HomeMy WebLinkAbout2308047 238 ELLA LN REXBURG ID FIBER DROP PERMIT DOCTITLE:W.O.# ISSUE DATE: W.O. NUMBER:
PROJECT DESCRIPTION:W.O. TYPE:
EXCH:BILLABLE?
TAX DIST G/L ACCT: 2423.10 4.13
CSA:RELATED W.O. #
CENSUS RELATED S.O. #
WORK ORDER ESTIMATE TOTALS PREPARED BY: J-HAWK
THIS WO ENG CLERK IN: OUT:
PLANT CLERK IN: OUT:
CUSTOMER PAIDOWES CONSTRUCTION RECV'D:BY: DATE:
ACTUAL COST ESTIMATE 8,625.71$ ISSUED TO: DATE:
EQUIP INSTALLED: BY: DATE:
#Subs ACAM ELG NO
Company 8-RXBG CIA NO CONSTRUCTION REV'D: BY: DATE:
APPROVAL LEVEL: 3
BUDGETED ITEM ? YES $750,000.00
BUDGET GRP ID ENGINEERING RECV'D: DATE:
ADDRESS:ENGINEERING REV'D: BY DATE:
PUNCH LIST: DATE:
CALLER NAME:_______________________ MAPPED: DATE:
FINAL REVIEW:DATE:
DATE:
ALL WORK PERFORMED WILL MEET SSC, RUS, NEC AND NESC
STANDARDS
IDAHO # 1-800-342-1585 WYOMING # 1-800-348-1030
HH 238-ELLA-LN
FINAL REVIEW
NEAREST INTERSECTING ST:
MIL23-803 DATE CALLED DIG LINE:__________________________
WORK ORDER APPROVED BY:238 ella ln , Rexburg, ID, 83246, USA (MADISON)
S.17 T.006N R.040E
8,625.71$
COMPLETION INFORMATION
DIG LINE NOTES SEC\TSHIP\RANGE
-$
CONTACT: Jared Killpack
CONTACT PHONE: 307-760-3204
NO
10022
REG ID 2308047
FIBER RXBHF3=191-192
SPLITTER
ONT (2) 711 ONT (NEW)
FCC CODE:
OSP WORK ORDER
238 ELLA LN REXBURG ID FIBER DROP 21-Apr-23 2308047
RXBH
160659501031013 143160 AND 143147
BUDGET INFORMATION W.O.NOTES PREPARATION
NEW CONSTRUCTION
RXBG
10/2/2023 8:32 AM 238 ELLA LN REXBURG ID FIBER DROP OSP FACE SHEET
Jason3Hawkins39lk9lkpk6
PLOW IN BFOV(2)(1.25) FROM HH-814-YELLOWSTONE-HWY TO NEW DRIVE,
BORE UNDER TO NEW HH LOCATION AND SET NEW HH-238-ELLA-LN. WUD
EXISTING CONDUIT GOING TO BUILDINGS. WUD AND TERMINATE ON
BUILDING ONE. SET BENNER Newman WITH 700 AND 711 ONT INSIDE.
