Loading...
HomeMy WebLinkAboutINFRASTRUCTURE Rev 8 3.30.23 - 20-00899 - Blue Ox - Yellowstone Heights Condo Plat-Reviewed-Approved (3)Author Name Author Email Author Phone No.: Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314 Joel Gray Joel.Gray@rexburg.org 208-372-2331 Kyle Baldwin Kyle.Baldwin@rexburg.org 208-372-2164 Katie Saurey Katie.Saurey@rexburg.org 208-372-2167 Description : Blue Ox - Yellowstone Heights Condos - Infrastructure & Condo Plat Address : 814 N Yellowstone Hwy Record Type : Plat Document Filename : INFRASTRUCTURE Rev 8 3.30.23 - 20-00899 - Blue Ox - Yellowstone Heights Condo Plat.pdf Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Approved # 20-00899 Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments C-2 Stamp Stan Crittenden : Fire Open 3 Approved - Fire Dept C-0 Stamp Katie Saurey : P&Z Open 1 Plan Received C-2 Stamp Kyle Baldwin : P&Z Open 3 Approved - Planning and Zoning C-2 Stamp Joel Gray : PW Open 3 Approved - Public Works Plat Approval of plans does not constitute approval of variance from code Powered by TCPDF (www.tcpdf.org) Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 co v e r . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 3 5 A M 1 CO V E R CO V E R AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 YELLOWSTONE HEIGHTS CONDOMINIUMS Rexburg, Idaho PROJECT NO. 20022 SITE PLAN BEING PART OF THE SOUTHWEST QUARTER OF SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST OF THE BOISE MERIDIAN, REXBURG, MADISON COUNTY, IDAHO 1. SPECIFICATIONS AND DRAWINGS FOR THIS WORK SHALL BE PER CITY OF REXBURG STANDARDS AND ISPWC STANDARDS. THE DETAIL DRAWINGS HEREIN SUPPLEMENT THE CITY OF REXBURG STANDARDS. 2. BED PIPE IN NATIVE MATERIAL FREE OF ROCKS LARGER THAN 1 INCH IN DIAMETER AS BEDDING. IF ROCKS LARGER THAN 1 INCH ARE PRESENT, USE CRUSHED AGGREGATE OR SAND AS APPROVED BY THE ENGINEER. 3. ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO BID. IN CASE OF CONFLICT THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF WORK. 4. ELEVATIONS SHOWN ARE TO FINISHED SURFACE OR PIPE INVERT UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR SHALL RETAIN AND PROTECT OR REMOVE AND REPLACE ALL LANDSCAPING, TREES, UTILITIES, DITCHES, CULVERTS, FENCES, MAILBOXES, SIGNS, LIGHTPOLES, HEADGATES, AND ALL OTHER MISCELLANEOUS ITEMS. ANY DAMAGE DONE BY THE CONTRACTOR TO EXISTING STRUCTURES TO REMAIN, SHALL BE REPAIRED AT CONTRACTORS EXPENSE. 6. GENERAL LOCATIONS AND SIZES OF EXISTING UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT INTERFERE WITH NORMAL OPERATION OF ANY UTILITIES. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY COMPANY FIELD-LOCATE ANY EXISTING UTILITIES WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED DUE TO CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING SOURCES FOR GRANULAR MATERIAL, DISPOSAL SITES, AND ANY ADDITIONAL MATERIALS THAT MAY BE NECESSARY FOR PROPER CONSTRUCTION OF THIS PROJECT. 8. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE ARRANGEMENTS FOR WATER REQUIRED FOR TESTING, COMPACTION AND DUST CONTROL MEASURES. 9. THE CONTRACTOR SHALL PROVIDE REQUIRED TRAFFIC CONTROL IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 10.SITE ADDRESS: 238 ELLA LANE REXBURG, IDAHO. APPROVED BY: CITY OF REXBURG ENGINEERING DEPARTMENT APPROVED BY: ROCKY MOUNTAIN POWER APPROVED BY: CITY OF REXBURG FIRE DEPARTMENT APPROVED BY: CENTURY LINK APPROVED BY: INTERMOUNTAIN GAS 1.WATER SERVICE IN PROJECT WILL BE PVC. 2.CONSTRUCT WATER SERVICE CONNECTIONS PER ISPWC DETAIL SD-402 INCLUDING METER BOX, PIPING AND FITTINGS UP TO BUT NOT INCLUDING THE WATER METER. 3.THRUST BLOCKS SHALL BE PLACED AT ALL DIRECTION CHANGES IN THE PRESSURE PIPE PER THE 2020 ISPWC DETAIL SD-403. PROVIDE TEMPORARY CAPS AND TEMPORARY END THRUST BLOCKS AT ALL TEMPORARY WATERLINE TERMINATION POINTS AS REQUIRED DUE TO PHASED DEVELOPMENT. 4.COORDINATE ALL METER INSTALLATIONS WITH THE CITY OF REXBURG. 5.WATER PIPE MUST HAVE A MINIMUM SEPARATION DISTANCE OF 10' HORIZONTALLY AND 18" VERTICALLY FROM ANY SANITARY SEWER OR STORM SEWER MEASURED FROM THE EDGE OF EACH PIPE AS OUTLINED IN THE ISPWC 2008 STANDARD DRAWINGS SD-407. 6. COORDINATE LOCATION OF WATER METERS FOR SPRINKLING SYSTEM WITH OWNER'S SPRINKLER IRRIGATION PLAN. 7. TEST, FLUSH, AND DISINFECT CONSTRUCTED PIPE PER THE 2008 ISPWC SECTIONS 401.3.6 AND 401.3.9. 8. COMPLY STRICTLY TO MANUFACTURER INSTALLATION REQUIREMENTS IN REGARDS TO PULLED JOINTS ON THE WATERLINE WORK. USE STANDARD ELBOWS WHEREVER POSSIBLE IN LIEU OF PULLING JOINTS EVEN IF THE JOINT PULLS ARE WITHIN MANUFACTURE INSTALLATION TOLERANCES. 9. ALL WATER PIPES SHALL INCLUDE ALL APPURTENANCES INCLUDING BUT NOT LIMITED TO TEES, VALVES, ETC.... 10. WATER METERS SHALL BE INSTALLED PER CITY OF REXBURG STANDARDS (BY OTHERS). 11.WATER MAIN VALVES SHALL BE RESILIENT WEDGE GATE VALVES FOR 10" AND SMALLER DIAMETER PIPES AND BUTTERFLY VALVES FOR LARGER DIAMETER PIPES RATED AT 250 PSI OR GREATER. 1. ALL STORM SEWER PIPING IS TO BE ADS N 12 WT IB PIPE MEETING ASTM F2648 WITH SMOOTH INTERIOR. 2. ALL SEWER SERVICES ARE TO BE 4 IN. SDR 35 PVC. 3. GRADE ALL FINISH SURFACES AWAY FROM MANHOLE LIDS. 4. TEST GRAVITY SEWER PIPE PER ISPWC SECTIONS 501.3.4. 5. CONSTRUCT ALL SANITARY SEWER MANHOLES PER ISPWC 2020 STANDARD DRAWINGS SD-501. 6. ALL PIPE BEDDING TO BE CONSTRUCTED PER ISPWC 2020 STANDARD DRAWINGS SD-301 & SD-302. 7. ALL SANITARY SEWER SERVICE LINES ARE TO BE CONSTRUCTED PER ISPWC 2020 STANDARD DRAWINGS SD-511, SD-511A, AND SD-512. WATER NOTES: SEWER NOTES: 1.ALL NEW ELECTRICAL FACILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT ROCKY MOUNTAIN POWER SERVICE POLICY. 2.DEVELOPER SHALL BEAR ALL COSTS TO RELOCATE OR REMOVE EXISTING POWER POLES, LIGHT POLES, ANCHOR GUYS AND MISCELLANEOUS ELECTRICAL FACILITIES. 3.ALL PVC ELECTRIC CONDUITS SHALL BE PVC SCHEDULE 40. ALL FIBERGLASS CONDUITS SHALL MEET ROCKY MOUNTAIN POWER'S MARKING AND STRENGTH RATING REQUIREMENTS. CONDUIT DIAMETERS SHALL MEET ROCKY MOUNTAIN POWER'S DESIGN. ALL ELBOWS SWEEP RADII SHALL BE 36”, 48” OR 60” DEPENDING ON ROCKY MOUNTAIN POWER'S DESIGN. 4.ALL PRIMARY AND SECONDARY CONDUITS SHALL BE PROVIDED AND INSTALLED BY THE DEVELOPER. 