HomeMy WebLinkAboutFRAMING REPORT RESPONSE - 22-00283 - Teton River Lofts - 24 Units - Bldg 2 REQUEST FOR INFORMATION (RFI) RFI #: 014 SUBMITTED TO: GPC ARCHITECTS DATE: 2/7/2023 NEEDED BY: 2/9/2023 SUBMITTED BY: VENTURE BUILDERS PROJECT: Teton River Lofts PROJECT #:2022-201 RFI DESCRIPTION During installation of plumbing/heating and air ducts it was discovered that some of the BP1 roll blocking was in the way. Would we be able to cut, or remove some of the roll blocking to get these lines through? Please suggest any solutions. Thanks ATTACHMENTS: SUBMITTED BY: Scott Page, VENTURE BUILDERS RESPONSE TO RFI RESPONSE BY: DATE: Yes, BP1 roll blocking between floor trusses can be modified as indicated below to accommodate plumbing/heating. If these options don't meet the needs of the project please provide more information so individual locations can be evaluated. 0' - 1 3 / 1 6 " PENETRATIONS ARE ALLOWED IN THIS HATCH REGION BOTTOM CHORD MAY BE REMOVED IN HATCH AREA A A SECTION REMOVE BOTTOM CHORD AND VERTICAL WEBS WITH 2x4 CRIPPLE STUDS (2) 16d NAILS THROUGH TOP CHORD INTO CRIPPLE STUD