HAND DIG TO BUILDING TWO AND INSTALL BENNER NEWMAN WITH 700
AND 711 ONT INSIDE.2ND ONT REG ID WILL BE 2308048
Heath3JensenChris Blayne
10/02/2023 08:31:25 AM Workorder Page:1
Estimate Summary
Work Order: 2308047 Open Date: 09/15/2023 Project:
Revision: Staked By: CHRISTOPHER C BLAYNE Map Location:
Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0
Type: New Construction Rel Date: Customer:
Status: Open
54501 estimate-2308047.pdf jhawkins
Tran Type:Construction
Assembly Unit Rate Qty/Total Material Labor
Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost
1" EMT 3
CONDUIT 1" EMT 0 0 $12.14 $0.00 $0.00 $0.00 $12.14
700 ENCLOSURE TV 2
700 ENCLOSURE 0 0 $71.67 $0.00 $310.00 $0.00 $381.67
711GE TV 2
711GE ONT 0 0 $1,107.40 $0.00 $200.00 $0.00 $1,307.40
BFOV(ADDER)1.25"TV 120
BFOV(ADDER)1.25"0 0 $77.51 $0.00 $93.60 $0.00 $171.11
BFOV1"TV 29
1" PLOWCON 0 0 $7.13 $0.00 $88.45 $0.00 $95.58
BFOV E 1.25"TV 120
1 1/4 PLOWCON 0 0 $77.51 $0.00 $403.20 $0.00 $480.71
BHF (24X36)TV 1
PENCELL 2436 W/POLY LID PLASTIC 0 0 $1,076.56 $0.00 $310.00 $0.00 $1,386.56
BM60(3")COBBLE 1.25"TV 60
3" BORE COBBLE (W/1.25"CONDUIT)0 0 $38.75 $0.00 $2,400.00 $0.00 $2,438.75
CABLE PREP 4F TV 3
CABLE PREP 4F 0 0 $0.00 $0.00 $225.00 $0.00 $225.00
ENGINEERING LABOR TV 4
ENGINEERING LABOR 0 0 $0.00 $0.00 $340.00 $0.00 $340.00
HO-1 TV 4
LOOSE TUBE FIBER SPLICE 0 0 $0.99 $0.00 $56.00 $0.00 $56.99
SEBF-4 TV 230
BURIED FIBER OPTIC 4 0 0 $37.93 $0.00 $172.50 $0.00 $210.43
SEBF-4(IE)TV 118
BURIED FIBER OPTIC 4 INSIDE EXISTING DUC 0 0 $19.46 $0.00 $238.36 $0.00 $257.82
10/02/2023 08:31:25 AM Workorder Page:2
Estimate Summary
Work Order: 2308047 Open Date: 09/15/2023 Project:
Revision: Staked By: CHRISTOPHER C BLAYNE Map Location:
Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0
Type: New Construction Rel Date: Customer:
Status: Open
54501 estimate-2308047.pdf jhawkins
Assembly Unit Rate Qty/Total Material Labor
Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost
SURFACE MOUNT ENCLOS 2
24X26 SURFACE MOUNT BOX 0 0 $538.21 $0.00 $0.00 $0.00 $538.21
WUD TV 2
LOCATE, EXPOSE, INTERCEPT EXISTING CONDU 0 0 $0.00 $0.00 $723.34 $0.00 $723.34
Total For Construction Assembly Units:0 $3,065.26 $0.00 $5,560.45 $0.00 $8,625.71
10/02/2023 08:31:25 AM Workorder Page:3
Estimate Summary
Work Order: 2308047 Open Date: 09/15/2023 Project:
Revision: Staked By: CHRISTOPHER C BLAYNE Map Location:
Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0
Type: New Construction Rel Date: Customer:
Status: Open
54501 estimate-2308047.pdf jhawkins
10/02/2023 08:31:25 AM Workorder Page:4
Estimate Summary
Work Order: 2308047 Open Date: 09/15/2023 Project:
Revision: Staked By: CHRISTOPHER C BLAYNE Map Location:
Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0
Type: New Construction Rel Date: Customer:
Status: Open
54501 estimate-2308047.pdf jhawkins
Additional Costs:
Type Rate Qty/Total Material Labor
Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost
Total For Additional Costs:$0.00
Total For Work Order 2308047:0 $3,065.26 $0.00 $5,560.45 $0.00 $8,625.71
