•,::,..�s;;:.::;�,•;:::f:�y..:•:- EXISTING CONCRETE S\ONAL FN PROPOSED 4 PVC SDR 35 SEWER 15 ADS SDWN NEW STORM LINE/CB 1°; r •' ''y"
0 30 60 120 LATERAL (S=2.0% min) EXISTING STREET LIGHT G
EXISTING GAS NEW STREET LIGHT -PER
SCALE: 1 "= 60' (24X36 PLAN SET) - EXISTING ELECTRICAL '* CITY STANDARDS 929
4 3-2�3
q qTf OF SOP P�
CANAL MA C K E- e�
Fy
C►i
w 25 24 YS 22 21 20 19 18 17 16 15 14 13 12 11
7,610 sf 6,596 sf 6,596 sf 6,596 sf 6,596 sf 6,596 sf 6,596 sf 7,695 s.f. 7,695 s.f. 7,695 s.f. 7,695 s.f. 7,695 s.f. 7,695 s.f. 7,704 s.f. 9,610 s.f. 10,414 s.f. S 8 7 8 5 4 S 2 1 0
o 11,098 s.f.
D IV 13 D IV 1 11,713 s.f. 11,851 s.f. 11,852 s.f. 11,852 s.f. 11,852 s.f. 11,852 s.f. 11,852 s.f. 11,719 s.f.
w
S W S W S W S W S W S W S W S W S W S W 5 W S W S W S W
S W
,.
S W N z
o
--------- ------ -----
s w
I I : s w s w s w s w s w s w s w s w �
8 DI TER D1 WAT R 8 DI W ERI D WATER DI WATER `8 DI WATER 8 DI WATER 8 DI W T _ Q
: 8 DI WATER
8 PVC SEWE 8 PVC SEW 8 P WE 8 PVC SE E H2 8 PVC SEWE 8 PVC SEWE 8 PVC SEW 8 PVC S _ ---
ADS SD 15 ADS SD 1 S SD I 370 SO TH STREET MH3 8Q SEWER-
15- PVC SEWE 8 p� WATER ---- ° �r{Jy,Sn(,[� j�j+'j+'�' m
MH4 $ VC SE E� 8 DI VAN SO T TDf�VATER 8 DI WATER 8 DI WATER 8 DI WATER w 8 DI W TER 8 DI WATER r7,
AD
vc
o12 ADS Spp 8 PVC S E 8 PVC SEWE 8 PVC S WE 8 PVC SEWE 8 PVC S E 8 PVC SEWE MH6 MH7 _us w s w s w s w s w 12 ADS sr� H 5 W 1$SW---=--- Q1110 3 14 6,736 s.f. S w ,7,623 s.f. 622 s.f. 6,735 s.f. ,+.•,.s7,623 s.f. o 10 S w E"
00 oo 00 S W s W S W S W W s w s w co
0 12,576 s.f. s
"' w C-
ly
Q w 11 w n2 Q
1 1,849 s.f. 18 13
�I WATE 18 1� 8 15 1Y 0 10,926 s.f. 10,243 s.f. 10,0311 s.f. 10,038 s.f. 10,0581 s.f. 12,809 s.f. °° W 12 W�
7,910 s.f. 7,910 s.f. Q 7 064 s.f. = I ¢� 13,372 s.f. 11
7,910 s.f. _ = 7 023 s.f.
e-s s 3 s s 3 S S oW oO 12,918 s.f. �w
e-W W W W W wEi g DIV 11 N 0
j Uw _ �wO
:. w ¢ � 11,953 s.f. o
w
• � E"
44;U 11 >C)
•` 1S a 15 8 16 7,075 s.f. a S ;' M o�
w 7,910 s.f. 7,910 s.f. 7,910 s.f. 7,075 s.f. � Q
W W w
•... a-s s s s s S
3 e-w w s w w s w W lop
q �-+
co r'
SUMMERFIELD DIVISION 9 / (�� E
W I o Uj
w 14 14 7 p I A e-S q
z 7,910 s.f. U 7,910 s.f. 7 910 s.f. > 17 e_s /e-
> a = e-s e-W w �W
o a 7,075 s.f. rn 3 3 cn 3 v) 3 � 3 3
=r e-s cn s- s s s e-s a-w I I I I I I I I I I I
e-W 0 W W w W e-w - GAS -GAS SAS r - N N N - GASLd
q or
F p•• ^�
• 15 6,9 15 s.f. 6,9688 s.f. vwi s ATER WAT R TE - D
3 6,900 s.f. s s s �'
e-S U ER W R ER
• c e-W W W W a 18 I rn A S S DS SL' �..' �:
° a e-
..: w w 14151 s.f. ' e-W
v
...
