Loading...
HomeMy WebLinkAbout2308047 238 ELLA LN REXBURG ID FIBER DROP PERMIT DOCTITLE:W.O.# ISSUE DATE: W.O. NUMBER: PROJECT DESCRIPTION:W.O. TYPE: EXCH:BILLABLE? TAX DIST G/L ACCT: 2423.10 4.13 CSA:RELATED W.O. # CENSUS RELATED S.O. # WORK ORDER ESTIMATE TOTALS PREPARED BY: J-HAWK THIS WO ENG CLERK IN: OUT: PLANT CLERK IN: OUT: CUSTOMER PAIDOWES CONSTRUCTION RECV'D:BY: DATE: ACTUAL COST ESTIMATE 8,625.71$ ISSUED TO: DATE: EQUIP INSTALLED: BY: DATE: #Subs ACAM ELG NO Company 8-RXBG CIA NO CONSTRUCTION REV'D: BY: DATE: APPROVAL LEVEL: 3 BUDGETED ITEM ? YES $750,000.00 BUDGET GRP ID ENGINEERING RECV'D: DATE: ADDRESS:ENGINEERING REV'D: BY DATE: PUNCH LIST: DATE: CALLER NAME:_______________________ MAPPED: DATE: FINAL REVIEW:DATE: DATE: ALL WORK PERFORMED WILL MEET SSC, RUS, NEC AND NESC STANDARDS IDAHO # 1-800-342-1585 WYOMING # 1-800-348-1030 HH 238-ELLA-LN FINAL REVIEW NEAREST INTERSECTING ST: MIL23-803 DATE CALLED DIG LINE:__________________________ WORK ORDER APPROVED BY:238 ella ln , Rexburg, ID, 83246, USA (MADISON) S.17 T.006N R.040E 8,625.71$ COMPLETION INFORMATION DIG LINE NOTES SEC\TSHIP\RANGE -$ CONTACT: Jared Killpack CONTACT PHONE: 307-760-3204 NO 10022 REG ID 2308047 FIBER RXBHF3=191-192 SPLITTER ONT (2) 711 ONT (NEW) FCC CODE: OSP WORK ORDER 238 ELLA LN REXBURG ID FIBER DROP 21-Apr-23 2308047 RXBH 160659501031013 143160 AND 143147 BUDGET INFORMATION W.O.NOTES PREPARATION NEW CONSTRUCTION RXBG 10/2/2023 8:32 AM 238 ELLA LN REXBURG ID FIBER DROP OSP FACE SHEET Jason3Hawkins39lk9lkpk6 PLOW IN BFOV(2)(1.25) FROM HH-814-YELLOWSTONE-HWY TO NEW DRIVE, BORE UNDER TO NEW HH LOCATION AND SET NEW HH-238-ELLA-LN. WUD EXISTING CONDUIT GOING TO BUILDINGS. WUD AND TERMINATE ON BUILDING ONE. SET BENNER Newman WITH 700 AND 711 ONT INSIDE. HAND DIG TO BUILDING TWO AND INSTALL BENNER NEWMAN WITH 700 AND 711 ONT INSIDE.2ND ONT REG ID WILL BE 2308048 Heath3JensenChris Blayne 10/02/2023 08:31:25 AM Workorder Page:1 Estimate Summary Work Order: 2308047 Open Date: 09/15/2023 Project: Revision: Staked By: CHRISTOPHER C BLAYNE Map Location: Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0 Type: New Construction Rel Date: Customer: Status: Open 54501 estimate-2308047.pdf jhawkins Tran Type:Construction Assembly Unit Rate Qty/Total Material Labor Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost 1" EMT 3 CONDUIT 1" EMT 0 0 $12.14 $0.00 $0.00 $0.00 $12.14 700 ENCLOSURE TV 2 700 ENCLOSURE 0 0 $71.67 $0.00 $310.00 $0.00 $381.67 711GE TV 2 711GE ONT 0 0 $1,107.40 $0.00 $200.00 $0.00 $1,307.40 BFOV(ADDER)1.25"TV 120 BFOV(ADDER)1.25"0 0 $77.51 $0.00 $93.60 $0.00 $171.11 BFOV1"TV 29 1" PLOWCON 0 0 $7.13 $0.00 $88.45 $0.00 $95.58 BFOV E 1.25"TV 120 1 1/4 PLOWCON 0 0 $77.51 $0.00 $403.20 $0.00 $480.71 BHF (24X36)TV 1 PENCELL 2436 W/POLY LID PLASTIC 0 0 $1,076.56 $0.00 $310.00 $0.00 $1,386.56 BM60(3")COBBLE 1.25"TV 60 3" BORE COBBLE (W/1.25"CONDUIT)0 0 $38.75 $0.00 $2,400.00 $0.00 $2,438.75 CABLE PREP 4F TV 3 CABLE PREP 4F 0 0 $0.00 $0.00 $225.00 $0.00 $225.00 ENGINEERING LABOR TV 4 ENGINEERING LABOR 0 0 $0.00 $0.00 $340.00 $0.00 $340.00 HO-1 TV 4 LOOSE TUBE FIBER SPLICE 0 0 $0.99 $0.00 $56.00 $0.00 $56.99 SEBF-4 TV 230 BURIED FIBER OPTIC 4 0 0 $37.93 $0.00 $172.50 $0.00 $210.43 SEBF-4(IE)TV 118 BURIED FIBER OPTIC 4 INSIDE EXISTING DUC 0 0 $19.46 $0.00 $238.36 $0.00 $257.82 10/02/2023 08:31:25 AM Workorder Page:2 Estimate Summary Work Order: 2308047 Open Date: 09/15/2023 Project: Revision: Staked By: CHRISTOPHER C BLAYNE Map Location: Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0 Type: New Construction Rel Date: Customer: Status: Open 54501 estimate-2308047.pdf jhawkins Assembly Unit Rate Qty/Total Material Labor Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost SURFACE MOUNT ENCLOS 2 24X26 SURFACE MOUNT BOX 0 0 $538.21 $0.00 $0.00 $0.00 $538.21 WUD TV 2 LOCATE, EXPOSE, INTERCEPT EXISTING CONDU 0 0 $0.00 $0.00 $723.34 $0.00 $723.34 Total For Construction Assembly Units:0 $3,065.26 $0.00 $5,560.45 $0.00 $8,625.71 10/02/2023 08:31:25 AM Workorder Page:3 Estimate Summary Work Order: 2308047 Open Date: 09/15/2023 Project: Revision: Staked By: CHRISTOPHER C BLAYNE Map Location: Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0 Type: New Construction Rel Date: Customer: Status: Open 54501 estimate-2308047.pdf jhawkins 10/02/2023 08:31:25 AM Workorder Page:4 Estimate Summary Work Order: 2308047 Open Date: 09/15/2023 Project: Revision: Staked By: CHRISTOPHER C BLAYNE Map Location: Desc: 238 ELLA LN, REXBURG ID FIBER DROP Rel By: Service Location: 0 Type: New Construction Rel Date: Customer: Status: Open 54501 estimate-2308047.pdf jhawkins Additional Costs: Type Rate Qty/Total Material Labor Description Group Labor Hrs Hours Cost Overhead Cost Overhead Total Cost Total For Additional Costs:$0.00 Total For Work Order 2308047:0 $3,065.26 $0.00 $5,560.45 $0.00 $8,625.71 10/02/2023 08:30:49 AM Work Order Page:1 Item Pick List Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction MI Location: Location: Status: Open Pick List ID: Customer: Open Date: 09/15/2023 Project: Staked By: CHRISTOPHER C BLAYNE Rel By: Map Location: Rel Date: 54501 pickList-2308047.pdf jhawkins Construction Original Charged Group Item Description Quantity UOM ALL Quantity Loc EXP SMOUV-1120-01-U SPLICE SLEEVES FOR LOOSETUBE FIBER 4 EA INV1 000-01175 GS4220E GIGASPIRE-U6 2 EA INV1 100-05159 711GE ONT MODULE 2 EA EXP 41089-1WP 1-PORT SURFACE MOUNT BOX, WHITE 2 EA EXP 61110-RW6 CAT 