10/02/2023 08:30:49 AM Work Order Page:1
Item Pick List
Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction
MI Location: Location: Status: Open
Pick List ID: Customer: Open Date: 09/15/2023
Project: Staked By: CHRISTOPHER C BLAYNE Rel By:
Map Location: Rel Date:
54501 pickList-2308047.pdf jhawkins
Construction
Original Charged
Group Item Description Quantity UOM ALL Quantity Loc
EXP SMOUV-1120-01-U SPLICE SLEEVES FOR LOOSETUBE
FIBER
4 EA
INV1 000-01175 GS4220E GIGASPIRE-U6 2 EA
INV1 100-05159 711GE ONT MODULE 2 EA
EXP 41089-1WP 1-PORT SURFACE MOUNT BOX,
WHITE
2 EA
EXP 61110-RW6 CAT 6 DATA JACK 2 EA
INV1 CSN30C12V-E Cyber Power Outdoor rated 12v w 30w
outp
2 EA
INV1 FTL-E/E-D001M SCA-SCA SIMPLEX FO JUMPER 1 MTR 2 EA
INV1 FTL-E/E-D006M SCA-SCA SIMPLEX FO JUMPER 6 MTR 2 EA
EXP BN24268W-UL SURFACE MOUNT
COMMUNICATIONS ENCLOSURE
2 EA
INV1 100-01578 700 SERIES ENCLOSURE 2 EA
INV1 4 FIBER 4 fiber 348 FT
EXP 1" EMT CONDUIT 1" EMT 3 EA
INV1 1 1/4 PLOWCON 1 1/4" Plowcon, SDR11, Ribbed Silicore 300 FT
INV1 FOSC450-B6-6-NT B CASE FOSC450-B6-6-NT-0-B3V 1 EA
EXP 6 SOLID BARE CU #6 SOLID BARE GROUND WIRE (315'
REEL)
10 FT
EXP STC002 "BURIED FIBER" WARNING SIGNS 1 EA
EXP BA3 6 X 8 Post 1 EA
EXP EHL58C1K HAMMERLOCK 5/8" GROUND ROD TO
#6 copper
1 EA
EXP EM8100-12.25 #60 AWG 12" INSULATED BONDING
HARNESS W
1 EA
EXP FAK-MULDRP-45-S MULTI DROP KIT FAK-MULDRP-45-
SEAL-FLAT4
1 EA
INV1 FOSC-ACC-B-TRAY B TRAY FOSC-ACC-B-TRAY-24-KIT 1 EA
INV1 PEN2436 PENCELL 2436 VAULT W/POLY LID 1 EA
INV1 1" PLOWCON 1" PLOWCON, SDR11, Ribbed Silicore 29 FT
10/02/2023 08:30:49 AM Work Order Page:2
Item Pick List
Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction
MI Location: Location: Status: Open
Pick List ID: Customer: Open Date: 09/15/2023
Project: Staked By: CHRISTOPHER C BLAYNE Rel By:
Map Location: Rel Date:
54501 pickList-2308047.pdf jhawkins
Construction
Original Charged
Group Item Description Quantity UOM ALL Quantity Loc
INV1 6258 GROUND RODS 5/8 X 8'1 EA
NINV 1646181 BLACKBURN ADR2 14-2 ALCU
SCREW LUG MECHA
1 EA
Total Quantity For Construction:722
* Indicates Non-Stock Or Exempt Material Item
Signature:Date:
10/02/2023 08:30:49 AM Work Order Page:3
Item Pick List
Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction
MI Location: Location: Status: Open
Pick List ID: Customer: Open Date: 09/15/2023
Project: Staked By: CHRISTOPHER C BLAYNE Rel By:
Map Location: Rel Date:
54501 pickList-2308047.pdf jhawkins
Assembly Unit Summary
Type Pole Wire Misc Neut Assembly Unit Quantity
Construction 1" EMT 3
700 ENCLOSURE 2
711GE 2
BFOV E 1.25"120
BFOV(ADDER)1.25"120
BFOV1"29
BHF (24X36)1
BM60(3")COBBLE 1.25"60
CABLE PREP 4F 3
ENGINEERING LABOR 4
HO-1 4
SEBF-4 230
SEBF-4(IE)118
SURFACE MOUNT ENCLOS 2
WUD 2
Caution: Known utility lines are
shown in approx. locations only. Exact
locations are to be determined by
the contractor during construction.L
Service Address:
Comments:
Exchange:
Route:
WO#: 2308047
Description: 238 ELLA LN, REXBURG ID FIBER DROP
Project:
County: Madison