16 Qoo
16 5 p -... -...- -...- -...- .
..•.� 6,780 s.f. > 6,780 s.f. 6,780 s.f. � QI W ,~HE"
e-s s S s w �,
co La
3 I ¢ H
e-w w w w W : e-s U
+; w U) `. W w
E, I e-w
• w w w w * 0
Uj
-10
6,780 s.f. w a�
s--�� 6,780 s.f. 6,780 s.f. a I I
e-s s s 18
0
e-w W"'
1 W 0 s 6,069 s.f.
w
I
18 18 a � w e-S
e-s 6,780 s.f. s S 6,780 s.f. 6,780 s.f. s , ' I
w �O
e-w w w w w s 6,069 s.f.
Ei
19 a °° 19 Y °° w
F cK
6,780 s.f. 6,780 s.f. 3 W e-w
e-S S S 3 21 % r-: IR
-- a-s
z.
e-w w w w > �+ 6,069 s.f. -W
4 d�
w p w w W S I ao
w ¢ ¢ W
w ' ��'_ w
e-s �0 S � s 7,712 s.f. 7 71O
s �
0 s.f.
771s.f. e-s
e-w ' w°� W ' W 4 p e-w
w co
6,069 s.f. o I }
w
o a w L
- 12 D ; SD Ld
460 SOUTH ST ET 0
0
8 DI WATER 8 DI WATE 8 DI WAT R 8 DI TER 8 DI WATER I R R
68'
�8 a-s :
8 PVC SEWE 8 PVC S E 8 PVC S E 11 SIDEWALK
ADS SD 1 ADS SD M H 10 6,069 s.f. e-w
�_ s A
((
7' 19.5' 19.5' 30"
s w s w s w s w s w s w I � 5 2% ROLLED CURB
14 2%
p; 8 8 10 11 12 13 7,444 s.f. w N 6,069 s.f. a-s a-s //\//\/ /\\ 12" GRANULAR BORROW
9,069 s.f. 6,435 s.f. 6,435 s.f. 6,435 s.f. 6,435 s.f. 6,435 s.f. s s e-w .t-Wco
00 w 2-1/2" ASPHALT PLANTMIX PAVEMENT 4»
3-1/2 OF AGGREGATE BASE
15 85 �, '. I USE 12" GRANULAR BORROW 12"
6,526 s.f. 6,065 s.f.
s s e-s GEOTEXTILE FABRIC BELOW
W W e-w I AND UP SIDES 2.5"
I:
SUMMERFIELD DIVISION 6 68' TYPICAL ROAD CROSS-SECTION
ao o cn 3 (1)3 U) 3 U) 3 3 U) 3 I cn 3 cn 3 ! 30„
P/(A w 00 I I I I I I I I I s
a� a) aD m a) �� a� ai a� m e-s (
. y
17
_-) CL
U Ld
O rY v'
00
O A
0
o z
O
J
0
r
SHEET
2
OF
6 SHEETS
MH1
LEGEND
4850
Tee w/ n
(3) valves
MH9—exist
STA: 0-7.00 8.97 R
Rim: 4848.964840
IE—in: 4835.90
IE—out: 4835.75
DATUM ELE
4835.00
LO
Q0
0+00 1 +00 2+00 3+00 4+00 5+00
460 SOUTH STREET
SUMMERFIELD SUBDIVISION DIVISION NO.11112113
L l'6-V8-V = A111 lAd
9-V79+9 = `d1S Ind
2355 WEST1460 SOUTH ROAD CONSTRUCTION
0 30 60 120
SCALE: 1 "= 60' (24X36 PLAN SET)
SCALE: 1 "= 10'_VERTICAL
c6 w
0
—N to ro
(0�'t
q- LO
P2 0
0
:2NIiE w
I
b\
cD
rl
I -
o
in
V)
m �
E
CL
Lm
I
tiL'058t = AN-11 Ind
ZL'OL+Z = d1S Ind
L8'6-V8-V = A3_13 lAd
8L'25+0 = ViS lAd
o�
0
'L L
O C'
6
I..