5.TRENCH EXCAVATION AND CONDUIT PLACEMENT SHALL BE IN ACCORDANCE WITH ROCKY MOUNTAIN POWER SERVICE POLICY SPECIFICATIONS AND IN ACCORDANCE WITH OSHA STANDARDS. CONDUIT TRENCH DEPTHS SHALL BE BETWEEN 36” AND 48” (NOT TO EXCEED 60”) AND INCLUDE THE REQUIRED SAND PLACEMENT BELOW AND ABOVE THE PLACED CONDUIT. 6.THE ENGINEER SHALL PROVIDE ALL STAKING AND LAYOUT OF NEW ELECTRICAL FACILITIES INCLUDING POWER POLES. 7.THE CONTACTOR SHALL RETAIN AND PROTECT ALL EXISTING POWER POLES AND ELECTRICAL FACILITIES DURING CONSTRUCTION. 8.THE DEVELOPER SHALL COORDINATE ALL ELECTRICAL CONSTRUCTION WITH ROCKY MOUNTAIN POWER. 9.CLEARANCE BETWEEN OVERHEAD POWER AND NEW BUILDING STRUCTURES SHALL BE MAINTAINED MEETING THE CURRENT ROCKY MOUNTAIN POWER SERVICE POLICY. 10.SEE ROCKY MOUNTAIN POWER ELECTRICAL SITE PLAN FOR OFF-SITE AND ON-SITE ELECTRICAL LAYOUT AND INSTALLATION DETAILS. IN THE EVENT THE FIBER OPTIC UTILITY ELECTS TO USE THE SAME TRENCH, THEY MUST MEET NESC UNDERGROUND UTILITY CLEARANCES. 11.A 15 FOOT WIDE PUBLIC UTILITY EASEMENT IS PERPETUALLY RESERVED WITHIN EACH LOT ALONG ALL ROAD FRONTAGES FOR THE USE OF PUBLIC UTILITIES WITHIN THIS SUBDIVISION. NO PERMANENT STRUCTURES, SIDEWALKS, AND DRIVEWAYS SHALL BE CONSTRUCTED OVER SAID EASEMENT (OTHER THAN CROSSINGS) IN ORDER FOR THE UTILITY COMPANIES TO MAINTAIN. ELECTRICAL NOTES: 1. LANDSCAPING REQUIRED OVER 10% OF TOTAL AREA AND 10% OF TOTAL PLOWED AREA REQUIRED FOR SNOW STORAGE. LANDSCAPE/GREEN SPACE/ SNOW STORAGE CITY OF REXBURG ENGINEERING DEPARTMENT KEITH DAVIDSON (208) 359-3020 DEQ (208) 528-2650 DIGLINE (CALL BEFORE YOU DIG)811 OR (800) 342-1585 EAGLE ROCK ENGINEERING PROJECT ENGINEER PAUL SNARR (208) 542-2665 PROJECT MANAGER PAUL SNARR (208) 542-2665 PROJECT CONTACTS INDEX GENERAL NOTES EL.ELEVATION FF FINISHED FLOOR INV INVERT O.C.ON CENTER REQ'D REQUIRED STD STANDARD TEMP TEMPORARY TYP TYPICAL TBC TOP BACK OF CURB DWG DRAWING FL FLOW LINE OF CURB X-TBC EXISTING TOP BACK OF CURB X EXISTING BTM BOTTOM FO FINISHED OIL GRADE EO EDGE OF OIL MH MANHOLE SSMH SANITARY SEWER MANHOLE CB CATCH BASIN FW FRONT OF SIDEWALK BW BACK OF SIDEWALK GB GRADE BREAK TOW TOP OF WALL HP HIGH POINT LP LOW POINT ABBREVIATIONS VICINITY MAP N S EW PROJECTLOCATION N Y E L L O W S T O N E H W Y E 7TH N N 2 N D E SHEET #SHEET NAME SHEET TITLE 1 COVER COVER 2 C-1 EXISTING CONDITIONS 3 C-2 SITE PLAN 4 C-3 STORM PLAN & GRADING 5 PP-1 LOT 1, AND LOT 2 6 PP-2 HIGHWAY 33 7 T-1 YELLOWSTONE HIGHWAY 33 PAVEMENT MARKINGS 8 T-2 YELLOWSTONE HIGHWAY 33 TRAFFIC CONTROL 9 D-1 DETAILS 10 D-2 DETAILS APPROVED BY: IDAHO TRANSPORTATION DEPARTMENT - HIGHWAY 33 Digitally signed by Paul J Snarr Date: 2023.03.30 08:27:15-06'00' EO EO EG EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EG EG EG X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X (8 ' ' S S (8 ' ' S S OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P EO EO EO EO EG EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO YE L L O W S T O N E U S H I G H W A Y 3 3 8' ' W 8' ' W N0 ° 0 8 ' 0 8 " W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W N89° 35' 22"E 420.47' ELLA LANE BORE UNDER EXISTING ASPHALT IN HIGHWAY 51 5 + 5 0 (8''SS(8''SS(8''SS(8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8 ' ' S S 8'' S S ) 8' ' S S ) (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S PARADISE NURSERY & P O N D C E N T E R L L C INST # 269950, 269 9 7 4 , 2 6 9 9 7 5 , 2 7 9 9 6 6 , 3 1 8 8 7 1 4872 4873 4873 4873 4872 4873 48 7 4 48 7 5 4875 4872 48 7 2 48 7 3 48 7 4 487 4 48 7 5 487 5 487 6 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 c 1 ex i s t i n g c o n d i t i o n s . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 3 8 A M W E S N 030'30'15' SCALE: 1" = 30' 2 C- 1 EX I S T I N G C O N D I T I O N S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 REMOVE EXISTING FENCE AND REPLACE WITH 6' SOLID VINYL FENCE REMOVE EXISTING FENCE AND REPLACE WITH 6' SOLID VINYL FENCE REMOVE EXISTING BUILDINGS REMOVE EXISTING GRAVEL DRIVE AND CONCRETE RELOCATE EXISTING POWER POLES AND POWER LINES N89°35'22"E 420.78' WEST QUARTER CORNER SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN CP&F INSTRUMENT NUMBER 264337 N0 ° 1 1 ' 0 6 " E 14 9 8 . 0 2 ' SOUTHWEST CORNER SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN CP&F INSTRUMENT NUMBER 264347 N0 0 ° 1 1 ' 0 6 " E 2 6 5 7 . 3 9 ' 11 5 9 . 3 7 ' BA S I S O F B E A R I N G C I T Y O F R E X B U R G REMOVE EXISTING CONCRETE PAD NOTES: 1.EXISTING WELL TO BE ABANDONED PER IDWR REQUIREMENTS. 2.EXISTING SEPTIC SYSTEM TO BE ABANDONED PER HEALTH DISTRICT REQUIREMENTS. REMOVE EXISTING FENCE ASPHALT WALKING PATH CULVERT DESCRIPTION PRESSURE LINE (WATER LINE) SANITARY SEWER MAIN LINETYPE GAS LINE FENCE LINE G G XXX UGP OHP UNDERGROUND POWER LINE UNDERGROUND PVC POWER CONDUIT OVERHEAD POWER LINE TELEPHONE LINE DRAINAGE FLOW BREAKLINE PROPOSED/EXISTING ELEVATION PROPOSED/EXISTING FIRE HYDRANT PROPOSED/EXISTING VALVE PROPOSED/EXISTING CURB AND GUTTER PROPOSED/EXISTING STREET LIGHT PROPOSED/EXISTING POWER POLE EXIST.PRO.DESCRIPTION PROPOSED/EXISTING MANHOLE PROPOSED/EXISTING STORM DRAIN INLET PROPOSED ASPHALT DRAINAGE FLOW ARROW LEGEND 0.75% BOUNDARY LINE CENTERLINE SECTION LINE CONCRETE EXISTING GROUND CONTOUR4727 TBC 72.1 0 XG = 7 2 . 1 0 PUBLIC UTILITY EASEMENT STORM DRAIN MAIN(12''SD EXISTING PRESSURE LINE (WATER LINE)8''W 8''W (8''SS EXISTING SANITARY SEWER MAIN(8''SS EXISTING STORM DRAIN MAIN(12''SD YE L L O W S T O N E U S H I G H W A Y 3 3 8'' W 8' ' W N0 ° 0 8 ' 0 8 " W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 16 ' ' W N89° 35' 22"E 420.47' ELLA LANE BORE UNDER EXISTING ASPHALT IN HIGHWAY 51 5 + 5 0 (8''SS(8''SS(8''SS(8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8 ' ' S S 8'' S S ) 8' ' S S ) 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S BLOCK 1 LOT 2 BLOCK 2 LOT 2 PARADISE NURSERY & P O N D C E N T E R L L C INST # 269950, 269 9 7 4 , 2 6 9 9 7 5 , 2 7 9 9 6 6 , 3 1 8 8 7 1 PLAYGROUND GAZEBO/ PAVILLION STORM POND 2 AND SNOW STORAGE RIP RAP BLDG C F.F.=4874.78 BLDG D F.F.=4874.71 X X X X BLDG A F.F.