Sec: 17 Twp: 06N Rng: 40E
Easement/ROW:
Scale: 1:187
15 0 15
SCALE IN FEET
Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023
Constructed By: Date:
Released By: Date:
As Built By: Date:
Revised By: Date:
PAGE 1 OF 5
Pr
i
n
t
A
r
e
a
1
STATION BHF (30X36)CABLE PREP 4F ENGINEERING LABOR HO-1
814-N-
YELLOWSTONE-HWY
1 1 4 2
Total 1 1 4 2
Caution: Known utility lines are
shown in approx. locations only. Exact
locations are to be determined by
the contractor during construction.L
Service Address:
Comments:
Exchange:
Route:
WO#: 2308047
Description: 238 ELLA LN, REXBURG ID FIBER DROP
Project:
County: Madison
Sec: 17 Twp: 06N Rng: 40E
Easement/ROW:
Scale: 1:271
22 0 22
SCALE IN FEET
Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023
Constructed By: Date:
Released By: Date:
As Built By: Date:
Revised By: Date:
PAGE 2 OF 5
Pr
i
n
t
A
r
e
a
2
STATION BFOV(ADDER)1.25"BFOV E 1.25"BHF (24X36)SEBF-4 WUD
238-ELLA-LN 120 120 1 170 1
Total 120 120 1 170 1
Caution: Known utility lines are
shown in approx. locations only. Exact
locations are to be determined by
the contractor during construction.L
Service Address:
Comments:
Exchange:
Route:
WO#: 2308047
Description: 238 ELLA LN, REXBURG ID FIBER DROP
Project:
County: Madison
Sec: 17 Twp: 06N Rng: 40E
Easement/ROW:
Scale: 1:125
10 0 10
SCALE IN FEET
Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023
Constructed By: Date:
Released By: Date:
As Built By: Date:
Revised By: Date:
PAGE 3 OF 5
Pr
i
n
t
A
r
e
a
3
STATION 1" EMT 700 ENCLOSURE 711GE BFOV1"CABLE PREP 4F HO-1 SEBF-4 SEBF-4(IE)SURFACE MO
UNT ENCLOS
WUD
238 ELLA LN MAIN 2 1 1 1 1 118 1 1
238 ELLA LN 2ND 1 1 1 29 1 1 60 1
Total 3 2 2 29 2 2 60 118 2 1
Caution: Known utility lines are
shown in approx. locations only. Exact
locations are to be determined by
the contractor during construction.L
, ,
Exchange:
Route:
WO#: 2308047
Description: 238 ELLA LN, REXBURG ID FIBER DROP
Project:
County: Madison
Sec: 17 Twp: 06N Rng: 40E
Easement/ROW:
Scale: 1:1794.62
149 0 149
SCALE IN FEET
Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023
Constructed By: Date:
Released By: Date:
As Built By: Date:
Revised By: Date:
PAGE 4 OF 5
23
0
8
0
4
7
Caution: Known utility lines are
shown in approx. locations only. Exact
locations are to be determined by
the contractor during construction.L
, ,
Exchange:
Route:
WO#: 2308047
Description: 238 ELLA LN, REXBURG ID FIBER DROP
Project:
County: Madison
Sec: 17 Twp: 06N Rng: 40E
Easement/ROW:
Scale: 1:1794.62
149 0 149
SCALE IN FEET
Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023
Constructed By: Date:
Released By: Date:
As Built By: Date:
Revised By: Date:
PAGE 5 OF 5
Span Tally
Action Span Quantity No. of Spans
C 1" EMT 3 1
C BFOV(ADDER)1.25"120 1
C BFOV1"29 1
C BFOV E 1.25"120 1
C SEBF-4 230 1
C SEBF-4(IE)118 1
Recap
*Units Req.
E BHF (30X36)1
C 1" EMT 3
C 700 ENCLOSURE 2
C 711GE 2
C BFOV(ADDER)1.25"120
C BFOV1"29
C BFOV E 1.25"120
C BHF (24X36)1
C CABLE PREP 4F 3
C ENGINEERING LABOR 4
C HO-1 4
C SEBF-4 230
C SEBF-4(IE)118
C SURFACE MOUNT ENCLOS 2
C WUD 2