00
J
Ln
r
M Q_
O N ,
rn��a
+00�t
V) UJ U
U)
L A'Fi�Q�
9'8_178-17
8-V'6t8-V
ZZ'6�8t
Z�'6t8�
Z9'6-V8-V
_V'8t8-17
Z8'6-V8-V
Z'8_178_17
Z0'OS8-17
9'8_178-17
zz'OSB-17
6'8-V8-V
Z-17'099-17
I,'6-V8-V
Z9'OS8_17
6'8t8-V
59'058-17
L'8_178_17
9-17'099-17
8'8_178-17
Sz'OS8t
8'8_178-17
50'058-17
6'8-V8-V
-V8'6-V8-V
-'8-178-17
9t'6-V8t
S 8�817
Ld
00
Wo
\ m
�
3 >
OJCpr,r,
N
p O N N 0
j
0,6000000
4
=0
I �w
o —w
U)
(D
0
NOTES:
All sewer laterals to be installed at 5' below
native ground 10' into property.
o All hydrants to be Waterous brand.
+
0
0
+
Ln
0
0
h
w
P,
co
W
o
0 Lf)
+cr)
r')N
0
0
N
0
0
0
0
0
E 8 PVC SEWER
e-s
8 PVC SEWER
4 PSEW
S
WV
E 8 DI WATER 9VN y.
e-w
�- 8 DI WATER
—
PROPERTY BOUNDARY
EXISTING PVC SANITARY
SEWER LINE AS NOTED
EXISTING SEWER LATERAL
PROPOSED PVC SDR35 SANITARY
SEWER LINE AS NOTED
PROPOSED 4" PRESSURE SEWER
PROPOSED 4" PVC SDR 35 SEWER
LATERAL (S=2.0% min)
EXISTING WATER LINE —SIZE
AS SHOWN
EXISTING WATER LATERAL
PROPOSED DI CLASS 50
WATER LINE AS NOTED
PROPOSED 1" SERVICE PER
ISPWC SD-401
EXISTING STORM LINE/CB
NEW STORM LINE/CB
EXISTING STREET LIGHT
NEW STREET LIGHT —PER
CITY STANDARDS
NEW ASPHALT
EXISTING ASPHALT
•"''''3''''' PROPOSED CONCRETE
•:r ?:t::5: •.,.* :'? ...,..� ;::y,.;: ;? EXISTING CONCRETE
w
15 E ADS SDW
15 ADS SD -o
\ONAL E c
929
4 3-2� ,
\vq qTF OF SOP P�
MACKE y
CL
W
H
V)C�
n N
L0
ry
O �LLi
0
o
o .�
N z Lo
ro
con
O
W J
O
SHEET
4
OF
6 SHEETS
NOTES:
All sewer laterals to be installed at 5' below
native ground 10' into property.
All hydrants to be Waterous brand.
3 0
~v I
SZ' 158- = n313 Ind
I
ZO'9L+8 = 'd1S Ind
E o
LZ
LZ'058ti = n313 Ind
LZ'81+9 = `d1S Ind
t9'098V = AA11 Ind
-VS'L-V+S = `d1S Ind
6Z'098ti = n113 Ind
88'9L+ti = d1S Ind
3
0
z
� I
80' L58V = n3-13 Ind 3 o
>
ti-V' 19+Z = d1S Ind
0
L0
00
rr
0
0
N
cq �
r, � co
+ 00
0
r �-%
•• n
:2V)Ww
0
TF
V)
U
Ll-
LO
0
CO N O
�0) L0��
Lc)o 0000000000
1:2_c
(o �w o
+ -w
n -
cn
0
I I
U)
U
n
00
-0 J
V
a'
o �
a
•n
l l' lS8t
Z'6-V8t
I•I,92
0' 6-V8t
�6'OS8�
tiL'OS8t
�S'OS8�
O'6�8t
Z2'058ti
Z9'OSB-17
S'6-V8t
S�'OS8�
Z�'OS8�
ZS'OSB�
S'6�8t
ZL'058-V
Z6'058V
20' L S8ti
0'6-V8-V
28'OSB-17
�9'OS8�
��'058ti
l'6t8�
�Z'OSB�
O'6�8t
20'OS8-V 0
o 6'8�8-V o+
00
wo
N�
A
O
0
+
00
0
O
O
0
+
LO
SX
s W
S.f.