6 DATA JACK 2 EA INV1 CSN30C12V-E Cyber Power Outdoor rated 12v w 30w outp 2 EA INV1 FTL-E/E-D001M SCA-SCA SIMPLEX FO JUMPER 1 MTR 2 EA INV1 FTL-E/E-D006M SCA-SCA SIMPLEX FO JUMPER 6 MTR 2 EA EXP BN24268W-UL SURFACE MOUNT COMMUNICATIONS ENCLOSURE 2 EA INV1 100-01578 700 SERIES ENCLOSURE 2 EA INV1 4 FIBER 4 fiber 348 FT EXP 1" EMT CONDUIT 1" EMT 3 EA INV1 1 1/4 PLOWCON 1 1/4" Plowcon, SDR11, Ribbed Silicore 300 FT INV1 FOSC450-B6-6-NT B CASE FOSC450-B6-6-NT-0-B3V 1 EA EXP 6 SOLID BARE CU #6 SOLID BARE GROUND WIRE (315' REEL) 10 FT EXP STC002 "BURIED FIBER" WARNING SIGNS 1 EA EXP BA3 6 X 8 Post 1 EA EXP EHL58C1K HAMMERLOCK 5/8" GROUND ROD TO #6 copper 1 EA EXP EM8100-12.25 #60 AWG 12" INSULATED BONDING HARNESS W 1 EA EXP FAK-MULDRP-45-S MULTI DROP KIT FAK-MULDRP-45- SEAL-FLAT4 1 EA INV1 FOSC-ACC-B-TRAY B TRAY FOSC-ACC-B-TRAY-24-KIT 1 EA INV1 PEN2436 PENCELL 2436 VAULT W/POLY LID 1 EA INV1 1" PLOWCON 1" PLOWCON, SDR11, Ribbed Silicore 29 FT 10/02/2023 08:30:49 AM Work Order Page:2 Item Pick List Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction MI Location: Location: Status: Open Pick List ID: Customer: Open Date: 09/15/2023 Project: Staked By: CHRISTOPHER C BLAYNE Rel By: Map Location: Rel Date: 54501 pickList-2308047.pdf jhawkins Construction Original Charged Group Item Description Quantity UOM ALL Quantity Loc INV1 6258 GROUND RODS 5/8 X 8'1 EA NINV 1646181 BLACKBURN ADR2 14-2 ALCU SCREW LUG MECHA 1 EA Total Quantity For Construction:722 * Indicates Non-Stock Or Exempt Material Item Signature:Date: 10/02/2023 08:30:49 AM Work Order Page:3 Item Pick List Work Order: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Type: New Construction MI Location: Location: Status: Open Pick List ID: Customer: Open Date: 09/15/2023 Project: Staked By: CHRISTOPHER C BLAYNE Rel By: Map Location: Rel Date: 54501 pickList-2308047.pdf jhawkins Assembly Unit Summary Type Pole Wire Misc Neut Assembly Unit Quantity Construction 1" EMT 3 700 ENCLOSURE 2 711GE 2 BFOV E 1.25"120 BFOV(ADDER)1.25"120 BFOV1"29 BHF (24X36)1 BM60(3")COBBLE 1.25"60 CABLE PREP 4F 3 ENGINEERING LABOR 4 HO-1 4 SEBF-4 230 SEBF-4(IE)118 SURFACE MOUNT ENCLOS 2 WUD 2 Caution: Known utility lines are shown in approx. locations only. Exact locations are to be determined by the contractor during construction.L Service Address: Comments: Exchange: Route: WO#: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Project: County: Madison Sec: 17 Twp: 06N Rng: 40E Easement/ROW: Scale: 1:187 15 0 15 SCALE IN FEET Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023 Constructed By: Date: Released By: Date: As Built By: Date: Revised By: Date: PAGE 1 OF 5 Pr i n t A r e a 1 STATION BHF (30X36)CABLE PREP 4F ENGINEERING LABOR HO-1 