HomeMy WebLinkAboutBOLT REPORT 2 - 22-00611 - EVO Automation - New CommercialInspection Details Date Contractor Inspector Weather Permit Number 02/03/2023 Silverline Builders Clark, Josh Sunny na Project Specifications: Snug Tight only Full Tension/Slip Critical Full Tension/Slip Critical: Turn­of­the­Nut method Calibrated Wrench method Direct Tension Indicators ­ Load­Indicating Washers Direct Tension Indicators ­Twist­Off­Bolts (”Lejune” bolts) Bolt Type: ASTM A­325 ASTM A­490 Other Bolt Type Other: Bolt size Diameter Length varied varied Washer Specifications: Hardened washers Plate washers None required General Conditions Faying surfaces flush and in full contact Faying surfaces free from paint, oil, etc. Visually monitored turn­of­the­nut method Verified Installation equipment and bolts using Skidmore­ Wilhelm tension measuring device Visually Inspected twist­off bolts Washers at slotted holes under turned element Verified a minimum of 2 bolts per connection or 10% of all bolts Reference Drawing Sheet and Detail, and Approved RFI:general structural notes Location(s):rigid frame lines Notes: snug­tight verified. additional 1/3 of turn to be accomplished at a later date. contractor will reschedule to verify final rotation has been completed Work inspected was: in compliance in compliance, except as noted in comments section reinspection/retesting required Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punishable as a felony under Federal Statute. ✔ ✔ ✔ ✔ ✔ ✔ ✔ High Strength Bolting Report 02/07/2023Report Date: Atlas Technical Consultants, LLC ­ Idaho Falls 1753 E Precision Drive Idaho Falls, ID 83402 Phone: (208) 529­8242 Client: Silverline Builders 1052 West 14 North Rexburg, ID 83440 Project: E230205c EVO Automation, 2557 South Frontage Road, Rexburg, ID 2557 South Frontage Road Rexburg, ID NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified, to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of construction. Page 1 of 2Page 1 of 1