=4873.30 BLDG B F.F.4873.30 (8 ' ' S S (8 ' ' S S 8' ' W 8' ' W 8' ' W 8' ' W 6''W 6''W 4''SS 8' ' S S ) 8' ' S S ) 2''W 2''W 4''SS 4''SS 6''W6''W 24 ' X 1 2 0 ' 1 0 C A R G A R A G E 6' ' W 2' ' W 12''SD) AD S S T O R M T E C H CH A M B E R ( S E E T A B L E 5 ) 6''W STORM POND/ LANDSCAPED POND FOR ADDITIONAL AREA FOR BUILDING DRAINAGE EO EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP (8 ' ' S S (8 ' ' S S (8 ' ' S S OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P EO EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W SNOW 4 STORAGE 5586 sqft SNOW 5 STORAGE 1008 sqft STO R A G E 6 843 s q f t STORAGE 7 351 sqft 1 1 4 2 3 4 3 2 2 3 4 3 2 4 SCREENED TRASH ENCLOSURE 9' X 2 0 ' 20 S T A L L S 9' X 2 0 ' 12 S T A L L S 9' X 2 0 ' 11 S T A L L S 9'X 2 0 ' 5 S T A L L S INSTALL SSMH #2 CONNECT TO EXISTING 8" SANITARY SEWER CONNECT TO EXISTING 8" WATER LINE 15' P.U.E. (TYP.) VALLEY GUTTER 9'X20' 18 STALLS 8'X 1 8 ' 8 S T A L L S SCREENED TRASH ENCLOSURE 20 ' 20' 24' 24 ' 24 . 5 6 ' R=3 0 ' 46.4'10 . 4 8 ' 24' 20 ' 15' 24' 8'X 1 8 ' 7 S T A L L S 9'X20' 8 STALLS 7 7 5 5 6 6 6 5 5 15' P.U.E. (TYP.) PHASE 1 PHASE 2 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 c 2 s i t e pl a n . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 4 0 A M 3 C- 2 SI T E P L A N AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 SURVEY NOTE: This site plan conforms to an actual survey that was performed on the ground by a licensed land surveyor in and for the State of Idaho. It is the owner’s responsibility to construct all structures shown on this site plan in accordance with said survey. W E S N SCALE: 1" = 30.0' 30'0 30' NOTES: PROPOSED USE= RESIDENTIAL APARTMENTS PROJECT AREA=2.60 ACRES ZONE = MDR1 PARKING STALLS REQUIRED @ 2 PER UNIT=84 PARKING STALLS PROVIDED=79 + 10 STALL GARAGE HANDICAP PARKING STALLS=8 LANDSCAPE AREA=1.26 ACRES IMPERVIOUS AREA=1.34 ACRES DEVELOPER OF YELLOWSTONE HEIGHTS SHALL BE RESPONSIBLE FOR ALL HIGHWAY WIDENING AND PAVEMENTS MARKINGS AS SHOWN HEREIN IN ACCORDANCE WITH CURRENT ITD STANDARDS (SEE SHEET 6 FOR HIGHWAY DESIGN) INSTALL SIDEWALK TO 2ND STREET PER CITY OF REXBURG. ELLA LANE COMMERCIAL DRIVEWAY APPROACH WITH HANDICAP RAMPS AS PER CITY OF REXBURG STANDARDS. 6" FIRE WATER SERVICE INTO BUILDING. 2" WATER SERVICE WITH GATE VALVE INTO BUILDING. 4" SANITARY SEWER SERVICE INTO BUILDING. LIP UP CURB AND GUTTER. SEE DETAIL 12 SHEET D-1. LIP DOWN CURB AND GUTTER. SEE DETAIL 11 SHEET D-1. THICKENED EDGE SIDEWALK. SEE DETAIL 14 SHEET D-1. KEYNOTES: 1 2 3 4 DESCRIPTION PRESSURE LINE (WATER LINE) SANITARY SEWER MAIN LINETYPE GAS LINE FENCE LINE G G UGP OHP UNDERGROUND POWER LINE UNDERGROUND PVC POWER CONDUIT OVERHEAD POWER LINE TELEPHONE LINE DRAINAGE FLOW BREAKLINE PROPOSED/EXISTING ELEVATION PROPOSED/EXISTING FIRE HYDRANT PROPOSED/EXISTING VALVE PROPOSED/EXISTING CURB AND GUTTER PROPOSED/EXISTING STREET LIGHT PROPOSED/EXISTING POWER POLE EXIST.PRO.DESCRIPTION PROPOSED/EXISTING MANHOLE PROPOSED/EXISTING STORM DRAIN INLET PROPOSED ASPHALT DRAINAGE FLOW ARROW LEGEND 0.75% BOUNDARY LINE CENTERLINE SECTION LINE CONCRETE EXISTING GROUND CONTOUR4727 TBC 72.1 0 XG = 7 2 . 1 0 PUBLIC UTILITY EASEMENT STORM DRAIN MAIN(12''SD EXISTING PRESSURE LINE (WATER LINE)8''W 8''W (8''SS EXISTING SANITARY SEWER MAIN(8''SS EXISTING STORM DRAIN MAIN(12''SD LANDSCAPE AREA IMPERIA HONEYLOCUST FOR LANDSCAPING AUTUMN JOY SEDUM FOR LANDSCAPING NEW MUGO PINE FOR LANDSCAPING NEW BUSH FOR LANDSCAPING NEW DIABOB NINEBARK FOR LANDSCAPING EXISTING ASPHALT 5 6 7 SIDEWALK ALONG HWY 33 TO BE COORDINATED AND CONSTRUCTED PER THE GROVE AT THOMSON FARMS PROJECT TIE ONTO EXISTING 16" WATER MAIN AND EXTEND WATER MAIN TO NORTH BOUNDARY LINE OF PROJECT WATER LINE WILL BE INSTALLED BY CITY OF REXBURG INSTALL PARKING BUMPERS PER OWNERS SPECIFICATIONS (TYP.) INSTALL PARKING BUMPERS PER OWNERS SPECIFICATIONS (TYP.) YE L L O W S T O N E U S H I G H W A Y 3 3 8' ' W 8' ' W N0 ° 0 8 ' 0 8 " W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 16 ' ' W N89° 35' 22"E 420.47' BORE UNDER EXISTING ASPHALT IN HIGHWAY 51 5 + 5 0 (8''SS(8''SS(8''SS(8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8''SS (8 ' ' S S 8'' S S ) 8'' S S ) 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S (1 2 ' ' S S BLOCK 1 LOT 2 BLOCK 2 LOT 2 PLAYGROUND GAZEBO/ PAVILLION STORM POND 2 AND SNOW STORAGE RIP RAP BLDG C F.F.=4874.78 BLDG D F.F.=4874.71 X X X X BLDG A F.F.=4873.30 BLDG B F.F.4873.30 (8 ' ' S S (8 ' ' S S 8' ' W 8' ' W 8' ' W 8' ' W 6''W 6''W 4''SS 8' ' S S ) 8' ' S S ) 2''W 2''W 4''SS 4''SS 6''W6''W 24 ' X 1 2 0 ' 1 0 C A R G A R A G E 6' ' W 2' ' W 12''SD) AD S S T O R M T E C H CH A M B E R ( S E E T A B L E 5 ) 6''W STORM POND/ LANDSCAPED POND FOR ADDITIONAL AREA FOR BUILDING DRAINAGE EO EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X EO EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W SNOW 4 STORAGE 5586 sqft SNOW 5 STORAGE 1008 sqft STO R A G E 6 843 s q f t STORAGE 7 351 sqft 9' X 2 0 ' 9'X 2 0 ' 1 1 15' P.U.E. (TYP.) LIP 73.76 TBC/TFW 74.26 LIP 74.60TBC 75.10 LIP 72.96 TBC 73.31 TBC 73.52 LIP 73.17 HP LIP 73.60 HP/TBC 73.95 LIP 73.35 TBC 73.70 LIP 73.25 TBC 73.60 LIP 73.15 TBC 73.50 TBC 73.40 LIP 73.05TBC 73.08 LIP 72.58 TBC 73.20 LIP 72.78 TBC 73.13TBC 73.28 LIP 72.93 LIP 72.00 FL 71.90 LIP 72.00 LIP 72.66 TBC 73.16 TBC 73.68 LIP 73.18 LIP 73.31 LIP 73.76 FW/TBC 74.26 LIP 72.98 LIP 72.90 TBC 73.58 TBC 73.50 LIP 73.06 TBC 73.66 LIP 73.10 TBC 73.70 OIL 73.88 TBC 74.38 TBC 73.72 TBC 73.80 TBC 73.63 TBC 73.55 TBC 73.46 OIL 73.96 TBC 74.46TBC 74.30 LIP 73.30TBC 73.90 TBC 74.80 LIP 74.60 TBC 75.10 TBC 75.20 TBC 73.78 TBC 73.70 TBC 73.62 TBC 73.54 TBC 73.46 TBC 73.81 TBC 74.34 LIP/OIL 73.84 LIP/OIL 73.94 TBC 74.44 TBC 73.20 TBC 72.77 TBC/TFW 73.14 TBC/TFW 73.14TBC 72.74 TBC 72.74 TBC 72.04 TBC 71.92TBC 71.86TBC 71.52 TBC 71.20 TBC 71.54 TBC 71.80 TBC 71.75 TBC 71.68 TBC 71.14 TBC 70.90 TBC 72.45 TBC 72.80 TBC 72.40 LOT 2 STORM AREA LOT 1 STORM AREA 4873 4872 4871 4873 4872 4872 4873 48 7 4 48 7 3 48 7 2 48 7 1 LIP 72.40 TBC 72.90 TBC 72.50 TBC 72.48 LIP 72.60 EG F 7 4 . 6 0 LIP 73.70 LIP 74.60 LIP 74.20 TBW 74.36 TBW 74.36 TBC 72.50 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 c 3 s t o r m pl a n . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 4 2 A M 4 C- 3 ST O R M P L A N & G R A D I N G AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 INSTALL STANDARD CURB AND GUTTER FROM ELLA LANE NORTH ELLA LANE INSTALL SIDEWALK TO 2ND STREET PER CITY OF REXBURG. W E S N 030'30'15' SCALE: 1" = 30' COMMERCIAL DRIVEWAY APPROACH WITH HANDICAP RAMPS AS PER CITY OF REXBURG STANDARDS. KEYNOTES: 1 TYPE 3 BARRICADE 8''W 8''W 8''W X 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S (8 ' ' S S (8 ' ' S S (8 ' ' S S (8 ' ' S S (8 ' ' S S (8''SS8''SS)8''SS)8''SS) B L O C K 2 L O T 2 B L D G C F . F . = 4 8 7 4 . 