HomeMy WebLinkAboutCOMPREHENSIVE CONCRETE 2 - 23-00222 - 125 Valley River Dr - Goodwill - Suite 201Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 7 07/13/23 /
1-2 28 08/03/23 /
1-3 28 08/03/23 /
1-4 28 08/03/23 /
1-5 28 H 08/03/23 /
Set #:1
Specimen Size:4" X 8"
Specimens In Set:5
Truck / Ticket #:73 / 06196
Contractor:Trico Construction
Technician:Seay, Ryker
Cast By:Seay, Ryker
Date Cast:07/06/23
Sampled From:Chute
Placement Method:Chute
Sample Details
Batched:13:48 MDT
Sampled:14:20 MDT
Cast:14:30 MDT
Truck Empty:14:50 MDT
Placement Time:62 (min)
Placement Location:Exterior - Footing
Location Details:Three footings West of West entrance of building and entrance ramp on NW corner of building
Sample Location / Notes:NW corner of NW entrance ramp
Batch Log
Strength:4500 (psi)
Air:4.5 - 6.5 (%)
Slump:0 - 6 (in)
Specifications
Supplier:Walters Ready Mix Mix Design:400
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight:138.8 (lb/ft³) (ASTM C138)
Air Content:6.0 (ASTM C231)
Load Volume:10.00 (yd³)
Weather:Sunny Slump (in):4 1/4 (ASTM C143)
Air Temperature (F):79 Concrete Temp (F):70 (ASTM C1064)
Lab Test Results
General Remarks
Spencer with Trico was informed of passing tests. Report was emailed to all approved recipients. Gear used was #1600
This report shall not be reproduced, in full, without prior written approval of Atlas Technical Consultants, LLC. Results only relate to
the items inspected or tested.
Page 1 of 1
Client:
Wind River Construction
Idaho Falls, ID 83402
2420 South Yellowstone Highway
Project:
125 Valley River Drive Rexburg, ID
E231146c
Rexburg, ID 83402
125 Valley River Drive
Compressive Strength of Concrete
Test Method: ASTM C 39
Sample: 13357
Atlas Technical Consultants, LLC - Idaho
Falls
1753 E Precision Drive
Idaho Falls, ID 83402
Phone: (208) 529-8242
Report Date: 07/06/2023
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 6 07/12/23 1 / 5 3.99 12.50 52,130 4,170 5 P
1-2 28 08/03/23 1 / 27
1-3 28 08/03/23 1 / 27
1-4 28 08/03/23 1 / 27
1-5 28 H 08/03/23 1 / 27
Test Age Average Strengths (psi): 6 Day - 4170
Tested By: Jayden Erickson (1)
Checked In : 07/07/2023 (1,2,3,4,5)
Capping Methods
P: Un-bonded Caps of Concrete
Cylinders (ASTM C1231)
Set #:1
Specimen Size:4" X 8"
Specimens In Set:5
Truck / Ticket #:73 / 06196
Contractor:Trico Construction
Technician:Seay, Ryker
Cast By:Seay, Ryker
Date Cast:07/06/23
Sampled From:Chute
Placement Method:Chute
Sample Details
Batched:13:48 MDT
Sampled:14:20 MDT
Cast:14:30 MDT
Truck Empty:14:50 MDT
Placement Time:62 (min)
Placement Location:Exterior - Footing
Location Details:Three footings West of West entrance of building and entrance ramp on NW corner of building
Sample Location / Notes:NW corner of NW entrance ramp
Batch Log
Strength:4500 (psi)
Air:4.5 - 6.5 (%)
Slump:0 - 6 (in)
Specifications
Supplier:Walters Ready Mix Mix Design:400
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight:138.8 (lb/ft³) (ASTM C138)
Air Content:6.0 (ASTM C231)
Load Volume:10.00 (yd³)
Weather:Sunny Slump (in):4 1/4 (ASTM C143)
Air Temperature (F):79 Concrete Temp (F):70 (ASTM C1064)
Lab Test Results
Testing Lab: Atlas Technical Consultants LLC - Idaho Falls, 1778 E. Precision Dr., Idaho Falls, ID, 83401
General Remarks
Spencer with Trico was informed of passing tests. Report was emailed to all approved recipients. Gear used was #1600
NOTICE: Our firm¶s professionals are represented on site solely to observe operations of the contractor identified, to form opinions
about the adequacy of those operations, and to report those opinions to our client. The presence and activities of our field
representatives do not relieve any contractor from its obligation to meet contractual requirements. No one except our client may rely
on our findings and opinions. The contractor retains sole responsibility for site safety and the methods, operations, and sequences of
construction.