814-N- YELLOWSTONE-HWY 1 1 4 2 Total 1 1 4 2 Caution: Known utility lines are shown in approx. locations only. Exact locations are to be determined by the contractor during construction.L Service Address: Comments: Exchange: Route: WO#: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Project: County: Madison Sec: 17 Twp: 06N Rng: 40E Easement/ROW: Scale: 1:271 22 0 22 SCALE IN FEET Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023 Constructed By: Date: Released By: Date: As Built By: Date: Revised By: Date: PAGE 2 OF 5 Pr i n t A r e a 2 STATION BFOV(ADDER)1.25"BFOV E 1.25"BHF (24X36)SEBF-4 WUD 238-ELLA-LN 120 120 1 170 1 Total 120 120 1 170 1 Caution: Known utility lines are shown in approx. locations only. Exact locations are to be determined by the contractor during construction.L Service Address: Comments: Exchange: Route: WO#: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Project: County: Madison Sec: 17 Twp: 06N Rng: 40E Easement/ROW: Scale: 1:125 10 0 10 SCALE IN FEET Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023 Constructed By: Date: Released By: Date: As Built By: Date: Revised By: Date: PAGE 3 OF 5 Pr i n t A r e a 3 STATION 1" EMT 700 ENCLOSURE 711GE BFOV1"CABLE PREP 4F HO-1 SEBF-4 SEBF-4(IE)SURFACE MO UNT ENCLOS WUD 238 ELLA LN MAIN 2 1 1 1 1 118 1 1 238 ELLA LN 2ND 1 1 1 29 1 1 60 1 Total 3 2 2 29 2 2 60 118 2 1 Caution: Known utility lines are shown in approx. locations only. Exact locations are to be determined by the contractor during construction.L , , Exchange: Route: WO#: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Project: County: Madison Sec: 17 Twp: 06N Rng: 40E Easement/ROW: Scale: 1:1794.62 149 0 149 SCALE IN FEET Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023 Constructed By: Date: Released By: Date: As Built By: Date: Revised By: Date: PAGE 4 OF 5 23 0 8 0 4 7 Caution: Known utility lines are shown in approx. locations only. Exact locations are to be determined by the contractor during construction.L , , Exchange: Route: WO#: 2308047 Description: 238 ELLA LN, REXBURG ID FIBER DROP Project: County: Madison Sec: 17 Twp: 06N Rng: 40E Easement/ROW: Scale: 1:1794.62 149 0 149 SCALE IN FEET Staked By: CHRISTOPHER C BLAYNE Date: 09/29/2023 Constructed By: Date: Released By: Date: As Built By: Date: Revised By: Date: PAGE 5 OF 5 Span Tally Action Span Quantity No. of Spans C 1" EMT 3 1 C BFOV(ADDER)1.25"120 1 C BFOV1"29 1 C BFOV E 1.25"120 1 C SEBF-4 230 1 C SEBF-4(IE)118 1 Recap *Units Req. E BHF (30X36)1 C 1" EMT 3 C 700 ENCLOSURE 2 C 711GE 2 C BFOV(ADDER)1.25"120 C BFOV1"29 C BFOV E 1.25"120 C BHF (24X36)1 C CABLE PREP 4F 3 C ENGINEERING LABOR 4 C HO-1 4 C SEBF-4 230 C SEBF-4(IE)118 C SURFACE MOUNT ENCLOS 2 C WUD 2