7 8 B L D G D F . F . = 4 8 7 4 . 7 1 X X X X X X X X 8''W 8''W 8''W 8''W 6' ' W 6' ' W 6' ' W 6' ' W 4' ' S S 4' ' S S 4''SS 8''SS)8''SS)8''SS) 2 ' ' W 2 ' ' W 2 ' ' W 6 ' ' W 6 ' ' W 6 ' ' W 24'X120' 10 C A R G A R A G E S T O R M P O N D / L A N D S C A P E D A D D I T I O N A L A R E A XX SSMH #2 CONNECT TO EXISTING 8" WATERLINE CONNECT TO EXISTING 8" SANITARY SEWER LINE O I L 7 3 . 8 8 T B C 7 4 . 3 8 O I L 7 3 . 9 6 T B C 7 4 . 4 6 L I P 7 3 . 7 6 L I P 7 4 . 6 0 L I P 7 2 . 9 6 T B C 7 3 . 3 1 T B C 7 3 . 5 2 L I P 7 3 . 1 7 H P L I P 7 3 . 6 0 H P / T B C 7 3 . 9 5 L I P 7 3 . 3 5 T B C 7 3 . 7 0 L I P 7 3 . 2 5 T B C 7 3 . 6 0 L I P 7 3 . 1 5 T B C 7 3 . 5 0 T B C 7 3 . 4 0 L I P 7 3 . 0 5 T B C 7 3 . 0 8 L I P 7 2 . 5 8 T B C 7 3 . 2 0 L I P 7 2 . 7 8 T B C 7 3 . 1 3 T B C 7 3 . 2 8 L I P 7 2 . 9 3 L I P 7 2 . 0 0 F L 7 1 . 9 0 L I P 7 2 . 0 0 L I P 7 2 . 6 6 T B C 7 3 . 1 6 L I P 7 3 . 1 8 L I P 7 3 . 3 1 L I P 7 3 . 7 6 F W / T B C 7 4 . 2 6 L I P 7 2 . 9 8 L I P 7 2 . 9 0 T B C 7 3 . 5 8 T B C 7 3 . 5 0 L I P 7 3 . 0 6 T B C 7 3 . 6 6 L I P 7 3 . 1 0 T B C 7 3 . 7 0 T B C 7 4 . 3 0 L I P 7 3 . 3 0 T B C 7 3 . 9 0 T B C 7 4 . 8 0 L I P 7 4 . 6 0 T B C 7 5 . 1 0 T B C 7 5 . 2 0 T B C 7 3 . 8 1 L I P 7 2 . 4 0 T B C 7 2 . 9 0 T B C 7 2 . 5 0 T B C 7 2 . 4 8 L I P 7 2 . 6 0 EGF 74.60 L I P 7 3 . 7 0 L I P 7 4 . 6 0 L I P 7 4 . 2 0 T B W 7 4 . 3 6 T B W 7 4 . 3 6 T B C 7 2 . 5 0 4860 4862 4864 4866 4868 4870 4872 4874 4876 4878 4880 4860 4862 4864 4866 4868 4870 4872 4874 4876 4878 4880 0+001+002+002+20 EXISTING 76-LF OF 8" PVC @ 0.40% E INV IN=4861.87 S INV IN=4861.87 N INV IN=4861.87 W INV OUT=4861.77 EX SSMH STA=0+20, 0.00' RIM=4873.65 84-LF OF 8" PVC @ -0.45% N INV IN=4862.55 SSMH #2 STA=1+80, 0.00' RIM=4873.50 EXISTING 69-LF OF 8" WATERLINE68-LF OF 8" WATERLINE 28-LF OF 8" WATERLINE CONNECT TO EXISTING 8" SANITARY SEWER LINE (FIELD VERIFY) CONNECT TO EXISTING 8" WATER LINE (FIELD VERIFY) FINISHED GRADE EXISTING GRADE 6' MIN BURY 4860 4862 4864 4866 4868 4870 4872 4874 4876 4878 4880 4860 4862 4864 4866 4868 4870 4872 4874 4876 4878 4880 0+00 1+00 2+00 2+20 E INV IN=4861.87 S INV IN=4861.87 N INV IN=4861.87 W INV OUT=4861.77 EX SSMH STA=0+20, 0.00' RIM=4873.65 EXISTING 70-LF OF 8" PVC @ 0.40% EXISTING 72-LF OF 8" WATERLINE 73-LF OF 8" WATERLINE 5-LF OF 8" WATERLINE 17-LF OF 8" WATERLINE 89-LF OF 8" PVC @ 0.40%S INV OUT=4862.51 SSMH #1 STA=1+79.53, 0.00' RIM=4871.82 CONNECT TO EXISTING 8" SANITARY SEWER LINE (FIELD VERIFY) CONNECT TO EXISTING 8" WATER LINE (FIELD VERIFY) W INV IN=4867.12 NE INV OUT=4867.02 CB #1 STA: 1+58.35 GRATE=4870.70 12" SW INV IN=4866.99 24" N INV OUT=4867.19 SDMH #1 STA: 1+67.58 RIM=4871.00 BOTTOM=4861.006' MIN BURY FINISHED GRADE EXISTING GRADE ADS STORM TECH INFILTRATION SYSETM (SEE TABLE 5) 8''W 8''W X X X X X X X X X X X X X X X X X X X X X X X X X 8 ' ' W 8 ' ' W 8 ' ' W 8 ' ' W 8' ' W 8' ' W 8' ' W 8' ' W 8''W ( 8 ' ' S S ( 8 ' ' S S ( 8 ' ' S S (8 ' ' S S (8 ' ' S S (8 ' ' S S (8 ' ' S S (8''SS (8''SS8''SS) B L O C K 1 L O T 2 I N S T # 2 6 9 9 5 0 , 2 6 9 9 7 4 , 2 6 9 9 7 5 , 2 7 9 9 6 6 , 3 1 8 8 7 1 B L D G A F . F . = 4 8 7 3 . 3 0 B L D G B F . F . 4 8 7 3 . 3 0 (8''SS (8''SS (8''SS 8''W 8''W 8''W 4 ' ' S S 4 ' ' S S 6''W 2 ' ' W 2''W 2''W 2 ' ' W 1 2 ' ' S D ) 6' ' W EG EG X X X X X X X X X X X X X X X X X X X X X X X X X OHP OHP OHP OHP OHP OHP OH P OH P EO EO EO 22.5° EG EG X X X X X X X X X X X X X X X X X X X X X X X X X OHP OHP OHP OHP OHP OHP OH P OH P EO EO EO SSMH #1 22.5° T B C T B C 7 4 . 3 4 L I P / O I L 7 3 . 8 4 L I P / O I L 7 3 . 9 4 T B C 7 4 . 4 4 T B C 7 3 . 2 0 T B C 7 2 . 7 7 T B C / T F W 7 3 . 1 4 T B C / T F W 7 3 . 1 4 T B C 7 2 . 7 4 T B C 7 2 . 7 4 T B C 7 2 . 0 4 T B C 7 1 . 9 2 T B C 7 1 . 8 6 T B C 7 1 . 5 2 T B C 7 1 . 2 0 T B C 7 1 . 5 4 T B C 7 1 . 8 0 T B C 7 1 . 7 5 T B C 7 1 . 6 8 T B C 7 1 . 1 4 T B C 7 0 . 9 0 T B C 7 2 . 4 5 T B C 7 2 . 8 0 T B C 7 2 . 4 0 E INV OUT=4867.21 CB #2 GRATE=4870.40 W INV IN=4867.12 CB #1 GRATE=4870.7037-LF OF 12" S.D. @ 0.22% 14-LF OF 12" S.D. @ 0.22% SW INV IN=4866.99 N INV OUT=4867.19 SDMH #1 STA=1+67.58, 24.85' L RIM=4871.00 W E S N 020'20'10' SCALE: 1" = 20' 5 PP - 1 LO T 1 , A N D L O T 2 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 p p 1 se r v i c e c o n n e c t i o n s . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 4 6 A M LOT 2 SERVICE CONNECTIONS LOT 1 SERVICE CONNECTIONS FIRE HYDRANT ASSEMBLY. SEE DETAIL 4 SHEET D-1. 8"x6" TEE WITH THRUST BLOCK. SEE DETAIL 3 SHEET D-1. BEND (ANGLE PER PLAN) WITH THRUST BLOCK. SEE DETAIL 3 SHEET D-1. 6" FIRE SERVICE INTO BUILDING. 2" WATER SERVICE INTO BUILDING. 4" SANITARY SEWER SERVICE INTO BUILDING. KEYNOTES: 1 2 1 2 1 2 3 3 4 5 6 4 5 6 6 4 5 6 4 5 4 6 EX SSMH EX SSMH AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 4856 4858 4860 4862 4864 4866 4868 4870 4872 4874 4876 4856 4858 4860 4862 4864 4866 4868 4870 4872 4874 4876 9+80 10+00 11+00 12+00 13+00 14+00 15+00 15+50 PC S T A : 1 3 + 4 6 . 9 9 EL : 4 8 7 4 . 1 6 PC S T A : 1 3 + 0 0 . 7 6 EL : 4 8 7 4 . 1 6 PT S T A : 1 3 + 6 9 . 6 1 EL : 4 8 7 5 . 0 0 PT S T A : 1 2 + 7 7 . 3 6 EL : 4 8 7 4 . 8 0 ST A : 1 4 + 4 1 . 8 2 EL : 4 8 7 4 . 7 0 ST A : 1 2 + 0 4 . 3 4 EL : 4 8 7 4 . 5 0 ST A : 1 1 + 3 2 . 7 2 EL : 4 8 7 4 . 8 0 ST A : 1 0 + 6 4 . 7 0 EL : 4 8 7 4 . 5 0 ST A : 9 + 9 2 . 4 3 EL : 4 8 7 4 . 8 0 ST A : 1 5 + 4 1 . 9 6 EL : 4 8 7 5 . 2 8 -0.37%0.44%-0.42%0.41%-0.42%0.56% 2.0% AL:36.7 7 ' 2.0% AL:35. 