For SFHP Project:
Page 1 of 1
Client:
Wind River Construction
Idaho Falls, ID 83402
2420 South Yellowstone Highway
Project:
125 Valley River Drive Rexburg, ID
E231146c
Rexburg, ID 83402
125 Valley River Drive
Compressive Strength of Concrete
Test Method: ASTM C 39
Sample: 13357
Atlas Technical Consultants, LLC - Idaho
Falls
1753 E Precision Drive
Idaho Falls, ID 83402
Phone: (208) 529-8242
Report Date: 07/12/2023
Inspection Details
Date Contractor Inspector Ambient
Temperature (°F)
Weather Permit Number
07/06/2023 Trico Construction Seay, Ryker 79 Sunny Not Provided
Reinforcing Steel
Is this a reinspection?No
Atlas Personals Performed:Periodic Inspection
Inspected reinforcing steel placement for element:
Exterior Footing
Inspected reinforcing steel placement at location:
Three footings West of West entrance of building and entrance ramp on
NW corner of building
Plans used:Structural Clearance as specified?Yes
Drawing No.:S2.0
Rebar size as per plans?Yes
Notes:
Spencer with Trico was informed of results. Report was emailed to all approved recipients.
Work inspected was:
in compliance
in compliance, except as noted in discrepancies section
reinspection/retesting required
Does this inspection have any discrepancies to open or close?
(if yes see comments section)
No✔
Reinforcing Steel Inspection
ASTM A955
07/06/2023Report Date:
Atlas Technical Consultants, LLC Idaho
Falls
1753 E Precision Drive
Idaho Falls, ID 83402
Phone: (208) 5298242
Client:
Wind River Construction
2420 South Yellowstone Highway
Idaho Falls, ID 83402
Project:
E231146c
125 Valley River Drive Rexburg, ID
125 Valley River Drive
Rexburg, ID 83402
This report shall not be reproduced, in full, without prior written approval of Atlas Technical Consultants, LLC.
Results only relate to the items inspected or tested.
Page 1 of 2Page 1 of 1
Inspection Details
Date Contractor Inspector Weather Permit Number
07/27/2023 Wind River Clark, Josh Sunny na
Reported to:
Job Site
Fabrication
Shop
Examined Per:
AISC 341 Chapter J AISC 360 Chapter N AWS D1.1 AWD D1.2 AWS D1.3
AWS D1.4 AWS D1.5 AWS D1.6 AWS D1.8
Other:Code Year/Edition:2020
Welder, Process, Procedures:
Checked welder(s) Certifications
Checked procedure qualifications
Visually Inspected inprogress
Visually Inspected completed
Verified proper electrode storage
Welding performed by qualified welders using:
SMAW GMAW FCAW SAW Method
with E 7018 filler metal(s)
Material Identification:
Collected/Checked mill certifications:No
Weld Types:
Single pass fillet welds
Multipass fillet welds
Flare bevel grove welds
PJP (Partial joint penetration welds)
CJP (Complete joint penetration welds)
Direct
Indirect butt splice on reinforcing steel
Other (specify):
Reference Drawing Sheet and Detail, and Approved RFI:S4.0/203,S3.0,S4.1
Type of connections and locations:columns to base plate and beam to column in donation drive thru. and 2 new door frames
Notes:reported to Erin with Wind River
Work inspected was:
in compliance in compliance, except as noted in comments section reinspection/retesting required
Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punishable as a felony under
Federal Statute.
✔✔
✔
✔
✔
✔
✔
STRUCTURAL STEEL
WELDING
Final
07/28/2023Report Date:
Atlas Technical Consultants, LLC Idaho
Falls
1753 E Precision Drive
Idaho Falls, ID 83402
Phone: (208) 5298242
Client:
Wind River Construction
2420 South Yellowstone Highway
Idaho Falls, ID 83402
Project:
E231146c
125 Valley River Drive Rexburg, ID
125 Valley River Drive
Rexburg, ID 83402
NOTICE: Our firm’s professionals are represented on site solely to observe operations of the contractor identified,
to form opinions about the adequacy of those operations, and to report those opinions to our client. The presence
and activities of our field representatives do not relieve any contractor from its obligation to meet contractual
requirements. No one except our client may rely on our findings and opinions. The contractor retains sole
responsibility for site safety and the methods, operations, and sequences of construction.
Page 1 of 2Page 1 of 1