Loading...
HomeMy WebLinkAboutFINAL SI LETTER - 22-00269 - Hibbard Elementary School 4103 E 605 N Suite 1 • Rigby, ID 83442 • 208.881.0081 December 20, 2022 Cody Jones Building Official City of Rexburg 35 N 1st East Rexburg, ID 83440 RE: FINAL REPORT OF REQUIRED SPECIAL INSPECTIONS Project: New Hibbard Elementary School, Rexburg, ID In accordance with Section 1704 of the International Building Code (IBC) and the project documents special inspection has been provided for the following items: 1. Soils – Bottom of excavation, footing backfill and structural backfill against foundation walls. 2. Concrete – Concrete testing and inspection of the reinforcement for the footings, foundations, and slabs on grade. 3. Masonry – Masonry Reinforcement, Grouting operations. 4. Structural Steel Bolting and Welding – Bolted Connections, Steel Decking Mechanical Connections, Welded Connections Based upon inspections performed and our substantiating reports, it is our professional judgment that, to the best of our knowledge, the inspected work was performed in general accordance with the approved plans, specifications and applicable workmanship provisions of the IBC. Jacob Christensen Laboratory Manager 208.881.0081 Jchristensen@connectengr.com