7 0 ' CENTERLINE OF EXISTING HIGHWAY 33 PROPOSED TBC RIGHT SIDE OF ROAD 170-LF OF 8" PVC @ 0.71% 396-LF OF 8" PVC @ 0.61% E INV IN=4860.78 NE INV IN=4860.83 SW INV OUT=4860.73 EX-SSMH #1 STA=12+71.69, 38.10' L RIM=4875.60 NE INV IN=4859.51 SW INV OUT=4859.41 EX-SSMH #2 STA=10+76.55, 73.75' L RIM=4874.97 201-LF OF 8" PVC @ 0.61% 331-LF OF 16" WATERLINE 203-LF OF 16" WATERLINE 12" NW INV IN=4871.10 24" SW INV OUT=4869.70 SDMH #3 STA: 14+42.23 RIM=4874.70 BOTTOM=4866.7012" W INV IN=4870.90 24" S INV OUT=4869.50 SDMH #4 STA: 12+04.56 RIM=4874.50 BOTTOM=4866.50 12" W INV IN=4870.90 24" S INV OUT=4869.50 SDMH #5 STA: 10+64.68 RIM=4873.96 BOTTOM=4866.50 E INV OUT=4871.00 CB #5 STA: 10+64.68 GRATE=4874.00 E INV OUT=4871.00 CB #4 STA: 12+04.53 GRATE=4874.22 SE INV OUT=4871.20 CB #3 STA: 14+42.18 GRATE=4873.72 INFILTRATION SYSTEM 3 SEE TABLE 6 INFILTRATION SYSTEM 4 SEE TABLE 6 INFILTRATION SYSTEM 5 SEE TABLE 6 YELLOW S T O N E U S H I G H W A Y 3 3 24'X120' 10 CAR GARAGE S T O R M P O N D / L A N D S C A P E D P O N D F O R A D D I T I O N A L A R E A F O R B U I L D I N G EO EO EO EO X X X X (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS (12''SS OH P OH P EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EOEOEOEOEOEOEOEOEOEOEOEO R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W 9+80 10+00 11+00 12+00 13+00 14+00 15+00 TBC: 4874.80 TBC: 4874.50 TBC: 4874.50 TBC: 4874.80 TBC: 4874.16 TBC: 4874.16 TBC: 4875.00 TBC: 4874.70 TBC: 4875.28 105'155' W E S N 020'20'10' SCALE: 1" = 20' 6 PP - 2 HI G H W A Y 3 3 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 p p 2 ye l l o w s t o n e h i g h w a y 3 3 . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 4 9 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 HIGHWAY 33 MINOR ARTERIAL STREET TYP. SECTION 9 (HIGHWAY 33)17 SEE SHEET T1 FOR DISTANCE SEE SHEET T1 FOR DISTANCE SEE SHEET T1 FOR DISTANCE VARIES' UTILITY OR LANDSCAPING 5' SIDEWALK VARIES TO PROPERTY LINE 4" TYP 12"4" ASPHALT PLANTMIX PAVEMENT 6" - 3/4" AGGREGATE BASE 20" GRANULAR BORROW GEOTEXTILE FABRIC BELOW AND UP SIDES 12" TYP GRANULAR BORROW SEAL COAT 2% SLOPE2% SLOPE 2% SLOPEYELLOWSTONE HIGHWAY (HIGHWAY 33 NOTES) SEE SHEETS T-1 AND T-2 FOR COMPLETE HIGHWAY WIDENING PLANS 1.DEVELOPER OF YELLOWSTONE HEIGHTS SHALL BE RESPONSIBLE FOR ALL HIGHWAY WIDENING AND PAVEMENT MARKINGS AS SHOWN HEREIN IN ACCORDANCE WITH CURRENT ITD STANDARDS. THE ASPHALT WIDENING AND PAVEMENT MARKINGS SHOWN HEREIN , WITH THE EXCEPTION OF THE NORTHBOUND RIGHT TURN LANE WAS ORIGINALLY APPROVED BY ITD FOR THE KENNETH SQUARE PROJECT AND REFERENCED IN THE DEVELOPMENT AGREEMENT INSTRUMENT NUMBER 411147 DATED 7/28/2017. 2.ALL WORK SHALL MEET THE CURRENT ITD STANDARDS INCLUDING ROADBASE THICKNESS, PAVEMENT THICKNESS AND CLASS PAVEMENT. 12 ' 12 ' 12 ' 12 ' 12 ' 12 ' EXISTING FOG LINE 11 . 5 ' 11 ' N8 9 ° 3 5 ' 1 5 " E 290 . 0 0 ' 4''S S ) ( 4' ' S S ( 4' ' S S 4''S S ) YEL L O W S T O N E U S H I G H W A Y 3 3 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W UN I T 1 4 P L E X UN I T 2 4 P L E X UN I T 3 4 P L E X UN I T 1 4 P L E X UN I T 2 4 P L E X UN I T 4 4 P L E X N0 ° 0 8 ' 0 8 " W UN I T 3 4 P L E X N8 9 ° 3 5 ' 1 5 " E 290 . 0 0 ' S89 ° 3 5 ' 1 5 " W 290 . 0 0 ' EL L A L A N E P 4''S S ) 4''S S ) ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S 4''S S ) 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W B P : 5 1 1 + 0 2 . 0 0 BL O C K 1 LOT 2 BL O C K 2 LOT 2 S0 ° 0 8 ' 0 8 " E 2 1 3 . 6 0 ' S0 ° 0 8 ' 0 8 " E 2 1 3 . 4 0 ' N19 ° 0 7 ' 5 9 " E 2 0 6 . 5 9 ' C3 N 6 6 ° 5 9 ' 1 6 " W 6 9 . 5 7 ' S89 ° 3 5 ' 1 5 " W 8 8 . 0 6 ' S0 ° 0 8 ' 0 8 " E 4 9 5 . 0 0 ' N8 9 ° 3 5 ' 1 5 " E 3 6 0 . 2 7 ' S 6 6 ° 5 9 ' 1 6 " E 9 5 . 8 3 ' C 4 N8 9 ° 3 5 ' 1 5 " E 8 7 . 7 3 ' N8 9 ° 3 5 ' 2 2 " E 142 . 4 3 ' N30° 0 8 ' 0 0 " E 102. 0 3 ' C6 PLA Y G R O U N D GA Z E B O / PA V I L L I O N STO R M P O N D 2 A N D SN O W S T O R A G E RIP RA P BLD G C F.F. = 4 8 7 4 . 7 8 BLD G D F.F. = 4 8 7 4 . 7 1 X X X BLD G A F.F. = 4 8 7 3 . 3 0 BLD G B F.F. 4 8 7 3 . 3 0 (8' ' S S 8''W 8''W 8''W 6'' W 6'' W 4''SS 8''S S ) 2'' W 6'' W 24'X 1 2 0 ' 1 0 C A R G A R A G E 2''W AD S S T O R M T E C H CH A M B E R ( S E E T A B L E 5 ) STO R M P O N D / LAN D S C A P E D PO N D F O R AD D I T I O N A L A R E A FO R B U I L D I N G DR A I N A G E EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EPEP EP EP EP EP EP EP EP EP EP EP EP EP X X X X X X X (8''S S (8''S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S (12' ' S S O H P O H P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP O H P EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EPEP EP EP EP EP EP EP EP EP EP EP EP EP EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO SN O W 4 ST O R A G E 558 6 s q f t SN O W 5 STO R A G E 100 8 s q f t S T O R A G E 6 8 4 3 s q f t STO R A G E 7 351 s q f t 22. 5 ° 511 + 0 2 512 + 0 0 513 + 0 0 514 + 0 0 515 + 0 0 516 + 0 0 517+ 0 0 518+ 0 0 519+ 0 0 520+ 0 0 521+ 0 0 522+ 0 0 523+ 0 0 524+ 0 0 525+ 0 0 511 + 5 0 512 + 5 0 513 + 5 0 514 + 5 0 515 + 5 0 516+ 5 0 517+ 5 0 518+ 5 0 519+ 5 0 520+ 5 0 521+ 5 0 522+ 5 0 523+ 5 0 524+ 5 0 2 5 ' 1 0 ' R25 ' 1 2 ' 155' 96' 96' 270' 1 2 ' 1 2 ' 1 2 ' 1 1 ' 7' 105 ' 1 2 ' 1 2 ' 1 1 . 5 ' W E S N 040'40'20' SCALE: 1" = 40' 7 T- 1 YE L L O W S T O N E H I G H W A Y 3 3 P A V E M E N T M A R K I N G S Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 t 2 ye l l o w s t o n e h i g h w a y 3 3 p a v e m e n t m a r k i n g s . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 5 2 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 4" DOUBLE YELLOW START CONSTRUCTION/START TAPER HIGHWAY WIDENING 512+39 (EXISTING 33' HWY WIDTH) NOTES: 1. THIS PROJECT CONSISTS OF THE WIDENING OF THE EXISTING HIGHWAY FROM STATION 509+70 TO 521+20. 2. CONTRACTOR TO CUT EXISTING ASPHALT APPROXIMATELY 2 FEET FROM THE EDGE OF ASPHALT TO ENSURE THE SLOPE SHOE IS REMOVED. CUT SHALL BE STRAIGHT MEETING ITD STANDARDS. 3. LEFT AND RIGHT TURN ARROWS WILL BE THERMOPLASTIC MEETING ITD STANDARDS. 4. EXTEND DOUBLE YELLOW MARKINGS TO STATION 526+79 5. STATIONING, CURVE DATA AND BEARINGS ARE FROM ITD PROJECT NO. ST - 6767 (502). 6. PROFILE GRADES OF THE HIGHWAY ARE NOT BEING CHANGED, THIS PROJECT IS WIDENING THE EXISTING PROFILE ONLY. 7. DEVELOPER/CONTRACTOR SHALL BE RESPONSIBLE FOR THE WIDENING OF HIGHWAY 33 TO ENSURE MINIMUM OF 12 FOOT LANE WIDTHS AND MEET ITD SHOULDER WIDTHS. 8. CONTRACTOR TO SAW CUT EXISTING PAVEMENT LONGITUDINALLY TO ENSURE PROPER TRANSITION WITH EXISTING AND NEWLY PLACED ASPHALT. 9. CONTRACTOR TO MEET COMPACTION MEETING ITD SPECIFICATIONS. 10. ALL WORK TO BE IN ACCORDANCE WITH ITD, MUTCD, AND AASTHO STANDARDS. 11. EXISTING PAVEMENT MARKINGS WITHIN THE PROJECT SHALL BE COMPLETELY REMOVED MEETING ITD APPROVAL INCLUDING; BUT NOT LIMITED TO ARROWS, CENTERLINE AND FOG LINE MARKINGS. 12. EXISTING SIGNS AND POSTS SHALL BE REMOVED BY THE CONTRACTOR. 