HomeMy WebLinkAboutDAILY FIELD REPORT 4 - 23-00332 - Madison Jr High - AdditionPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6B6075C2-9AEF-4935-BB88-CCCE28666C7A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23252DFR10232023CH Daily Field Report Date: 10/20/2023 Project Number: 23-252 Project Name: Madison JR. High Client: Madison School District Start Time: 01:30 PM Contractor: Daniels Masonry Time on Project: 2 hours Current Weather Conditions: Sunny/Clear Wind: Calm Ambient Temperature (°F): 61 Results Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Classroom bathroom section, two sections of interior wall of corridor Observations/ Remarks: I left the lab and headed to the job site, upon arrival at the job site I observed that the grout truck was already there and pouring. The contractor was using a lift and finished filling the first section of wall before they took it down to let me on to the lift and check the other side. I observed that there was adequate reinforcement in the sections I was able to check including correct bar size and vertical and horizontal pieces of reinforcement. I observed that they were not using a mechanical consolidator and upon inquiry the contractor said it was self consolidating grout and did not need to be consolidated. I informed him that he still should consolidate it but did not make any changes. I remained on site for the duration of the pour and left the site. Inspector Information Truck: DEADPOOL Mileage From Lab to Project (One Way) 15 Total Mileage 30.00 Inspector's Name:Inspector's Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6B6075C2-9AEF-4935-BB88-CCCE28666C7A 2 Caleb Hammar Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Reviewer's Name: E. Vail Reviewer's Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 6B6075C2-9AEF-4935-BB88-CCCE28666C7A 3