HomeMy WebLinkAboutFRAMING REPORT RESPONSE - 22-00283 - Teton River Lofts - 24 Units - Bldg 2
REQUEST FOR INFORMATION (RFI)
RFI #: 014 SUBMITTED TO: GPC ARCHITECTS
DATE: 2/7/2023
NEEDED BY: 2/9/2023 SUBMITTED BY: VENTURE BUILDERS
PROJECT: Teton River Lofts
PROJECT #:2022-201
RFI DESCRIPTION
During installation of plumbing/heating and air ducts it was discovered that some of the BP1 roll blocking was in
the way. Would we be able to cut, or remove some of the roll blocking to get these lines through? Please suggest
any solutions. Thanks
ATTACHMENTS:
SUBMITTED BY: Scott Page, VENTURE BUILDERS
RESPONSE TO RFI
RESPONSE BY: DATE:
Yes, BP1 roll blocking between floor trusses can be modified as indicated below to accommodate
plumbing/heating. If these options don't meet the needs of the project please provide more
information so individual locations can be evaluated.
0'
-
1
3
/
1
6
"
PENETRATIONS ARE ALLOWED
IN THIS HATCH REGION
BOTTOM CHORD MAY BE
REMOVED IN HATCH AREA
A
A SECTION
REMOVE BOTTOM CHORD AND VERTICAL
WEBS WITH 2x4 CRIPPLE STUDS
(2) 16d NAILS THROUGH TOP
CHORD INTO CRIPPLE STUD