13. CONTRACTOR TO INSTALL NEW SIGNS AS SHOWN ON THE PLANS MEETING ITD AND MUTCD STANDARDS. 14. CONTRACTOR SHALL BE REQUIRED TO MEET WORK ZONE REQUIREMENTS AS SET FORTH PER MUTCD AND ITD REQUIREMENTS INCLUDING CHANNELIZATION DRUMS, CANDLES, AND SIGNAGE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SIGNAGE AND PAINTED PAVEMENT MARKINGS UPON COMPLETION OF THE INTERSECTION AND WIDENING OF THE HIGHWAY. THIS SHALL CONSIST OF 8 INCH CHANNELIZATION LINES, 4 INCH SOLID AND SKIP YELLOW, 4 INCH SOLID WHITE, TURN AND STRAIGHT ARROWS MEETING THE PLANS AND ITD STANDARD SPECIFICATIONS AND DRAWINGS. 15. CONTRACTOR/DEVELOPER TO CONTACT ITD (2 DAYS MINIMUM) PRIOR TO INSTALLING PAVEMENT MARKINGS ON YELLOWSTONE HIGHWAY. SHIF T I N G T A P E R GAP L E N G T H SL & D L MATCH INTO EXISTING CURB & GUTTER TBC ELEV=4876.50 R-O-W 100' R-O-W 4" WHITE 10 0 ' CURVE DATA FROM ITD STA - 6767 (502) Δ=11°00'00" R=1273.24 L=244.40' T=122.60 12' L A N E 12' L A N E PT=517+34.12 PC=514+89.71 PER ITD PROJECT No. ST - 6767 (502) C BEARING N18°08'32"E L 519+29 (42' HWY WIDTH) BEGIN RT TURN SHIFTING TAPER STATION 512+39 TAPER IS 270' EXISTING HIGHWAY STREET SECTION 2.0% MIN. STRAIGHT GRADE LC R.O.W. 66' ASPHALT - MATCH EXISTING OR 3" MIN. 4"- 3/4" AGGREGATE BASE 12" GRANULAR BORROW 2.0% MIN. STRAIGHT GRADE SLOPE SHOE 32'- 34' 12'12' VARIABLE C U T VARIABL E C U T & FILL SL O P E S & FILL SLOP E S EXISTING PATH 8" WHITE 4" DOUBLE YELLOW EXISTING PATH 8" WHITE 12' M E D I A N L A N E 12' L A N E 12' L A N E 12' L A N E DEVELOPER SHALL COORDINATE WITH UTILITY COMPANIES TO RELOCATE AND/OR REMOVE EXISTING FACILITIES WITHIN THE PROJECT LIMITS MEETING UTILITY DESIGN AND STANDARDS. (PROPOSED POWER LOCATION WITHIN THE 15' EASEMENT. ROCKY MOUNTAIN POWER TO DESIGN POLE LOCATIONS. EXISTING PAVEMENT MARKINGS RE-LOCATE SIGN MATCH INTO EXISTING PAVEMENT MARKINGS EXTEND 4" DOUBLE LINE TO EXISTING DOUBLE LINE FINISHED TBC ELEV=4876.20 FINISHED TBC ELEV=4876.00 FINISHED TBC ELEV=4875.28 4''S S ) ( 4' ' S S ( 4' ' S S 4''S S ) 4''S S ) ( 4' ' S S ( 4' ' S S YEL L O W S T O N E U S H I G H W A Y 3 3 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W 1-1 / 2 ' ' W UN I T 1 4 P L E X UN I T 2 4 P L E X UN I T 3 4 P L E X UN I T 1 4 P L E X UN I T 2 4 P L E X UN I T 4 4 P L E X UN I T 6 4 P L E X UN I T 7 4 P L E X UN I T 6 4 P L E X UN I T 5 4 P L E X UN I T 5 4 P L E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X UN I T 3 4 P L E X CA P & B L O C K WA T E R M A I N 37 . 5 0 ' 9.6 5 ' EL L A L A N E PA R K 2 " F I R E W 2 " F I R E W 4''S S ) 4''S S ) 2 " F I R E W 2 " F I R E W ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S ( 4' ' S S 4''S S ) 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W 2 " F I R E W B P : 5 1 1 + 0 2 . 0 0 511 + 5 0 515 + 5 0 519+ 5 0 520+ 5 0 521+ 5 0 522+ 5 0 523+ 5 0 8''S S ) 8''S S ) 8''S S ) 8''S S ) 8''S S ) PAR A D I S E N U R S E R Y & P O N D C E N T E R L L C INST # 2 6 9 9 5 0 , 2 6 9 9 7 4 , 2 6 9 9 7 5 , 2 7 9 9 6 6 , 3 1 8 8 7 1 PLA Y G R O U N D GA Z E B O / PA V I L L I O N RIP RA P BLD G C F.F. = 4 8 7 4 . 7 8 BLD G D F.F. = 4 8 7 4 . 7 1 X X X BLD G A F.F. = 4 8 7 3 . 3 0 BLD G B F.F. 4 8 7 3 . 3 0 8''S S ) 24'X 1 2 0 ' 1 0 C A R G A R A G E EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EPEP EP EP EP EP EP EP EP EP EP EP EP EP EP EP X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N0 0 ° 1 1 ' 0 6 " E 2 6 5 7 . 3 9 ' 11 5 9 . 3 7 ' BA S I S O F B E A R I N G C I T Y O F R E X B U R G O H P O H P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP O H P EO EO EO EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EPEP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO EO 22. 5 ° 511 + 0 2 512 + 0 0 513 + 0 0 514 + 0 0 515 + 0 0 516 + 0 0 517+ 0 0 518+ 0 0 519+ 0 0 520+ 0 0 521+ 0 0 522+ 0 0 523+ 0 0 524+ 0 0 511 + 5 0 512 + 5 0 513 + 5 0 514 + 5 0 515 + 5 0 516+ 5 0 517+ 5 0 518+ 5 0 519+ 5 0 520+ 5 0 521+ 5 0 522+ 5 0 523+ 5 0 W E S N 040'40'20' SCALE: 1" = 40' 8 T- 2 YE L L O W S T O N E H I G H W A Y 3 3 T R A F F I C C O N T R O L Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ 2 0 0 2 2 t 3 ye l l o w s t o n e h i g h w a y 3 3 t r a f f i c c o n t r o l . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 5 5 A M AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 END OF CONSTRUCTION 521+58 RT ADD SIGN END ROAD WORK G-20-2633+90 SIGN 36"x18" STATION 526+58 LT ADD SIGN W21-5 SHOULDER WORK SIZE 36"x36" STATION 502+39 RT ADD SIGN W21-5 SHOULDER WORK SIZE 36"x36" 1000 FEET BEFORE START OF CONSTRUCTION STATION 507+39 RT ADD SIGN R-21 ROAD WORK SPEED SIGN 30"x36" 500 FEET BEFORE START OF CONSTRUCTION STATION 525+58 LT ADD SIGN R2-1 ROAD WORK SPEED SIGN 30"x36" STATION 502+39 LT END ROAD WORK G-20-2 SIGN 36"x18" NOTE: SIGNAGE TO MEET MUTCD WORK ON SHOULDERS (TA-3 FIGURE 6H-3) SIGNAGE TO HAVE ROADWORK AHEAD AND OPTIONAL SPEED SIGN. E N D R O A D W O R K S P E E D LI M I T 3 5 S H O U L D E R W O R K S H O U L D E R W O R K S P E E D LI M I T 3 5 100' R-O-W EXISTING EDGE OF OIL EXISTING EDGE OF OIL EXISTING EDGE OF OIL PC=514+89.71 CURVE DATA FROM ITD STA - 6767 (502) Δ=11°00'00" R=1273.24 L=244.40' T=122.60 REMOVE AND REPLACE SPEED LIMIT SIGN AFTER CONSTRUCTION TO MEET ITD STANDARDS END CONSTRUCTION/END TAPER HIGHWAY WIDENING TO MEET WITH EXISTING PAVEMENT MARKINGS EXISTING PATHWAY FINISHED TBC ELEV=4875.28 FINISHED TBC ELEV=4876.00 MATCH INTO EXISTING CURB & GUTTER TBC ELEV=4876.50 FINISHED TBC ELEV=4876.20 FINISHED TBC ELEV=4876.00 VALVE BOX CONC. COLLAR CUT LINE WATER #4 REBAR, 12" OVERLAP SCORE CONTROL JOINT 4 PLACES THE WORD "WATER" TO BE ENGRAVED ON COVER ASPHALT PAVEMENT OR EXISTING ROAD -3/4" BEDDING 5' - 0 " M I N 6" M I N 6" M I N PLACE SAFETY FLANGE OR FLANGE WITH BREAK AWAY BOLTS 2" MIN. 8" MAX. ABOVE GRADE DO NOT COVER DRAIN HOLES WITH CONCRETE (2"x8"x12") CONCRETE BLOCK FLANGED JOINT DI LINE TO CITY THRUST BLOCK THRUST BLOCK TO FINISHED GRADE VALVE FINISHED GRADE VALVE BOX SET HYDRANT TEE MJ JOINT VALVE NUT EXTENSION TO WITHIN 6" OF SURFACE MAINLINE 1 CUBIC YARD OF WASHED GRAVEL SURROUNDING DRAIN HOLES 2' SPOOL CONCRETE COLLAR 6" M I N 2' MIN. RED COLOR WITH STORZ ADAPTER B/ 3 MI N . A B REDUCER 12" 14"5'-5" 4'-0" 6" 4" 8" 10"3'-4" 2'-8" 2'-0" 1'-7" 3'-10" 3'-10" 6'-6" 4'-8" 3'-3" 2'-6" 1'-11" 1'-2" 3'-2" 4'-0" 2'-5" 1'-9" 1'-6" 1'-11" 0'-10" 0'-6" 2'-5" 2'-3" 1.WRAP ALL FITTINGS WITH 8 MIL POLYETHYLENE ENCASEMENT TO PREVENT CONCRETE FROM ADHERING TO THE FITTINGS. 