S
W
S.f. s
W
S.f.
s
W
�I WATER
O 0
O 0
N
O
0
+
S
S.f. W -
8459 �
t. s -
W-
1f
14,151
1�
6,069
s
W
21
6,069
s
W
21
6,069
s
-w
6,069
s
W
23
6,069
S
W
24
6,069
S
W
25
6,065
S
W
3
� e
SUMMERFIELD SUBDIVISION DIVISION NO.11112113
23251227512100 WEST ROAD CONSTRUCTION
61
0 30 60 120
SCALE: 1 "= 60' (24X36 PLAN SET)
SCALE: 1 "= 10'-VERTICAL
7+00 8+00
2275 WEST STREET
Finish
grade
8" Tee w/
//'--(3) valves
0
�
r
U
L
o
+
0000
0
cfl
00
U
II
II
N
o
Ex FH +
�
w
r
Q
o,
Finish
5;a
m
grade
o_
a -
Original
ground
III
0.40%
-
-
-
-
Tie t
0
existing
stub 5' min
8"
DI
waterline
,.
MF
141
LF 8"
PVC 3
=0.4%
ST
Rir
IE-
IE
STA: 7+45.27 4.81 L
existing manhole
Rim: 4851.41
I E-i n: 4841.98
IE-out:
4841.78
r7
(0
N
r
O
rN
00
oo
pp
as
O rn
O
O
O'
O
O
O
ci O
00
00
00
co
00
00
00
00
00
00
00
00 00
8+00
2100 WEST STREET
1,852 s.1
1�
13,372 s.f.
8" Tee w/
(3) valves
6 4'dia
a: 8+88.19 8.84 L
n: 4851.96
-in: 4842.74
-out: 4842.54
LEGEND
PROPERTY BOUNDARY
E s PVC SEWER
EXISTING PVC SANITARY
SEWER LINE AS NOTED
e-s
EXISTING SEWER LATERAL
PROPOSED PVC SDR35 SANITARY
s PVC SEWER
SEWER LINE AS NOTED
4 PSEW
PROPOSED 4" PRESSURE SEWER
PROPOSED 4" PVC SDR 35 SEWER
S
LATERAL (S=2.0% min)
WV
EXISTING WATER LINE -SIZE
E 8 DI WATER s�
AS SHOWN
e-W
EXISTING WATER LATERAL
PROPOSED DI CLASS 50
�- 8 DI WATER
WATER LINE AS NOTED
PROPOSED 1" SERVICE PER
W
ISPWC SD-401
15 E ADS SDW
EXISTING STORM LINE/CB
15 ADS SD -o
NEW STORM LINE/CB
#
EXISTING STREET LIGHT
NEW STREET LIGHT -PER
CITY STANDARDS
NEW ASPHALT
EXISTING ASPHALT
PROPOSED CONCRETE
EXISTING CONCRETE
•:r ?:t::5: •.,.* ...f..� ;::y,.;: ;?
:'?
v/..�•,.i�ti!,;�i`i;c
WERE, �1
8- N-400
10929
3-29
O�9TF OF
\MA C K
z
0
W
N z o
N Q
I �Q
W
LU Q
J Q
U �
co
��
�-I P + O
�o o
C� O� � 0
�Pq q o
W C\2
C\2
E
cn
Ld �
W co r�j c J
W
I-
V) rN
� N
00 Lo
I
O L0
O O
O .�
N z Lf-)
0
J
O
SHEET
5
OF
6 SHEETS