HomeMy WebLinkAboutUPDATED PLAN - 22-00368 - 916 Pine Brook Ln - Shed & Patio cover 2 1 1 .5 1
7
.
2
5
0
.
6
3
9 7.8 5°
1
0
.
0
0
3
.
0
0
43.13
4
8
.
0
0
48.00
7.25
3.50
7
.
2
5
7
.
2
5
0
.
6
3
3
.
1
7
141.00
w12x26
2x4 bolted to 3/8 studs on top of beam @ 57.6" o.c.
2x3x.120 rec tube
welded to the channel
3 in std
channel
2x4 stud in
house wall
@ 24" O.C.
2x8 thick wall
double top plate
existing truss with
5/8 sheeting
gray is metal
dark brown is the new
back patio cover
light brown is existing
knee brace every 10 feet
attached to studs in wall of house
W10x12 beam welded
to knee brace
2x8 ledger board (2) ledgerlok @ 19.2" o.c.
on top of beam that hangs the roof joists
4x4x0.25
rec column
@ 26' o.c.
6x12x0.5
steel plate
welded to posts
and (4) 5/8
bolts to beam
6x12x0.5
steel plate
welded to posts
and (4) 5/8
bolts to beam
2x8 overhangs
66" past beam
2x8 DF-L every 19.2
in with 5/8 sheeting
w/ 16 ga. 3/12
spacing and metal
roofing w/
birdsmouth cuts
and (4) #10 wood
screws each end
(6)1/4x6 lags
into top plates
(6)1/4x2.5 lags
into rim board
32 RAFTER DETAILRAFTER DETAILRAFTER DETAILRAFTER DETAIL
NOT TO NOT TO NOT TO NOT TO SCALESCALESCALESCALE
DE
S
C
R
I
P
T
I
O
N
RE
V
I
S
I
O
N
D
A
T
E
DE
T
A
I
L
S
SH
E
E
T
T
I
T
L
E
:
R-101
PLN# 22-05-011
DR
A
W
N
B
Y
:
CH
K
'
D
B
Y
:
JU
S
T
I
N
R
A
S
M
U
S
S
E
N
BA
PL
O
T
D
A
T
E
:
7/
7
/
2
0
2
3
EN
G
I
N
E
E
R
:
R
A
Y
M
C
D
O
U
G
A
L
,
P
E
EI
T
:
B
A
7/7/2023
12
7
E
.
M
a
i
n
S
t
.
S
u
i
t
e
1
1
1
Re
x
b
u
r
g
,
I
D
8
3
4
4
0
ww
w
.
s
o
u
t
h
f
o
r
k
d
e
s
i
g
n
.
c
o
m
20
8
-
8
5
2
-
6
2
3
6
So
u
t
h
F
o
r
k
D
e
s
i
g
n
G
r
o
u
p
,
L
L
C
JO
E
R
A
S
M
U
S
S
E
N
RE
X
B
U
R
G
I
D
THESE PLANS ARE
STAMPED/ENGINEERED FOR
THE LOCATION SPECIFIED. IF
LOCATION CHANGES
REENGINEERING IS REQUIRED.
Co
p
y
r
i
g
h
t
2
0
2
3
|
S
o
u
t
h
f
o
r
k
E
n
g
i
n
e
e
r
i
n
g
|
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
.