Loading...
HomeMy WebLinkAboutINFRASTRUCTURE - 23-00368 - Summerfield Phases 11-13 - Plat-Reviewed-Corrections-RequiredAuthor Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Todd Smith Todd.Smith@rexburg.org 208-372-2181 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Summerfield Phase 11 - Plat & Infrastructure Address : Summerfield Application Type : Document Filename : INFRASTRUCTURE - 23-00368 - Summerfield Phases 11-13 - Plat.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments s2 Callout Joel Gray : PW Open 2 Streetlight required. s2 Callout Joel Gray : PW Open 2 Streetlight required. s2 Callout Joel Gray : PW Open 2 Streetlight required. s3 Callout Joel Gray : PW Open 3 2 manholes required. s6 Callout Joel Gray : PW Open 6 Install storm main line with manholes. # 23-00368 Plat Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 06.29.2023 Approval of plans does not constitute approval of variance from code Page 1 of 1 Powered by TCPDF (www.tcpdf.org) Streetlight required. Streetlight required. Streetlight required. 2 m a n ho les required. In s ta ll s to rm m a in lin e w ith m a n ho les .