HomeMy WebLinkAboutPickle Ball Options PresentationPowerPoint Presentation Pickle Ball Courts Project DONJO SPORTS COMPLEX Current Budget for Four Courts to Be Constructed in Summer 2024 $100,000 Transfer made in FY 2023 Budget FY 2024 $100,000 in Carryover $270,000 General Fund Transfer $370,000 Total Budget FY 2024 Layout Option 1 Layout Option 2 Option to Cover Pickleball Courts in FY 2025Court size 20’ Width x 44’ LengthCourt area ideal size 36’ Width x 66’ Length Advantages Year-Round Pickle Ball Play No need to add Outdoor Lights on 4 Courts Projected Outdoor Light Savings $35,000 No need to add Fencing around and between 4 Courts Projected Fence Savings $25,000 (Cost was $18,300 in 2017 for 4 courts) Potential savings from being covered vs. exposed to the elements Future Revenue Stream Monthly Membership Options Open Play Options Projected Revenue Stream Minimum $30,000 plus Covered Structure Options Steel Building Cost unknown (could bid out) Tension Fabric Building Likely less expensive than Steel Building Uninsulated allows natural light No sewer or water services needed Can keep bathroom at Quad Building Open year-round and Sidewalk Maintained Warranty 10 years on steel structure and 5 years on fabric from 1 vendor we quoted They have a structure that has been up for 30 plus years in Whistler British Columbia You can add the structure after building the 4 courts No need to involve any foundation work Covered Structure Examples https://allsitestructures.com/sports-facilities/ https://allsitestructures.com/sports-facilities/ https://www.mywrc.ca/tennis https://www.mywrc.ca/tennis file:///C:\Users\mattn\Downloads\Allsite_Brochure__2021_.pdf file:///C:/Users/mattn/Downloads/Allsite_Brochure__2021_.pdf Covered Structure Cost Example Covered Structure Potential Budget FY 2024 Budget $400,000 Would need to bid out when we bid out the 4 courts and consider options Potential Savings by Covering Courts $66,000 (No Fencing or Outdoor Lights) Funding Sources: $60,000 Carryover from Savings on 4 Courts $160,000 Parks Impact Fund $180,000 General Fund $400,000 Total Budget Options To Consider Option 1 – Build Out 4 Outdoor Courts Designed to accommodate a potential covered structure several years down the road Would likely need to add lighting and fencing this summer Option 2 – Bid out both the 4 Courts Designed to accommodate a covered structure and the covered structure now and plan to budget to cover the structure in October 2024 Option 3 – Move Forward with the concept of just outdoor pickle ball courts and build the 4 courts this year and consider more courts down the road as funds are made available