HomeMy WebLinkAboutDEQ LETTER - 22-00269 - Hibbard Elementary SchoolSTATE OF IDAHO DEPARTMENTOF ENVIRONMENTAL QUALIry 900 N Skyline, Suite B, ldaho Falls, lD 83402 (208) s28-26s0 Brad Little, Governor Jess Byrne, Director November 9,2022 By email: lordsr@msd32L.com Randy Lords Superintendent Madison School District #321 60 West Main Street Rexburg, lD 83440 Subject:Approved; Hibbard Elementary School Revised Wastewater Subsurface Disposal Large Soil Absorption System (LSAS) Elien GSF Drain Field Design, Madison Co. DEQ # 22-10-33. Dear Mr. Lords: The ldaho Department of Environmental Quality (DEQ) received the revised Operation and Maintenance Manual (O&M) and revised plans and specifications entitled Hibbard Elementary School Lorge SoilAbsorption System (LSAS) Eljen GSF Design submitted to DEQon November 8,2022. The plans and specifications were sealed and signed by David Hansen, PE on March 8,2022. The project generally includes the plans and specification for the LSAS Eljen GSF System. DEQ has reviewed the O&M manual, plans and specifications for general conformance with DEQ Rulesl and determined them to be approved for construction. Standard Conditions: A. DEQ s construction approval expires after one calendar year from the date of this letter. For construction to proceed beyond this date, an extension request or new plans and specifications must be submitted to DEQfor review and approval before construction may proceed. B. Any material deviations from the approved plans and specifications must be reviewed and approved by DEQ before construction. C. We attached a copyof the approved drawingsforyou. An additionalcopyhas been senttoyour engineer. The owner is required to always maintain one copy of the approved plans and specifications and this DEQ approval letter on-site during construction. The owner must ensure that the contractor, construction inspector, and certifying engineer are aware of the approval conditions. D. An ldaho-licensed Professional Engineer representing the system must submit record drawings, Page2 or a statement of material compliance, to DEQ within 30 days after construction completion. E. This approval pertains only to the LSAS Subsurface Disposal System infrastructure and does not relieve the owner, engineer, or the contractor of the responsibility to comply with all current applicable federal, state, and local laws, rules, regulations, or ordinances. ll. Proiect-Specific Conditions A. DEQ has not conducted design review for stormwater plans and specifications and has made no determination regarding whether the plans and specifications include appropriate best management practices (BMPs) to protect ground water and surface water quality. lf the project is anticipated to disturb at least one acre of land or is part of a larger project that disturbs one acre or more of land, the project must obtain coverage under the ldaho Pollution Discharge Elimination System (IPDES) Construction General Permit. Stormwater events that occur during construction should be managed according to the site-specific Stormwater Pollution Prevention Plan, and other requirements of the General Permit. To submit a Notice of lntent for permit coverage under the Construction General Permit, apply online at http ://www2.deq.idaho.eov/water/l PD ES/. lf you have any questions regarding this letter or if we can be of further assistance, please call me at (208) s28-26s0, Sincerely, William T er, PE Senior Water Quality Engineer DEQ-IFRO EDMS: 2O22AFML457 c:Ryan Loftus, P.E., Aspen Engineering, lnc.,rvan @asoenens.net DavidHansen,P'E.,EngineeredSystemsAssociates,@ John Mackin, EIPH Rexburg, JMackin@eiph.idaho.gov Nathan Taylor, EIPH ldaho Falls, NTavlor@eiph.idaho.gov