2.THRUST BLOCKING CONCRETE TO BE MINIMUM 3000PSI MIX. 3.ALL THRUST BLOCKS ARE TO BE FORMED ON THE VERTICAL PLANES. 4.PLACE THRUST BLOCKS ON ALL WATERLINE BENDS AND TEES. 4'-11" 4'-8" 4'-9" THRUST BLOCK NOTES: 3'-8" 3'-0" 3'-10" 2'-2" 1'-6" 3'-0" 2'-5" 1'-10" 1'-8" 3'-5" 2'-7" 3'-5" 3'-3" 2'-2"2'-9" 2'-1" 1'-7" 0'-10" 1'-9" 1'-9" 1'-7" 90° BEND DIMENSION FOR THRUST BLOCKING TEE TEES & PLUGS A B A 45° BEND & WYES B A B A B REDUCERS & 22° BENDFITTING SIZES BEND 4" M I N 6" M I N 6' - 0 " M I N . B U R Y ( T Y P . ) 4 D-2 PIPE BEDDING NATIVE MATERIAL COMPACTED AS PER CITY REQUIREMENTS AND ISPWC TYPICAL STREET/OPEN FIELD 6" 1'-6" 8" 12 " 2" 1/ 2 " 6" SLOPE 1/4" TOOLED RADIUS R=2" R=3" ZONE 4 REFER TO IDAPA 58.01.08 IDAHO RULES FOR PUBLIC DRINKING WATER SYSTEM. SITE SPECIFIC APPROVAL FROM DEQ MUST BE SECURED BEFORE ZONE 2 OR 3 INSTALLATIONS ARE MADE. SAME REQUIREMENTS AS ZONE 1 EXCEPT THE SEWER MAIN MUST ALSO BE SUPPORTED ABOVE THE CROSSING TO PREVENT SETTLING. SANITARY SEWER OR STORM DRAIN SEWER LINE ZONE 1 ZONE 2 ZONE 3 SAME REQUIREMENTS AS ZONE 2 EXCEPT THE SEWER MAIN MUST ALSO BE SUPPORTED ABOVE THE CROSSING TO PREVENT SETTLING. A)ONE FULL, UNCUT LENGTH OF WATER PIPE MUST BE CENTERED OVER THE CROSSING SO THAT THE JOINTS ARE AS FAR AS POSSIBLE FROM THE SEWER, AND EITHER; B)SEWER MAIN MUST BE CONSTRUCTED TO WATER MAIN STANDARDS AND PRESSURE TESTED FOR WATER TIGHTNESS FOR A HORIZONTAL DISTANCE OF 10 FEET ON BOTH SIDES OF THE CROSSING, OR; C)EITHER THE SEWER LINE OR THE WATER LINE OR BOTH MUST BE ENCASED IN AT LEAST 4 INCHES OF CONCRETE MEASURED AT THE BELL FOR A HORIZONTAL DISTANCE OF 10 FEET ON BOTH SIDES OF THE CROSSING. A)WATER AND SEWER MUST BE B)SEPARATED BY 18 INCHES, AND ONE FULL, UNCUT LENGTH OF WATER PIPE MUST BE CENTERED OVER THE CROSSING SO THAT THE JOINTS ARE AS FAR AS POSSIBLE FROM THE SEWER. (WATER<18" ABOVE TOP OF SEWER) WATER LINE ZO N E 1 ZO N E 2 1' - 6 " 1' - 6 " ZO N E 4 ZO N E 3 FORD S91-607 SADDLE OFFSET CORP. STOPS 15° 12" MIN. RADIUS 45° M I N 60° M A X (PVC) FOR PE PIPE USE SYSTEM THAT DELIVERS AN EQUIVALENT PE CORP STOP FB 1100 SERIES CORPORATION STOP DIRECT TAP W/ CC THREADS SERVICE LINE -3/4 BEDDING 6" M I N 6" M I N MATCH EXISTING LINE SIZE 4 FT. OR GREATER DEPTH, PIPE DIA. < 24"7 11 A A7 7 LEGEND 1 CONCRETE COLLAR IN PAVED STREET SECTIONS PER SD-508. 2 GRADE RINGS GROUTED WATERTIGHT IN PLACE, NOT TO EXCEED 21" FROM FINISHED SURFACE TO TOP OF CONE. 3 PRECAST MONOLITHIC ECCENTRIC CONE SECTION. (REBAR NOT SHOWN). 4 RAMNEK OR APPROVED GASKETS ALL JOINTS. 5 PROPERLY ALIGN ALL INTERIOR JOINTS. 6 PRECAST CONCRETE MANHOLE-BARREL SECTION (REBAR NOT SHOWN). 7 PRECAST GASKETED HUB RING OR RUBBER GASKETED COLLAR-FLEXIBLE AND WATER TIGHT. 8 REPLACEMENT SURFACING TO MATC FLUSH WITH EXISTING SURFACING (AC SHOWN). 9 FRAME TO BE GROUTED TO GRADE RINGS. 10 FRAME AND COVER PER SD-507. 11 MANHOLE STEPS, SEE NOTE H. 12 CAST IN PLACE MANHOLE BASE. SEE SD-501A FOR PREFABRICATED BASE. 45° SHE L F SHE L F SHE L F FL O W PLAN N.T.S. 45° 891012" 6" ( M I N ) 1 2 3 4 5 6 7 12 11 12 " ( M A X ) 36 " ( M A X ) 24" (MIN) 24 " ( M I N ) 6" (MIN) 4" (MIN) 12 " 48" 16 " ( M A X ) 6 SHELF SLOPE 1" PER FOOT D< 2 4 " 9" (MIN) 4" TYPE 1 BEDDING SECTION A-A N.T.S. NOTES: A OPTIONAL PREFABRICATED MANHOLE BASE WITH APPROVED PIPE CONNECTIONS MAY BE USED WITH ENGINEERS APPROVAL, SEE SD-501A. B PLACE VERTICAL WALL ON UPSTREAM SIDE OF MANHOLE, ROTATED 45 DEGREES. C FOR DIAMETER, D, GREATER THAN 24", SEE SD-502 OR SD-503. D MANHOLE FRAME AND COVER: A.REFER TO DRAWING NO. SD-507. B.FRAME AND COVER SHALL BE FLUSH WITH SLOPE OF PAVEMENT. E WHERE PVC PIPE IS UTILIZED, INSTALL A RUBBER RING OR GASKET COLLAR WHERE THE PIPE IS IN CONTACT WITH MANHOLE BASE AND/OR MANHOLE CHANNEL, IN ORDER TO INSURE A WATERTIGHT SEAL. F EITHER BASE ON SD-501 OR SD-501A MAY BE USED WITH ANY MANHOLE DESIGN. G PROVIDE MANHOLE CONCRETE REINFORCING TO ACCOMMODATE TRAFFIC LOADINGS. H VERIFY WITH ENGINEER REGARDING LOCAL PREFERENCE ON INSTALLATION OF MANHOLE STEPS PRIOR TO ORDERING MATERIALS OR INSTALLATION. 2-45° BENDS MIN. GRADE 1/4"/FT.(2%) "E" "D" CAP OR PLUG AND INSTALL SERVICE LINE MARKER PER SD-512 (TYP.) PL ABSOLUTE MIN. GRADE 1/8"/FT.(1%) 4"-1/8 OR 1/16 BEND AS NEEDED MIN. GRADE 1/4"/FT.(2%) "C" "B" "A" FINISH GRADE (SEE NOTE 2) TYPE C TEE OR APPROVED CONNECTION USE 6" OF TYPE I BEDDING ALL AROUND EACH SERVICE. TYPE "E" ALLOWABLE FOR TRENCHES 15 FT. DEEP OR GREATER WITH PRE-APPROVAL BY THE ENGINEER. TYPE "C" SERVICE WILL ONLY BE ALLOWED IF SPECIFICALLY APPROVED BY THE ENGINEER. ALL SERVICE LINES TO BE 4" INSIDE DIAMETER UNLESS OTHERWISE NOTED. 4. 3. 2. 1. NOTES: TYPE E (SEE NOTE 3) TYPE A & D TEE OR APPROVED CONNECTION MIN. GRADE 1/4"/FT.(2% ) LP FINISH GRADE 45 ° M A X . 1/8 LONG RADIUS BEND TYPE B 45 ° M A X . - A -B 3' - 3 " 3 1 / 2 " 2" 3 1/2" 3' - 0 " M I N . 30" INSIDE DIA. BARREL SECTION 3'-3"2'-0"2'-0" 23 1/2" 1 3 / 4 " 6" 6" 7 1 / 4 " 9'-6" 3'-3" KNOCKOUTS TYPICAL (4) SIDES 18" DIA. TO RECEIVE UP TO 15" DIA. PIPE #4 REBAR BY MANUFACTURER GRATE CURB LIP TBC C1 C1 C3 #4 REBAR BY MANUFACTURER 90° PIPE BEDDING FOR RIGID PIPE GRANULAR FOUNDATION 90° SHAPED SUBGRADE GRANULAR FOUNDATIONSHAPED SUBGRADE PIPE BEDDING DETAIL FOR FLEXIBLE PIPE COMPACT 1" MAC. BACKFILL IN 6" LAYERS TO 95% OF ASTM D-698 COMPACT APPROVED BEDDING MATERIAL TO 95% OF ASTM D-69812" MAX 6" M I N SHAPED UNDISTURBED SOIL. EXCAVATE FOR BELL HOLES. 3" 6" M I N 12" MAX 90°90° COMPACT 1" MAC. TO 95% OF ASTM D-698 COMPACT APPROVED BEDDING MATERIAL TO 95% OF ASTM D-69812" MAX 6" M I N SHAPED UNDISTURBED SOIL. EXCAVATE FOR BELL HOLES. 3" 6" M I N 12" MAX 3" R 7- 3 / 4 " 8" 2'- 6" 1- 3 / 4 " 6" 1/2" 1/4" TOOLED RADIUS 1- 3 / 4 " ±5" DRIVEWAY RAISED 1/4" ABOVE CURB. CORNER TO HAVE 1/4" TOOLED RADIUS. (3) #4 REBAR EVENLY SPACED 2" 1/ 4 " 1' - 0 " 8" 1'-6" 1 3 / 4 " 6" 4 1 / 4 " 1/2" 6" 3 1 / 2 " R=2" R=3" TOP OF CONCRETE SIDEWALK TO BE 1/4" ABOVE BACK OF CURB 1/4" TOOLED RADIUS 1 1 4" 4'- 0" 3" 2" 8" 1 1 / 4 " NO. 4 REBAR 12" ON CENTER BOTH WAYS 6" OF 3/4" CRUSH CROSS DRAIN DETAIL Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ d e t a i l s . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 5 6 A M 9 D- 1 DE T A I L S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 6" 5' SIDEWALK TYPICAL PARKING LOT SECTION13 SANITARY SEWER7 SERVICE LINES 6 STANDARD MANHOLE TYPE A SD-501 10 CATCH BASIN - TYPE 2 4 VALVE & HYDRANT 5 WATER SERVICE LINE CONNECTION TYPICAL WATER LINE PLACEMENT 2 STANDARD TRENCH DETAIL 3 THRUST BLOCKING DETAIL 11 LIP DOWN CURB & GUTTER DETAIL CONCRETE COLLAR FOR VALVE BOX PIPE BEDDING DETAILS 12 LIP UP CURB & GUTTER DETAIL NOTE: 12" OF GRANULAR BORROW BENEATH CURB NOT SHOWN FOR CLARITY. VALLEY GUTTER SECTION9 2" ASPHALT 3" 3/4 CRUSHED GRAVEL 9" PIT RUN GRAVEL 4" CONCRETE 4" 3/4 GRAVEL 2-1/2" OF PLANT MIX PAVEMENT 4" OF 3/4" GRAVEL ROADBASE 12" OF GRANULAR BORROW/PITRUN UNDISTURBED EARTH 1 8 THICKENED EDGE SIDEWALK14 15 COMMERCIAL DRIVEWAY CURB & GUTTER SECTION 30" 6"24" 0" TO 1" BATTER 5" 6" M I N . 6" 4" 4" 6" 12 " ± 6" R=1" R=1" 1" R=1/2" R=1/2" AGGREGATE BASE NOTES A GRADE AND ALIGNMENT TO BE ESTABLISHED OR APPROVED BY THE ENGINEER. B BASE; 4-INCH COMPACTED DEPTH OF 3/4-INCH MINUS CRUSHED AGGREGATE BASE MATERIAL, PLACE AS SPECIFIED UNDER SECTION-802 ISPWC; COMPACTED TO FXCFFD 95% STANDARD PROCTOR. C 1/2-INCH PERFORMED EXPANSION JOINT MATERIAL ASHTO M 213) AT TERMINAL POINTS OF RADII. D CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS AT 10-FEET MAXIMUM SPACING (OR CONSISTENT WITH 2X SIDEWALK WIDTH FOR SCOPF SPACING). E MATERIALS AND CONSTRUCTION IN COMPLIANCE WITH ISPWC SPECIFICATIONS. F BACKFILL AS PER SECTION-706. G SECURE RIGHT-OF-WAY PERMIT BEFORE BEGINNING CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. H CURB AND GUTTER STANDARD TO BE USED ON ALL PUBLIC ROADWAYS UNLESS APPROVED BY ENGINEER. 24:1 SLOPE STANDARD CURB AND GUTTER SECTION (HIGHWAY 33)16 Fi l e L o c a t i o n : \\ 1 9 2 . 1 6 8 . 1 . 5 0 \ e a g l e r o c k e n g i n e e r i n g \ p r o j e c t s \ 2 0 2 0 \ 2 0 0 2 2 b l u e o x d e v e l o p m e n t ( y e l l o w s t o n e h e i g h t s c o n d o s ) \ 3 . 0 d e s i g n \ 3 . 1 c a d \ 3 . 1 3 f i n a l \ d e t a i l s . d w g Pl o t t e d B y : ma t t h e w p a t z e r Da t e P l o t t e d : Th u r s d a y , M a r c h 3 0 2 0 2 3 a t 0 7 : 5 6 A M 10 D- 2 DE T A I L S AG L E R O C K N G I N E E R I N G SU R V E Y E D B Y : DR A W N B Y : PR O J E C T N O . AP P R O V E D B Y : DE S C R I P T I O N DA T E RE V I S I O N S 1 2 3 4 5 6 AT T E N T I O N Th i s d o c u m e n t o r a n y p a r t t h e r e o f i n d e t a i l o r d e s i g n c o n c e p t is t h e p r o p e r t y o f E a g l e R o c k E n g i n e e r i n g a n d s h a l l n o t b e co p i e d i n a n y f o r m w i t h o u t t h e w r i t t e n a u t h o r i z a t i o n o f E a g l e Ro c k E n g i n e e r i n g . E SH E E T N O . SH E E T N A M E CI V I L P L A N N I N G S U R V E Y I N G ID A H O F A L L S ( 2 0 8 ) 5 4 2 - 2 6 6 5 RE X B U R G ( 2 0 8 ) 3 5 9 - 2 6 6 5 PR E P A R E D F O R : BL U E O X D E V E L O P M E N T YE L L O W S T O N E H E I G H T S T. H A N S E N J. L E H M A N N P. S N A R R 20 0 2 2 16 4 1 0 3/ 3 0 / 2 3 PLAN VIEW N.T.S. 1' 6' - 6 " ( T Y P . ) 24 " MI N . 36" TYP. 24" DIA. PERFORATED CORRUGATED EXTERIOR, SMOOTH INTERIOR HDPE PIPE WITH PERFORATIONS 4" O.C. 1" DIAMETER CLEAN SAND AND GRAVEL OVER EXCAVATE TO FREE DRAINING MATERIAL SEAL END CAP OR CONCRETE (TYPE.) SECTION A-A N.T.S. 36 " M I N . 3.0' TYP.10 ' VARIES 36 " M I N . A 12" PIPE FROM CATCH BASIN MIN. SLOPE 0.22% SEE CATCH BASIN DETAIL 2 5' 48" MANHOLE IN COMPLIANCE WITH CITY OF REXBURG STANDARDS *ALL DRAIN ROCK SHALL BE ENCASED IN SEPARATION FABRIC PERFORATE BOTTOM 2' OF ALL INFILTRATION MANHOLES (ENSURE 2' OF DRAIN ROCK IS INSTALLED AROUND PERIMETER OF MANHOLE) INSTALL MIRAFI 160N NON WOVEN FABRIC (OR EQUAL) SEPARATING DRAIN ROCK AND SOIL MEETING CITY OF REXBURG STANDARDS COURSE DRAIN ROCK BACKFILL 2" MIN. - 6" MAX. MEETING CITY OF REXBURG STANDARDS BACKFILL WITH NATIVE TOPSOIL COMPACT TO 95% OF STANDARD PROCTOR *STORM INFILTRATION SYSTEM TO BE BELOW DRAINAGE SWALE AND SIDEWALK. (MAINTAIN 1.0' MIN. FROM BACK OF CURB. COURSE DRAIN ROCK COURSE DRAIN ROCK COURSE DRAIN ROCK COURSE DRAIN ROCK INFILTRATION SYSTEM NOTES: 1.CONTRACTOR TO OVER EXCAVATE TO FREE DRAINING ROCK PRIOR TO INSTALLING DRAIN ROCK FOR INFILTRATION SYSTEM. CONTRACTOR SHALL CONTACT EAGLE ROCK ENGINEERING INSPECTION DEPARTMENT DURING EXCAVATIONS TO VERIFY. TYP. INFILTRATION DETAILS17 ADS STORM TECH SYSTEM NOTES: 1.SC-740 CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".^J 2.SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".^J 3."ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS.^J 4.THE "SITE DESIGN ENGINEER" REFERS TO THE ENGINEER RESPONSIBLE FOR THE DESIGN AND LAYOUT OF THE STORMTECH CHAMBERS FOR THIS PROJECT.^J 5.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.^J 6.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 7.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. 45" (1140 mm) 24" (600 mm) MIN* 8' (2.4 m) MAX SUBGRADE SOILS (SEE NOTE 5) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) SC-740 END CAP 12" (300 mm) MIN DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN D C B A PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 30" (750 mm). 6" (150 mm) MIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS 12" (300 mm) MIN77" (1950 mm)9" (230 mm) MIN SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP PART #: MC3500IEPP24BC TWO LAYERS OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS MANHOLE COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE SC-740 CHAMBER MC-3500 END CAP SC-740 ISOLATOR ROW DETAIL NTS OPTIONAL INSPECTION PORT STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES ADS STORM INFILTRATION NOTES 1.THE ADS STORM INFILTRATION SYSTEM SHOWN IS SIZED USING ADS STORM TECH SC-740 CHAMBER SYSTEM. THE CHAMBER AREAS ARE SET FOR DESIGN FOR EACH AREA; HOWEVER THE LENGTHS AND WIDTHS MAY VARY TO MEET SEPARATION FROM OTHER UTILITIES OR CONSTRUCTION OBSTACLES. 2.CONTRACTOR TO SUPPLY AND SUBMIT FINAL ADS STORM TECH DRAWINGS AND SPECIFICATIONS (OR EQUAL SYSTEM) TO ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. 3. CONTRACTOR TO INSTALL THE ADS STORM TECH SC-740 SYSTEM (OR EQUAL) WITH NYLOPLAST INLET AND OUTLET (OR PRECAST CONCRETE) PER MANUFACTURERS DRAWINGS AND SPECIFICATIONS. STORM TECH SC-740 ADDS CHAMBER SYSTEM18